CN108396630A - The big box-beam structure of precast concrete with the connection of wet seam direction across bridge - Google Patents
The big box-beam structure of precast concrete with the connection of wet seam direction across bridge Download PDFInfo
- Publication number
- CN108396630A CN108396630A CN201810397965.7A CN201810397965A CN108396630A CN 108396630 A CN108396630 A CN 108396630A CN 201810397965 A CN201810397965 A CN 201810397965A CN 108396630 A CN108396630 A CN 108396630A
- Authority
- CN
- China
- Prior art keywords
- construction
- precast
- bridge
- prefabricated components
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses the big box-beam structures of precast concrete connected with wet seam direction across bridge, including construction pile foundation, cushion cap, column, construction bracket and prefabricated components, cushion cap is mounted on the upper end of construction pile foundation, column is mounted on the upper end of cushion cap, construction bracket is mounted on the upper end of column, and prefabricated components are placed on the upper end of construction bracket, steel reinforcement cage is provided in prefabricated components, prefabricated components are provided with several precast sections, and each precast section is assemblied to form by web, bottom plate and top plate.The present invention builds the big box beam of concrete using the method for precast assembly, compare cast-in-place structural, reduce the live duration, reduce the influence of Construction on Environment, beam sections mode precast assembly is used compared to larger box beam, component on site construction method is flexible, facilitates the equipment of transfer to carry out lifting construction using crawler crane etc., multiple spot construction may be implemented.
Description
Technical field
The present invention relates to prefabricated bridge construction technique fields, more particularly to the prefabricated mixed of wet seam direction across bridge connection
The solidifying big box-beam structure of soil.
Background technology
The big box beam of common precast concrete in bridge structure at present, generally using beam sections pattern, concrete technology is:
Along bridge to direction, bridge is divided into segment, utilizes Bridge Erector, after beam sections lifting in place, prestressing force inside tensioning, by full-bridge
It is connected as an entirety.
But the big box beam of concrete is formed using above method on-site consolidation beam sections, scene needs input Bridge Erector to set
Standby, the movement of bridge formation machine equipment is inconvenient, next bridge beam bridge position can only be moved forward to after completing a hole bridge assembly, under development
The assembly of one hole beam sections.If encountering construction condition limitation, partial hole bridge duration needs are delayed, it will to bridge knot
The control of structure construction period, construction cost control bring huge trouble.
Those skilled in the art are dedicated to solving above-mentioned technological deficiency.
Invention content
In view of the drawbacks described above of the prior art, technical purpose of the invention is to connect with wet seam direction across bridge prefabricated
The big box-beam structure of concrete is capable of the prefabricated big box-beam structure of the pedrail crane erection construction of portable mobile easy to use.
To realize the above-mentioned technical purpose, the present invention provides the big box beam knots of precast concrete connected with wet seam direction across bridge
Structure, including construction pile foundation, cushion cap, column, construction bracket and prefabricated components, the cushion cap are mounted on the upper end of construction pile foundation, institute
The upper end that column is mounted on cushion cap is stated, the construction bracket is mounted on the upper end of column, and the prefabricated components are placed on construction branch
The upper end of frame is provided with steel reinforcement cage in the prefabricated components, and the prefabricated components are provided with several precast sections, each described pre-
Section processed is assemblied to form by web, bottom plate and top plate.
Preferably, it is provided with Cast-in-Situ Segment between two neighboring precast section, each Cast-in-Situ Segment is respectively connected with wet joint mould
Plate.
Preferably, the steel reinforcement cage includes bridge along bridge to the company between steel bar stress, stirrup and each prefabricated subsection
Connect reinforcing bar.
Preferably, the prefabricated components include 5 precast sections or 9 precast sections.
Preferably, the construction pile foundation is provided with several piles.
Preferably, it is formed with case hole between two neighboring precast section.
Beneficial effects of the present invention:
The present invention builds the big box beam of concrete using the method for precast assembly, and compare cast-in-place structural, reduces scene
Duration reduces the influence of Construction on Environment, and beam sections mode precast assembly, component on site construction method spirit are used compared to larger box beam
It is living, facilitate the equipment of transfer to carry out lifting construction using crawler crane etc., multiple spot construction may be implemented.
The technique effect of the design of the present invention, concrete structure and generation is described further below with reference to attached drawing, with
It is fully understood from the purpose of the present invention, feature and effect.
