CN105931681B CN201610402587.8A CN201610402587A CN105931681B CN 105931681 B CN105931681 B CN 105931681B CN 201610402587 A CN201610402587 A CN 201610402587A CN 105931681 B CN105931681 B CN 105931681B
Authority
CN
China
Prior art keywords
fitting
built
rear support
front leg
upper bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610402587.8A
Other languages
Chinese (zh)
Other versions
CN105931681A (en
Inventor
刘奎林
孙朝朋
康增保
师国柱
李旺
田野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry 23 Construction Co Ltd
Original Assignee
China Nuclear Industry 23 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry 23 Construction Co Ltd filed Critical China Nuclear Industry 23 Construction Co Ltd
Priority to CN201610402587.8A priority Critical patent/CN105931681B/en
Publication of CN105931681A publication Critical patent/CN105931681A/en
Application granted granted Critical
Publication of CN105931681B publication Critical patent/CN105931681B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C13/00Pressure vessels; Containment vessels; Containment in general
    • G21C13/02Details
    • G21C13/024Supporting constructions for pressure vessels or containment vessels
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C21/00Apparatus or processes specially adapted to the manufacture of reactors or parts thereof
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Manufacturing & Machinery (AREA)
  • Foundations (AREA)
  • Structure Of Emergency Protection For Nuclear Reactors (AREA)

Abstract

The invention belongs to the technical fields of Nuclear Power Station.In order to reduce the difficulty of high temperature air-cooled pile pressure container load bearing support installation of embedded parts construction, the present invention proposes a kind of high temperature air-cooled pile pressure container installation of embedded parts tool, including upper bracket and lower bracket, the upper bracket includes two the first front leg struts, two the first rear support legs, several support plates and connecting plate, it is connected by the connecting plate between described two first front leg struts, between described two first rear support legs, the support plate connects the top of first front leg strut and the top of the first rear support leg, which is equipped with several holding cards;Lower bracket includes connecting rod, two the second front leg struts and two the second rear support legs.Tool of the invention simplifies the installation process of built-in fitting, reduces the difficulty of installation of embedded parts operation, reduces construction safety risk, shortens the duration, and the engineering-built level for improving HTGR Nuclear Power Plant is of great significance with the market competitiveness.

