CN105952492B - A kind of high gas layer working face drilling Gas pre-drainage method - Google Patents

A kind of high gas layer working face drilling Gas pre-drainage method Download PDF

Info

Publication number
CN105952492B
CN105952492B CN201610357774.9A CN201610357774A CN105952492B CN 105952492 B CN105952492 B CN 105952492B CN 201610357774 A CN201610357774 A CN 201610357774A CN 105952492 B CN105952492 B CN 105952492B
Authority
CN
China
Prior art keywords
drilling
face
gas
working face
crossheading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610357774.9A
Other languages
Chinese (zh)
Other versions
CN105952492A (en
Inventor
袁永
伏映鹏
屠世浩
李波
魏宏民
刘志恒
陈忠顺
李�杰
孙松
张汉祥
张新旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201610357774.9A priority Critical patent/CN105952492B/en
Publication of CN105952492A publication Critical patent/CN105952492A/en
Application granted granted Critical
Publication of CN105952492B publication Critical patent/CN105952492B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Abstract

A kind of high gas layer working face drilling Gas pre-drainage method, belongs to coal seam drilling Gas pre-drainage method.It is anti-reflection to carry out release for first one layer of ultra-thin coal seam of drilling in coal seam; crossheading arranges twist bit this working face of drilling and subsequent work face above and below first mining face; drilling excavate so that around drilling hole rock stratum generate loosen and cranny development and combined under casing protection effect drainage tube using high water filling material by gap filling between drilling hole and drainage tube after form drilling extraction concentric holes, wait for that after the completion of face up and down trough all concentric holes arrangement drilling Gas pre-drainage can be implemented;Drilling ultra-thin coal seam leads to cranny development after making drilling hole aperture ambient stress that country rock be concentrated to be plastically deformed so that the adsorption capacity of coal-bed gas declines, and it is 5 times of drilling pore radius to obtain gas to dilute effective radius by theoretical calculation.The recovery method of the head mining height gassy seams is reliable, simple for process, is easy to implement the safe working of first mining height gassy seam.

