CN105952166A - Movable work shed - Google Patents
Movable work shed Download PDFInfo
- Publication number
- CN105952166A CN105952166A CN201610415516.1A CN201610415516A CN105952166A CN 105952166 A CN105952166 A CN 105952166A CN 201610415516 A CN201610415516 A CN 201610415516A CN 105952166 A CN105952166 A CN 105952166A
- Authority
- CN
- China
- Prior art keywords
- builder
- floating body
- temporary shed
- movable
- barrack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
- E04G21/28—Safety or protective measures preventing damage to building parts or finishing work during construction against unfavourable weather influence
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B64—AIRCRAFT; AVIATION; COSMONAUTICS
- B64B—LIGHTER-THAN AIR AIRCRAFT
- B64B1/00—Lighter-than-air aircraft
- B64B1/58—Arrangements or construction of gas-bags; Filling arrangements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Aviation & Aerospace Engineering (AREA)
- Tents Or Canopies (AREA)
Abstract
The invention discloses a movable work shed which comprises a work shed roof and at least three support assemblies. The support assemblies are not located at a straight line and all connected with the work shed roof; each support assembly comprises a floating body, fixing ropes and fixing parts, the floating bodies are connected with the work shed roof, the fixing parts are connected with the positions to be installed, one end of each fixing rope is connected with the corresponding floating body, the other end of each fixing rope is connected with the corresponding fixing part, the density of gas filling the floating body is smaller than that of air, and the sum of the floating force of all the floating bodies is larger than the sum of the gravity of a work shed and the gravity of the floating bodies. According to the movable work shed, by arranging the support assemblies to be of the floating body structure, the work shed roof can be supported through the floating force of the floating bodies; the whole device is light, and therefore the whole device can be moved only by relieving connection between the fixing parts and the positions to be installed; in addition, later disassembly and long-distance transportation can be conveniently achieved, the disassembly and assembly cost is reduced, and the using efficiency is improved.
Description
Technical field
The present invention relates to a kind of construction site builder's temporary shed, particularly relate to a kind of movable barrack.
Background technology
During the construction of engineering outfield, be exposed to the sun, the bad weather condition such as rainfall causes relatively major injury to workmen.And severe meteorological condition blocks construction the most often, cause construction delay, cause many adverse effects for project management.At present usually through the manufacture interim builder's temporary shed of steel construction to hide construction site, but the interim builder's temporary shed using steel construction to build has the disadvantage that (1) steel construction builder's temporary shed manufacturing time is long, and manufacturing cost is high;(2) steel construction builder's temporary shed weight is bigger, it is difficult to manually move, and needs crane to coordinate time mobile;(3) steel construction builder's temporary shed is difficult to dismounting and remote transhipment, often single use, when construction site changes, needs to remanufacture builder's temporary shed.
Summary of the invention
It is an object of the invention to provide a kind of movable barrack, its manufacturing time is short, and low cost is lightweight, can the most directly move, and detachable and remote transhipment.
For reaching above-mentioned purpose, the present invention by the following technical solutions:
A kind of movable barrack is provided, support component is propped up including builder's temporary shed top and at least three, a support component described at least three is the most point-blank, and be all connected with described builder's temporary shed top, can by described builder's temporary shed top support and formed tool effigurate block surface, described support component includes floating body, static line and fixture, described floating body is connected with described builder's temporary shed top, described fixture is connected with position to be installed, described static line one end is connected with described floating body, the other end is connected with described fixture, wherein, the density of the gas filled in described floating body is less than the density of air, and the buoyancy sum of all of described floating body is more than the gravity sum of described builder's temporary shed body with described floating body.
As a kind of preferred version of movable barrack, described floating body is the air bag using soft gastight material to make, and is provided with charging portion on described floating body.
By the air bag being set to use soft gastight material to make by floating body, and charging portion is set thereon, on the one hand the weight of floating body self can be reduced, on the other hand can be as required to the inflation of floating body or venting, it is simple to the dismounting in later stage and remote transhipment.
As a kind of preferred version of movable barrack, the side being connected with described builder's temporary shed top on described floating body arranges the first rib, and the side being connected with described static line on described floating body arranges the second rib.
By arranging rib, floating body can be increased with miscellaneous part in the intensity of link position, extend the service life of floating body.
As a kind of preferred version of movable barrack, described floating body is fixed at least through three described static lines, and every described static line is respectively provided with a described fixture away from one end of described floating body.
Being fixed floating body by least three static lines, 3 principles becoming faces make the position of floating body more firm, are not likely to produce position skew.
As a kind of preferred version of movable barrack, described static line is provided with rope draw off gear.
By arranging rope draw off gear, the length of static line can be regulated as required, or when whole movable barrack dismantled by needs, static line be regained in rope draw off gear, it is to avoid the problems such as static line winding occur, and also simplify folding and unfolding step.
As a kind of preferred version of movable barrack, described builder's temporary shed top uses waterproof cloth to make.
By being made by builder's temporary shed top employing waterproof cloth, the rainproof effect on builder's temporary shed top can be strengthened.
As a kind of preferred version of movable barrack, the surface configuration on described builder's temporary shed top has shading layer.
Surface configuration shading layer on builder's temporary shed top, it is possible to reduce penetrating of light, reduces the ambient temperature in movable barrack, increases environmental degree of comfort.
Preferably, being provided with described shading layer inside and outside described builder's temporary shed top, the thickness of described shading layer is 10-20 micron.
The thickness of each shading layer can be 10-20 micron, preferably 14-18 micron or 15-17 micron, such as 10 microns, 12 microns, 14 microns, 15 microns, 16 microns etc..It is understandable that the thickness of shading layer can also select the thickness of other any suitable.
More preferably, described shading layer is that the PE layer adding carbon black is constituted.
In shading layer, the interpolation of carbon black can ensure the high resistance light rate of shading layer, adds carbon black and belong to prior art in PE, can realize according to prior art and those of ordinary skill the understanding of the present invention.
A kind of preferred version as movable barrack, described builder's temporary shed top uses the waterproof cloth of rectangular configuration to make, it is supported by a support component described in six, wherein, support component described in four is positioned at the corner on described builder's temporary shed top, remain two described in prop up support component and lay respectively at the middle part of described builder's temporary shed top length direction.
As a kind of preferred version of movable barrack, the height of described the support component being positioned at the corner on described builder's temporary shed top is equal and is respectively less than positioned at the height of described support component at middle part of described builder's temporary shed top length direction.
A kind of preferred version as movable barrack, described fixture includes fixing seat and hook, one in described fixing seat and described hook is detachably arranged at position to be installed, another in described fixing seat and described hook is connected with described static line, described fixing seat is connected with described hook selectivity, to realize the location of a support component.
Beneficial effects of the present invention: the movable barrack that the present invention provides is by using at least three support modular support the most point-blank by builder's temporary shed top, this support component can be utilized to be formed and to have effigurate block surface, and a support component is set to floating body structure, the buoyancy of floating body can be utilized builder's temporary shed top support, whole installation weight is light, have only to the connection releasing fixture with position to be installed, the movement of whole device can be realized, and the dismounting in later stage and remote transhipment can be facilitated, reduce dismounting cost, improve service efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of the movable barrack described in the embodiment of the present invention.
Fig. 2 is the structural representation of a support component of the movable barrack described in the embodiment of the present invention.
In Fig. 1 and 2:
1, builder's temporary shed top;2, support component is propped up;21, floating body;22, static line;23, fixture.
Detailed description of the invention
Further illustrate technical scheme below in conjunction with the accompanying drawings and by detailed description of the invention.
As illustrated in fig. 1 and 2, the movable barrack that the embodiment of the present invention provides includes that builder's temporary shed top 1 and at least three prop up support component 2, a support component 2 described at least three is the most point-blank, and be all connected with described builder's temporary shed top 1, described builder's temporary shed top 1 can be supported and formed the effigurate block surface of tool, described support component 2 includes floating body 21, static line 22 and fixture 23, described floating body 21 is connected with described builder's temporary shed top 1, described fixture 23 is connected with position to be installed, described static line 22 one end is connected with described floating body 21, the other end is connected with described fixture 23, wherein, the density of the gas filled in described floating body 21 is less than the density of air, and the buoyancy sum of all of described floating body 21 is more than the gravity sum of described builder's temporary shed body 1 with described floating body 21.By builder's temporary shed top 1 uses an at least three support component 2 the most point-blank support, this support component 2 can be utilized to be formed and to have effigurate block surface, and a support component 2 is set to floating body 21 structure, builder's temporary shed top 1 is supported by the buoyancy that can utilize floating body 21, whole installation weight is light, have only to the connection releasing fixture 23 with position to be installed, the movement of whole device can be realized, and the dismounting in later stage and remote transhipment can be facilitated, reduce dismounting cost, improve service efficiency.
In a preferred embodiment of the invention, described floating body 21 is the air bag using soft gastight material to make, and is provided with charging portion on described floating body 21.By the air bag being set to use soft gastight material to make by floating body 21, and charging portion is set thereon, on the one hand can reduce the weight of floating body 21 self, on the other hand as required floating body 21 can be inflated or exit, it is simple to the dismounting in later stage and remote transhipment.
Preferably, the side being connected with described builder's temporary shed top 1 on described floating body 21 arranges the first rib, and the side being connected with described static line 22 on described floating body 21 arranges the second rib.By arranging rib, floating body 21 can be increased with miscellaneous part in the intensity of link position, extend the service life of floating body 21.
In a preferred embodiment of the invention, described floating body 21 is fixed at least through three described static lines 22, and every described static line 22 is respectively provided with a described fixture 23 away from one end of described floating body 21.Being fixed floating body 21 by least three static lines 22,3 principles becoming faces make the position of floating body 21 more firm, are not likely to produce position skew.
Preferably, described static line 22 is provided with rope draw off gear.By arranging rope draw off gear, the length of static line 22 can be regulated as required, or when whole movable barrack dismantled by needs, static line 22 be regained in rope draw off gear, it is to avoid the problems such as static line 22 winding occur, and also simplify folding and unfolding step.
In another preferred embodiment of the present invention, described builder's temporary shed top 1 uses waterproof cloth to make.By using waterproof cloth to make on builder's temporary shed top 1, the rainproof effect on builder's temporary shed top 1 can be strengthened.
Preferably, the surface configuration on described builder's temporary shed top 1 has shading layer.Surface configuration shading layer on builder's temporary shed top 1, it is possible to reduce penetrating of light, reduces the ambient temperature in movable barrack, increases environmental degree of comfort.Preferably, being provided with described shading layer inside and outside described builder's temporary shed top 1, the thickness of described shading layer is 10-20 micron.The thickness of each shading layer can be 10-20 micron, preferably 14-18 micron or 15-17 micron, such as 10 microns, 12 microns, 14 microns, 15 microns, 16 microns etc..It is understandable that the thickness of shading layer can also select the thickness of other any suitable.More preferably, described shading layer is that the PE layer adding carbon black is constituted.In shading layer, the interpolation of carbon black can ensure the high resistance light rate of shading layer, adds carbon black and belong to prior art in PE, can realize according to prior art and those of ordinary skill the understanding of the present invention.
In a specific embodiment of the present invention, described builder's temporary shed top 1 uses the waterproof cloth of rectangular configuration to make, it is supported by a support component 2 described in six, wherein, support component 2 described in four is positioned at the corner on described builder's temporary shed top 1, remain two described in prop up support component 2 and lay respectively at the middle part of described builder's temporary shed top 1 length direction.The height of described the support component 2 being positioned at the corner on described builder's temporary shed top 1 is equal and is respectively less than positioned at the height of described support component 2 at middle part of described builder's temporary shed top 1 length direction.
Each floating body 21 is all connected by four static lines 22, four static lines 22 are all connected with the same fixed bit on floating body 21 near one end of floating body 21, the other end is connected with position to be installed by fixture 23, four fixtures 23 the corner location that position is rectangle frame is set.
Further, described fixture 23 includes fixing seat and hook, one in described fixing seat and described hook is detachably arranged at position to be installed, another in described fixing seat and described hook is connected with described static line 22, described fixing seat is connected with described hook selectivity, to realize the location of a support component 2.
The dead area of movable barrack can the most arbitrarily adjust, and has only to change the builder's temporary shed top 1 of different area and increase as required or reduce supporting construction 2 during adjustment.
The use step of this movable barrack is as follows:
(1) according to the areal array covered required for job site (position the most to be installed), builder's temporary shed top 1 is made;
(2) quantity of a support component 2 is determined according to the area on builder's temporary shed top 1;
(3) being assembled by figure by each support component 2, now floating body 21 is not inflated;
(4) the floating body 21 of each support component 2 is connected with builder's temporary shed top 1;
(5) floating body 21 is inflated, makes floating body 21 support builder's temporary shed top 1 under buoyancy in the air;
(6) movable barrack that combination completes is moved to job site, use fixture 23 to be fixed on ground a support component 2, complete to install;
(7), when construction site is moved, cancel the connection of fixture 23 and ground, the movement of whole movable barrack can be realized;
(8), when removing movable barrack, floating body 21 and builder's temporary shed top 1 are drawn in ground, the gas in release floating body 21, can realize removing, reusable after keeping properly.
The movable barrack of the present invention has the advantage that
(1), manufacturing cost aspect;
As a example by the builder's temporary shed of dead area 20m × 20m, need to use channel-section steel about 220m, 10mm steel plate 400, if using 14a type channel-section steel, this builder's temporary shed gross weight about 9.8 tons, with frock labor and materials unit price 10000 yuan/ton calculating, this builder's temporary shed cost about 9.8 ten thousand yuan.
Use movable barrack of the present invention, builder's temporary shed top area 400, weight about 72kg, unit price is 10 yuan/, builder's temporary shed top price lattice 4000 yuan;Floating balloon, diameter 2m, single balloon net buoyancy 3.36kg, need 22 altogether, single balloon valency 500 yuan, balloon total price 11000 yuan;Plus the adnexa such as cable, helium, total price about 17000 yuan, price advantage is obvious.
(2), use cost aspect;
Steel construction builder's temporary shed weight is big, needs crane gear to coordinate mobile.As a example by above-mentioned steel construction builder's temporary shed, use 32 tons of high pedestal jib cranes to coordinate mobile, consider the activity durations such as loop wheel machine preparation, construction operation, suspension hook dismounting, need about 1 hour altogether.32t high-altitude gantry crane unit use cost about 5000 yuan/hour, a builder's temporary shed moves and needs 5000 yuan, if distance moves, also needs repeatedly to lift, and use flat bed transport vehicle to transport, and mobile expense is costly.
Using movable barrack of the present invention, builder's temporary shed moves use manpower and can complete, and mobile cost is relatively low.
(3), storage transport aspect
Steel construction builder's temporary shed cannot fold, and when depositing, occupied ground is big, uses more inconvenience.
Use movable barrack shown in the present invention, can take up room after folding and folding when builder's temporary shed does not uses few, store, transport the most more convenient.
In description of the invention, it is to be understood that term " first ", " second ", it is used only for being distinguish between on describing, the most special implication.
It is to be understood that; above-mentioned detailed description of the invention is only presently preferred embodiments of the present invention and institute's application technology principle; in technical scope disclosed in this invention, change that any those familiar with the art is readily apparent that or replacement, all should contain within the scope of the present invention.
Claims (10)
1. a movable barrack, it is characterised in that include that builder's temporary shed top and at least three prop up support component, at least
A support component described in three the most point-blank, and is all connected with described builder's temporary shed top, can be by described builder's temporary shed top
Supporting and formed the effigurate block surface of tool, described support component includes floating body, static line and fixes
Part, described floating body is connected with described builder's temporary shed top, and described fixture is connected with position to be installed, described fixing
Rope one end is connected with described floating body, and the other end is connected with described fixture, wherein, fills out in described floating body
The density of the gas filled is less than the density of air, and the buoyancy sum of all of described floating body is more than described work
Canopy body and the gravity sum of described floating body.
Movable barrack the most according to claim 1, it is characterised in that described floating body is soft for using
The air bag that matter gastight material is made, is provided with charging portion on described floating body.
Movable barrack the most according to claim 1, it is characterised in that with institute on described floating body
The side stating the connection of builder's temporary shed top arranges the first rib, be connected with described static line on described floating body
Side arranges the second rib.
Movable barrack the most according to claim 1, it is characterised in that described floating body at least through
Three described static lines are fixed, and every described static line is respectively provided with one away from one end of described floating body
Described fixture.
Movable barrack the most according to claim 1, it is characterised in that be provided with on described static line
Rope draw off gear.
6. according to the movable barrack described in any one of claim 1 to 5, it is characterised in that described builder's temporary shed
Top uses waterproof cloth to make.
Movable barrack the most according to claim 6, it is characterised in that the surface on described builder's temporary shed top sets
It is equipped with shading layer.
8. according to the movable barrack described in any one of claim 1 to 5, it is characterised in that described builder's temporary shed
Top uses the waterproof cloth of rectangular configuration to make, and it is supported by a support component described in six, wherein, and four
Individual described support component is positioned at the corner on described builder's temporary shed top, remain two described in described in a support component lays respectively at
The middle part of builder's temporary shed top length direction.
Movable barrack the most according to claim 8, it is characterised in that be positioned at the four of described builder's temporary shed top
The height of described the support component at angle is equal and is respectively less than positioned at middle part described of described builder's temporary shed top length direction
Prop up the height of support component.
10. according to the movable barrack described in any one of claim 1 to 5, it is characterised in that described solid
Locking member includes fixing seat and hook, and one in described fixing seat and described hook is detachably arranged at and treats
Installation site, another in described fixing seat and described hook is connected with described static line, described solid
Reservation is connected with described hook selectivity, to realize the location of a support component.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610415516.1A CN105952166A (en) | 2016-06-14 | 2016-06-14 | Movable work shed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610415516.1A CN105952166A (en) | 2016-06-14 | 2016-06-14 | Movable work shed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105952166A true CN105952166A (en) | 2016-09-21 |
Family
ID=56905584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610415516.1A Pending CN105952166A (en) | 2016-06-14 | 2016-06-14 | Movable work shed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105952166A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10140843A (en) * | 1996-11-08 | 1998-05-26 | Unit Houzai:Kk | Roofed sheet cover |
DE20310672U1 (en) * | 2003-07-11 | 2003-10-23 | Biendl Walter | House side-awning has supplementary legs and telescopic supports for conversion to tent or marquee |
CN2654782Y (en) * | 2003-11-07 | 2004-11-10 | 张连义 | Gas floating force shed |
AU2007203166A1 (en) * | 2007-07-06 | 2009-01-22 | Hing Kwok Mak | A Method for Water Conservation Using Self-Suspended Shading |
CN101457574A (en) * | 2008-11-05 | 2009-06-17 | 毛天鹏 | Air buoyancy awning |
CN102979355A (en) * | 2012-12-24 | 2013-03-20 | 苏州才子佳人文化传播有限公司 | Movable shop shielding shack |
CN203640318U (en) * | 2013-12-02 | 2014-06-11 | 浙江正华装饰设计工程有限公司 | Shed for civil infrastructure construction |
CN203846817U (en) * | 2014-05-14 | 2014-09-24 | 西安长庆科技工程有限责任公司 | Protective shed for mounting equipment construction |
CN205677268U (en) * | 2016-06-14 | 2016-11-09 | 广船国际有限公司 | A kind of movable barrack |
-
2016
- 2016-06-14 CN CN201610415516.1A patent/CN105952166A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10140843A (en) * | 1996-11-08 | 1998-05-26 | Unit Houzai:Kk | Roofed sheet cover |
DE20310672U1 (en) * | 2003-07-11 | 2003-10-23 | Biendl Walter | House side-awning has supplementary legs and telescopic supports for conversion to tent or marquee |
CN2654782Y (en) * | 2003-11-07 | 2004-11-10 | 张连义 | Gas floating force shed |
AU2007203166A1 (en) * | 2007-07-06 | 2009-01-22 | Hing Kwok Mak | A Method for Water Conservation Using Self-Suspended Shading |
CN101457574A (en) * | 2008-11-05 | 2009-06-17 | 毛天鹏 | Air buoyancy awning |
CN102979355A (en) * | 2012-12-24 | 2013-03-20 | 苏州才子佳人文化传播有限公司 | Movable shop shielding shack |
CN203640318U (en) * | 2013-12-02 | 2014-06-11 | 浙江正华装饰设计工程有限公司 | Shed for civil infrastructure construction |
CN203846817U (en) * | 2014-05-14 | 2014-09-24 | 西安长庆科技工程有限责任公司 | Protective shed for mounting equipment construction |
CN205677268U (en) * | 2016-06-14 | 2016-11-09 | 广船国际有限公司 | A kind of movable barrack |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102635256B (en) | Self-unloading emergency communication base station | |
CN108557051A (en) | A kind of captive balloon sphere, shelter for guaranteeing and its captive balloon system | |
DE102006057808A1 (en) | Flight transporter for transporting loads, has hemispherical-shaped elements that are locked at their edges in two axes and are interlocked to lifting module in third axis, and transport/crane module arranged as fixed keel by lifting module | |
CN101678787A (en) | A support system for a wind turbine component, a vehicle transport system for a wind turbine component and a method for operating a support system | |
GB2245241A (en) | An airship. | |
CN100422045C (en) | Suspended load-bearing structure having buoyancy | |
US20090184196A1 (en) | Wide area aerial crane system | |
CN212173293U (en) | Novel self-loading and unloading shelter structure | |
CN208377039U (en) | A kind of captive balloon sphere, shelter for guaranteeing and its captive balloon system | |
CN203760619U (en) | Vehicle-mounted antenna pedestal | |
CN205677268U (en) | A kind of movable barrack | |
JP6468575B1 (en) | Power generation system using many solar panels | |
CN112660357B (en) | Container-type captive balloon anchoring platform | |
CN202557390U (en) | Bridge type frame vehicle special for large-size transformer transportation | |
CN109160421A (en) | A kind of integral hoisting system of mobile shelter | |
CN105952166A (en) | Movable work shed | |
CN102966030B (en) | Air suspension ropeway bridge | |
WO2003097450A1 (en) | Air transportation apparatus | |
CN1109176C (en) | Construction working method for nuclear electric power generation installation | |
CN107021199B (en) | A kind of annular aerostatics carrying astronomical telescope | |
US11981414B2 (en) | Method and system for manufacturing an aerostat with a rigid structure, and heavy-load-carrying aerostat manufactured in this way | |
CN106452294A (en) | Construction method and construction supporting device for solar power generating device installed on water | |
CN109057409A (en) | It is a kind of can integral hoisting mobile shelter | |
CN108843034B (en) | Umbrella for building | |
CN219058470U (en) | Portable installation and maintenance device for glass fiber reinforced plastic radar radome |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160921 |
|
RJ01 | Rejection of invention patent application after publication |