Description

The installation tool and installation method of high temperature air-cooled pile pressure container built-in fitting
Technical field
The invention belongs to the technical fields of Nuclear Power Station, and in particular to a kind of high temperature air-cooled pile pressure container built-in fitting Installation tool and installation method.
Background technique
High temperature gas cooled reactor is the Advanced Nuclear Energy Technology with forth generation technical characteristic, high temperature gas cooled reactor reactor pressure vessel It is one of the core component of nuclear power station, is the important leverage for guaranteeing reactor safety operation.Wherein, pressure vessel load-bearing bearing is pre- Embedded part is embedded on the wall of reactor cabin, for connecting pressure vessel load-bearing bearing, as shown in Figure 1, high temperature air-cooled pile pressure Container load bearing support built-in fitting 10 includes front vertical plate 11 and back vertical plate 12, and front vertical plate 11 is more longer than back vertical plate 12, front vertical plate It is equipped with kingbolt casing 13 between 11 and back vertical plate 12, and three layers of kingbolt casing 13 are distributed with from top to bottom, first layer has four A kingbolt casing 13, the second layer is there are two kingbolt casing 13, and also there are two kingbolt casings 13 for third layer.10 weight of built-in fitting About seven tons, be eccentric structure, and front side is heavier than rear side, and the generally irregular shape of built-in fitting 10, without suitably solid Fixed point, causes the installation of built-in fitting difficult.Since pressure vessel load-bearing supports 10 place reactor cabin of built-in fitting Wall civil structural engineering and installing engineering are intricate, add reactor room office operation limited space, further increase The complexity and difficulty of 10 installation exercise of built-in fitting.
Summary of the invention
In order to reduce the difficulty of high temperature air-cooled pile pressure container load bearing support installation of embedded parts construction, the present invention proposes one kind High temperature air-cooled pile pressure container installation of embedded parts tool, including upper bracket and lower bracket, the upper bracket include two A first front leg strut, two the first rear support legs, several support plates and connecting plate, between described two first front leg struts, described It is connected by the connecting plate between two the first rear support legs, the support plate connects the top and of first front leg strut The top of one rear support leg, when so as to which built-in fitting being fixed in the upper bracket, the kingbolt casing of built-in fitting is located at described In support plate;The support plate is equipped with several holding cards;The lower bracket includes connecting rod, two the second front leg struts and two A second rear support leg, between described two second front leg struts, between described two second rear support legs, second front leg strut and It is connected by the connecting rod between two rear support legs;In use, by the top of the second front leg strut of the lower bracket and institute The bottom connection of the first front leg strut of upper bracket is stated, is propped up after the top of second rear support leg and the first of the upper bracket The bottom of leg connects.
Wherein, the quantity of the support plate is four.
Wherein, the length of first front leg strut is greater than the length of first rear support leg, the length of second front leg strut Degree is less than the length of second rear support leg, and the difference of the length of first front leg strut and the first rear support leg is equal to described second The difference of the length of rear support leg and the second front leg strut.
It wherein, further include securing plate, by described between the lower part of first front leg strut and the lower part of the first rear support leg Securing plate connection.
Wherein, second front leg strut is equipped with preceding supporting plate, second rear support leg far from the side of second rear support leg Side far from second front leg strut is equipped with rear supporting plate.
Wherein, gusset is equipped between second front leg strut and preceding supporting plate, between second rear support leg and rear supporting plate.
The present invention also proposes a kind of installation method of high temperature air-cooled pile pressure container built-in fitting, using above-mentioned high temperature gas-cooled Core pressure vessel installation of embedded parts tool, comprising the following steps:
(1) built-in fitting is placed in the upper bracket, and the kingbolt casing of built-in fitting is made to be located at the support plate On, then kingbolt casing is blocked using the holding card in the support plate, by built-in fitting and the fixed company of the upper bracket It connects;
(2) when the design installation site of reactor cabin wall construction to preburied column, on the wall of reactor cabin Bury four preburied columns;
(3) lower bracket is lifted to the position that the lower bracket is adjusted into cabin to design position, then by institute State the second front leg strut of lower bracket, the second rear support leg is connect with four preburied columns, the lower bracket is fixed In on four preburied columns;
(4) by built-in fitting and the upper bracket integral hoisting into reactor cabin, dropping place is in the lower bracket, so After adjust first front leg strut and the second front leg strut, built-in fitting is adjusted to design position, then will be propped up before described first Leg is connect with the second front leg strut, and first rear support leg is connect with the second rear support leg, the upper bracket is fixed on institute It states in lower bracket.
Wherein, in the step (1), the kingbolt casing of built-in fitting first layer is placed in the support plate.
Wherein, in the step (4), forestock is set far from the side of second rear support leg in second front leg strut Plate is arranged rear supporting plate far from the side of second front leg strut in second rear support leg, the upper bracket is fixed on institute After stating in lower bracket, built-in fitting front vertical plate is resisted against on the preceding supporting plate, and built-in fitting back vertical plate is resisted against in the rear supporting plate.
Wherein, muscle is respectively provided between second front leg strut and preceding supporting plate, between second rear support leg and rear supporting plate Plate.
High temperature air-cooled pile pressure container installation of embedded parts of the present invention tool have it is following the utility model has the advantages that
Tool of the invention includes upper bracket, after upper bracket and built-in fitting are fixed, the first front leg strut of upper bracket It is converted to the fixed point of built-in fitting with the first rear support leg, the first front leg strut and the fixation of the first rear support leg are achieved that built-in fitting Fixation, and by adjusting the position of the first front leg strut and the adjustable upper bracket of the first rear support leg, to realize adjustment The position of built-in fitting simplifies the position adjustment and fixed operation of built-in fitting, simplifies the installation process of built-in fitting, reduce The difficulty of installation of embedded parts operation, reduces construction safety risk, shortens the duration, for improving HTGR Nuclear Power Plant Engineering-built level is of great significance with the market competitiveness.
The kingbolt casing connection of support plate and built-in fitting of the invention, built-in fitting is fixed in upper bracket, by It is larger in the caliber of kingbolt casing, so can increase kingbolt casing as the connecting component of built-in fitting and upper bracket The stability that built-in fitting is connect with upper bracket.The first layer kingbolt casing connection of support plate and built-in fitting of the invention, by It is more in first layer kingbolt casing quantity, and the position of first layer kingbolt casing is more top, so increasing built-in fitting The stability being connect with upper bracket.
Second front leg strut of the invention is equipped with preceding supporting plate, and the second rear support leg is equipped with rear supporting plate, and preceding supporting plate is used to support Front vertical plate, rear supporting plate is used to support back vertical plate, in this way after upper bracket is fixed in lower bracket, can prevent built-in fitting Center of gravity inclination.
The installation method of high temperature air-cooled pile pressure container built-in fitting of the present invention have it is following the utility model has the advantages that
In method of the invention, built-in fitting is fixedly connected with upper bracket, the first front leg strut of such upper bracket and First rear support leg is converted to the fixed point of built-in fitting, and the first front leg strut and the fixation of the first rear support leg are achieved that built-in fitting It is fixed, and by adjusting the position of the first front leg strut and the adjustable upper bracket of the first rear support leg, to realize that adjustment is pre- The position of embedded part simplifies the position adjustment and fixed operation of built-in fitting, simplifies the installation process of built-in fitting, reduce pre- The difficulty of embedded part installation exercise, reduces construction safety risk, shortens the duration, for improving the work of HTGR Nuclear Power Plant Journey standard of construction is of great significance with the market competitiveness.
In installation method of the invention, lower bracket is first fixed on preburied column by technical staff, with that can be into The binding of reinforcing bar around row lower bracket, and at this time since built-in fitting is not installed also, there are also working spaces by lower bracket and pre- It buries column and is fixedly connected with and binds reinforcing bar around lower bracket, and after built-in fitting and upper bracket are fixed in lower bracket, Also just without the working space for lower bracket being fixedly connected with and being bound the reinforcing bar around lower bracket with preburied column, this hair Upper bracket and lower bracket are used in bright method to complete the installation exercise of built-in fitting, such reinforcing bar binding operation also can It goes on smoothly, improves construction quality.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of high temperature air-cooled pile pressure container load bearing support built-in fitting;
Fig. 2 is the structural schematic diagram of the upper bracket of high temperature air-cooled pile pressure container installation of embedded parts tool of the present invention;
Fig. 3 is by installation of embedded parts to the structural schematic diagram of upper bracket of the invention;
Fig. 4 is the structural schematic diagram of the lower bracket of high temperature air-cooled pile pressure container installation of embedded parts tool of the present invention;
Fig. 5 is the structural schematic diagram that lower bracket of the invention is connect with preburied column;
Fig. 6 is the schematic diagram of installation of embedded parts.
Specific embodiment
Technical solution of the present invention is introduced with reference to the accompanying drawing.
High temperature air-cooled pile pressure container installation of embedded parts tool of the present invention includes upper bracket and lower bracket, such as Fig. 2 Shown, upper bracket 20 includes two the first front leg struts, 21, two the first rear support legs 22, several support plates 23 and connecting plate 25, it is connected by connecting plate 25 between two the first front leg struts 21, connecting plate 25 can be located at top, the bottom of the first front leg strut 21 Portion and/or middle part similarly connect between two the first rear support legs 22 also by connecting plate 25, and connecting plate 25 can be located at the Top, bottom and/or the middle part of one rear support leg 22.Pass through between the top of first front leg strut 21 and the top of the first rear support leg 22 Support plate 23 connects, and support plate 23 is several, such as can be four, which is equipped with several holding cards 24.Such as Shown in Fig. 3, in use, built-in fitting 10 is placed in upper bracket 20, and the first front leg strut 21 is located at before built-in fitting 10 The side of vertical plate 11, the first rear support leg 22 are located at the side of the back vertical plate 12 close to built-in fitting 10, the kingbolt set of built-in fitting 10 Pipe 13 is located in support plate 23, and the holding card 24 in support plate 23 blocks kingbolt casing 13, by built-in fitting 10 and upper bracket 20 are fixedly connected.Wherein, holding card 24 is U-shaped band steel, when blocking kingbolt casing 13 using holding card 24 in this way, holding card 24 and main spiral shell The contact area of bolt casing 13 increases, and is conducive to protect kingbolt casing 13.As shown in Fig. 2, the lower part of the first front leg strut 21 with It is connected between the lower part of first rear support leg 22 by securing plate 26, to increase the stability of upper bracket 20.
As shown in figure 4, lower bracket 30 includes 32, two the second front leg struts 31 of connecting rod and two the second rear support legs 38, Lead between two the second front leg struts 31, between two the second rear support legs 38, between the second front leg strut 31 and the second rear support leg 38 The connection of connecting rod 32 is crossed, is in this way connected as two the second front leg struts 31 and two the second rear support legs 38 by connecting rod 32 whole Body, while connecting rod 32 also increases the stability of lower bracket 30.In use, top and the upper bracket of the second front leg strut 31 The bottom of 20 the first front leg strut 21 connects, the bottom of first rear support leg 22 at the top and upper bracket 20 of the second rear support leg 38 Connection, upper bracket 20 is fixedly connected with lower bracket 30.
Preferably, the quantity of support plate 23 is four, in use, the four of 10 first layer of built-in fitting (that uppermost layer) A kingbolt casing 13 is located in four support plates 23, using holding card 24 that kingbolt casing 13 and support plate 23 is fixed Connection, built-in fitting 10 is fixedly connected with upper bracket 20.After built-in fitting 10 and upper bracket 20 are fixed, upper bracket 20 First front leg strut 21 and the first rear support leg 22 are converted to the fixed point of built-in fitting 10, by the first front leg strut 21 and the first rear support leg The 22 fixed fixations for being achieved that built-in fitting 10, and by adjusting the first front leg strut 21 and the first rear support leg 22 it is adjustable on The position of portion's bracket 20, to realize the position of adjustment built-in fitting 10, the position for simplifying built-in fitting 10 adjusts and fixed work Industry simplifies the installation process of built-in fitting 10, reduces the difficulty of 10 installation exercise of built-in fitting, while irregular shape is pre-buried After part 10 has fixed point, construction safety risk is also reduced.The diameter of kingbolt casing 13 be greater than built-in fitting 10 on other The diameter of tubular part, so kingbolt casing 13 can be increased as the connecting component of built-in fitting 10 and upper bracket 20 pre- The stability that embedded part 10 is connect with upper bracket 20.10 first layer kingbolt casing 13 of built-in fitting is four, the second layer and third Layer kingbolt casing 13 is two, so first layer kingbolt casing 13 is connect with support plate 23, in this way due to first layer 13 quantity of kingbolt casing is more, and the position of first layer kingbolt casing 13 is more top, so can increase built-in fitting 10 The stability being connect with upper bracket 20.
