CN105951843A - 一种深基坑施工方法 - Google Patents
一种深基坑施工方法 Download PDFInfo
- Publication number
- CN105951843A CN105951843A CN201610431687.3A CN201610431687A CN105951843A CN 105951843 A CN105951843 A CN 105951843A CN 201610431687 A CN201610431687 A CN 201610431687A CN 105951843 A CN105951843 A CN 105951843A
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- central area
- construction
- foundation ditch
- collar region
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Abstract
本发明公开了一种深基坑施工方法,属于建筑施工的技术领域。其技术方案为:基坑围护,依据基坑围护结构,将深基坑划分为中心区域和周圈区域,在基坑的周圈区域建立第一道支撑,逐层开挖所述中心区域,形成边坡,并对边坡进行护坡处理,铺设第二层地下室底板,施工第二层地下室结构,施工第一层地下室结构,开挖周圈区域,在周圈区域建立第二道支撑,拆除所述第二道支撑,拆除第一道支撑。本发明的有益效果为:以周圈区域土体作支护,中心区域深基坑可以在不采用水平支撑条件下,由上而下逐层挖土,直至坑底,并在坑底完成底板后,再由下而上逐层回筑地下结构,减少了施工工序,提高出土速度,减少施工间歇时间,降低了施工成本,并减少了对周边环境的影响。
Description
技术领域
本发明涉及建筑施工的技术领域,特别涉及一种深基坑施工方法。
背景技术
基坑支护体系是临时结构,通常在地下工程施工完成后就不在需要,目前大型地下工程的施工常见的施工方法是顺作法,其中,顺作法是先自上而下分层开挖土体,每开挖一层土施工一道支撑,直至坑底施加底板,再自下而上依次拆除一道支撑施工一层结构,建造地下结构物的基坑工程施工方法。
顺作法具有施工方便、难度低、质量好的优点,但对于大型地下工程需要设置大量的混凝土支撑系统,土方开挖受到一定限制,临时工程多、对基坑支护体系的拆除量大,显著增加施工工期;而且水平支撑仅用于开挖阶段,施工地下室结构时需要再拆除,费用较高。
发明内容
为了解决上述已有技术的不足,本发明的目的是:提供一种利用中心区域地下室结构为支护体系,中心区域采用无支撑顺作施工,减少支撑数量,以减少施工工序,提高出土速度的深基坑施工方法。
一种深基坑施工方法,用于利用中心区域地下室结构为支护体系的深基坑施工,包括如下步骤:
步骤一、基坑围护:在待施工的所述基坑的四周建立所述基坑围护结构;
步骤二、依据所述基坑围护结构,将所述深基坑划分为中心区域和周圈区域;
步骤三、将所述基坑的所述中心区域划分为若干段,在无水平支撑结构的条件下,依次进行所述中心区域的土方开挖,土方开挖至所述周圈区域时,在所述基坑的所述周圈区域建立第一道支撑;
步骤四、逐层开挖所述中心区域,形成边坡,并对所述边坡进行护坡处理,所述中心区域开挖到坑底,在坑内加固围成的土体上浇筑垫层,然后在所述垫层上铺设第二层地下室底板;
步骤五、在所述第二层地下室底板上施工第二层地下室结构,同时吊装临时立柱A,在所述第二层地下室结构的顶板预留后期需施工的混凝土支撑的钢筋;
步骤六、在所述第二层地下室结构基础上施工第一层地下室结构,同时吊装临时立柱B,然后施工所述第一道支撑的剩余部分,使得所述第一层地下室结构的顶板与所述第一道支撑连接;
步骤七、待所述第一层地下室结构、所述第二层地下室结构、临时立柱A以及临时立柱B达到设计强度,开挖所述周圈区域,在所述基坑的所述周圈区域建立第二道支撑;
步骤八、开挖所述周圈区域至坑底,及时浇筑垫层底板传力带,待所述底板A及底板传力带的强度达到设计,拆除所述第二道支撑;
步骤九、对所述周圈区域进行施工,在所述第二层地下室结构的顶板浇筑顶板传力带;
步骤十、待所述顶板传力带达到设计强度,拆除所述第一道支撑。
所述基坑围护结构包括搅拌桩、灌注桩、立柱桩以及坑内加固。
所述无水平支撑结构条件指所述中心区域施工时,利用所述周圈区域剩余土体抵抗坑外水土压力产生的变形。
所述第一道支撑与所述立柱桩连接。
本发明的有益效果:本发明通过提供一种利用周圈区域土体作支护体系施工中心区域地下结构,利用中心区域地下结构作支护体系施工周圈区域地下结构的深基坑施工方法,例如以周圈区域土体作支护时,则中心区域深基坑可以在不采用水平支撑条件下,由上而下逐层挖土,直至坑底,并在坑底完成底板后,再由下而上逐层回筑地下结构,以减少施工工序,提高出土速度,减少施工间歇时间,进而节约深基坑开挖及地下结构的施工工期,降低施工成本,并减少对周边环境的影响。
附图说明
图1为本发明步骤三的结构示意图。
图2为图1的A-A的剖视图。
图3为本发明步骤四的结构示意图。
图4为图3的B-B的剖视图。
图5为本发明步骤五的结构示意图。
图6为图5的C-C的剖视图。
图7为本发明步骤六的结构示意图。
图8为图7的D-D的剖视图。
图9为本发明步骤七的结构示意图。
图10为图9的E-E的剖视图。
图11为本发明最终结构示意图。
图12为图11的F-F的剖视图。
其中,附图标记为:1、基坑;2、基坑围护结构;21、搅拌桩;22、灌注桩;23、立柱桩;24、坑内加固;3、中心区域;31、垫层;32、第二层地下室底板;33、第二层地下室结构;34、临时立柱A;35、第一层地下室结构;36、临时立柱B;4、周圈区域;5、第一道支撑;6、第二道支撑;7、底板传力带;8、顶板传力带。
具体实施方式
针对大型地下工程需要设置大量的混凝土支撑系统,土方开挖受到一定限制的问题,本发明提供了一种深基坑施工方法。
参见图1,本发明是一种深基坑施工方法,用于利用中心区域地下室结构为支护体系的深基坑施工,包括如下步骤:
步骤一、基坑围护:在待施工的基坑1的四周建立基坑围护结构2;
具体来说,为了确保基坑整体及周围环境的安全,基坑围护结构采用排桩结合止水帷幕的形式。本工程的基坑围护主要分为两部分,第一部分为挡土桩部分,其主要起到挡土墙的作用,形式为钢筋混凝土灌注桩,桩与桩之间有一定的空隙,能挡土。第二部分是止水帷幕部分,其作用是挡土墙后的土体固结,阻断基坑内外的水层交流,形式为水泥土搅拌桩。
步骤二、依据基坑围护结构2,将深基坑1划分为中心区域3和周圈区域4;
步骤三、将基坑1的中心区域3划分为若干段,在无水平支撑结构的条件下,依次进行中心区域3的土方开挖,土方开挖至周圈区域4时,在基坑1的周圈区域4建立第一道支撑5;
步骤四、逐层开挖中心区域3,形成边坡,并对边坡进行护坡处理,中心区域3开挖到坑底,在坑内加固24围成的土体上浇筑垫层31,然后在垫层31上铺设第二层地下室底板32;
步骤五、在第二层地下室底板32上施工第二层地下室结构33,同时吊装临时立柱A34,在第二层地下室结构33的顶板预留后期需施工的混凝土支撑的钢筋;
步骤六、在第二层地下室结构33基础上施工第一层地下室结构35,同时吊装临时立柱B36,然后施工第一道支撑5的剩余部分,使得第一层地下室结构35的顶板与第一道支撑5连接;
步骤七、待第一层地下室结构35、第二层地下室结构33、临时立柱A34以及临时立柱B36达到设计强度,开挖周圈区域4,在基坑1的周圈区域4建立第二道支撑6;
步骤八、开挖周圈区域4至坑底,及时浇筑垫层底板传力带7,待底板A7强度达到设计,拆除第二道支撑6;
步骤九、对所述周圈区域4进行施工,在第二层地下室结构33的顶板浇筑顶板传力带8;
步骤十、待顶板传力带8达到设计强度,拆除第一道支撑5。
具体来说,深基坑放线测量完毕后,根据深基坑工程情况,在深基坑内由上到下设计两层支撑结构,并采用岛式开挖法,逐层开挖基础土方,开挖第一层水平支撑钢板以上的土方,达到第一层水平支撑钢板施工标高后,将第一层水平支撑钢板一端与外侧钢板桩焊接,在第一层水平支撑钢板的另一端向下打入内侧钢板桩,内侧钢板桩与第一层水平支撑钢板之间留 50 ~ 300mm 的空隙,该空隙用细石混凝土浇灌密实;
本工程是在建立第一道支撑后,继续深挖中心区域的基坑到坑底,在坑底的土体上浇筑垫层,然后再垫层上再施工第二层地下室结构,然后依次从下往上建立第一层地下室结构,等地下室结构及周围的临时立柱达到设计强度的80%后,再修建第二层水平支撑,将第二层水平支撑钢板一端与外侧钢板桩焊接,在第二层水平支撑钢板的另一端与内侧钢板桩之间留 50 ~ 300mm 的空隙,该空隙用细石混凝土浇灌密实,
等第二道支撑强度达到设计的80%的时候,拆除第二道支撑,然后再开挖第二道支撑下的土方直至坑底,然后在第二层地下室结构的基础上往外继续修建地下室二层结构;
等到第二层地下室的顶板结构和传力带达到设计要求强度的80%的时候,再拆除第一道支撑,然后,第一道支撑的位置修建第一层地下室结构;
等到地下室结构达到设计要求强度的80%的时候,并且外墙防水施工完成后,回填至地坪。
基坑围护结构2包括搅拌桩21、灌注桩22、立柱桩23以及坑内加固24。
无水平支撑结构条件指中心区域3施工时,利用周圈区域4剩余土体抵抗坑外水土压力产生的变形。
第一道支撑5与立柱桩23连接。
以上所述仅为本发明的较佳实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (4)
1.一种深基坑施工方法,用于利用中心区域地下室结构为支护体系的深基坑施工,其特征在于,包括如下步骤:
步骤一、基坑围护:在待施工的所述基坑(1)的四周建立所述基坑围护结构(2);
步骤二、依据所述基坑围护结构(2),将所述深基坑(1)划分为中心区域(3)和周圈区域(4);
步骤三、将所述基坑(1)的所述中心区域(3)划分为若干段,在无水平支撑结构的条件下,依次进行所述中心区域(3)的土方开挖,土方开挖至所述周圈区域(4)时,在所述基坑(1)的所述周圈区域(4)建立第一道支撑(5);
步骤四、逐层开挖所述中心区域(3),形成边坡,并对所述边坡进行护坡处理,所述中心区域(3)开挖到坑底,在坑内加固(24)围成的土体上浇筑垫层(31),然后在所述垫层(31)上铺设第二层地下室底板(32);
步骤五、在所述第二层地下室底板(32)上施工第二层地下室结构(33),同时吊装临时立柱A(34),在所述第二层地下室结构(33)的顶板预留后期需施工的混凝土支撑的钢筋;
步骤六、在所述第二层地下室结构(33)基础上施工第一层地下室结构(35),同时吊装临时立柱B(36),然后施工所述第一道支撑(5)的剩余部分,使得所述第一层地下室结构(35)的顶板与所述第一道支撑(5)连接;
步骤七、待所述第一层地下室结构(35)、所述第二层地下室结构(33)、临时立柱A(34)以及临时立柱B(36)达到设计强度,开挖所述周圈区域(4),在所述基坑(1)的所述周圈区域(4)建立第二道支撑(6);
步骤八、开挖所述周圈区域(4)至坑底,及时浇筑垫层底板传力带(7),待所述底板A(7)强度达到设计,拆除所述第二道支撑(6);
步骤九、对所述周圈区域(4)进行施工,在所述第二层地下室结构(33)的顶板浇筑顶板传力带(8);
步骤十、待所述顶板传力带(8)达到设计强度,拆除所述第一道支撑(5)。
2.根据权利要求1所述的深基坑施工方法,其特征在于,所述基坑围护结构(2)包括搅拌桩(21)、灌注桩(22)、立柱桩(23)以及坑内加固(24)。
3.根据权利要求1所述的深基坑施工方法,其特征在于,所述无水平支撑结构条件指所述中心区域(3)施工时,利用所述周圈区域(4)剩余土体抵抗坑外水土压力产生的变形。
4.根据权利要求1所述的深基坑施工方法,其特征在于,所述第一道支撑(5)与所述立柱桩(23)连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610431687.3A CN105951843B (zh) | 2016-06-17 | 2016-06-17 | 一种深基坑施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610431687.3A CN105951843B (zh) | 2016-06-17 | 2016-06-17 | 一种深基坑施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105951843A true CN105951843A (zh) | 2016-09-21 |
CN105951843B CN105951843B (zh) | 2019-02-15 |
Family
ID=56905814
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610431687.3A Active CN105951843B (zh) | 2016-06-17 | 2016-06-17 | 一种深基坑施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105951843B (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522241A (zh) * | 2016-12-14 | 2017-03-22 | 上海建工建集团有限公司 | 超大层高地下室结构的深基坑支护方法 |
CN108643195A (zh) * | 2018-06-27 | 2018-10-12 | 上海建工二建集团有限公司 | 基坑的主体与支护结构的一体化系统与方法 |
CN109677864A (zh) * | 2019-02-27 | 2019-04-26 | 中铁十二局集团有限公司 | 一种移动式皮带传输机及“之”字型土方开挖方法 |
CN110004993A (zh) * | 2019-04-22 | 2019-07-12 | 上海建工一建集团有限公司 | 一种超厚底板测量放线施工方法及放线平台 |
CN110130356A (zh) * | 2019-06-05 | 2019-08-16 | 汕头市建筑工程总公司 | 一种淤泥质软土区地下室坑底整体式封底施工方法 |
CN110397043A (zh) * | 2019-07-18 | 2019-11-01 | 中国建筑第四工程局有限公司 | 一种基坑支护内支撑体系与地下室结构体系三合一的方法 |
CN112609706A (zh) * | 2020-12-09 | 2021-04-06 | 中铁二十局集团第六工程有限公司 | 填海区基坑对撑角撑混凝土水平支护结构施工方法 |
CN114032959A (zh) * | 2021-12-20 | 2022-02-11 | 陕西建工第五建设集团有限公司 | 一种超深地下室分区异步开挖交错拆换撑施工方法 |
CN115094905A (zh) * | 2022-08-01 | 2022-09-23 | 上海建工一建集团有限公司 | 一种大型基坑地下工程中心向四周预制装配结构施工方法 |
CN115162345A (zh) * | 2022-06-27 | 2022-10-11 | 中建八局第三建设有限公司 | 一种长江漫滩超大深基坑土方开挖组织及施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1982546A (zh) * | 2005-12-12 | 2007-06-20 | 上海市第七建筑有限公司 | 中心岛顺作局部裙边逆作施工方法 |
KR101034398B1 (ko) * | 2007-06-28 | 2011-05-16 | (주)바로건설기술 | 지하 흙막이 공법을 겸한 지하구조물 축조공법 |
CN102995659A (zh) * | 2012-12-03 | 2013-03-27 | 杭州南联地基基础工程有限公司 | 超大型地下工程的先中心区结合周边的施工方法 |
CN103103988A (zh) * | 2013-01-21 | 2013-05-15 | 安徽省城建设计研究院 | 利用中心岛楼板水平支撑结构的基坑施工方法 |
CN104631468A (zh) * | 2015-03-11 | 2015-05-20 | 中国建筑第八工程局有限公司 | 基坑开挖工程的支护方法 |
-
2016
- 2016-06-17 CN CN201610431687.3A patent/CN105951843B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1982546A (zh) * | 2005-12-12 | 2007-06-20 | 上海市第七建筑有限公司 | 中心岛顺作局部裙边逆作施工方法 |
KR101034398B1 (ko) * | 2007-06-28 | 2011-05-16 | (주)바로건설기술 | 지하 흙막이 공법을 겸한 지하구조물 축조공법 |
CN102995659A (zh) * | 2012-12-03 | 2013-03-27 | 杭州南联地基基础工程有限公司 | 超大型地下工程的先中心区结合周边的施工方法 |
CN103103988A (zh) * | 2013-01-21 | 2013-05-15 | 安徽省城建设计研究院 | 利用中心岛楼板水平支撑结构的基坑施工方法 |
CN104631468A (zh) * | 2015-03-11 | 2015-05-20 | 中国建筑第八工程局有限公司 | 基坑开挖工程的支护方法 |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522241B (zh) * | 2016-12-14 | 2019-04-12 | 上海建工一建集团有限公司 | 超大层高地下室结构的深基坑支护方法 |
CN106522241A (zh) * | 2016-12-14 | 2017-03-22 | 上海建工建集团有限公司 | 超大层高地下室结构的深基坑支护方法 |
CN108643195A (zh) * | 2018-06-27 | 2018-10-12 | 上海建工二建集团有限公司 | 基坑的主体与支护结构的一体化系统与方法 |
CN109677864A (zh) * | 2019-02-27 | 2019-04-26 | 中铁十二局集团有限公司 | 一种移动式皮带传输机及“之”字型土方开挖方法 |
CN110004993B (zh) * | 2019-04-22 | 2024-01-02 | 上海建工一建集团有限公司 | 一种超厚底板测量放线施工方法及放线平台 |
CN110004993A (zh) * | 2019-04-22 | 2019-07-12 | 上海建工一建集团有限公司 | 一种超厚底板测量放线施工方法及放线平台 |
CN110130356A (zh) * | 2019-06-05 | 2019-08-16 | 汕头市建筑工程总公司 | 一种淤泥质软土区地下室坑底整体式封底施工方法 |
CN110397043A (zh) * | 2019-07-18 | 2019-11-01 | 中国建筑第四工程局有限公司 | 一种基坑支护内支撑体系与地下室结构体系三合一的方法 |
CN112609706B (zh) * | 2020-12-09 | 2022-05-17 | 中铁二十局集团第六工程有限公司 | 填海区基坑对撑角撑混凝土水平支护结构施工方法 |
CN112609706A (zh) * | 2020-12-09 | 2021-04-06 | 中铁二十局集团第六工程有限公司 | 填海区基坑对撑角撑混凝土水平支护结构施工方法 |
CN114032959A (zh) * | 2021-12-20 | 2022-02-11 | 陕西建工第五建设集团有限公司 | 一种超深地下室分区异步开挖交错拆换撑施工方法 |
CN114032959B (zh) * | 2021-12-20 | 2024-04-16 | 陕西建工第五建设集团有限公司 | 一种超深地下室分区异步开挖交错拆换撑施工方法 |
CN115162345A (zh) * | 2022-06-27 | 2022-10-11 | 中建八局第三建设有限公司 | 一种长江漫滩超大深基坑土方开挖组织及施工方法 |
CN115162345B (zh) * | 2022-06-27 | 2024-03-01 | 中建八局第三建设有限公司 | 一种长江漫滩超大深基坑土方开挖组织及施工方法 |
CN115094905A (zh) * | 2022-08-01 | 2022-09-23 | 上海建工一建集团有限公司 | 一种大型基坑地下工程中心向四周预制装配结构施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105951843B (zh) | 2019-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105951843A (zh) | 一种深基坑施工方法 | |
CN104264688B (zh) | 人工挖孔变截面桩支护施工工艺 | |
CN205742213U (zh) | 基坑支护结构 | |
CN105089061B (zh) | 一种超深基坑支护方法 | |
CN106522241A (zh) | 超大层高地下室结构的深基坑支护方法 | |
CN105672348A (zh) | 一种深水区砂卵石地层截除桥梁桩基的施工方法 | |
CN103938634B (zh) | 一种深基坑支护结构及施工方法 | |
CN104563131B (zh) | 一种矩形围护桩以及围护结构兼做主体结构的施工方法 | |
CN104594361B (zh) | 一种工字型围护桩以及围护结构兼做主体结构的施工方法 | |
CN105332380B (zh) | 一种地下建筑的换撑结构及方法 | |
CN110438999A (zh) | 一种地下水丰富的深基坑放坡开挖施工方法 | |
CN107119695A (zh) | 一种取消地下室外墙回填的操作架体及施工方法 | |
CN110080169A (zh) | 一种基于地下室利用的围海造地的施工方法 | |
CN113638445A (zh) | 一种超深圆形基坑半逆作施工方法 | |
CN110004991A (zh) | 基于外凸式翼脚板的地下结构抗浮体系及构建方法 | |
CN104532714B (zh) | 一种处理深厚软土岩溶地基的路基结构 | |
CN102235007B (zh) | 上钉下桩组合的深基支护方法 | |
CN104652444A (zh) | 超大型深基坑中心岛式交替土方开挖的整体逆作施工方法 | |
CN103215950B (zh) | 回填区桩基接长施工方法 | |
CN107090837A (zh) | 一种坑中坑钢筋砼挡墙复合支护结构及其施工方法 | |
CN106758890A (zh) | 排桩箱涵结构及其施工方法 | |
CN107503355B (zh) | 外排后插型钢式双排桩基坑支护体系及其施工方法 | |
CN108252307A (zh) | 一种用于地铁隧道上方的基坑修建方法 | |
CN105421488B (zh) | 地下复合围护体系中基础底板换撑的施工方法 | |
CN207211176U (zh) | 一种超高大沉井 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |