CN105947898B CN201610460055.XA CN201610460055A CN105947898B CN 105947898 B CN105947898 B CN 105947898B CN 201610460055 A CN201610460055 A CN 201610460055A CN 105947898 B CN105947898 B CN 105947898B
Authority
CN
China
Prior art keywords
towed
door frame
fixed pulley
group
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610460055.XA
Other languages
Chinese (zh)
Other versions
CN105947898A (en
Inventor
车德慧
张尚尉
杨广全
董平华
史宏
孙志敏
齐向春
孙华平
刘中玲
胡进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TRANSPORT AND ECONOMY RESEARCH INSTITUTE CHINA ACADEMY OF RAILWAY SCIENCES
China Academy of Railway Sciences Corp Ltd CARS
China State Railway Group Co Ltd
China Railway Heavy Machinery Co Ltd
Original Assignee
China Railway Heavy Machinery Co Ltd
Transportation and Economics Research Institute of CARS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Heavy Machinery Co Ltd, Transportation and Economics Research Institute of CARS filed Critical China Railway Heavy Machinery Co Ltd
Priority to CN201610460055.XA priority Critical patent/CN105947898B/en
Publication of CN105947898A publication Critical patent/CN105947898A/en
Application granted granted Critical
Publication of CN105947898B publication Critical patent/CN105947898B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • B66C19/002Container cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C11/00Trolleys or crabs, e.g. operating above runways
    • B66C11/02Trolleys or crabs, e.g. operating above runways with operating gear or operator's cabin suspended, or laterally offset, from runway or track
    • B66C11/04Underhung trolleys
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C9/00Travelling gear incorporated in or fitted to trolleys or cranes
    • B66C9/10Undercarriages or bogies, e.g. end carriages, end bogies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00Cranes
    • B66C2700/01General aspects of mobile cranes, overhead travelling cranes, gantry cranes, loading bridges, cranes for building ships on slipways, cranes for foundries or cranes for public works

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The invention discloses a kind of lifting mechanism and its method for arranging of container crane dispersed placement, lifting mechanism includes door frame assembly, walking dolly, lifting mechanism, suspender, the lifting mechanism includes raising hoisting mechanism, towed fixed pulley dolly, towed traveling hoisting mechanism, the raising hoisting mechanism is distributed in the lower end of door frame assembly, the towed traveling hoisting mechanism is installed in the top of girder, and the towed fixed pulley dolly correspondence is pulled by towed traveling hoisting mechanism.Each raising hoisting mechanism correspondence of the invention is distributed on four angles of door frame assembly, and its position distribution realizes machine gravity and moves down, and reduces superstructure load weight, realizes gantry container crane self structure lightweight;By the way that to its rational arrangement, lifting mechanism is forming multiple dels along girder direction and vertical girder direction, by multi-direction triangular arrangement, coordinates damper pulley, realizes the purpose that all directions prevent shaking.

Description

A kind of lifting mechanism and its method for arranging of container crane dispersed placement
Technical field
The present invention relates to crane field, the more particularly to a kind of lifting mechanism and its cloth of container crane dispersed placement Put method.
Background technology
Traditional lifting mechanism is made up of trolley, raising hoisting system, fixed pulley group, walking system etc., its volume Greatly, big from anharmonic ratio its lifting capacity, particularly container crane is especially prominent, it is integrated after be placed on girder, caused to girder Unnecessary additional load.Therefore, research and development lightweight, efficient, advanced in performance lightweight Multifunctional container gate-type Crane construction technology and its equipment become particularly urgent.
Additionally, also there is the influence of unpredictable operation inertia and wind load, cause suspender and container in vertical Produced in plane and oscillated, produced in the horizontal plane and reverse and shake.
This to wave and reverse, shake, container position aligning time is comfortable with operation in not only directly affecting cargo handling process Property, security, also tend to make container to produce collision.Such as collide frequently, by the electric of railway container crane hanger and The stability of hydraulic system, reliability produce strong influence.According to statistics, the failure of railway container bridge crane 80% exists Suspender, and the failure of suspender 80% is caused by casing working.It can be seen that, waving and reversing, shake for suspender, is influence railway packaging The main cause of case crane operating efficiency, and turned into railway container crane raising efficiency, reduced fault rate, reduce labor Bottleneck in terms of fatigue resistance.Therefore, efficiently worked to ensure railway container crane, it is necessary to efficiently control its suspender Wave and reverse, shake.
This to wave and reverse, shake, container position aligning time is comfortable with operation in not only directly affecting cargo handling process Property, security, also tend to make container to produce collision.Such as collide frequently, by the electric of railway container crane hanger and The stability of hydraulic system, reliability produce strong influence.According to statistics, the failure of railway container bridge crane 80% exists Suspender, and the failure of suspender 80% is caused by casing working.It can be seen that, waving and reversing, shake for suspender, is influence railway packaging The main cause of case crane operating efficiency, and turned into railway container crane raising efficiency, reduced fault rate, reduce labor Bottleneck in terms of fatigue resistance.Therefore, efficiently worked to ensure railway container crane, it is necessary to efficiently control its suspender Wave and reverse, shake.
The content of the invention
The technical problems to be solved by the invention are that the deficiency existed for above-mentioned prior art provides a kind of structure letter It is single, can effectively reduce that crane weight, operation are flexible, with subtract the lightweight Multifunctional container gantry crane that shakes function and Its method for arranging.
The technical solution adopted in the present invention is:
A kind of lifting mechanism of container crane dispersed placement, it includes door frame assembly, installed in door frame assembly four Walking dolly on individual angle, lifting mechanism, the suspender being installed on door frame assembly, it is characterised in that:On door frame assembly at least It is installed on one group of lifting mechanism, every group of lifting mechanism includes two sets of raising hoisting mechanisms, one group of towed fixed pulley dolly, a set of Towed traveling hoisting mechanism, assembly pulley, steel wire rope group, the raising hoisting mechanism are distributed in door frame metal structure, and are dragged Drag formula fixed pulley dolly and separate arrangement, be placed at the supporting leg of door frame assembly, the girder of towed fixed pulley dolly and door frame assembly Mutually arrange, the towed traveling hoisting mechanism is installed in the top of girder, and the towed fixed pulley dolly correspondence is by pulling Formula traveling hoisting mechanism is pulled, and locus of the steel wire rope group between the suspender and fixed pulley dolly forms multiple and fall Triangle, the lower summit of the del is symmetrically distributed on the suspender.
By above-mentioned technical proposal, the lifting mechanism is two groups, is distributed on door frame assembly, and every group of towed is slided surely Wheel dolly is made up of the first towed fixed pulley dolly and the second towed fixed pulley dolly, and both structures are identical, two draggings It is connected by connecting rod between formula fixed pulley dolly, every towed fixed pulley dolly includes trolley frame, is provided with trolley frame Travelling wheel group, travelling wheel is pyramidal structure, and 1 group of fixed pulley is arranged with the two ends of travelling wheel group, and every group of fixed pulley is by two The fixed pulley of the fixed pulley composition being arranged side by side, the first towed fixed pulley dolly and the second towed fixed pulley dolly is inside and outside Dislocation arrangement.
By above-mentioned technical proposal, 4 fixed pulleys that the assembly pulley includes being set on every towed fixed pulley dolly, The 4 groups of movable pulleys set on suspender, every group of movable pulley includes 2 movable pulleys, and the steel wire rope group includes left side steel wire rope and the right side Side steel wire rope, the first leading block group and the second leading block group, the left side steel wire rope are distributed with the surrounding of each door frame Four angles be oriented to by the first leading block group respectively, the first leading block group includes two that are installed on the left of door frame Concentric leading block and two eccentric changed course damper pulleys being installed on the right side of door frame, four angles difference of the right side steel wire rope It is oriented to by the second leading block group;The second leading block group includes being installed in two eccentric changed course dampings on the left of door frame Pulley and two concentric leading blocks being installed on the right side of door frame;One end of the left side steel wire rope is fixed on a two-way raising volume One end on cylinder, the other end through winding correspondence with the first towed fixed pulley dolly on fixed pulley and suspender on 1 group move Fixation is wrapped on the two-way hoisting drum after pulley phase configuration;One end of the right side steel wire rope is fixed on another two-way raising One end on reel, the other end run through be wound in correspondence with the second towed fixed pulley dolly on fixed pulley and suspender on it is another Fixation is wrapped on the two-way hoisting drum after one group of movable pulley phase configuration;The grooving of the two-way hoisting drum is symmetrical different rotation To structure, steel wire rope locking device is provided with its two ends or middle part
By above-mentioned technical proposal, the door frame assembly include two door frames be arrangeding in parallel, the door frame by girder and The supporting leg at girder two ends is constituted, and two door frames are connected by entablature, sill, one group is correspondingly arranged on each door frame and is risen Mechanism is risen, the walking rails mutually arranged with towed fixed pulley dolly are provided with girder.
By above-mentioned technical proposal, towed traveling hoisting mechanism include traveling hoist engine, 4 be distributed in the corner of door frame 3rd leading block, towed steel wire rope, the towed steel wire rope are fixed on the reel of traveling hoist engine, from traveling elevator After the tensioning apparatus on towed fixed pulley dolly is walked after two the 3rd leading blocks of side on machine, the two of opposite side are walked Individual 3rd leading block, eventually passes back to fixed on the reel of traveling hoist engine;Described its drum rope groove of traveling hoist engine is with rotation To structure, steel wire rope locking device is provided with its two ends or middle part.
By above-mentioned technical proposal, the 3rd leading block group includes 4 concentric leading blocks.
By above-mentioned technical proposal, the steel wire rope bottom footpath circle and the central pin shaft of pulley of the eccentric changed course damper pulley are inclined Core structure.
The method for arranging of the lifting mechanism of above-mentioned container crane dispersed placement, it is characterised in that:It includes following step Suddenly:
Step one, door frame assembly is arranged to two door frames be arrangeding in parallel, the door frame is by girder and at girder two ends Supporting leg constitute, two door frames are connected by entablature, sill;
Step 2, lifting mechanism is arranged to two groups, wherein four sets of raising hoisting mechanisms are uniformly installed in door frame assembly On supporting leg between girder and sill, supporting leg is penetrated or positioned at supporting leg side, every group of towed fixed pulley dolly is hung respectively On the lower ear beam of girder;
Step 3, steel wire rope group is set to two groups, every group of steel wire rope is divided into left side steel wire rope and right side steel wire rope, respectively Individual steel wire rope correspondence and the two-way hoisting drum of a set of raising hoisting mechanism and the fixed pulley of assembly pulley and movable pulley phase configuration, make Locus of the steel wire rope group between the suspender and fixed pulley dolly forms multiple dels, the del Lower summit be symmetrically distributed on the suspender;
Step 4, the top that every set towed traveling hoisting mechanism correspondence is installed in each girder, by towed steel wire Rope is fixed on the reel of traveling hoist engine, and towed is walked after two the 3rd leading blocks of side from traveling hoist engine After tensioning apparatus on fixed pulley dolly, two the 3rd leading blocks of opposite side are walked, eventually pass back to the reel of traveling hoist engine Upper fixation, towed traveling hoisting mechanism control towed fixed pulley dolly moves ahead or retreats.
Having the beneficial effect that acquired by the present invention:1st, each raising hoisting mechanism correspondence of the invention is distributed in door frame assembly Four angles on, its position distribution realizes machine gravity and moves down, and improves the stress of door frame assembly, reduces superstructure Load weight, realizes gantry container crane self structure lightweight;2nd, lifting mechanism of the invention along girder direction and Vertical girder direction forms multiple dels, by multi-direction triangular arrangement, coordinates damper pulley, realizes all directions and prevents The purpose shaken;3rd, 4 sets of raising elevators of the invention can be with a single movement, or two or three or four teamworks, uses In other handling goods, one-machine-multi-function is realized, operation is flexible;4th, by setting two groups of lifting mechanisms of independence, by towed The assymmetric motion of fixed pulley dolly, realizes loading and unloading container ± 30 ° revolute function, facilitates container to align;5th, by bias Damper pulley is set, and plays a part of anti-shake.
Brief description of the drawings
Fig. 1 is front view of the invention.
Fig. 2 is side view of the invention.
Fig. 3 is the front view of door frame assembly in the present invention.
Fig. 4 is the side view of door frame assembly in the present invention.
The cross-sectional view of Fig. 5 middle girders of the present invention.
Fig. 6 is the partial structural diagram of middle girder of the present invention.
Fig. 7-Fig. 8 is the arrangement schematic diagram of lifting mechanism in the present invention.
Fig. 9 is the front view of towed fixed pulley dolly in the present invention.
Figure 10 is the top view of towed fixed pulley dolly in the present invention.
One group of winding schematic diagram of the steel wire rope of lifting mechanism in Figure 11 present invention.
Figure 12 is the wirerope-winding schematic diagram of two-way hoisting drum in the present invention.
Figure 13 is the wirerope-winding schematic diagram of traveling reel in towed traveling hoist engine.
Figure 14 is the winding schematic diagram of left side steel wire rope winding and right side steel wire rope.
Figure 15 is the inverted triangle schematic diagram formed along girder direction left side steel wire rope and right side steel wire rope winding.
Figure 16 is the inverted triangle schematic diagram that vertical girder direction left side steel wire rope winding is formed.
Figure 17 is the main sectional view of damper pulley in the present invention.
Figure 18 is the structural representation of damper pulley in the present invention.
Figure 19-Figure 20 is the damper pulley torque analysis schematic diagram in the present invention.
The front view of suspender in Figure 21 present invention.
Figure 22 is the top view of suspender in the present invention.
Figure 23 is the front view of over sling in the present invention.
Figure 24 is the top view of over sling in the present invention.
Figure 25-Figure 28 is the structural representation of rotating lock mechanism in the present invention.
Figure 29 is the front view of walking carriage in the present invention.
Figure 30 is to set the arrangement schematic diagram of jack at the two ends of bogie frame in the present invention.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.
As shown in Figure 1, 2, a kind of lifting mechanism of container crane dispersed placement is present embodiments provided, it includes door Frame assembly 1, the walking dolly 4 on four angles of door frame assembly 1, the lifting mechanism 2, suspender being installed on door frame assembly 3rd, drivers' cab 5, ladder access railing 6, electrical system 7, cable drum 62, windbreak anchoring 63.
As seen in figures 3-6, the door frame assembly includes two door frames be arrangeding in parallel, and the door frame is by girder 8 and in master The supporting leg 9 at the two ends of beam 8 is constituted, and two door frames are connected by entablature 10, needle beam 11, sill 12, the primary structure of girder 8 Form uses box beam section, is provided with dividing plate and waling, and bottom both sides set ear beam as dolly walking rails.Ear beam knot Structure is made up of wearing plate 13, ear beam cover plate 14, ear web 15, ear beam dividing plate 16.Ear beam sets 1:5 downward slopes, are easy to drag Wheel automatic centering when dragging formula fixed pulley trolley travelling, wearing plate is easy to quick-replaceable.Supporting leg 9 is variable section structure.Needle beam 11st, sill 12 is box girder structure.Entablature 10, needle beam 11 and supporting leg 12 per side constitute " well " word structure, convenient Live quick overall package.Wherein, the metal material of door frame assembly uses high-strength weathering steel, by the optimization of structure, and Same type congenerous conventional hoist contrast, weight be only its 1/2, effectively reduce the deadweight of crane, realize whole machine Lightweight.
As Figure 7-8, one group of lifting mechanism is correspondingly arranged on each door frame, two groups is had on door frame assembly and is risen Rise mechanism.Every group of lifting mechanism is walked including two sets of raising hoisting mechanisms, 17, one group of towed fixed pulley dolly 18, a set of towed Row hoisting mechanism 19.Each raising hoisting mechanism 17 correspondence is distributed on each sill 12, it is also possible to be arranged in girder with On any position of supporting leg 9 between crossbeam, supporting leg 9 is penetrated or positioned at the side of supporting leg 9, its position distribution realizes machine gravity Move down, reduce superstructure load weight, realize gantry container crane self structure lightweight.Towed fixed pulley is small It is hung under car 18 on the lower ear beam of the girder 8 of door frame, towed traveling hoisting mechanism 19 is arranged on the top of girder 8.The present invention In by lifting mechanism dispersiveness arrange, improve the stress of door frame assembly.
In the present embodiment, the lifting mechanism has the anti-effect of shaking, and every group of lifting mechanism also includes assembly pulley, two-way raising Reel and the steel wire rope group being wound on the two-way hoisting drum, assembly pulley, the steel wire rope group the suspender with it is fixed Locus between pulley trolley forms multiple dels, and the lower summit of the del is symmetrically distributed in the suspender On.The present invention utilizes geometrical principle, winding angle and different fixed positions by steel wire rope group, and forming one kind has certain firm Property flexible connection mode, thus the suspender for having single pendulum property increased geometrical interference damping, eliminate bobbing amplitude, And then the swing of suspender is eliminated, realization is shaken along girder direction and vertical the anti-of girder direction.
Wherein, raising hoisting mechanism 17 is using two-way hoisting drum in the same direction, while it is for left-handed, another side be dextrorotation (such as Shown in Figure 12), grooving rotation direction is symmetrical, and steel wire rope is separately fixed at spool body two ends or middle part, and it passes through brake and encoder Variable frequency reducer motor drive.2 are respectively set in the left and right of sill, totally 4.Four sets of raising hoisting mechanisms 17 of the invention can be single Solely realize that raising is acted, it is also possible to link, operation is flexible.
As shown in figs. 9-10, every group of towed fixed pulley dolly 18 is dragged by the first towed fixed pulley dolly and second Formula fixed pulley dolly composition is dragged, both structures are identical, on the walking track of its ear beam for hanging over girder down.Every towed is determined Pulley trolley includes trolley frame 26, and travelling wheel group 29 and 1 group of fixed pulley 27 are symmetrically arranged on two with trolley frame 26, and every group slides surely Wheel is made up of two fixed pulleys being arranged side by side, two groups of the 2 of fixed pulley dolly groups of fixed pulleys dislocation arrangements, it is to avoid steel wire rope is done Relate to, torr rope sheave 25 is equipped with the two ends of trolley frame 26.The travelling wheel group 29 is pyramidal structure.Two towed fixed pulleys It is connected by connecting rod 28 between dolly, constitutes one group.To ensure that trolley travelling is steady, trolley frame running track extreme position sets Buffer unit 23 (is illustrated) in the figure 7.Tensioning apparatus 22 is also configured with trolley frame, its tensioning apparatus 22- uses screw machine Tool locking mechanism, designs for regulation steel wire rope length.Wherein, trolley frame 26 is main components and bearing part, with enough Intensity, rigidity, fatigue strength and stability.For ease of easy for installation, trolley frame 26 uses segment design, and junction uses method Blue high-strength bolt connection.
As shown in Fig. 7,11, the assembly pulley include every towed fixed pulley dolly on set 4 fixed pulleys 27, The 4 groups of movable pulleys 22 set on suspender, the first leading block group of the surrounding distribution on each door frame and the second leading block Group, every group of movable pulley includes 2 movable pulleys, and every group of movable pulley matches with 4 fixed pulleys on every towed fixed pulley dolly Put, the steel wire rope group includes left side steel wire rope 30 and right side steel wire rope 31, and four angles of the left side steel wire rope pass through respectively First leading block group is oriented to, and the first leading block group includes being installed in two concentric leading blocks and the peace on the left of door frame Two eccentric changed course damper pulleys on the right side of door frame are located at, four angles of the right side steel wire rope pass through the second leading block respectively Group is oriented to;The second leading block group includes being installed in two eccentric changed course damper pulleys on the left of door frame and is installed in door frame The concentric leading block of two of right side;Wherein, left side steel wire rope 30 and right side steel wire rope 31 raising motion can with single movement, Can also act together, form specification weight during lifting according to lifting goods is selected.
As shown in Fig. 7,11, towed traveling hoisting mechanism includes traveling hoist engine 19, is distributed in the corner of each door frame The 3rd leading block group 20, the 3rd leading block group 20 includes 4 concentric leading blocks, the steel wire rope of traveling hoisting mechanism around Prescription formula is:Towed steel wire rope 24 is fixed on traveling hoist engine, around No. 13 concentric leading blocks from traveling hoist engine, No. 14 concentric leading blocks are walked, the tensioning apparatus on trolley frame is walked, No. 15 concentric leading blocks are walked, No. 16 is walked and is oriented to cunning with one heart Wheel, eventually passes back on traveling hoist engine, and its drum rope groove is same rotation direction, and two ends or middle part are provided with Locking stylet rope device.
In the present embodiment, bias changed course damper pulley is that steel wire rope bottom footpath circle is tied with the central pin shaft circle 32 of pulley for eccentric Structure (as shown in Figure 19,20), when damper pulley is balanced, radius of gyration L1=L2, flywheel moment, L1*F=L2*F;Work as damping During pulley rotation, one enters radius of gyration L1 at rope and becomes big, it is another enter rope at radius of gyration L2 diminish, L1*F>L2*F, from The torque for preventing it from rotating so is formed, keeps two to enter the equalising torque at rope.The bearing pin of directive wheel is using the big material of coefficient of friction Material, increases frictional resistance, constrains pulley rotation.
As further illustrated in figures 21-24, the suspender in the present embodiment includes over sling 64, slew gear, lower suspension bracket 33, described to hang oneself Frame 64 is connected by slew gear with lower suspension bracket 33, and the slew gear is used to realize the 360 degree of revolutions of lower suspension bracket, in over sling 64 4 connecting seats 34 are provided with, for realizing quickly being connected by bearing pin and movable pulley.Set on two right-angle sides of lower suspension bracket 33 Guide plate 35 is equipped with, for realizing quick positioning during container hanging.It is mounted at the two ends of the end carriage 37 of lower suspension bracket 33 Rotating lock mechanism 36.
In the present embodiment, the slew gear includes the turning motor 65 and turning motor 65 that are installed on over sling 64 The connected turbine and worm mechanism 66 of output shaft, the gyroaxis 67 with turbine and worm mechanism phase configuration, the upper company of the gyroaxis 67 Joint chair is connected with over sling 64, and the lower connecting base on gyroaxis is connected with lower suspension bracket 33, real to realize the 360 degree of revolutions of lower suspension bracket The handling requirement of railway container " door t door " is showed.
As shown in Figure 25-28, rotating lock mechanism include electric pushrod 38, eccentric wheel 39, linkage 40, guide wheel assembly 41, Rotation lock assembly 42 a, termination of the electric pushrod 38 is connected with eccentric wheel 39, and eccentric wheel 39 is connected with linkage 40, described Linkage 40 is connected with rotation lock assembly 42, and the guide wheel assembly 41 is that linkage 40 provides guide effect.According to reasonable row Journey is calculated, and electric pushrod 38 drives eccentric wheel 39 to be rotated by 90 °, and can then drive rotation lock assembly to ship and resell on another market rotation by linkage 40 90 °, it is capable of achieving rotating lock mechanism open locking.Electric pushrod 38 is a kind of electric operator, and its operation principle is rotated by motor Change into linear motion through turbine and worm or gear, by push-and-pull come and go reach make linkage complete reciprocating action, tool Have small volume, it is easy for installation, environment friendly and pollution-free, operate steadily, load big, high precision and can realize synchronised automatic control etc. Advantage.Electric pushrod uses minimum thrust 300kg.f.As shown in figure 27, the linkage 40 includes the swing rod being sequentially connected 43rd, horizon bar 44, pull bar 45, the swing rod 43 are connected with eccentric wheel 39, horizon bar 44 and the phase configuration of guide wheel assembly 41, pull bar 15 It is connected with rotation lock assembly 42.Wherein, horizon bar 44 can move along a straight line along guide wheel assembly 41;Swing rod 43 is in electric pushrod and partially Cycloid motion can be done under the promotion of heart wheel 39 around connecting shaft.Wherein, as shown in figure 28, rotation lock assembly is by 46, seat ring 47 of shipping and reselling on another market, cunning Set 48, slide plate 49, convex ball block 50, recessed ball block 51, fairlead 52 are constituted.Seat ring 47 is made up of male and female seat ring, ease of assembly and tears open Unload.Mechanism drives seat ring 47 to rotate by linkage 40, so as to drive 46 rotations of shipping and reselling on another market.Slide plate 49, convex ball block 50, recessed ball block Oil groove, convenient lubrication are set in 51.Fairlead 52 can be protected to ship and resell on another market when container hanging works and 46 is not mechanically damaged.
When needing lifting container, control suspender falls, and realizes shipping and reselling on another market using suspender both sides guide plate 35 being accurately positioned, and adjusts Whole suspender, suspender is declined after making four twist lock hook contraposition four oblong holes of container again, and four corners of suspender case limit Level sensor transmits signal to control room, starts electric pushrod afterwards in place, is shipped and resell on another market by linkage driving and is rotated by 90 °, twist lock Head clasps lockhole;Container and suspender lock into 1 entirety, are blocking, can carry out handling.
Suspender in the present invention drives rotation latch mechanism using electric pushrod, and structural detail is few, compact conformation, installation and debugging side Just, performance safety reliability, mechanism driving accuracy is easily guaranteed that, by slew gear, realizes 360 degree of any revolutions of container, Operating efficiency is effectively raised, the handling requirement of railway container " door t door " is realized.And in middle-size and small-size goods yard task amount The handling operation that suspender realizes different boxes can be at any time changed as needed in the case of less, simplify system, lightweight, dimension Shield is convenient, can effectively lower girder load and whole machine traveling power, while reducing the cost of suspender.
In the present embodiment, running truck wheel is whole machine load-bearing traveling part, and month after month frequent operation easily causes wheel rim throughout the year Abrasion and bearing damage etc., thus the present invention study it emphatically can be with the structure of quick-replaceable running truck wheel.Such as Figure 29-30 Shown, the running truck includes equalizer bar 55, and the upper end of the equalizer bar 55 is by free bearing 54 and the sill of door frame assembly It is connected, lower end is connected with bogie frame 56, equipped with the reducing motor 53, travelling wheel with brake and encoder on bogie frame 56 Group 57, is provided with the jack pad assembly matched with jack 59 on the leading section of equalizer bar 55, is all provided with the both sides of bogie frame 56 There is the jack pad assembly 61 matched with jack 58.Three jack pad assembly correspondence three jack of configuration, triangle structure, When needing to change travelling wheel group, jacking is started after jack is in place makes travelling wheel leave rail level, and bearing and platform are made using instrument Vehicle frame is separated, and then carries out the replacing of travelling wheel group.
Present invention also offers a kind of method for arranging of the lifting mechanism of container crane dispersed placement, it includes as follows Step:
Step one, door frame assembly 1 is arranged to two door frames be arrangeding in parallel, the door frame is by girder 8 and in girder two The supporting leg 9 at end is constituted, and two door frames are connected by entablature 10, needle beam 11, sill 12;
Step 2, lifting mechanism is arranged to two groups, wherein four sets of raising hoisting mechanisms are uniformly installed in door frame assembly On sill or supporting leg or entablature, and it is located at four supporting legs respectively, supporting leg is penetrated or positioned at supporting leg side, by every group of dragging Formula fixed pulley dolly 18 is mounted on the lower ear beam of girder 8 respectively;
Step 3, steel wire rope group is set to two groups, every group of steel wire rope is divided into left side steel wire rope 30 and right side steel wire rope 31, each steel wire rope correspondence matches with the two-way hoisting drum of a set of raising hoisting mechanism and the fixed pulley of assembly pulley and movable pulley Put, locus of the steel wire rope group between the suspender and fixed pulley dolly is formed multiple dels, it is described fall The lower summit of triangle is symmetrically distributed on the suspender.
Step 4, as shown in Figure 11,14, the winding method of left side steel wire rope 30 is:
One end of the left side steel wire rope 30 be fixed on left side hoisting mechanism two-way hoisting drum on, the other end correspondence around To No. 20 concentric leading blocks, No. 4 fixed pulleys are walked, walk No. 10 movable pulleys, walk No. 3 fixed pulleys, walked No. 19 eccentric changed course dampings and slide Wheel, walks No. 18 eccentric changed course damper pulleys, walks No. 6 fixed pulleys, walks No. 11 movable pulleys, walks No. 5 fixed pulleys, walks No. 17 and is oriented to one heart Pulley, winds and fixed on the two-way hoisting drum for eventually passing back to left side raising hoist engine.
Step 5, as shown in Figure 11,14, the winding method of right side steel wire rope is:
One end of right side steel wire rope 31 is fixed on the two-way hoisting drum of the hoisting mechanism on right side, other end correspondence and the No. 23 concentric leading blocks on one towed fixed pulley dolly, walk No. 1 fixed pulley, walk No. 9 movable pulleys, walk No. 2 fixed pulleys, walk No. 24 eccentric changed course damper pulleys, walk No. 21 eccentric changed course damper pulleys, walk No. 7 fixed pulleys, walk No. 12 movable pulleys, walk No. 8 and determine Pulley, walks No. 22 second leading blocks, is wound on the two-way hoisting drum for eventually passing back to right side raising hoist engine and fixed.
Step 6, the top that every correspondence of set towed traveling hoisting mechanism 19 is installed in each girder, by towed steel Cord 24 is fixed on the reel of traveling hoist engine, is walked after two the 3rd leading blocks 20 of side from traveling hoist engine After tensioning apparatus on towed fixed pulley dolly, two the 3rd leading blocks 20 of opposite side are walked, eventually pass back to traveling elevator Fixed on the reel of machine, towed traveling hoisting mechanism control towed fixed pulley dolly moves ahead or retreats.Finally, such as Figure 15 institutes Show, along girder direction, the locus of left side steel wire rope 30 and right side steel wire rope 31 between suspender and fixed pulley dolly forms 2 Individual big del, realizes and is shaken along the anti-of girder direction.Perpendicular to girder direction, left side steel wire rope around fixed pulley with Movable pulley forms a small triangle by the arrangement of Unequal distance, right side steel wire rope institute around fixed pulley pass through with movable pulley Away from arrangement be similarly formed a small triangle, so as to realize that vertical subtracting for girder direction shakes.It is comprehensive along girder direction and vertical Girder direction, by multi-direction triangular arrangement, coordinates damper pulley, realizes the purpose that all directions prevent shaking.
In sum, 4 sets of raising elevators of the invention can be with a single movement, or two or three or four joints are moved Make, for other handling goods, realize one-machine-multi-function.

Claims (7)

1. a kind of lifting mechanism of container crane dispersed placement, it include door frame assembly, four installed in door frame assembly Walking dolly on angle, lifting mechanism, the suspender being installed on door frame assembly, it is characterised in that:At least pacify on door frame assembly It is provided with one group of lifting mechanism, every group of lifting mechanism includes two sets of raising hoisting mechanisms, one group of towed fixed pulley dolly, a set of drags Formula traveling hoisting mechanism, assembly pulley, steel wire rope group are dragged, the raising hoisting mechanism is distributed in door frame metal structure, with dragging Formula fixed pulley dolly separates arrangement, is placed at the supporting leg of door frame assembly, the girder phase of towed fixed pulley dolly and door frame assembly Arrange, the towed traveling hoisting mechanism is installed in the top of girder, and the towed fixed pulley dolly correspondence is by towed Traveling hoisting mechanism is pulled, and locus of the steel wire rope group between the suspender and towed fixed pulley dolly forms many Individual del, the lower summit of the del is symmetrically distributed on the suspender, and the lifting mechanism is two groups, is distributed in On door frame assembly, every group of towed fixed pulley dolly is small by the first towed fixed pulley dolly and the second towed fixed pulley Car is constituted, and both structures are identical, is connected by connecting rod between two towed fixed pulley dollies, and every towed fixed pulley is small Car includes trolley frame, and travelling wheel group is provided with trolley frame, and travelling wheel is pyramidal structure, is arranged with the two ends of travelling wheel group 1 group of fixed pulley, every group of fixed pulley is made up of two fixed pulleys being arranged side by side, and the first towed fixed pulley dolly and second is pulled The fixed pulley of formula fixed pulley dolly is inside and outside dislocation arrangement.
2. the lifting mechanism of a kind of container crane dispersed placement according to claim 1, it is characterised in that:The cunning Wheel group includes 4 fixed pulleys set on every towed fixed pulley dolly, the 4 groups of movable pulleys set on suspender, and every group is moved Pulley includes 2 movable pulleys, and the steel wire rope group includes left side steel wire rope and right side steel wire rope, is distributed in the surrounding of each door frame Four angles for having the first leading block group and the second leading block group, the left side steel wire rope pass through the first leading block group respectively It is oriented to, the first leading block group includes two concentric leading blocks being installed on the left of door frame and is installed on the right side of door frame Two eccentric changed course damper pulleys, four angles of the right side steel wire rope are oriented to by the second leading block group respectively;Described Two eccentric changed course damper pulleys that two leading block groups include being installed on the left of door frame are same with two be installed on the right side of door frame Heart leading block;One end of the left side steel wire rope is fixed on the one end on a two-way hoisting drum, and the other end is right through winding It is two-way this should to be wrapped in fixation after 1 group of movable pulley phase configuration on the fixed pulley on the first towed fixed pulley dolly and suspender On hoisting drum;One end of the right side steel wire rope is fixed on the one end on another two-way hoisting drum, and the other end is through winding In fixed winding after the fixed pulley in correspondence with the second towed fixed pulley dolly and another group of movable pulley phase configuration on suspender On the two-way hoisting drum;The grooving of the two-way hoisting drum is symmetrical different rotation direction structure, is provided with its two ends or middle part Steel wire rope locking device.
3. the lifting mechanism of a kind of container crane dispersed placement according to claim 1, it is characterised in that:The door Frame assembly includes two door frames be arrangeding in parallel, and supporting leg of the door frame by girder and at girder two ends is constituted, and two door frames lead to Entablature, sill connection are crossed, one group of lifting mechanism is correspondingly arranged on each door frame, be provided with fixed with towed on girder The walking rails that pulley trolley is mutually arranged.
4. the lifting mechanism of a kind of container crane dispersed placement according to claim 1, it is characterised in that:Towed Traveling hoisting mechanism includes traveling hoist engine, 4 the 3rd leading blocks, towed steel wire ropes being distributed in the corner of door frame, institute State towed steel wire rope to be fixed on the reel of traveling hoist engine, two the 3rd around side from traveling hoist engine are oriented to be slided After the tensioning apparatus on towed fixed pulley dolly is walked after wheel, two the 3rd leading blocks of opposite side are walked, eventually pass back to traveling It is fixed on the reel of hoist engine;Described its drum rope groove of traveling hoist engine is same rotation direction structure, and steel is provided with its two ends or middle part Cord locking device.
5. the lifting mechanism of a kind of container crane dispersed placement according to claim 4, it is characterised in that:Described Three leading blocks include 4 concentric leading blocks.
6. the lifting mechanism of a kind of container crane dispersed placement according to claim 2, it is characterised in that:It is described inclined The steel wire rope bottom footpath circle of heart changed course damper pulley and the central pin shaft of pulley are eccentric structure.
7. a kind of a kind of method for arranging of the lifting mechanism of container crane dispersed placement according to claim 1, its It is characterised by:It comprises the following steps:
Step one, door frame assembly is arranged to two door frames be arrangeding in parallel, the door frame is by girder and the branch at girder two ends Leg is constituted, and two door frames are connected by entablature, sill;
Step 2, lifting mechanism is arranged to two groups, wherein four sets of raising hoisting mechanisms are uniformly installed in the girder of door frame assembly On supporting leg between sill, supporting leg is penetrated or positioned at supporting leg side, every group of towed fixed pulley dolly is mounted on respectively On the lower ear beam of girder;
Step 3, steel wire rope group is set to two groups, every group of steel wire rope is divided into left side steel wire rope and right side steel wire rope, each steel Cord correspondence and the two-way hoisting drum of a set of raising hoisting mechanism and the fixed pulley of assembly pulley and movable pulley phase configuration, make described Locus of the steel wire rope group between the suspender and towed fixed pulley dolly forms multiple dels, the inverted triangle The lower summit of shape is symmetrically distributed on the suspender;
Step 4, the top that every set towed traveling hoisting mechanism correspondence is installed in each girder, towed steel wire rope is consolidated It is scheduled on the reel of traveling hoist engine, walk towed after two the 3rd leading blocks of side from traveling hoist engine slides surely After tensioning apparatus on wheel dolly, two the 3rd leading blocks of opposite side are walked, eventually passed back to solid on the reel of traveling hoist engine Fixed, towed traveling hoisting mechanism control towed fixed pulley dolly moves ahead or retreats.
CN201610460055.XA 2016-06-22 2016-06-22 A kind of lifting mechanism and its method for arranging of container crane dispersed placement Expired - Fee Related CN105947898B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610460055.XA CN105947898B (en) 2016-06-22 2016-06-22 A kind of lifting mechanism and its method for arranging of container crane dispersed placement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610460055.XA CN105947898B (en) 2016-06-22 2016-06-22 A kind of lifting mechanism and its method for arranging of container crane dispersed placement

Publications (2)

Publication Number Publication Date
CN105947898A CN105947898A (en) 2016-09-21
CN105947898B true CN105947898B (en) 2017-06-23

Family

ID=56903636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610460055.XA Expired - Fee Related CN105947898B (en) 2016-06-22 2016-06-22 A kind of lifting mechanism and its method for arranging of container crane dispersed placement

Country Status (1)

Country Link
CN (1) CN105947898B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110271975A (en) * 2019-06-14 2019-09-24 中国一冶集团有限公司 Small space is lauched middle steel platform and removes device

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106564766B (en) * 2016-10-24 2017-11-24 中车长江车辆有限公司 A kind of transportation system
CN107673202B (en) * 2017-11-13 2019-04-09 无锡华东重型机械股份有限公司 A kind of track crane installation method
CN111332938A (en) * 2019-12-15 2020-06-26 黑龙江省农业机械工程科学研究院齐齐哈尔农业机械化研究所 Standardized fixed sheep platform that goes out in sheep farm
CN111847309B (en) * 2020-07-28 2021-09-28 上海振华重工(集团)股份有限公司 Integral dismounting and mounting device and method for cart travelling mechanism on container crane
CN114057112A (en) * 2020-08-03 2022-02-18 河南华工实业集团有限公司 Special crane for hoisting fermentation tank of winery
CN112723183A (en) * 2021-01-26 2021-04-30 中铁工程装备集团盾构制造有限公司 Large-tonnage lifts transfer device and system
CN113460856B (en) * 2021-09-02 2021-11-02 启东友铭衡器有限公司 Weighing device for container

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007137557A (en) * 2005-11-16 2007-06-07 Mitsubishi Heavy Ind Ltd Rope exchange method and crane
CN201495044U (en) * 2009-09-27 2010-06-02 大连华锐股份有限公司 Maintaining gantry crane
KR101202280B1 (en) * 2010-07-21 2012-11-16 한국기계연구원 Micro motion equipment of spreader for container transfer
CN102616666A (en) * 2011-01-30 2012-08-01 交通运输部水运科学研究所 Semi-traction dolly type light-weight portal crane
CN203295068U (en) * 2013-06-03 2013-11-20 大连博瑞重工有限公司 Underneath-type three-trolley four-suspension centre portal crane for winch
CN203428791U (en) * 2013-08-30 2014-02-12 纽科伦(新乡)起重机有限公司 Portal crane
CN203877787U (en) * 2014-06-19 2014-10-15 华电重工股份有限公司 Rail type container crane with hoisting and travelling combined travelling mechanism
ES2554647B1 (en) * 2014-06-20 2016-07-12 Eduardo Manuel MONTERO RICO PORTO CRANE FOR CONTAINER HANDLING.

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110271975A (en) * 2019-06-14 2019-09-24 中国一冶集团有限公司 Small space is lauched middle steel platform and removes device
CN110271975B (en) * 2019-06-14 2021-06-29 中国一冶集团有限公司 Steel platform demolishs device in narrow and small space offal

Also Published As

Publication number Publication date
CN105947898A (en) 2016-09-21

Similar Documents

Publication Publication Date Title
CN105947898B (en) A kind of lifting mechanism and its method for arranging of container crane dispersed placement
CN105936477B (en) A kind of lightweight Multifunctional container gantry crane and its anti-shake method
CN106081924B (en) A kind of lightweight Multifunctional container gantry crane and its assemble method
CN105883635B (en) The walking carriage and wheel quick change method of a kind of gantry container crane
CN105692464B (en) A kind of incorgruous mobile crane span structure type crane of double trolley
CN106672817A (en) Ship stabilization crane
CN106741707A (en) A kind of automatic stowage balance system for rig a ship
CN105858487B (en) A kind of incorgruous mobile crane span structure type crane of double trolley
CN113371621A (en) Hydraulic hoisting equipment for constructional engineering
CN102826448B (en) Hoisting mechanism and gantry crane
CN102182167B (en) Stayed bidirectional portal opening and closing machine for dam gate
CN205204669U (en) Differential type track container crane
CN205312918U (en) Portal frame changes outfit
CN105384079B (en) Differential type track container crane
CN213085256U (en) Single-beam portal crane with suspended trolley
CN111016933B (en) Frame and air transport vehicle
CN209038910U (en) Gantry crane
KR20010021248A (en) Crane apparatus
CN205740074U (en) A kind of lightweight Multifunctional container gantry crane
CN106882709B (en) A kind of electric single beam crane of anti-knotting
CN106365058A (en) Portal crane for assembling motor with weight being above 100T
CN211310603U (en) Anti-sway and anti-sway system
CN209038894U (en) A kind of boom hoisting
CN106240430A (en) A kind of moving gantry type, rotatable automatic weighing vehicle-mounted Self-loading-unloading equipment
CN106081905A (en) Gantry container crane suspender actively anti-roll device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171023

Address after: 100844 Fuxing Road, Beijing, Haidian District, No. 10

Co-patentee after: CHINA ACADEMY OF RAILWAY SCIENCES

Patentee after: CHINA RAILWAY Corp.

Co-patentee after: TRANSPORT AND ECONOMY Research Institute CHINA ACADEMY OF RAILWAY SCIENCES

Co-patentee after: CHINA RAILWAY HEAVY MACHINERY Co.,Ltd.

Address before: 100081 Beijing City, Haidian District Road No. 2 Daliushu district 15 building five layer

Co-patentee before: CHINA RAILWAY HEAVY MACHINERY Co.,Ltd.

Patentee before: TRANSPORT AND ECONOMY Research Institute CHINA ACADEMY OF RAILWAY SCIENCES

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170623