Preferably, as shown in figure 4, the second front leg strut 31 far from the second rear support leg 38 side be equipped with preceding supporting plate 34, second Rear support leg 38 is equipped with rear supporting plate 33 far from the side of the second front leg strut 31.As shown in fig. 6, in use, built-in fitting 10 is fixed on After in upper bracket 20, when built-in fitting 10 and 20 entirety of upper bracket are placed in lower bracket 30, the preceding of built-in fitting 10 is stood Before plate 11 is resisted against on supporting plate 34, preceding supporting plate 34 is used to support front vertical plate 11, and the back vertical plate 12 of built-in fitting 10 is resisted against rear supporting plate On 33, rear supporting plate 33 is used to support back vertical plate 12, since built-in fitting 10 is eccentric structure, can prevent 10 center of gravity of built-in fitting in this way Inclination.As shown in figure 4, gusset 35 is equipped between the second rear support leg 38 and rear supporting plate 33, so that the second rear support leg 38 and rear supporting plate Connection between 33 is more firm.Similarly, it also is provided with gusset (not shown) between the second front leg strut 31 and preceding supporting plate 34, with Reinforce the connection between the second front leg strut 31 and preceding supporting plate 34.
As shown in Figs. 1-2, the length of the first front leg strut 21 is greater than the length of the first rear support leg 22, before built-in fitting 10 Vertical plate 11 is more longer than back vertical plate 12, and when built-in fitting 10 is fixed in upper bracket 20, the first front leg strut 21 is located at by nearby The side of vertical plate 11, the first rear support leg 22 are located at close to the side of back vertical plate 12, so the length when the first front leg strut 21 is greater than When the length of the first rear support leg 22, upper bracket 20 and the shape of built-in fitting 10 can be made to cooperate, so that built-in fitting 10 and top Bracket 20 connects stronger;The length that the length of first front leg strut 21 is greater than the first rear support leg 22 is existing also for construction is not interfered The laying of reinforcing bar, as shown in figure 4, length of the length of the second front leg strut 31 less than the second rear support leg 38, this is in order to the Before one front leg strut 21 and the first rear support leg 22 cooperate, and the difference of the length of the second rear support leg 38 and the second front leg strut 31 is equal to first The difference of the length of supporting leg 21 and the first rear support leg 22, when built-in fitting 10 and upper bracket 20 are integrally fixed in lower bracket 30 When, built-in fitting 10 can be adjusted to level.
The present invention also proposes a kind of installation method of high temperature air-cooled pile pressure container built-in fitting, using above-mentioned high temperature gas-cooled Core pressure vessel installation of embedded parts tool, comprising the following steps:
(1) as shown in figure 3, built-in fitting 10 is placed in upper bracket 20, and make the kingbolt casing 13 of built-in fitting 10 In support plate 23, the kingbolt casing 13 of 10 first layer of built-in fitting, the kingbolt casing 13 of the second layer or third can be The kingbolt casing 13 of layer is located in support plate 23, is then blocked kingbolt casing 13 using the holding card 24 in support plate 23, Kingbolt casing 13 to be fixed in support plate 23, so that built-in fitting 10 is fixedly connected with upper bracket 20.
After built-in fitting 10 and upper bracket 20 are fixed, the first front leg strut 21 of upper bracket 20 and the first rear support leg 22 just turn It is changed to the fixed point of built-in fitting 10, the first front leg strut 21 and the first rear support leg 22 are fixed to the fixation for being achieved that built-in fitting 10, And by adjusting the position of the first front leg strut 21 and the adjustable upper bracket 20 of the first rear support leg 22, to realize that adjustment is pre- The position of embedded part 10 simplifies the position adjustment and fixed operation of built-in fitting 10, simplifies the installation process of built-in fitting 10, drop The low difficulty of 10 installation exercise of built-in fitting, reduces construction safety risk.
Preferably, upper bracket 20 will be pre- when being placed in built-in fitting 10 in upper bracket 20 including four support plates 23 Four kingbolt casings 13 of 10 first layer of embedded part are respectively placed in four support plates 23, then will be pre-buried by holding card 24 Part 10 is fixedly connected with upper bracket 20.Since first layer kingbolt 13 quantity of casing are more, and first layer kingbolt casing 13 position is more top than the second layer and third layer kingbolt casing 13, so by first layer kingbolt casing 13 and support plate 23 Connection can increase the stability that built-in fitting 10 is connect with upper bracket 20.
This step can not be completed in the erecting bed of built-in fitting 10, and be completed outside the venue.
(2) as shown in figure 5, when the design installation site of the construction of reactor cabin wall 37 to preburied column 36, anti- Four preburied columns 36 are buried on the cabin Ying Dui wall 37.The effect of preburied column 36 is fixed lower bracket 30, i.e., subsequent In step, lower bracket 30 is affixed on preburied column 36.
The installation site of built-in fitting 10 be it is designed, in the method for the invention, built-in fitting 10 is fixed on upper bracket On 20, upper bracket 20 is fixed in lower bracket 30, and lower bracket 30 is fixed on preburied column 36, so according to built-in fitting 10 installation site can design upper bracket 20, lower bracket 30 and the respective installation site of preburied column 36, so that in advance The installation site of embedded part 10 meets the requirements.
When the design installation site of the construction of reactor cabin wall 37 to preburied column 36, the wall 37 in reactor cabin Upper to bury four preburied columns 36, for example, the design mounting height of preburied column 36 is 22m, reactor cabin wall 37 is constructed When, concrete pours in layer, such as every layer pours 10m, and when pouring the second layer concrete, preburied column 36 is buried In concrete, and make the height 22m at 36 top of preburied column, such preburied column 36 is just fixed in concrete.
(3) as shown in figure 5, when wall 37 concrete strength in reactor cabin meets the load requirement of lower bracket 30, Lower bracket 30 is lifted into the position for adjusting lower bracket 30 into cabin to design position, is then fixed on lower bracket 30 On preburied column 36, i.e. the second front leg strut 31, the second rear support leg 38 of lower bracket 30 are connect with four preburied columns 36.Lower part After bracket 30 is fixed, so that it may carry out the binding operation of 30 surrounding reinforcing bar of lower bracket, the lashing location of reinforcing bar is also to design , the effect of reinforcing bar is the pull resistance for increasing concrete.
(4) as shown in fig. 6, dropping place is in lower part branch by built-in fitting 10 and 20 integral hoisting of upper bracket into reactor cabin On frame 30, the first front leg strut 21 and the second front leg strut 31 are then adjusted, to adjust the position of upper bracket 20, and then is adjusted pre-buried The position of part 10, until built-in fitting 10 is adjusted to design installation site, it is then that upper bracket 20 and lower bracket 30 is fixed First front leg strut 21, i.e., connect with the second front leg strut 31, the first rear support leg 22 connect with the second rear support leg 38, with complete by connection At the installation of built-in fitting 10.Before this step, to confirm that the binding of 30 surrounding reinforcing bar of lower bracket was fully completed already, because After upper bracket 20 and lower bracket 30 are fixed, built-in fitting 10 has been installed, and also just allows technical staff to enter again without space 30 surrounding of lower bracket carries out reinforcing bar and binds operation.
Preferably, the supporting plate 34 before the second front leg strut 31 is arranged far from the side of the second rear support leg 38, in the second rear support leg Upper bracket 20 is fixed on lower part branch in this way in step (4) by the 38 side setting rear supporting plates 33 far from the second front leg strut 31 After on frame 30, before the front vertical plate 11 of built-in fitting 10 is resisted against on supporting plate 34, preceding supporting plate 34 is used to support front vertical plate 11, built-in fitting 10 Back vertical plate 12 be resisted against in rear supporting plate 33, rear supporting plate 33 is used to support back vertical plate 12, due to built-in fitting 10 be eccentric structure, this Sample can prevent 10 center of gravity of built-in fitting from tilting.Can also between the second front leg strut 31 and preceding supporting plate 34, the second rear support leg 38 with Be respectively provided with gusset between rear supporting plate 33, with reinforce the connection between the second front leg strut 31 and preceding supporting plate 34, the second rear support leg 38 with It is connected between rear supporting plate 33.
In installation method of the invention, built-in fitting 10 is fixedly connected with upper bracket 20, the of such upper bracket 20 One front leg strut 21 and the first rear support leg 22 are converted to the fixed point of built-in fitting 10, to simplify the installation of built-in fitting 10 Journey.In installation method of the invention, lower bracket 30 is first fixed on preburied column 36 by technical staff, then can be carried out The binding of 30 surrounding reinforcing bar of lower bracket, and at this time since built-in fitting 10 is not installed also, there are also working spaces by lower bracket 30 It is fixedly connected with and binds the reinforcing bar around lower bracket 30 with preburied column 36, and built-in fitting 10 and upper bracket 20 are fixed to down After on portion's bracket 30, also just it is fixedly connected and binds around lower bracket 30 with preburied column 36 without by lower bracket 30 The working space of reinforcing bar has used upper bracket 20 and lower bracket 30 to complete the installation of built-in fitting 10 in method of the invention Operation, such reinforcing bar binding operation can also be gone on smoothly, and improve construction quality.

Claims (10)

1. a kind of high temperature air-cooled pile pressure container installation of embedded parts tool, which is characterized in that including upper bracket and lower part branch Frame, the upper bracket include two the first front leg struts, two the first rear support legs, several support plates and connecting plate, described two It is connected by the connecting plate between a first front leg strut, between described two first rear support legs, the support plate connects institute The top of the first front leg strut and the top of the first rear support leg are stated, it is pre-buried when so as to which built-in fitting being fixed in the upper bracket The kingbolt casing of part is located in the support plate;The support plate is equipped with several holding cards;
The lower bracket includes connecting rod, two the second front leg struts and two the second rear support legs, described two second front leg struts Between, connected by the connecting rod between described two second rear support legs, between second front leg strut and the second rear support leg It connects;
In use, the top of the second front leg strut of the lower bracket and the bottom of the first front leg strut of the upper bracket are connected It connects, the bottom of first rear support leg at the top and upper bracket of second rear support leg is connect.
2. high temperature air-cooled pile pressure container installation of embedded parts tool according to claim 1, which is characterized in that the branch The quantity of fagging is four.
3. high temperature air-cooled pile pressure container installation of embedded parts tool according to claim 1 or 2, which is characterized in that institute The length for stating the first front leg strut is greater than the length of first rear support leg, after the length of second front leg strut is less than described second The length of supporting leg, and the difference of the length of first front leg strut and the first rear support leg be equal to second rear support leg and second before prop up The difference of the length of leg.
4. high temperature air-cooled pile pressure container installation of embedded parts tool according to claim 1 or 2, which is characterized in that also Including securing plate, connected between the lower part of first front leg strut and the lower part of the first rear support leg by the securing plate.
5. high temperature air-cooled pile pressure container installation of embedded parts tool according to claim 1 or 2, which is characterized in that institute It states the second front leg strut and is equipped with preceding supporting plate far from the side of second rear support leg, second rear support leg is far from propping up before described second The side of leg is equipped with rear supporting plate.
6. high temperature air-cooled pile pressure container installation of embedded parts tool according to claim 5, which is characterized in that described Gusset is equipped between two front leg struts and preceding supporting plate, between second rear support leg and rear supporting plate.
7. a kind of installation method of high temperature air-cooled pile pressure container built-in fitting, which is characterized in that using described in claim 1-4 High temperature air-cooled pile pressure container installation of embedded parts tool, comprising the following steps:
(1) built-in fitting is placed in the upper bracket, and is located at the kingbolt casing of built-in fitting in the support plate, so Kingbolt casing is blocked using the holding card in the support plate afterwards, built-in fitting is fixedly connected with the upper bracket;
(2) it when the design installation site of reactor cabin wall construction to preburied column, is buried on the wall of reactor cabin Four preburied columns;
(3) lower bracket is lifted and adjusts the position of the lower bracket into cabin to design position, then will be described under The second front leg strut, the second rear support leg of portion's bracket are connect with four preburied columns, and the lower bracket is fixed on institute It states on four preburied columns;
(4) by built-in fitting and the upper bracket integral hoisting into reactor cabin, then dropping place is adjusted in the lower bracket Whole first front leg strut and the second front leg strut adjust built-in fitting to design position, then by first front leg strut with Second front leg strut connection, first rear support leg is connect with the second rear support leg, by the upper bracket be fixed on it is described under On portion's bracket.
8. the installation method of high temperature air-cooled pile pressure container built-in fitting according to claim 7, which is characterized in that the step Suddenly in (1), the kingbolt casing of built-in fitting first layer is placed in the support plate.
9. the installation method of high temperature air-cooled pile pressure container built-in fitting according to claim 7 or 8, which is characterized in that institute It states in step (4), the supporting plate before second front leg strut is arranged far from the side of second rear support leg props up after described second Rear supporting plate is arranged far from the side of second front leg strut in leg, after the upper bracket is fixed in the lower bracket, in advance Embedded part front vertical plate is resisted against on the preceding supporting plate, and built-in fitting back vertical plate is resisted against in the rear supporting plate.
10. the installation method of high temperature air-cooled pile pressure container built-in fitting according to claim 9, which is characterized in that in institute It states between the second front leg strut and preceding supporting plate, be respectively provided with gusset between second rear support leg and rear supporting plate.
CN201610402587.8A 2016-06-08 2016-06-08 The installation tool and installation method of high temperature air-cooled pile pressure container built-in fitting Active CN105931681B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610402587.8A CN105931681B (en) 2016-06-08 2016-06-08 The installation tool and installation method of high temperature air-cooled pile pressure container built-in fitting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610402587.8A CN105931681B (en) 2016-06-08 2016-06-08 The installation tool and installation method of high temperature air-cooled pile pressure container built-in fitting

Publications (2)

Publication Number Publication Date
CN105931681A CN105931681A (en) 2016-09-07
CN105931681B true CN105931681B (en) 2019-03-01

Family

ID=56832630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610402587.8A Active CN105931681B (en) 2016-06-08 2016-06-08 The installation tool and installation method of high temperature air-cooled pile pressure container built-in fitting

Country Status (1)

Country Link
CN (1) CN105931681B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109461507B (en) * 2018-09-22 2020-07-10 中核能源科技有限公司 Installation device and installation method for high-temperature gas cooled reactor containment vessel sealing support

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1773630A (en) * 1998-05-25 2006-05-17 东芝株式会社 Reactor-containment vessel and its building method
CN102061788A (en) * 2010-11-09 2011-05-18 中国核工业华兴建设有限公司 Method for mounting bottom plates and cylinder of steel lining of nuclear power plant
CN202217513U (en) * 2011-08-18 2012-05-09 中广核工程有限公司 Precast supporting device of thermal insulating layer of pressure vessel of nuclear power station
CN105609148A (en) * 2015-12-24 2016-05-25 上海核工程研究设计院 Device for nuclear power plant push-pull device embedded component precision control and installation method thereof
CN205276926U (en) * 2015-11-13 2016-06-01 华能山东石岛湾核电有限公司 High temperature gas cooled core power station steam generator cabin module

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5391836B2 (en) * 2009-05-29 2014-01-15 株式会社日立製作所 Module structure and plant construction method
JP5688383B2 (en) * 2012-01-31 2015-03-25 日立Geニュークリア・エナジー株式会社 Shroud support repair method and repair device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1773630A (en) * 1998-05-25 2006-05-17 东芝株式会社 Reactor-containment vessel and its building method
CN102061788A (en) * 2010-11-09 2011-05-18 中国核工业华兴建设有限公司 Method for mounting bottom plates and cylinder of steel lining of nuclear power plant
CN202217513U (en) * 2011-08-18 2012-05-09 中广核工程有限公司 Precast supporting device of thermal insulating layer of pressure vessel of nuclear power station
CN205276926U (en) * 2015-11-13 2016-06-01 华能山东石岛湾核电有限公司 High temperature gas cooled core power station steam generator cabin module
CN105609148A (en) * 2015-12-24 2016-05-25 上海核工程研究设计院 Device for nuclear power plant push-pull device embedded component precision control and installation method thereof

Also Published As

Publication number Publication date
CN105931681A (en) 2016-09-07

Similar Documents

Publication Publication Date Title
CN101435276B (en) Hydraulic lifting and positioning device for steel beam at top of silo structure and construction method thereof
CN104631810B (en) High altitude moving hanging basket system and construction method
CN104674854B (en) Ballasting system for detecting engineering pile foundation
CN102261067A (en) Method for installing reinforcement cage of large-diameter ultra-long pile
CN106284663A (en) A kind of construction method of oval suspended-dome structure
CN110374200A (en) Large span rigidity unevenly mixes rack high altitude bulk method
CN205636474U (en) Assembled bracket structure
CN105931681B (en) The installation tool and installation method of high temperature air-cooled pile pressure container built-in fitting
CN202658590U (en) Integral assembled drilling platform
CN109629449A (en) A kind of steel case arch bridge arch springing toughened internal stress installation locating support and alignment method
CN105113415B (en) Hydraulic pressure sliding sash climbing frame
CN201826320U (en) Assembling and sinking device for double wall steel cofferdam
CN209722744U (en) A kind of Bracing Systems for steel box girder assembling
CN102720360B (en) Combination device of secondary high building supported lifted and poured cement formwork and building material lifting and lifting box
CN207633795U (en) A kind of foundation pit suspension lane device
CN208632968U (en) Pier stud 0# beam section cast-in-place support
CN207177310U (en) A kind of crane beam on rock wall for underground power house reinforcing bar is from steady structure
CN105970988B (en) The construction method of elevator sidewall reinforcing bar is installed in raft foundation
CN211949726U (en) Building stand foundation stabilization steel structure frame
CN204574800U (en) The combined heat-treatment furnace column of lattice
CN104266482B (en) A kind of method of docking support for cylinder of rotary kiln in the air
CN204780601U (en) Bed -jig is assembled to reinforcing bar festival section
CN105178393B (en) The manufacture method of water tank, hanging method, installation method
CN107034788B (en) A kind of suspender tension device and its construction method
CN204326658U (en) LNG storage tank reinforced mesh wind-resistant column bracing means

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant