CN105951867A - Foundation for installation and positioning of automatic meteorological station - Google Patents

Foundation for installation and positioning of automatic meteorological station Download PDF

Info

Publication number
CN105951867A
CN105951867A CN201610153142.0A CN201610153142A CN105951867A CN 105951867 A CN105951867 A CN 105951867A CN 201610153142 A CN201610153142 A CN 201610153142A CN 105951867 A CN105951867 A CN 105951867A
Authority
CN
China
Prior art keywords
hole
weather station
automatic weather
connector
basis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610153142.0A
Other languages
Chinese (zh)
Other versions
CN105951867B (en
Inventor
关军
文元宏
任莉
唐敬
李晓辉
王朴军
郑伟静
王建华
秦洪才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
63655 TROOPS OF PEOPLE'S LIBERATION ARMY
Original Assignee
63655 TROOPS OF PEOPLE'S LIBERATION ARMY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 63655 TROOPS OF PEOPLE'S LIBERATION ARMY filed Critical 63655 TROOPS OF PEOPLE'S LIBERATION ARMY
Priority to CN201610153142.0A priority Critical patent/CN105951867B/en
Publication of CN105951867A publication Critical patent/CN105951867A/en
Application granted granted Critical
Publication of CN105951867B publication Critical patent/CN105951867B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a foundation for installation and positioning of an automatic meteorological station. The foundation includes a prefabricated balancing weight arranged in a foundation pit; the lower end of the prefabricated balancing weight is arranged on the bottom of the foundation pit, and the lower end of the prefabricated balancing weight is connected to the lower end of a central wind rod of the automatic meteorological station, the lower end of a pull rope of the automatic meteorological station or a rain gauge of the automatic meteorological station. The foundation is easy to prepare, is easy to install, can effectively avoid the situation that a foundation is temporarily fabricated by cement cast-in-place, and is especially suitable for construction of remote areas such as high mountains, wildernesses, and sea islands.

Description

Basis, location installed by automatic weather station
Technical field
The present invention relates to automatic weather station and field of locating technology is installed, particularly relate to a kind of automatic meteorological Stand and basis, location is installed.
Background technology
Automatic weather station has been widely used in the every field such as military affairs, the people's livelihood, and automatic weather station is general Including centre wind bar 1, bracing wire 2 and rain gage bucket, the lower end of described centre wind bar 1 is fixed on its cement On the basis of pouring, the upper end of described bracing wire 2 is connected to the top of centre wind bar 1, described bracing wire 2 Lower end is connected on the basis of its cement pours, and rain gage bucket and centre wind bar 1 are provided separately, rainfall Cylinder is integrally fixed on the basis of its cement pours, and examines it addition, be provided with on centre wind bar 1 for meteorology Solar panels 5, visibility sensor 6, shutter shield 3 and the vasculum 4 surveyed and for for above-mentioned The battery case 7 that each device is powered, the upper end of above-mentioned centre wind bar 1 is additionally provided with discharging rod 9 and hearsay Sensor 8.
But, the centre wind bar 1 of automatic weather station, bracing wire 2 and rain gage bucket when mounted, typically need Offer two tons (about 5 bags of cement;About 10 bags of sands;About 15 bags of stones) concrete pedestal Pour.For in remote districts, during such as region constructions such as high mountain, desert, islands, on-the-spot cement waters Build and be difficult to implement, have the biggest difficulty of construction.
Summary of the invention
It is an object of the invention to overcome above-mentioned deficiency of the prior art, it is provided that a kind of automatic weather station Basis, location is installed.This basis is ready prepared for, easy for installation, it is possible to is prevented effectively from and passes through at the scene Cement is cast-in-place makes basis temporarily, and it is particularly well-suited to remote districts, such as high mountain, wilderness and island Construct Deng region.
For achieving the above object, the technical solution used in the present invention is: automatic weather station is installed location and used Basis, it is characterised in that: include the prefabricated balancing weight being arranged in foundation ditch, described prefabricated balancing weight Lower end is supported at the bottom of the hole of described foundation ditch, the upper end of described prefabricated balancing weight and the center of automatic weather station The rain gage bucket of wind bar lower end, the bracing wire lower end of automatic weather station or automatic weather station is connected.
Basis, location installed by above-mentioned automatic weather station, it is characterised in that: described prefabricated balancing weight bag Include base plate and top board, and be arranged on the cement block between described base plate and top board, described base plate Contact connection with the bottom surface of described foundation ditch, described base plate offers the first through hole, described concrete prefabricated Offer the second through hole on block, described top board offers third through-hole, described first through hole, second Through hole and third through-hole one_to_one corresponding, described base plate, top board and cement block are by through described One through hole, the second through hole are connected with the connector of third through-hole, and the upper end of described connector is with described The lower end of centre wind bar, the lower end of described bracing wire or described rain gage bucket are connected.
Basis, location installed by above-mentioned automatic weather station, it is characterised in that: described connector includes even Order unit, described connection unit includes that connecting rod and screw rod, the lower end of described connecting rod are provided with end cap, The upper end of described connecting rod is connected with the lower end of described screw rod, and the hole wall of described first through hole is provided with For the first step matched with described end cap.
Basis, location installed by above-mentioned automatic weather station, it is characterised in that: described cement block Quantity is multiple, is provided with dividing plate, described dividing plate is provided with confession between adjacent two cement blocks The fourth hole that described connector passes, the hole wall of described fourth hole be provided with for described end cap The second step matched;Offering screwed hole on described end cap, described screwed hole is along the axle of connecting rod Line direction extends in connecting rod, and the quantity that each described connector connects unit is multiple, lower section The screw rod connecting unit is threadeded with the screwed hole being connected above unit.
It is basic that location installed by above-mentioned automatic weather station, it is characterised in that: described top board and described in The installing plate of heart-wind syndrome bar lower end fits tightly, and the connector stretching out described top board passes described installing plate, The screw rod of the connector through described installing plate is cased with installing plate locking nut.
Basis, location installed by above-mentioned automatic weather station, it is characterised in that: stretch out the company of described top board Being provided with eyenut on the screw rod of fitting, the bracing wire lower end of automatic weather station is connected to described suspension ring spiral shell On female suspension ring.
Basis, location installed by above-mentioned automatic weather station, it is characterised in that: described top board and automatic gas As the substrates into intimate laminating of the rain gage bucket lower end at station, stretch out the connector of described top board through described base Plate, is cased with substrate locking nut on the screw rod of the connector through described substrate.
Basis, location installed by above-mentioned automatic weather station, it is characterised in that: described cement block phase Corresponding dual-side is all embedded with the handle of convenient carrying.
Basis, location installed by above-mentioned automatic weather station, it is characterised in that: the number of described first through hole The quantity of amount, the quantity of the second through hole and the quantity of third through-hole and described connector is three, Three described first through holes, three described second through holes and three described third through-hole cloth the most triangular in shape If.
Basis, location installed by above-mentioned automatic weather station, it is characterised in that: described prefabricated balancing weight is It is horizontally disposed with.
The present invention compared with prior art has the advantage that
1, the present invention uses the balancing weight made in advance, so at the centre wind to automatic weather station When bar, bracing wire or rain gage bucket carry out location and installation, very quickly with convenient, and work as automatic weather station When needing transition, for centre wind bar, bracing wire or the rain gage bucket of described automatic weather station are positioned The basis installed also is able to fast quick-detach and transition, has used great convenience.
2, the prefabricated balancing weight of the present invention is for being horizontally disposed with.By the level to described prefabricated balancing weight Arrange such that it is able to guarantee that centre wind bar and rain gage bucket are in vertical state when mounted.
3, the present invention uses cement block to be used as main mass, by connector by base plate, Top board and cement block connect into an entirety, enhance the globality of described prefabricated balancing weight, also Facilitate the assembling of described prefabricated balancing weight.
4, the present invention is by carrying out particular design to connector, it is possible to meet pre-to abundant cement The concatenation of clamp dog, is i.e. connected unit by the described screw rod of connection unit of lower section with the described of top Screwed hole is threaded, completes adjacent two concatenations connecting unit, is connecting adjacent two connections During unit, owing to arranging dividing plate, the end cap of connection unit lower end can be made to be positioned at dividing plate fourth hole Second step in, and then achieve the described connection unit lower end above base plate fixing, so, The connection of multiple connection unit can be realized quickly, effectively, easily, and then realize multiple cement The concatenation of prefabricated section, to reach the quick assembling of described prefabricated balancing weight.
5, the present invention is by arranging handle on cement block, the convenient carrying to cement block, Further speed up the assembling of described prefabricated balancing weight.
Below by drawings and Examples, technical scheme is described in further detail.
Accompanying drawing explanation
Fig. 1 is centre wind bar and the annexation schematic diagram of bracing wire of automatic weather station in prior art.
Fig. 2 is the structural representation of the embodiment of the present invention 1.
Fig. 3 is the structural representation of cement block in the embodiment of the present invention 1.
Fig. 4 is the A-A sectional view of Fig. 3.
Fig. 5 is the structural representation of base plate, dividing plate and top board in the embodiment of the present invention 1.
Fig. 6 is the B-B sectional view of Fig. 5.
Fig. 7 is the structural representation of connector in the embodiment of the present invention 1.
Fig. 8 is the annexation schematic diagram of two connectors in the embodiment of the present invention 1.
Fig. 9 is the structural representation of the embodiment of the present invention 2
Figure 10 is the structural representation of the embodiment of the present invention 3.
Description of reference numerals:
1 centre wind bar;1-1 installing plate;2 bracing wires;
3 shutter shields;4 vasculums;5 solar panels;
6 visibility sensors;7 battery cases;8 wind sensors;
9 discharging rod;10 base plates;10-1 the first through hole;
10-2 first step;11 dividing plates;11-1 fourth hole;
11-2 second step;12 cement blocks;12-1 the second through hole;
13 top boards;13-1 third through-hole;13-2 the 3rd step;
14 installing plate locking nuts;15 connectors;15-1 connecting rod;
15-2 screw rod;15-3 end cap;15-4 screwed hole;
16 handles;17 eyenuts;18 plain nuts;
19 substrates;20 substrate locking nuts.
Detailed description of the invention
Embodiment 1
Basis, location installed by a kind of automatic weather station as shown in Figure 2, including being arranged in foundation ditch Prefabricated balancing weight, the lower end of described prefabricated balancing weight is supported at the bottom of the hole of described foundation ditch, described prefabricated joins The upper end of pouring weight and centre wind bar 1 lower end of automatic weather station, bracing wire 2 lower end of automatic weather station or The rain gage bucket of automatic weather station is connected.
In the present embodiment, this basis is for positioning the installation of automatic weather station centre wind bar 1.Right When described centre wind bar 1 carries out installing location, described prefabricated balancing weight is placed on the base dug in advance In hole, more described centre wind bar 1 lower end is connected with described prefabricated balancing weight, has i.e. reached certainly The installation location of dynamic weather station centre wind bar 1, and then avoid cast-in-place next interim by cement at the scene The difficulty making basis and face, it is particularly well-suited to remote districts, such as high mountain, wilderness and island etc. Construct in region.And this basis is to use the balancing weight made in advance, so to described centre wind When bar 1 carries out location and installation, very quickly with convenient, and when automatic weather station needs transition, Basis for described centre wind bar 1 is carried out location and installation also is able to fast quick-detach and transition, uses Get up to have had great convenience.
In the present embodiment, described prefabricated balancing weight is for being horizontally disposed with.By to described prefabricated balancing weight It is horizontally disposed with such that it is able to guarantee that centre wind bar 1 is in vertical state when mounted.
As shown in Fig. 2, Fig. 3, Fig. 4, Fig. 5 and Fig. 6, described prefabricated balancing weight includes base plate 10 With top board 13, and it is arranged on the cement block 12 between described base plate 10 and top board 13, institute State base plate 10 and contact connection with the bottom surface of described foundation ditch, described base plate 10 offers the first through hole 10-1, described cement block 12 offers the second through hole 12-1, described top board 13 offers Third through-hole 13-1, described first through hole 10-1, the second through hole 12-1 and third through-hole 13-1 mono- One is corresponding, and described base plate 10, top board 13 and cement block 12 are by through described first through hole 10-1, the connector 15 of the second through hole 12-1 and third through-hole 13-1 are connected, described connector The upper end of 15 is connected with the lower end of described centre wind bar 1.
In the present embodiment, by using cement block 12 to be used as main mass, by connecting Base plate 10, top board 13 and cement block 12 are connected into an entirety by part 15, enhance described The globality of prefabricated balancing weight, has been also convenient for the assembling of described prefabricated balancing weight.By arranging base plate 10, It can be made effectively to be located by connecting with the lower end of connector 15, it is to avoid connector 15 is directly anchored to Damage is caused on cement block 12 and then to cement block 12.Meanwhile, by top board 13 energy The upper end of described connector 15 is fixed by enough assistance.Wherein, described base plate 10 and top board 13 It is steel plate.
As it is shown in fig. 7, described connector 15 includes connecting unit, described connection unit includes connecting Bar 15-1 and screw rod 15-2, the lower end of described connecting rod 15-1 is provided with end cap 15-3, described company The upper end of extension bar 15-1 is connected with the lower end of described screw rod 15-2, described first through hole 10-1's Hole wall is provided with the first step 10-2 for matching with described end cap 15-3.
In the present embodiment, the simple in construction of described connector 15, it is by end cap 15-3 and base plate 10 The hole wall of the first through hole 10-1 matches, thus realizes being fixed the lower end of described connector 15, By arranging described screw rod 15-2, conveniently by locking nut, the upper end of connector 15 is locked Fixing, owing to connecting rod 15-1 is polished rod, convenient from the second through hole 12 of cement block 12 Pass, so can effectively base plate 10, top board 13 and cement block 12 be connected into one whole Body.
In conjunction with Fig. 2, Fig. 7 and Fig. 8, owing to the quantity of described cement block 12 is multiple, each The quantity connecting unit on described connector 15 is multiple, specific in the present embodiment, and described cement The quantity of prefabricated section 12 is six, is provided with dividing plate 11, institute between adjacent two cement blocks 12 State and on dividing plate 11, be provided with the fourth hole 11-1 passed for described connector 15, described fourth hole The hole wall of 11-1 is provided with the second step 11-2 for matching with described end cap 15-3;Described end Offering screwed hole 15-4 on cap 15-3, described screwed hole 15-4 is along the axis side of connecting rod 15-1 In extending to connecting rod 15-1, the quantity that each described connector 15 connects unit is seven, Lower section connects the screw rod 15-2 of unit and threadeds with the screwed hole 15-4 being connected above unit.
As in figure 2 it is shown, in the present embodiment, owing to needing to install weather detection devices on centre wind bar 1, So it is higher to the counterweight requirements on its basis.The present embodiment by the particular design to connector 15, Disclosure satisfy that the concatenation to abundant cement block 12, i.e. by the described connection unit of lower section Screw rod 15-2 and top described to be connected the screwed hole 15-4 of unit threaded, complete adjacent Two concatenations connecting unit, when connecting adjacent two connection unit, owing to arranging dividing plate 11, can So that the end cap 15-3 connecting unit lower end is positioned at the second step of dividing plate 11 fourth hole 11-1 In 11-2, and then achieve fixing the described connection unit lower end above base plate 10, so, The connection of multiple connection unit can be realized quickly, effectively, easily, and then realize multiple cement The concatenation of prefabricated section 12, to reach the quick assembling of described prefabricated balancing weight.
As shown in Figure 5 and Figure 6, in the present embodiment, in the third through-hole 13-1 hole of described top board 13 The 3rd step 13-2 for matching it is also provided with the end cap 15-3 of connector 15, on the one hand on wall Cement block 12, top board 13 now can be directly installed when needed on described top board 13 Can use as dividing plate 11.
As shown in Figure 3 and Figure 5, the quantity of described first through hole 10-1, the number of the second through hole 12-1 The quantity of amount and the quantity of third through-hole 13-1 and described connector 15 is three, described in three First through hole 10-1, three described second through hole 12-1 and three described third through-hole 13-1 are all in three Dihedral is laid.Use the first through hole 10-1 of laying triangular in shape, the second through hole 12-1 and threeway Absolutely empty 13-1 can be effectively improved the integrated connection intensity of described prefabricated balancing weight.
As in figure 2 it is shown, the corresponding dual-side of described cement block 12 is all embedded with convenient carrying Handle 16.By arranging handle 16, the convenient carrying to cement block 12, further speed up The assembling of described prefabricated balancing weight.In the present embodiment, described handle 16 is concrete prefabricated for being embedded in Reinforcing bar in the dual-side of block 12 correspondence.
As in figure 2 it is shown, in the present embodiment, concrete is being connected this basis with centre wind bar 1 Time, described top board 13 fits tightly with the installing plate 1-1 of described centre wind bar 1 lower end, stretches out institute The connector 15 stating top board 13 passes described installing plate 1-1, in the company through described installing plate 1-1 It is cased with installing plate locking nut 14 on the screw rod 15-2 of fitting 15.
In the present embodiment, during by making connector 15 through the installing plate 1-1 of centre wind bar 1 lower end, By installing plate locking nut 14, the screw rod 15-2 of described connector 15 can be locked, from And achieve connector 15 and be connected with the firm of centre wind bar 1.
Embodiment 2
As it is shown in figure 9, the present embodiment is with the difference of embodiment 1: described prefabricated balancing weight Upper end be connected with bracing wire 2 lower end of automatic weather station.I.e. this basis is for drawing automatic weather station The installation location of line 2, when described bracing wire 2 carries out installing location, puts described prefabricated balancing weight Put in the foundation ditch dug in advance, more described bracing wire 2 lower end be connected with described prefabricated balancing weight, I.e. reach the location of the installation to automatic weather station centre wind bar 1, and then avoided and pass through water at the scene The cast-in-place difficulty temporarily making basis and face of mud, it is particularly well-suited to remote districts, as high mountain, Construct in the region such as wilderness and island.
Hang as it is shown in figure 9, stretch out to be provided with on the screw rod 15-2 of the connector 15 of described top board 13 Ring nut 17, bracing wire 2 lower end of automatic weather station is connected on the suspension ring of described eyenut 17. The bracing wire 2 of automatic weather station can effectively be fixed by this basis.
In the present embodiment, described eyenut 17 is installed only at the screw rod 15-2 of a connector 15 On, owing to the quantity of described connector 15 is three, the screw rod 15-2 of other two connector 15 On plain nut 18 is installed.
In the present embodiment, the quantity of described cement block 12 is three.
Embodiment 3
As shown in Figure 10, the present embodiment is with the difference of embodiment 1: described prefabricated counterweight The upper end of block is connected with the rain gage bucket of automatic weather station.I.e. this basis is for automatic Weather Station Precipitation The installation location of cylinder, when described rain gage bucket carries out installing location, places described prefabricated balancing weight In the foundation ditch dug in advance, then by the substrate 19 of described rain gage bucket lower end and described prefabricated balancing weight It is connected, has i.e. reached the location of the installation to automatic weather station substrate 19, and then avoided at the scene By the cast-in-place difficulty making basis and face of cement temporarily, it is particularly well-suited to remote districts, as The region constructions such as high mountain, wilderness and island.
In the present embodiment, described top board 13 is tight with the substrate 19 of the rain gage bucket lower end of automatic weather station Laminating, the connector 15 stretching out described top board 13 passes described substrate 19, through described substrate It is cased with substrate locking nut 20 on the screw rod 15-2 of the connector 15 of 19.The most effectively company of achieving Fitting 15 and the connection of rain gage bucket substrate 19, be arranged on rain gage bucket on its substrate 19 the most again.
The above, be only presently preferred embodiments of the present invention, not impose any restrictions the present invention, all It is any simple modification, change and equivalence above example made according to the technology of the present invention essence Reconfiguration, all still falls within the protection domain of technical solution of the present invention.

Claims (10)

1. basis, location installed by automatic weather station, it is characterised in that: include being arranged in foundation ditch Prefabricated balancing weight, the lower end of described prefabricated balancing weight is supported at the bottom of the hole of described foundation ditch, described prefabricated joins The upper end of pouring weight and centre wind bar (1) lower end of automatic weather station, the bracing wire (2) of automatic weather station The rain gage bucket of lower end or automatic weather station is connected.
Basis, location installed by automatic weather station the most according to claim 1, it is characterised in that: Described prefabricated balancing weight includes base plate (10) and top board (13), and is arranged on described base plate (10) And the end of the cement block (12) between top board (13), described base plate (10) and described foundation ditch Face contact connects, and described base plate (10) offers the first through hole (10-1), described concrete prefabricated Offering the second through hole (12-1) on block (12), described top board offers third through-hole on (13) (13-1), described first through hole (10-1), the second through hole (12-1) and third through-hole (13-1) One_to_one corresponding, described base plate (10), top board (13) and cement block (12) are by through institute State the connector (15) of the first through hole (10-1), the second through hole (12-1) and third through-hole (13-1) Be connected, the lower end of the upper end of described connector (15) and described centre wind bar (1), described in draw Lower end or the described rain gage bucket of line (2) are connected.
Basis, location installed by automatic weather station the most according to claim 2, it is characterised in that: Described connector (15) includes connecting unit, and described connection unit includes connecting rod (15-1) and spiral shell Bar (15-2), the lower end of described connecting rod (15-1) is provided with end cap (15-3), described connection The upper end of bar (15-1) is connected with the lower end of described screw rod (15-2), described first through hole (10-1) Hole wall be provided with the first step (10-2) for matching with described end cap (15-3).
Basis, location installed by automatic weather station the most according to claim 3, it is characterised in that: The quantity of described cement block (12) is multiple, sets between adjacent two cement blocks (12) It is equipped with dividing plate (11), described dividing plate (11) is provided with the passed for described connector (15) Four through holes (11-1), the hole wall of described fourth hole (11-1) be provided with for described end cap (15-3) The second step (11-2) matched;Screwed hole (15-4) is offered on described end cap (15-3), Described screwed hole (15-4) extends to connecting rod (15-1) along the axis direction of connecting rod (15-1) In, the upper quantity connecting unit of each described connector (15) is multiple, and lower section connects the spiral shell of unit Bar (15-2) is threadeded with the screwed hole (15-4) being connected above unit.
Basis, location installed by automatic weather station the most according to claim 3, it is characterised in that: Described top board (13) fits tightly with the installing plate (1-1) of described centre wind bar (1) lower end, stretches The connector (15) going out described top board (13) passes described installing plate (1-1), through described It is cased with installing plate locking nut (14) on the screw rod (15-2) of the connector (15) of installing plate (1-1).
Basis, location installed by automatic weather station the most according to claim 3, it is characterised in that: On the screw rod (15-2) of the connector (15) stretching out described top board (13), eyenut (17) is installed, Bracing wire (2) lower end of automatic weather station is connected on the suspension ring of described eyenut (17).
Basis, location installed by automatic weather station the most according to claim 3, it is characterised in that: Described top board (13) fits tightly with the substrate (19) of the rain gage bucket lower end of automatic weather station, stretches out The connector (15) of described top board (13) passes described substrate (19), through described substrate (19) Connector (15) screw rod (15-2) on be cased with substrate locking nut (20).
Basis, location installed by automatic weather station the most according to claim 2, it is characterised in that: The corresponding dual-side of described cement block (12) is all embedded with the handle (16) of convenient carrying.
Basis, location installed by automatic weather station the most according to claim 2, it is characterised in that: The quantity of described first through hole (10-1), the quantity of the second through hole (12-1) and third through-hole (13-1) Quantity and the quantity of described connector (15) be three, three described first through holes (10-1), Three described second through holes (12-1) and the laying the most triangular in shape of three described third through-holes (13-1).
Basis, location installed by automatic weather station the most according to claim 1, it is characterised in that: Described prefabricated balancing weight is for being horizontally disposed with.
CN201610153142.0A 2016-03-17 2016-03-17 Automatic weather station installation positioning basis Expired - Fee Related CN105951867B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610153142.0A CN105951867B (en) 2016-03-17 2016-03-17 Automatic weather station installation positioning basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610153142.0A CN105951867B (en) 2016-03-17 2016-03-17 Automatic weather station installation positioning basis

Publications (2)

Publication Number Publication Date
CN105951867A true CN105951867A (en) 2016-09-21
CN105951867B CN105951867B (en) 2018-04-24

Family

ID=56917505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610153142.0A Expired - Fee Related CN105951867B (en) 2016-03-17 2016-03-17 Automatic weather station installation positioning basis

Country Status (1)

Country Link
CN (1) CN105951867B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565123A (en) * 2021-07-15 2021-10-29 中建一局集团第二建筑有限公司 Movable type variable-counterweight steel structure temporary support foundation and installation method thereof
CN114278842A (en) * 2021-12-30 2022-04-05 航天新气象科技有限公司 Zipper-free air rod convenient to assemble and disassemble

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8004538A (en) * 1980-08-11 1982-03-01 Siemen Spinder Handelende Onde Concrete anchoring foot placement method - using stack of prefabricated slabs fitted over guide bars on metal baseplate
SU1560684A1 (en) * 1988-02-11 1990-04-30 Запорожский индустриальный институт Method of erecting piles foundation with ferroconcrete sectional solid foundation mat
CN202227362U (en) * 2011-09-15 2012-05-23 江苏九鼎环球建设科技集团有限公司 Prefabricated assembly type tower mast structural foundation
CN104234071A (en) * 2014-09-17 2014-12-24 国家电网公司 Prefabricated and assembled power transmission line tower footing and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8004538A (en) * 1980-08-11 1982-03-01 Siemen Spinder Handelende Onde Concrete anchoring foot placement method - using stack of prefabricated slabs fitted over guide bars on metal baseplate
SU1560684A1 (en) * 1988-02-11 1990-04-30 Запорожский индустриальный институт Method of erecting piles foundation with ferroconcrete sectional solid foundation mat
CN202227362U (en) * 2011-09-15 2012-05-23 江苏九鼎环球建设科技集团有限公司 Prefabricated assembly type tower mast structural foundation
CN104234071A (en) * 2014-09-17 2014-12-24 国家电网公司 Prefabricated and assembled power transmission line tower footing and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565123A (en) * 2021-07-15 2021-10-29 中建一局集团第二建筑有限公司 Movable type variable-counterweight steel structure temporary support foundation and installation method thereof
CN113565123B (en) * 2021-07-15 2022-07-01 中建一局集团第二建筑有限公司 Movable type variable-counterweight steel structure temporary support foundation and installation method thereof
CN114278842A (en) * 2021-12-30 2022-04-05 航天新气象科技有限公司 Zipper-free air rod convenient to assemble and disassemble
CN114278842B (en) * 2021-12-30 2024-03-26 航天新气象科技有限公司 Zipper-free air bar convenient to assemble and disassemble

Also Published As

Publication number Publication date
CN105951867B (en) 2018-04-24

Similar Documents

Publication Publication Date Title
CN105951867A (en) Foundation for installation and positioning of automatic meteorological station
CN201390973Y (en) Pile-plate foundation for self-supporting iron tower
CN101187268B (en) Height adjustable transmission iron tower capable of even precipitation
SU933879A1 (en) Foundation
CN104313999A (en) Bridge pier structure
CN201883720U (en) Wind and solar hybrid power generation intensive self-supporting communication base station with adjustable verticality
CN106245986A (en) The method for assembling of power network line steel tower and device
CN207796872U (en) A kind of solar street lamp structure
CN107980073A (en) Method for repairing storage dam water inlet
CN103741708A (en) Prefabricated concrete pole sleeve base
CN216587967U (en) Box type counterweight type foundation fast-assembling base station communication rod
CN203367936U (en) Cable trench
CN102605798A (en) Support foundation for solar photovoltaic power station and onsite construction method for support foundation
CN202131602U (en) Steel sheet pile cofferdam structure
CN210684493U (en) Can demolish interim support fast
CN104746522B (en) A kind of for dredging silt matter soil district foundation ditch can intelligent deformation regulation tiltedly throw support support system
CN107816067B (en) A kind of photovoltaic array foundation strength detection method
CN205918208U (en) Tubular communication tower
CN209686977U (en) A kind of wisdom communication tower
JP3194681U (en) Foundation stand for solar panel installation
CN207419514U (en) A kind of gravity type flood control fan foundation structure
CN208416809U (en) A kind of offshore wind turbine pile foundation support table basis
CN207092705U (en) A kind of fence
CN208009258U (en) A kind of bridge construction steel cofferdam sinking device
CN206461556U (en) A kind of floating body photovoltaic generating system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180424

Termination date: 20190317

CF01 Termination of patent right due to non-payment of annual fee