Description of the drawings
Fig. 1-2 is the structural schematic diagram of the present invention;
Fig. 3 is the substructure construction block diagram of the present invention;
Fig. 4 is the prefabricated components structure chart of the present invention;
Fig. 5-6 is another embodiment of the invention structure chart;
Fig. 7 is the substructure construction block diagram of another embodiment of the invention;
Fig. 8 is another embodiment of the invention prefabricated components structure chart.
Specific implementation mode
Such as Fig. 1 is simultaneously combined shown in Fig. 2 to Fig. 8, the big box-beam structure of precast concrete with the connection of wet seam direction across bridge, including
Construction pile foundation 1, cushion cap 2, column 3, construction bracket 4 and prefabricated components 5, the cushion cap 2 are mounted on the upper end of construction pile foundation 1, institute
The upper end that column 3 is mounted on cushion cap 2 is stated, the construction bracket 4 is mounted on the upper end of column 3, and the prefabricated components 5, which are placed on, to be applied
The upper end of work holder 4 is provided with steel reinforcement cage in the prefabricated components 5, and the prefabricated components 5 are provided with several precast sections 6, often
A precast section 6 is assemblied to form by web, bottom plate and top plate.
Further, it is provided with Cast-in-Situ Segment 7 between two neighboring precast section 6, each Cast-in-Situ Segment 7 is respectively connected with wet connect
Head mould plate, the steel reinforcement cage include bridge along bridge to the connection reinforcing bar between steel bar stress, stirrup and each prefabricated subsection.
Wherein, the prefabricated components 5 include 5 precast sections or 9 precast sections, and the construction pile foundation 1 is provided with several
A pile is formed with case hole 8 between two neighboring precast section 6.
The present invention builds the big box beam of concrete using the method for precast assembly, and compare cast-in-place structural, reduces scene
Duration reduces the influence of Construction on Environment, and beam sections mode precast assembly, component on site construction method spirit are used compared to larger box beam
It is living, facilitate the equipment of transfer to carry out lifting construction using crawler crane etc., multiple spot construction may be implemented.
At the scene in assembling construction, foundation precast elements piecemeal is set up onto bridge pier, coupling part bridge floor is set up at scene
Plate, bottom plate linkage section template, pour non-shrinkage concrete, and foundation precast elements connection is integral big box beam, pours big case
Beam crossbeam enhances big box beam lateral ties.Longitudinal prestressing is arranged in big box beam, enhance big box beam indulge bridge to span ability;
Transverse prestress is arranged in big box beam, enhances the span ability of floorings direction across bridge, reduces web quantity;It is prefabricated to optimize floorings
Pattern, floorings are individually prefabricated, and web and part backplane form foundation precast elements, and floorings are erected on web, are pouring
Web connecting top section, reduces Site Template and sets up workload, also optimizes operating space when bottom plate connection pours;On column
Falsework is set up, increases web and sets up range.
Using the height of web, rational steel bar stress or deformed bar are configured, can be met in hoisting process, with
And it is erected at the force request of foundation precast elements when on bridge pier holder;Using the reinforcing bar of stretching, scene binding or welding steel
Muscle, casting concrete realize the Lossless join between structure.
In work progress, the construction of related pile foundation, cushion cap bridge pier is completed first, and sets up temporary construction holder.Using hanging
Installing is standby to be erected at foundation precast elements are orderly on correct position.Field worker sets up template at wet joint, according to setting
Meter requires binding or is welded to connect reinforcing bar.It pours wet joint and conserves, concrete strength reaches form removal after design requirement
And falsework, complete main beam supporting.
The present embodiment proposes the foundation precast elements formed with bottom plate and web;It is formed by bottom plate and web pre-
Basic component processed can be born lifting operating mode by the prestressed, reinforced reinforcing bar of reasonable disposition and set up operating mode load.At the top of web
With the reserved connection reinforcing bar of bottom plate seam crossing, foundation precast elements are completed prefabricated in precast plant or construction site.
The preferred embodiment of the present invention has been described in detail above.It should be appreciated that those skilled in the art without
It needs creative work according to the present invention can conceive and makes many modifications and variations.Therefore, all technologies in the art
Personnel are available by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea
Technical solution, all should be in the protection domain being defined in the patent claims.
Claims (3)
1. the big box-beam structure of precast concrete with the connection of wet seam direction across bridge, it is characterised in that:Including construction pile foundation, cushion cap,
Column, construction bracket and prefabricated components, the cushion cap are mounted on the upper end of construction pile foundation, and the column is mounted on the upper of cushion cap
End, the construction bracket are mounted on the upper end of column, and the prefabricated components are placed on the upper end of construction bracket, the prefabricated components
It is inside provided with steel reinforcement cage, the prefabricated components are provided with several precast sections, and each precast section is by web, bottom plate and top
Plate is assemblied to form;It is provided with Cast-in-Situ Segment between two neighboring precast section, each Cast-in-Situ Segment is respectively connected with wet joint template;Institute
It includes bridge along bridge to the connection reinforcing bar between steel bar stress, stirrup and each prefabricated subsection to state steel reinforcement cage;It is two neighboring pre-
Case hole is formed between section processed.
2. the big box-beam structure of precast concrete as described in claim 1 with the connection of wet seam direction across bridge, it is characterised in that:Institute
It includes 5 precast sections or 9 precast sections to state prefabricated components.
3. the big box-beam structure of precast concrete as described in claim 1 with the connection of wet seam direction across bridge, it is characterised in that:Institute
It states construction pile foundation and is provided with several piles.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810397965.7A CN108396630A (en) | 2018-04-28 | 2018-04-28 | The big box-beam structure of precast concrete with the connection of wet seam direction across bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810397965.7A CN108396630A (en) | 2018-04-28 | 2018-04-28 | The big box-beam structure of precast concrete with the connection of wet seam direction across bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108396630A true CN108396630A (en) | 2018-08-14 |
Family
ID=63099428
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810397965.7A Pending CN108396630A (en) | 2018-04-28 | 2018-04-28 | The big box-beam structure of precast concrete with the connection of wet seam direction across bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108396630A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109487707A (en) * | 2018-12-28 | 2019-03-19 | 东南大学 | A kind of precast assembly expanded letter box beam and its assembling method |
CN110219235A (en) * | 2019-07-01 | 2019-09-10 | 四川省交通勘察设计研究院有限公司 | A kind of full precast assembly structural bridge and its construction method suitable for grassland wetland |
CN111172855A (en) * | 2020-03-20 | 2020-05-19 | 重庆市轨道交通设计研究院有限责任公司 | Upper bearing type longitudinal block prefabricated box girder |
CN111172856A (en) * | 2020-03-20 | 2020-05-19 | 重庆市轨道交通设计研究院有限责任公司 | Half-through type longitudinal block prefabricated box girder |
CN111778864A (en) * | 2020-07-20 | 2020-10-16 | 上海市城市建设设计研究总院(集团)有限公司 | Bridge with small box girders prefabricated in longitudinal sections and construction method |
CN114414784A (en) * | 2022-03-30 | 2022-04-29 | 中交第一公路勘察设计研究院有限公司 | Bridge splicing joint vehicle-mounted deformation difference simulation test device and simulation method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000017612A (en) * | 1998-06-29 | 2000-01-18 | Ps Corp | Corrugated steel plate web girder and construction of corrugated steel plate web girder bridge |
CN103711067A (en) * | 2014-01-13 | 2014-04-09 | 河南省交通规划勘察设计院有限责任公司 | Transversely assembled corrugated steel web combined box girder with small number of supports and construction method thereof |
CN103938549A (en) * | 2014-05-14 | 2014-07-23 | 河南省交通规划勘察设计院有限责任公司 | Construction method for fabricated type corrugated steel inclined web combined beam |
CN105275126A (en) * | 2015-10-21 | 2016-01-27 | 深圳市华阳国际建筑产业化有限公司 | Standardized prefabricated part for nonstandard shear wall and production method of standardized prefabricated part |
CN106758856A (en) * | 2017-03-09 | 2017-05-31 | 河南省交通规划设计研究院股份有限公司 | The construction method of the pretensioned prestressing corrugated steel web plate composite box girder of precast block |
-
2018
- 2018-04-28 CN CN201810397965.7A patent/CN108396630A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000017612A (en) * | 1998-06-29 | 2000-01-18 | Ps Corp | Corrugated steel plate web girder and construction of corrugated steel plate web girder bridge |
CN103711067A (en) * | 2014-01-13 | 2014-04-09 | 河南省交通规划勘察设计院有限责任公司 | Transversely assembled corrugated steel web combined box girder with small number of supports and construction method thereof |
CN103938549A (en) * | 2014-05-14 | 2014-07-23 | 河南省交通规划勘察设计院有限责任公司 | Construction method for fabricated type corrugated steel inclined web combined beam |
CN105275126A (en) * | 2015-10-21 | 2016-01-27 | 深圳市华阳国际建筑产业化有限公司 | Standardized prefabricated part for nonstandard shear wall and production method of standardized prefabricated part |
CN106758856A (en) * | 2017-03-09 | 2017-05-31 | 河南省交通规划设计研究院股份有限公司 | The construction method of the pretensioned prestressing corrugated steel web plate composite box girder of precast block |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109487707A (en) * | 2018-12-28 | 2019-03-19 | 东南大学 | A kind of precast assembly expanded letter box beam and its assembling method |
CN110219235A (en) * | 2019-07-01 | 2019-09-10 | 四川省交通勘察设计研究院有限公司 | A kind of full precast assembly structural bridge and its construction method suitable for grassland wetland |
CN111172855A (en) * | 2020-03-20 | 2020-05-19 | 重庆市轨道交通设计研究院有限责任公司 | Upper bearing type longitudinal block prefabricated box girder |
CN111172856A (en) * | 2020-03-20 | 2020-05-19 | 重庆市轨道交通设计研究院有限责任公司 | Half-through type longitudinal block prefabricated box girder |
CN111778864A (en) * | 2020-07-20 | 2020-10-16 | 上海市城市建设设计研究总院(集团)有限公司 | Bridge with small box girders prefabricated in longitudinal sections and construction method |
CN114414784A (en) * | 2022-03-30 | 2022-04-29 | 中交第一公路勘察设计研究院有限公司 | Bridge splicing joint vehicle-mounted deformation difference simulation test device and simulation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108396630A (en) | The big box-beam structure of precast concrete with the connection of wet seam direction across bridge | |
CN106758856B (en) | The construction method of the pretensioned prestressing corrugated steel web plate composite box girder of precast block | |
CN104929034B (en) | A modular steel-concrete rapid construction small box girder bridge and its construction method | |
CN106677049A (en) | Assembled steel-concrete combination structure bridge and construction method | |
CN206707124U (en) | Prefabricated assembling type reinforced concrete component with joint of steel structure | |
CN112982181B (en) | Construction method for steel-concrete combined section of through-type steel box continuous arch bridge | |
CN107476476A (en) | Combined construction method of long-span steel bar truss floor bearing plate and reinforced concrete beam | |
CN105839846A (en) | Prefabricated reinforced concrete composite beam | |
CN108104284B (en) | Wall panel connection structure and assembly method with steel arm of shear wall embedded in floor slab | |
CN105064200B (en) | Prefabricated and assembled fish-belly truss prestressed steel-concrete composite simply supported beam bridge and its construction method | |
CN113638304B (en) | Concrete beam type bridge hidden cover beam structure system and construction method thereof | |
CN112554077B (en) | Construction system and method of steel tube concrete assembled truss composite beam | |
CN114892813B (en) | Large-span building main body supporting steel structure and construction method | |
CN110409624B (en) | Reverse calculation and construction method for large equipment installation and main body structure | |
CN110512530A (en) | A kind of combination beam binodal section Cantilever Construction Method | |
CN109853365A (en) | A kind of high pier construction of modularization prefabrication and assembly construction based on high-strength bolt connection and production method | |
CN102808375B (en) | Hinge structure of steel pier column of portal frame platform bridge and bearing platform and construction method thereof | |
CN211074115U (en) | A double-column pier prefabricated cap structure | |
CN205257790U (en) | Fixed high -low leg handle portal crane | |
CN105735099B (en) | Construction time uses the simple supported-to-continuous girder bridge and its construction method of external prestressing | |
CN108411759A (en) | The big box-beam structure of precast concrete of direction across bridge stem grafting method connection | |
CN111218983A (en) | Lattice formula structure concrete frame house | |
CN207919582U (en) | A kind of assembled pile foundation wharfs structure | |
CN214168790U (en) | Steel pipe concrete assembled truss composite beam construction system | |
CN103938871A (en) | Method for constructing concrete-filled steel tube column and bonded prestressed frame beam structure adopting reinforced concrete ring beam joints |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180814 |