Description

A kind of high gas layer working face drilling Gas pre-drainage method
Technical field
The present invention relates to a kind of coal seam drilling Gas pre-drainage method, especially a kind of high gas layer working face drilling is taken out in advance Gas method.
Background technology
By high tension coal mining for many years, shallow-layer coal resources are gradually exhausted, and coal mining enters deep, especially economic phase To flourishing central and east mining area, main force's mine has developed to the middle and later periods, and main body mining depth has reached 800m or more, local mining depth Portion has reached 1500m.Since mining depth is big, crustal stress, gas pressure and content are big, and coal and gas prominent, impact occur for mine The possibility of the dynamic disasters accidents such as mine pressure increases, it has also become the key for restricting deep coal resources safety exploitation urgent need to resolve is asked Topic.And the girdle protective layer that first mash gas pressure is small, content is low, degree of danger is low is used, protected coal seam above and below release High stress, parsing low air permeability coal seam adsorption gas, have been produced and facts have proved to be the one of safety and high efficiency deep fractures group Kind effective means.Traditional protective coat extracted makes a large amount of gas pressure reliefs pour in protective layer working face, easily causes watt This transfinites or other gas accidents, and《Safety regulations in coal mine》198th article of regulation, when exploiting close distance protected seam, It must take measures to prevent that the gas of protected seam initial stage release pours in protective layer working face suddenly.And use spiral drilling very thin Protective layer can effectively solve the problem that the problem of existing protection films exploitation causes gas pressure relief to pour in protected seam, to solve to protect tradition shield Problem caused by layer exploitation, invents a kind of high gas layer working face drilling Gas pre-drainage method.
Invention content
The invention aims to provide a kind of high gas layer working face drilling Gas pre-drainage method, traditional protection is solved Caused by release initial stage a large amount of gas pour in protective layer working face in layer recovery process the problem of major accident.
Technical solution:To achieve the above object, the technical solution of the method for the present invention:Crossheading auger above and below first mining face The method for arranging of machine method for arranging and drainage holes;
Crossheading arranges one layer of pole in twist bit this working face of drilling and subsequent work face i.e. above and below first mining face Girdle progress release is anti-reflection, and drilling, which is excavated, so that rock stratum generates loosening and cranny development around drilling hole, therefore in drilling It first buries drainage tube and will be between drilling hole and drainage tube using high water filling material under casing protection effect in hole centre position Drilling extraction concentric holes are formed after gap filling, wait for that after the completion of all concentric holes arrangements of face up and down trough drilling can be implemented Gas pre-drainage.
The twist bit method for arranging of crossheading up and down:
(1) crossheading arranges auger drilling ultra-thin coal seam to first mining face up and down;
(2) crossheading only arranges this working face of twist bit drilling on;
(3) crossheading arranges twist bit, this working face of one side drilling under;On the other hand also working face under drilling;
(4) play the role of shielding to the driving in subsequent work face;
(5) arrangement for being arranged as drainage holes of crossheading drilling machine provides place up and down.
(6) method is arranged the arrangement of twist bit to other working faces according to this, forms high gas layer working face and takes out in advance Gas method.
The drainage holes method for arranging:
(1) drilling hole is formed after drilling;
(2) after state of surrounding rock is stablized, the float coal of a small amount of remaining in drilling hole is cleared up, and depth when according to spiral drilling And angle, in drilling hole centre position, early period first buries gas pumping pipeline, and divides into casing;
(3) under casing protection effect, using high water filling material by shape after gap filling between drilling hole and drainage tube At drilling extraction concentric holes;
(4) arrangement of concentric holes forms high gas layer working face safety and high efficiency method.
Drilling Gas pre-drainage method, specific stages of mining are as follows:
Step 1:Crossheading arranges twist bit above and below first mining face, and for safety drilling, first mining face tilts length Degree is general to be required to be less than 120m;Crossheading arranges that drilling machine creeps into 40m to this working face on working face, and crossheading is arranged under working face On the one hand drilling machine creeps into 80m to this working face, be on the other hand not less than the distance between 40m, drilling to next working face drilling For 2~3m;The advantages of this arrangement, is that the safety during the driving of subsequent work face can be screened.
Step 2:It is provided according to the relevant design of step 1, in high gas layer face up and down trough, using auger The ultra-thin coal seam of coalcutter drilling 0.3m or so, in order to form the preferable concentric holes of extraction quality, around auger simultaneously Arrangement high*.water packing equipment is filled in time;
Step 3:After spiral drilling, drilling surrounding terrane stress redistribution.By calculating, along drilling pore radius side Coverage to circumferential direct stress is about ρ=5a, and in formula, a is drilling pore radius, and it is about 5 that gas, which discharges effective radius, Drilling pore radius again;
Step 4:Clear up the float coal of a small amount of remaining in drilling hole after drilling, and depth when according to spiral drilling with Angle, early period first bury gas pumping pipeline;
Step 5:According to the size in drilling hole, casing protection gas pumping pipe is installed, screw thread will press from both sides between pipe nipple when installation Raw material band is simultaneously tightened, and drilling spillage occurs when preventing filling and casing protruded length cannot be more than 100mm;
Step 6:Using high-water material, rapid reinforcement casing and fill gas pumping pipe and casing, casing and drilling hole it Between gap;
Step 7:The drilling hole that i.e. gas pumping pipe is excavated with early period after the completion of filling forms concentric holes, carries out gas Extraction.
As the above scheme is adopted:First face up and down trough arrange twist bit drilling 0.3m ultra-thin coal seams into Row release, and setting of casing and the concentric drainage holes of utilization filling technique arrangement on the basis of drilling hole.Therefore to first mining height gas The exploitation in coal seam provides reliable infrastructural support.General auger bit diameter is 80cm, so radius is around drilling hole 2m range gas pumping effects are more preferable, simple for process, are easy to implement the safe working of first mining height gassy seam.Solves traditional guarantor Caused by release initial stage a large amount of gas pour in protective layer working face in sheath recovery process the problem of major accident, this hair is reached Bright purpose.
Advantage:
1, existing protection films exploitation release initial stage a large amount of gas are avoided and pour in major accident caused by protective layer working face.
2, for deep high gas layer, using drilling hole and drainage holes concentric arrangement due to country rock around drilling hole Plastic deformation occurs to generate crack therefore be more conducive to the release extraction of coal-bed gas.
3, drilling hole and drainage holes arranged concentric, greatly reduce quantities and have saved production cost.
4, crossheading can be released effectively the gas in subsequent work face to next working face drilling under this working face, it is ensured that under The safety that crossheading tunnels on one working face.
5, drilling hole and drainage holes concentric arrangement can also be used for using when projecting coal bed tunnelling.
Description of the drawings:
Fig. 1 is the drilling working face arrangement schematic diagram of the present invention.
Fig. 2 a are that crossheading drilling forms extraction drilling concentric holes schematic diagram on the working face of the present invention.
Fig. 2 b be the present invention working face under crossheading drilling formed extraction drilling concentric holes schematic diagram.
Fig. 2 c are that the face up and down trough drilling of the present invention forms extraction drilling concentric holes sectional view.
Fig. 3 is the drilling ambient stress distribution schematic diagram of the present invention.
Fig. 4 is the arrangement schematic diagram of the drainage tube of the present invention.
In figure, 1, fixed oil cylinder;2, auger type coalcutter;3, oblique adjusting oil cylinder;4, formula drilling rod is saved;5, drainage tube;6, it bores Adopt hole;7, high-water material;8, casing.
Specific implementation mode
The technical solution of the method for the present invention:The arrangement of crossheading twist bit method for arranging and drainage holes above and below first mining face Method;Crossheading arranges twist bit this working face of drilling and one layer of very thin coal seam in subsequent work face i.e. above and below first mining face It is anti-reflection that layer carries out release, and drilling is excavated so that rock stratum generates and loosens and cranny development around drilling hole, therefore in drilling hole Between position first bury drainage tube and under casing protection effect using high water filling material by gap between drilling hole and drainage tube Drilling extraction concentric holes are formed after filling, drilling can be implemented after the completion of face up and down trough all concentric holes arrangement by waiting for takes out in advance Gas;Drilling ultra-thin coal seam leads to cranny development after making drilling hole aperture ambient stress that country rock be concentrated to be plastically deformed, and makes The adsorption capacity of coal-bed gas declines, it is 5 times of drilling pore radius to obtain gas to dilute effective radius by theoretical calculation.
The twist bit method for arranging of crossheading up and down:
(1) crossheading arranges auger drilling ultra-thin coal seam to first mining face up and down;
(2) crossheading only arranges this working face of twist bit drilling on;
(3) crossheading arranges twist bit, this working face of one side drilling under;On the other hand also working face under drilling;
(4) play the role of shielding to the driving in subsequent work face;
(5) arrangement for being arranged as drainage holes of crossheading drilling machine provides place up and down;
(6) method is arranged the arrangement of twist bit to other working faces according to this, forms high gas layer working face and takes out in advance Gas method.
The drainage holes method for arranging:
(1) drilling hole is formed after drilling;
(2) after state of surrounding rock is stablized, the float coal of a small amount of remaining in drilling hole is cleared up, and depth when according to spiral drilling And angle, in drilling hole centre position, early period first buries gas pumping pipeline, and divides into casing;
(3) under casing protection effect, using high water filling material by shape after gap filling between drilling hole and drainage tube At drilling extraction concentric holes;
(4) arrangement of concentric holes forms high gas layer working face safety and high efficiency method.
Drilling Gas pre-drainage method, specific stages of mining are as follows:
Step 1:Crossheading arranges twist bit above and below first mining face, and for safety drilling, first mining face tilts length Degree is general to be required to be less than 120m;Crossheading arranges that drilling machine creeps into 40m to this working face on working face, and crossheading is arranged under working face On the one hand drilling machine creeps into 80m to this working face, be on the other hand not less than the distance between 40m, drilling to next working face drilling For 2~3m;The advantages of this arrangement, is that the safety during the driving of subsequent work face can be screened.
Step 2:It is provided according to the relevant design of step 1, in high gas layer face up and down trough, using auger The ultra-thin coal seam of coalcutter drilling 0.3m or so, in order to form the preferable concentric holes of extraction quality, around auger simultaneously Arrangement high*.water packing equipment is filled in time;
Step 3:After spiral drilling, drilling surrounding terrane stress redistribution.By calculating, along drilling pore radius side Coverage to circumferential direct stress is about ρ=5a, and in formula, a is drilling pore radius, and it is about 5 that gas, which discharges effective radius, Drilling pore radius again;
Step 4:Clear up the float coal of a small amount of remaining in drilling hole after drilling, and depth when according to spiral drilling with Angle, early period first bury gas pumping pipeline;
Step 5:According to the size in drilling hole, casing protection gas pumping pipe is installed, screw thread will press from both sides between pipe nipple when installation Raw material band is simultaneously tightened, and drilling spillage occurs when preventing filling and casing protruded length cannot be more than 100mm;
Step 6:Using high-water material, rapid reinforcement casing and fill gas pumping pipe and casing, casing and drilling hole it Between gap;
Step 7:The drilling hole that i.e. gas pumping pipe is excavated with early period after the completion of filling forms concentric holes, carries out gas Extraction.
Embodiment 1:Crossheading arranges twist bit above and below first mining face, and for safety drilling, first mining face tilts Length generally requires to be less than 120m;Crossheading arranges that drilling machine creeps into 40m, the crossheading cloth under working face to this working face on working face Set drilling machine on the one hand to this working face creep into 80m, on the other hand to next working face drilling be not less than 40m, between drilling away from From for 2~3m, as shown in Fig. 1.
It is different from traditional spiral drilling girdle, the present invention is directed high gas layer, in face up and down trough, Using the ultra-thin coal seam of auger coal mining machine drilling 0.3m or so, in order to form the preferable concentric holes of extraction quality, in spiral shell Around rotary drill and arrange that high*.water packing equipment is filled in time.
Due to trepanning, drilling hole ambient stress is caused to concentrate, passes through drilling hole known to the stress distribution analysis around device to hole There is a certain range of tensile stress so rock stratum will will produce certain crack around drilling hole in surrounding, this crack is beneficial to extraction Gas.
The float coal of a small amount of remaining after drilling work is completed in cleaning drilling hole, and depth when according to spiral drilling with Angle, early period first bury gas pumping pipeline.
According to the size in drilling hole, casing protection gas pumping pipe is installed, screw thread wants half-cooked material strip between pipe nipple when installation And tighten, drilling spillage occurs when preventing filling.And casing protruded length cannot be more than 100mm.
Before carrying out high water and reinforcing casing, the setting angle for measuring casing is needed, high water lines are connected after being measured, Casing is fastened with drilling machine, around progress high*.water packing casing behind practical inclination angle and the suitably adjustment of design difference and drilling hole Gap.First with high-water material being filled inside and outside casing, start after starting to return out high water in casing double using cement-waterglass Liquid is reinforced, and concentration of sodium silicate uses 40 ° of Be, the volume ratio 1 of cement mortar and waterglass:0.5, wait for the seam between orifice tube and drilling Gap has biliquid to start have biliquid to start to overflow in spilling or aperture, then gradually extracts casing, starts blow wash grouting pump, note Ensure that outer wall is water-tight after slurry.
After above-mentioned steps, then foring drainage holes and drainage holes surrounding rock, broken there are crack, gas adsorption energy Power declines, and is beneficial to gas pumping.

Claims (4)

1. a kind of high gas layer working face drilling Gas pre-drainage method, it is characterized in that:Crossheading is conducive to spiral shell to first mining face up and down Rotary drill machine drill adopts carry out release, and the method for arranging of extraction is carried out using drilling hole:
I.e. above and below first mining face crossheading arrange one layer of twist bit drilling head mining faces and subsequent work face it is very thin Coal seam progress release is anti-reflection, and drilling, which is excavated, so that rock stratum generates loosening and cranny development around drilling hole, therefore in drilling hole It first buries drainage tube and will be stitched between drilling hole and drainage tube using high water filling material under casing protection effect in centre position Drilling extraction concentric holes are formed after gap filling, waiting for can be real after the completion of all drilling extraction concentric holes of face up and down trough are arranged Apply drilling Gas pre-drainage.
2. a kind of high gas layer working face drilling Gas pre-drainage method according to claim 1, it is characterized in that:Described Upper and lower crossheading twist bit method for arranging:
(1)Crossheading arranges twist bit drilling ultra-thin coal seam to first mining face up and down;
(2)Upper crossheading only arranges twist bit drilling head mining faces;
(3)Lower crossheading arranges twist bit, one side drilling head mining faces;On the other hand also drilling subsequent work face;
(4)Play the role of shielding to the driving in subsequent work face;
(5)The arrangement for being arranged as drilling extraction concentric holes of upper and lower crossheading drilling machine provides place;
(6)Other working faces according to this method carry out twist bit arrangement, formed high gas layer working face drilling Gas pre-drainage Method.
3. a kind of high gas layer working face drilling Gas pre-drainage method according to claim 1, it is characterized in that:Described Drilling extraction concentric holes method for arranging:
(1)Drilling hole is formed after drilling;
(2)After state of surrounding rock is stablized, the float coal of a small amount of remaining in drilling hole is cleared up, and according to the depth and angle in drilling hole, In drilling hole centre position, early period first buries gas pumping pipeline, and divides into casing;
(3)Under casing protection effect, it will be formed and bored after gap filling between drilling hole and drainage tube using high water filling material Adopt extraction concentric holes;
(4)The arrangement of drilling extraction concentric holes forms high gas layer working face safety and high efficiency method.
4. a kind of high gas layer working face drilling Gas pre-drainage method described in claim 1, it is characterized in that:The pre- pumping watt of drilling This method, specific stages of mining are as follows:
Step 1:Crossheading arranges twist bit above and below first mining face, and for safety drilling, first mining face tilt length is wanted It asks and is less than 120m;Crossheading arranges that drilling machine creeps into 40m to this working face on working face, and crossheading arranges one side of drilling machine under working face 80m is crept into towards this working face, is on the other hand not less than 40m to next working face drilling, the distance between drilling is 2 ~ 3m;This The advantages of kind arrangement, is that the safety during the driving of subsequent work face can be screened;
Step 2:It is provided according to the relevant design of step 1, in high gas layer face up and down trough, using spiral drill shearer Machine drill adopts the ultra-thin coal seam of 0.3m or so, in order to form the preferable drilling extraction concentric holes of extraction quality, in auger week Cloth is set high*.water packing and is filled in time;
Step 3:After spiral drilling, drilling surrounding terrane stress redistribution;By calculating, along drilling pore radius direction ring It is about to the coverage of direct stress, in formula, a is drilling pore radius, and it is about 5 times that gas, which discharges effective radius, Drilling pore radius;
Step 4:The float coal of a small amount of remaining in drilling hole is cleared up after drilling, and according to the depth and angle in drilling hole, early period First bury gas pumping pipeline;
Step 5:According to the size in drilling hole, casing protection gas pumping pipe is installed, screw thread wants half-cooked material between pipe nipple when installation Band is simultaneously tightened, and drilling spillage occurs when preventing filling and casing protruded length cannot be more than 100mm;
Step 6:Using high water filling material, rapid reinforcement casing and fill gas pumping pipe and casing, casing and drilling hole it Between gap;
Step 7:The drilling hole that i.e. gas pumping pipe is excavated with early period after the completion of filling forms drilling extraction concentric holes, carries out Gas pumping.
CN201610357774.9A 2016-05-26 2016-05-26 A kind of high gas layer working face drilling Gas pre-drainage method Active CN105952492B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610357774.9A CN105952492B (en) 2016-05-26 2016-05-26 A kind of high gas layer working face drilling Gas pre-drainage method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610357774.9A CN105952492B (en) 2016-05-26 2016-05-26 A kind of high gas layer working face drilling Gas pre-drainage method

Publications (2)

Publication Number Publication Date
CN105952492A CN105952492A (en) 2016-09-21
CN105952492B true CN105952492B (en) 2018-09-18

Family

ID=56910850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610357774.9A Active CN105952492B (en) 2016-05-26 2016-05-26 A kind of high gas layer working face drilling Gas pre-drainage method

Country Status (1)

Country Link
CN (1) CN105952492B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106382131A (en) * 2016-11-17 2017-02-08 攀枝花煤业(集团)有限责任公司 Device for embedding gas draining sleeve in coal mining working surface
CN107489443A (en) * 2017-08-22 2017-12-19 西南交通大学 Toxic and harmful gas constructing tunnel hydrogen sulfide mash gas harnessing method
CN112127941B (en) * 2020-09-27 2023-04-07 山西鑫桥科技有限公司 Method for solving coal seam gas outburst
CN113464138B (en) * 2021-07-27 2024-03-29 辽宁煤科矿业产品制造有限公司 Coiled tubing water production equipment and technology for non-thin-layer-capable-of-production-protection coal bed
CN117266855B (en) * 2023-11-23 2024-01-19 太原理工大学 Pressure relief and permeability improvement method and system for ultrathin layered mining of coal seam

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1809115C (en) * 1990-10-30 1993-04-15 С.П.Щеголев, Н.И.Турушев и Б.А.Ишин Method to control gas emission by district retreating longwall heading without pillar stopping
CN104100292B (en) * 2014-07-31 2017-04-12 山西潞安环保能源开发股份有限公司 Regional forced gas extraction method for single low-permeability outburst thick coal seam
CN104533512A (en) * 2014-12-16 2015-04-22 中鼎国际工程有限责任公司 Construction method for preventing and treating gas outburst in coal roadway heading process
CN104632272A (en) * 2015-01-29 2015-05-20 西安科技大学 'Three-soft' low-breathability work surface rib shallow hole gas extraction method
CN104832209A (en) * 2015-04-04 2015-08-12 西安科技大学 Roadway advanced borehole diversion drainage goaf gas technology
CN104847401A (en) * 2015-04-30 2015-08-19 贵州盘江精煤股份有限公司 Regional coal and gas outburst coal seam coal face outburst preventing and controlling method

Also Published As

Publication number Publication date
CN105952492A (en) 2016-09-21

Similar Documents

Publication Publication Date Title
CN105952492B (en) A kind of high gas layer working face drilling Gas pre-drainage method
CN102493822B (en) Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN108518222B (en) Paste body filling combination top plate presplitting second mining super high seam stops the method for adopting line coal column
CN103061785B (en) Grouting process for borehole casing pressure-proof seepage sealing grouting device for drilling roadway breaking water burst surrounding rock
CN105888674B (en) Shared Rock of Neighborhood Tunnel reinforcement means under different surrounding rock grade
CN108222938A (en) A kind of large-inclination-angle coal bed goaf combination grouting filling recovery method
CN103089275A (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN101709651A (en) Grouting water blocking method for undersea tunnel
CN207177933U (en) A kind of advanced plugging structure of high-pressure high-flow underground water
CN103334770A (en) Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
WO2015021783A1 (en) Man-made retaining dam for coal mine underground reservoir, and method for connecting coal pillar dam body, surrounding rock, and same
CN101608552A (en) The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process
CN108915736A (en) The water damage control method of digging laneway under the strong weak cementing water-bearing layer of rich water
CN105927243B (en) A kind of underground country rock tomography suspension device and method for protecting support
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN109577989B (en) Novel deep mine shaft wall structure and construction method
CN106437612A (en) Horizontal gas extraction drilling and hole-sealing method and hole-sealing structure thereof
CN107165661A (en) A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method
CN103362117A (en) Full-section grouting method for grouting section
CN110617067A (en) Low-risk construction method for full-section boundary advanced pipe shed of extremely-soft surrounding rock tunnel
CN103089276A (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN109812269A (en) It is a kind of suitable for second mining working face without pillar mining method
CN114483109A (en) Curtain grouting advanced large pipe shed penetrating construction method for penetrating tunnel fault fracture zone
CN103742162B (en) Shield tail top is provided with shield machine and the synchronous grouting device of synchronous grouting device
CN203035203U (en) Pressure-isolating, permeating and cementing grouting device of borehole casing for roadway water-surrounded broken rock

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant