CN105937248A - Body structure section construction and temporary plugging wall connecting portion treatment method - Google Patents

Body structure section construction and temporary plugging wall connecting portion treatment method Download PDF

Info

Publication number
CN105937248A
CN105937248A CN201610520388.7A CN201610520388A CN105937248A CN 105937248 A CN105937248 A CN 105937248A CN 201610520388 A CN201610520388 A CN 201610520388A CN 105937248 A CN105937248 A CN 105937248A
Authority
CN
China
Prior art keywords
steel
agent structure
construction
wall
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610520388.7A
Other languages
Chinese (zh)
Other versions
CN105937248B (en
Inventor
董小龙
李志军
彭再勇
姚怡文
杨国胜
刘卫
徐多
刘钢
赵文龙
朱雄
高昆
崔海龙
邳仲强
蔡肖
彭炎锋
叶亮
李成娇
吴孔勇
陈强
罗苍宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201610520388.7A priority Critical patent/CN105937248B/en
Publication of CN105937248A publication Critical patent/CN105937248A/en
Application granted granted Critical
Publication of CN105937248B publication Critical patent/CN105937248B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention provides a body structure section construction and temporary plugging wall connecting portion treatment method. The method is suitable for foundation pit open cutting section construction body structure construction. According to the method, the security coefficient is high, the construction progress can be accelerated, and convenience is brought to foundation pit follow-up structure construction. H-shaped steel is utilized for transmitting soil pressure borne by the plugging wall to a bottom plate, a side wall and a top plate. The L-shaped temporary plugging wall is constructed above the top plate of a body structure, and therefore on the basis of backfilling the top plate of the body structure, the body structure on the connecting portion of the plugging wall can be constructed continuously.

Description

Agent structure section construction and temporary plugging wall joint processing method
Technical field
The present invention relates to an agent structure section construction and temporary plugging wall joint processing method.
Background technology
At present in city, open-cut foundation ditch place working space is little, and interval, single turn road length can not once have been constructed, and solid needs arranges temporary plugging wall in ring road, carries out repeatedly traffic and leads and change, thus realizes ring road excavation section by section, section construction, segmentation backfill.When being close to the structure construction of block wall, owing to the block wall opposite side soil body not yet excavates, the soil body has the biggest lateral pressure to block wall, and there is a certain distance in structure distance block wall, need backfilling of earthwork could realize traffic in structure roof to lead improvement and carry out block wall opposite side earth excavation and structure construction, if processing the relation of bad structure and block wall, then one, the stability of block wall stress cannot be ensured, it is ensured that not construction safety;Two, at temporary plugging wall, steel encloses purlin and bracing members cannot be removed in time, leasing period lengthens, increases construction costs;Three, backfill soil can be from block wall and the landing of interstructural space, it is impossible to carries out backfilling of earthwork, and then finally cannot be carried out the structure construction of block wall opposite side.Gu the treatment measures the most rationally processed between segmentation ring road structure and temporary plugging wall, ensure the normal backfilling of earthwork of top board, block wall structure on two sides connects smoothly, is the technical barrier needing in the structure built by opencut method construction of current city to overcome, the most not yet has good treatment measures.
Summary of the invention
It is an object of the invention to for existing deficiency, there is provided a kind of agent structure section construction and temporary plugging wall joint processing method to solve ring road cannot once construct, must segmentation construct, the problem of segmentation backfill, ensure both to have can ensure that the safety of temporary plugging wall, can complete again the backfill construction of side structure top board and block wall opposite side earth excavation, the construction of structure drop-over.
The method of the invention is:
(1) the agent structure base plate of a phase agent structure of first constructing: above agent structure baseplate reinforcing bar, the pre-buried longitudinal I22 I-steel of location interval 2m of base plate hoop galvanized steel plain sheet waterstop centered beneath, longitudinal I22 I-steel keeps flat, its rear and front end "eight" shape reinforcing bar is fixed firmly, longitudinal I22 I-steel anchors into 0.5m in agent structure base plate, stretch out the outer 0.5m of structure base slab, it is attached with transversal I 22 I-steel 6 between end and the temporary plugging wall 3 of longitudinal I22 I-steel, four sides weld all around is carried out between transversal I 22 I-steel and longitudinal I-steel, transversal I 22 I-steel is closely connected with temporary plugging wall, ensure middle seamless, soil body lateral pressure suffered by temporary plugging wall is delivered to agent structure base plate up by the gun iron link of I22 I-steel;
During the agent structure top board of a phase agent structure of constructing again, being laterally placed on by longitudinal direction I22 I-steel between hoop galvanized steel plain sheet waterstop and agent structure top board, remaining step is equal to agent structure construction of bottom plates;Owing to I22 I-steel exposes for a long time to closing, moist underground environment, get rusty easily corrosion, in order to avoid the oxidation reaction in air is delivered in structure by I22 I-steel, cause the deep charring of structure and the corrosion of structure reinforcing bars, needed I22 work steel external coating anticorrosion, antirust paint before I22 I-steel is pre-buried, during concrete placings, the necessary vibration compacting of the concrete at I22 I-steel position, bubble must not be accompanied.
(2) construction L-type reinforced concrete wall: during the construction of the agent structure top board of the phase agent structure first carried out, the horizontal main muscle of L-type reinforced concrete wall is reserved during agent structure top board construction, reserved horizontal main muscle anchors into 35d in agent structure top board, reserved steel bar staggers lap of splice 35d, after agent structure top board has poured, bar planting operation is carried out with scaffold building L-type reinforced concrete wall bar planting job platform, the vertical equity muscle of L-type reinforced concrete wall implants 15d in the building enclosure of both sides, and vertical equity muscle uses welding point mode to stagger 35d.After bar planting has worked, on scaffold, directly lay bed die and the inner side template of L-type reinforced concrete wall, carry out the reinforcing bar binding operation of L-type reinforced concrete wall, steel corrosion quantity its outboard template of qualified rear supporting also carries out reinforcement measure, acceptance(check) pours with agent structure with the concrete of label, and the age of the concrete of L-type reinforced concrete wall and intensity carry out form removal after reaching.
The agent structure top board of the inner side template of L-type reinforced concrete wall and scaffold and correspondence, the I-steel of base plate are removed and recycle when second phase structure construction.L-type reinforced concrete wall and I-steel constitute the structure of entirety and the treatment measures system of temporary plugging wall, and this measure just can carry out soil body backfill above agent structure top board after having constructed;Pit earthwork excavation and the second phase structure construction of block wall opposite side can not be affected.
The medicine have the advantages that this kind of construction method simple and effective can solve the structural segmented construction of ring road, reasonable arrangement tissue produces, the difficult problem owing to taking up an area not enough ring road structure of cannot once having constructed can be solved, can construct in time soil body backfill above segmental structure, reduction of erection time, solve cost.Material market used by this kind for the treatment of measures is generally to exist, and draws materials simple, and cost relative moderate does not produce too much waste, free from environmental pollution, environmental protection.
Accompanying drawing explanation
Fig. 1 is that at block wall, floor map reinforced by I-steel;
Fig. 2 is that at block wall, generalized section reinforced by I-steel;
In figure: the length of transversal I 22 I-steel is equal with foundation ditch width;
Fig. 3 is structure L-type xoncrete structure floor map at block wall;
Fig. 4 is structure L-type xoncrete structure generalized section at block wall;
In figure, a 1. phase structure;2, second phase structure;3, temporary plugging wall;4, hoop galvanized steel plain sheet waterstop;5, longitudinal I22 I-steel;6, transversal I 22 I-steel;7, agent structure base plate;8, agent structure side wall;9, agent structure top board;10, building enclosure;11, horizontal main muscle;12, vertical equity muscle;13, L-type reinforced concrete wall.
Detailed description of the invention
The method of the invention is:
(1) the agent structure base plate of a phase agent structure of first constructing: above agent structure baseplate reinforcing bar, the pre-buried longitudinal I22 I-steel of location interval 2m of base plate hoop galvanized steel plain sheet waterstop centered beneath, longitudinal I22 I-steel keeps flat, its rear and front end "eight" shape reinforcing bar is fixed firmly, longitudinal I22 I-steel anchors into 0.5m in agent structure base plate, stretch out the outer 0.5m of structure base slab, it is attached with transversal I 22 I-steel 6 between end and the temporary plugging wall 3 of longitudinal I22 I-steel, four sides weld all around is carried out between transversal I 22 I-steel and longitudinal I-steel, transversal I 22 I-steel is closely connected with temporary plugging wall, ensure middle seamless, soil body lateral pressure suffered by temporary plugging wall is delivered to agent structure base plate up by the gun iron link of I22 I-steel;
During the agent structure top board of a phase agent structure of constructing again, being laterally placed on by longitudinal direction I22 I-steel between hoop galvanized steel plain sheet waterstop and agent structure top board, remaining step is equal to agent structure construction of bottom plates;Owing to I22 I-steel exposes for a long time to closing, moist underground environment, get rusty easily corrosion, in order to avoid the oxidation reaction in air is delivered in structure by I22 I-steel, cause the deep charring of structure and the corrosion of structure reinforcing bars, needed I22 work steel external coating anticorrosion, antirust paint before I22 I-steel is pre-buried, during concrete placings, the necessary vibration compacting of the concrete at I22 I-steel position, bubble must not be accompanied.
(2) construction L-type reinforced concrete wall: during the construction of the agent structure top board of the phase agent structure first carried out, the horizontal main muscle of L-type reinforced concrete wall is reserved during agent structure top board construction, reserved horizontal main muscle anchors into 35d in agent structure top board, reserved steel bar staggers lap of splice 35d, after agent structure top board has poured, bar planting operation is carried out with scaffold building L-type reinforced concrete wall bar planting job platform, the vertical equity muscle of L-type reinforced concrete wall implants 15d in the building enclosure of both sides, and vertical equity muscle uses welding point mode to stagger 35d.After bar planting has worked, on scaffold, directly lay bed die and the inner side template of L-type reinforced concrete wall, carry out the reinforcing bar binding operation of L-type reinforced concrete wall, steel corrosion quantity its outboard template of qualified rear supporting also carries out reinforcement measure, acceptance(check) pours with agent structure with the concrete of label, and the age of the concrete of L-type reinforced concrete wall and intensity carry out form removal after reaching.
The agent structure top board of the inner side template of L-type reinforced concrete wall and scaffold and correspondence, the I-steel of base plate are removed and recycle when second phase structure construction.L-type reinforced concrete wall and I-steel constitute the structure of entirety and the treatment measures system of temporary plugging wall, and this measure just can carry out soil body backfill above agent structure top board after having constructed;Pit earthwork excavation and the second phase structure construction of block wall opposite side can not be affected.

Claims (1)

1. agent structure section construction and a temporary plugging wall joint processing method, is characterized in that:
(1) the agent structure base plate of a phase agent structure of first constructing: above agent structure baseplate reinforcing bar, the pre-buried longitudinal I22 I-steel of location interval 2m of base plate hoop galvanized steel plain sheet waterstop centered beneath, longitudinal I22 I-steel keeps flat, its rear and front end "eight" shape reinforcing bar is fixed firmly, longitudinal I22 I-steel anchors into 0.5m in agent structure base plate, stretch out the outer 0.5m of structure base slab, it is attached with transversal I 22 I-steel between end and the temporary plugging wall of longitudinal I22 I-steel, four sides weld all around is carried out between transversal I 22 I-steel and longitudinal I-steel, transversal I 22 I-steel is closely connected with temporary plugging wall, ensure middle seamless, soil body lateral pressure suffered by temporary plugging wall is delivered to agent structure base plate up by the gun iron link of I22 I-steel;
The agent structure top board of a phase agent structure of constructing again, is laterally placed on longitudinal direction I22 I-steel between hoop galvanized steel plain sheet waterstop and agent structure top board, and remaining step is equal to step (1) agent structure construction of bottom plates;Owing to I22 I-steel exposes for a long time to closing, moist underground environment, get rusty easily corrosion, in order to avoid the oxidation reaction in air is delivered in structure by I22 I-steel, cause the deep charring of structure and the corrosion of structure reinforcing bars, will be by I22 work steel external coating anticorrosion, antirust paint before I22 I-steel is pre-buried, during concrete placings, the necessary vibration compacting of the concrete at I22 I-steel position, bubble must not be accompanied;
(2) construction L-type reinforced concrete wall: during the construction of the agent structure top board of the phase agent structure first carried out, the horizontal main muscle of L-type reinforced concrete wall is reserved during agent structure top board construction, reserved horizontal main muscle anchors into 35d in agent structure top board, reserved steel bar staggers lap of splice 35d, after agent structure top board has poured, bar planting operation is carried out with scaffold building L-type reinforced concrete wall bar planting job platform, the vertical equity muscle of L-type reinforced concrete wall implants 15d in the building enclosure of both sides, and vertical equity muscle uses welding point mode to stagger 35d;After bar planting has worked, on scaffold, directly lay bed die and the inner side template of L-type reinforced concrete wall, carry out the reinforcing bar binding operation of L-type reinforced concrete wall, steel corrosion quantity its outboard template of qualified rear supporting also carries out reinforcement measure, acceptance(check) pours with agent structure with the concrete of label, and the age of the concrete of L-type reinforced concrete wall and intensity carry out form removal after reaching;L-type reinforced concrete wall and I-steel constitute the structure of entirety and the treatment measures system of temporary plugging wall, and this construction method carries out soil body backfill above agent structure top board after completing;Do not affect pit earthwork excavation and the second phase structure construction of block wall opposite side.
CN201610520388.7A 2016-07-05 2016-07-05 Agent structure section construction and temporary plugging wall joint processing method Expired - Fee Related CN105937248B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610520388.7A CN105937248B (en) 2016-07-05 2016-07-05 Agent structure section construction and temporary plugging wall joint processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610520388.7A CN105937248B (en) 2016-07-05 2016-07-05 Agent structure section construction and temporary plugging wall joint processing method

Publications (2)

Publication Number Publication Date
CN105937248A true CN105937248A (en) 2016-09-14
CN105937248B CN105937248B (en) 2017-11-28

Family

ID=56872624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610520388.7A Expired - Fee Related CN105937248B (en) 2016-07-05 2016-07-05 Agent structure section construction and temporary plugging wall joint processing method

Country Status (1)

Country Link
CN (1) CN105937248B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447792A (en) * 2017-08-07 2017-12-08 深圳市建筑设计研究总院有限公司 The waterproof connecting structure and its construction method of underground reserved passageway mouth
CN112560321A (en) * 2020-12-29 2021-03-26 重庆交通大学 Calculation method for ring-divided segmented pouring length of concrete wrapped outside arch ring of stiffened framework concrete arch bridge

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202689040U (en) * 2012-05-25 2013-01-23 中铁十八局集团有限公司 Steel end seal wall structure for large immersed tunnel
KR101330024B1 (en) * 2013-01-24 2013-11-15 (주)경동엔지니어링 Flexible connection apparatus for preventing water for facilities

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202689040U (en) * 2012-05-25 2013-01-23 中铁十八局集团有限公司 Steel end seal wall structure for large immersed tunnel
KR101330024B1 (en) * 2013-01-24 2013-11-15 (주)경동엔지니어링 Flexible connection apparatus for preventing water for facilities

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447792A (en) * 2017-08-07 2017-12-08 深圳市建筑设计研究总院有限公司 The waterproof connecting structure and its construction method of underground reserved passageway mouth
CN112560321A (en) * 2020-12-29 2021-03-26 重庆交通大学 Calculation method for ring-divided segmented pouring length of concrete wrapped outside arch ring of stiffened framework concrete arch bridge

Also Published As

Publication number Publication date
CN105937248B (en) 2017-11-28

Similar Documents

Publication Publication Date Title
CN106760619B (en) A kind of building translation apparatus and its construction method
CN101864959A (en) Method for tunneling construction of main structure of underground station
CN106907161A (en) A kind of novel tunnel inclined shaft chooses item special project construction method
CN106979021B (en) Large-section loess tunnel excavates and preliminary bracing quick closure cyclization method
CN105545323A (en) Construction method for open cut tunnel lining
CN108842819A (en) A kind of urban track traffic cable run method for tunnel construction
CN102434717A (en) Construction method of joist steel pipe-jacking work pit
CN109488347A (en) A kind of excavation construction method for special formation chamber
CN201943086U (en) Underground building wall body
CN108678751A (en) The shield cutter inspection-pit assembly construction method excavated after first jacking
CN103696429A (en) Concrete support and fish-belly sill combined supporting system of special-shaped foundation pit and construction method
CN108396630A (en) The big box-beam structure of precast concrete with the connection of wet seam direction across bridge
CN107905609A (en) Underground people's air defense construction method
CN105937248A (en) Body structure section construction and temporary plugging wall connecting portion treatment method
CN206888994U (en) A kind of inclined shaft two serves as a contrast and pilot tunnel caunches device
CN108708727A (en) The shield cutter inspection-pit assembly construction method of jacking after half excavation
CN209066508U (en) Cross the existing electric power piping lane protection structure of tunnel foundation pit
CN207392240U (en) For the full bag water proof structure structure of contrary sequence method building
CN110004942A (en) A kind of large span integral supporting structure and its construction method
CN109930610A (en) Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete
CN108798681A (en) What middle hole method zero distance passed through existing subway station underpins system and its construction method
CN109706955A (en) One kind being suitable for III class stake of cast-in-situ bored pile and cushion cap connection type
CN214738089U (en) Foundation pit structure
CN110566237B (en) Subway interval stop line large section undercut construction is first propped up into hole reinforced structure
CN103243722A (en) Construction method of novel inner support of foundation trench

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Dong Xiaolong

Inventor after: Ma Chengming

Inventor after: Luo Cangning

Inventor after: Li Junyue

Inventor after: Kong Xiangyuan

Inventor after: Yao Yuan

Inventor after: Duan Jiewen

Inventor after: Huang Yu

Inventor after: Zhang Ronghua

Inventor after: Li Xianlong

Inventor after: Gong Yunhui

Inventor after: Li Zhijun

Inventor after: Hu Chaogui

Inventor after: Peng Zaiyong

Inventor after: Guo Xiaolong

Inventor after: Sun Chao

Inventor after: Gao Kun

Inventor after: Dong Jun

Inventor after: Liu Min

Inventor after: Wang Yu

Inventor before: Dong Xiaolong

Inventor before: Zhu Xiong

Inventor before: Gao Kun

Inventor before: Cui Hailong

Inventor before: Pi Zhongqiang

Inventor before: Cai Xiao

Inventor before: Peng Yanfeng

Inventor before: Ye Liang

Inventor before: Li Chengjiao

Inventor before: Wu Kongyong

Inventor before: Chen Qiang

Inventor before: Li Zhijun

Inventor before: Luo Cangning

Inventor before: Peng Zaiyong

Inventor before: Yao Yiwen

Inventor before: Yang Guosheng

Inventor before: Liu Wei

Inventor before: Xu Duo

Inventor before: Liu Gang

Inventor before: Zhao Wenlong

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171128

Termination date: 20210705