CN105926780B - 双圆钢管混凝土柱的梁柱节点及施工方法 - Google Patents
双圆钢管混凝土柱的梁柱节点及施工方法 Download PDFInfo
- Publication number
- CN105926780B CN105926780B CN201610507657.6A CN201610507657A CN105926780B CN 105926780 B CN105926780 B CN 105926780B CN 201610507657 A CN201610507657 A CN 201610507657A CN 105926780 B CN105926780 B CN 105926780B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- interior
- interconnecting piece
- outer steel
- column node
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/58—Connections for building structures in general of bar-shaped building elements
- E04B1/5825—Connections for building structures in general of bar-shaped building elements with a closed cross-section
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
一种双圆钢管混凝土柱的梁柱节点及施工方法,梁柱节点由内钢管、外钢管、连接梁段、内连接件、高强螺栓和混凝土组成;内钢管的轴线与外钢管的轴线重合,内钢管上端伸出外钢管上端500mm;连接梁段焊接在外钢管上,连接梁段的翼缘板位于两圈高强螺栓之间;内连接件位于内钢管和外钢管之间,内连接件套在内钢管上,内连接件通过高强螺栓固定在外钢管上;内钢管和外钢管的内部都有混凝土。梁柱节点的施工中,先将内连接件通过高强螺栓固定在外钢管上,再将外钢管套到内钢管上,使内钢管穿过内连接件的内环钢管,最后浇筑混凝土。本发明的梁柱节点具有焊缝少、施工快捷、受力性能好等优点。
Description
技术领域
本发明涉及双圆钢管混凝土柱与钢梁连接的梁柱节点技术领域。
背景技术
双圆钢管混凝土柱具有承载力高、塑性和韧性好、抗火性能好等优点。但是,双圆钢管混凝土柱包含两层圆钢管,施工空间较小,梁柱节点的处理较为困难。目前已有的梁柱节点存在施工速度慢、焊缝多、焊接残余应力大等缺点,因此需要一种双圆钢管混凝土柱的梁柱节点及相应的施工方法,达到梁柱节点受力性能好、施工方便等目标。
发明内容
为了克服双圆钢管混凝土柱的梁柱节点焊缝多、焊接残余应力大、施工速度慢等问题,本发明公开一种双圆钢管混凝土柱的梁柱节点及施工方法,该梁柱节点具有构造简单、施工快捷、受力性能好等优点,该施工方法能够解决施工空间较小条件下梁柱节点的施工问题。
本发明的双圆钢管混凝土柱的梁柱节点的技术方案是:由内钢管、外钢管、连接梁段、内连接件、高强螺栓和混凝土组成;内钢管和外钢管的截面都为圆形,内钢管的轴线与外钢管的轴线重合,内钢管下端与外钢管下端平齐,内钢管上端伸出外钢管上端500mm;连接梁段焊接在外钢管上,连接梁段的翼缘板位于两圈高强螺栓之间;内连接件位于内钢管和外钢管之间,内连接件套在内钢管上,内连接件通过高强螺栓固定在外钢管上,两圈高强螺栓固定一个内连接件;高强螺栓的中心线与外钢管的轴线垂直相交;内钢管和外钢管的内部都有混凝土。
外钢管的上端有四圈外钢管螺栓孔,每一圈外钢管螺栓孔距外钢管底部的高度相同,外钢管螺栓孔的中心线与外钢管的轴线垂直相交,每两圈外钢管螺栓孔用于固定一个内连接件。
连接梁段由两块翼缘板和一块腹板组成,翼缘板与腹板之间通过焊缝连接,翼缘板三边为圆弧形,一边为直边,与直边相对的圆弧边的直径等于外钢管的外径,直边长度等于被连接钢梁的翼缘板宽度,腹板上有腹板螺栓孔,以便与钢梁连接。根据梁柱节点连接钢梁数量的不同,连接梁段可以为两个、三个或四个。
内连接件由内环钢管、外环钢管和连接钢板组成,内环钢管和外环钢管的截面都为圆形,内环钢管的轴线与外环钢管的轴线重合,连接钢板一端焊接在内环钢管上,另一端焊接在外环钢管上。外环钢管上有两圈外环钢管螺栓孔,每一圈外环钢管螺栓孔距外环钢管底部的高度相同,外环钢管螺栓孔的中心线与外环钢管的轴线垂直相交,外环钢管螺栓孔的位置与外钢管螺栓孔的位置相对应,外钢管的内径与外环钢管的外径之差不大于0.5mm。内环钢管的内径与内钢管的外径之差不大于0.5mm。连接钢板水平放置,位于两圈外环钢管螺栓孔之间,连接钢板呈V字形,中心有连通孔,有利于振捣混凝土时气泡的排出。内连接件有两个,其位置分别与连接梁段的上翼缘板和下翼缘板相对应,分别传递连接梁段的上翼缘板和下翼缘板传来的内力。通过内连接件,增强了内钢管、外钢管和连接梁段之间的联系,使连接梁段传来的内力能够传递到内钢管和混凝土上,避免外钢管局部承受较大的拉力,发生局部过大变形和破坏。
本发明的双圆钢管混凝土柱的梁柱节点的施工方法是:加工内钢管和外钢管,在外钢管的上端钻四圈外钢管螺栓孔;加工翼缘板和腹板,在腹板上钻腹板螺栓孔,把翼缘板和腹板焊接成连接梁段,将连接梁段焊接到外钢管上;加工内环钢管、外环钢管和连接钢板,在外环钢管上钻两圈外环钢管螺栓孔,在连接钢板上开连通孔,把连接钢板弯折成V字形,将内环钢管、外环钢管和连接钢板焊接成内连接件,把内连接件放到外钢管内,对齐外环钢管螺栓孔和外钢管螺栓孔,用高强螺栓把内连接件固定在外钢管上;将外钢管套到内钢管上,使内钢管穿过内连接件的内环钢管;在内钢管和外钢管的内部都浇筑混凝土。
在多高层建筑的施工中,上一层梁柱节点的施工方法是:将内钢管焊接到下层的内钢管上;把翼缘板和腹板焊接成连接梁段,将连接梁段焊接到外钢管上,把内环钢管、外环钢管和连接钢板焊接成内连接件,将内连接件放到外钢管内,对齐外环钢管螺栓孔和外钢管螺栓孔,用高强螺栓把内连接件固定在外钢管上;把外钢管套到内钢管上,使内钢管穿过内连接件的内环钢管,将外钢管焊接到下层外钢管上;在内钢管和外钢管的内部都浇筑混凝土。
本发明的双圆钢管混凝土柱的梁柱节点能够增强内钢管、外钢管和连接梁段之间的联系,把连接梁段传来的内力传递到内钢管及混凝土上,避免外钢管发生局部过大变形和破坏;内钢管和外钢管在梁柱节点区不断开,保证了节点区的整体性,并且内钢管和外钢管在不同位置断开,避免形成薄弱部位;内连接件与外钢管采用螺栓连接,与内钢管采用承插连接,具有焊缝少、施工快捷等优点。所述施工方法解决了双层钢管内部不易施工的问题。
附图说明
下面结合附图对本发明进一步说明。
图1是本发明的梁柱节点的轴测图。
图2是本发明的梁柱节点的俯视图。
图3是本发明的梁柱节点的侧视图。
图4是本发明的连接梁段的轴测图。
图5是本发明的内连接件的轴测图。
图6是本发明的连接钢板的轴测图。
图7是本发明的梁柱节点的使用状态图。
图8是本发明的梁柱节点的施工过程图。
图9是本发明的梁柱节点多层施工时的施工过程图。
图中:1—内钢管,2—外钢管,3—连接梁段,4—内连接件,5—高强螺栓,6—混凝土,7—钢梁,21-外钢管螺栓孔,31—翼缘板,32—腹板,41—内环钢管,42—外环钢管,43—连接钢板,321—腹板螺栓孔,421—外环钢管螺栓孔,431—连通孔。
具体实施方式
如图1-3所示,一种双圆钢管混凝土柱的梁柱节点,由内钢管(1)、外钢管(2)、连接梁段(3)、内连接件(4)、高强螺栓(5)和混凝土(6)组成;内钢管(1)和外钢管(2)的截面都为圆形,内钢管(1)的轴线与外钢管(2)的轴线重合,内钢管(1)下端与外钢管(2)下端平齐,内钢管(1)上端伸出外钢管(2)上端500mm;连接梁段(3)焊接在外钢管(2)上,连接梁段(3)的翼缘板位于两圈高强螺栓(5)之间;内连接件(4)位于内钢管(1)和外钢管(2)之间,内连接件(4)套在内钢管(1)上,内连接件(4)通过高强螺栓(5)固定在外钢管(2)上,每两圈高强螺栓(5)固定一个内连接件(4);高强螺栓(5)的中心线与外钢管(2)的轴线垂直相交;内钢管(1)和外钢管(2)的内部都有混凝土(6)。
如图4所示,连接梁段(3)由两块翼缘板(31)和一块腹板(32)组成,翼缘板(31)与腹板(32)之间通过焊缝连接,翼缘板(31)三边为圆弧形,一边为直边,腹板(32)上有腹板螺栓孔(321)。
如图5所示,内连接件(4)由内环钢管(41)、外环钢管(42)和连接钢板(43)组成,内环钢管(41)和外环钢管(42)的截面都为圆形,内环钢管(41)的轴线与外环钢管(42)的轴线重合,连接钢板(43)一端焊接在内环钢管(41)上,另一端焊接在外环钢管(42)上,连接钢板(43)水平放置,位于两圈外环钢管螺栓孔(421)之间。外环钢管(42)上有两圈外环钢管螺栓孔(421),每一圈外环钢管螺栓孔(421)距外环钢管(42)底部的高度相同。连接钢板(43)有四块,中心有连通孔(431)。
如图6所示,连接钢板(43)呈V字形,中心有连通孔(431)。
如图7所示,双圆钢管混凝土柱的梁柱节点通过连接梁段(3)与钢梁(7)连接,形成框架结构,翼缘板通过焊缝连接,腹板通过高强螺栓连接。
图8所示为本发明的双圆钢管混凝土柱的梁柱节点的施工过程图,整个施工过程分为a、b、c、d、e五个步骤,具体的施工过程为:步骤a,加工内钢管(1)和外钢管(2),在外钢管(2)的上端钻四圈外钢管螺栓孔(21);步骤b,加工翼缘板(31)和腹板(32),在腹板(32)上钻腹板螺栓孔(321),把翼缘板(31)和腹板(32)焊接成连接梁段(3),将连接梁段(3)焊接到外钢管(2)上;步骤c,加工内环钢管(41)、外环钢管(42)和连接钢板(43),在外环钢管(42)上钻两圈外环钢管螺栓孔(421),在连接钢板(43)上开连通孔(431),把连接钢板(43)弯折成V字形,将内环钢管(41)、外环钢管(42)和连接钢板(43)焊接成内连接件(4),把内连接件(4)放到外钢管(2)内,对齐外环钢管螺栓孔(421)和外钢管螺栓孔(21),用高强螺栓(5)把内连接件(4)固定在外钢管(2)上;步骤d,将外钢管(2)套到内钢管(1)上,使内钢管(1)穿过内连接件(4)的内环钢管(41);步骤e,在内钢管(1)和外钢管(2)的内部都浇筑混凝土(6)。
图9所示为本发明的梁柱节点多层施工时的施工过程图,整个施工过程分为a、b、c、d四个步骤,具体的施工过程为:步骤a,将内钢管(1)焊接到下层的内钢管(1)上;步骤b,将连接梁段(3)焊接到外钢管(2)上,把内连接件(4)放到外钢管(2)内,用高强螺栓(5)把内连接件(4)固定在外钢管(2)上;步骤c,把外钢管(2)套到内钢管(1)上,使内钢管(1)穿过内连接件(4)的内环钢管(41),将外钢管(2)焊接到下层的外钢管(2)上;步骤d,在内钢管(1)和外钢管(2)的内部都浇筑混凝土(6)。
Claims (1)
1.一种双圆钢管混凝土柱的梁柱节点的施工方法,内钢管、外钢管、连接梁段、内连接件、高强螺栓和混凝土组成梁柱节点,其特征是:加工内钢管和外钢管,在外钢管的上端钻四圈外钢管螺栓孔;加工翼缘板和腹板,在腹板上钻腹板螺栓孔,把翼缘板和腹板焊接成连接梁段,将连接梁段焊接到外钢管上;加工内环钢管、外环钢管和连接钢板,在外环钢管上钻两圈外环钢管螺栓孔,在连接钢板上开连通孔,把连接钢板弯折成V字形,将内环钢管、外环钢管和连接钢板焊接成内连接件,把内连接件放到外钢管内,对齐外环钢管螺栓孔和外钢管螺栓孔,用高强螺栓把内连接件固定在外钢管上;将外钢管套到内钢管上,使内钢管穿过内连接件的内环钢管;在内钢管和外钢管的内部都浇筑混凝土。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610507657.6A CN105926780B (zh) | 2016-07-01 | 2016-07-01 | 双圆钢管混凝土柱的梁柱节点及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610507657.6A CN105926780B (zh) | 2016-07-01 | 2016-07-01 | 双圆钢管混凝土柱的梁柱节点及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105926780A CN105926780A (zh) | 2016-09-07 |
CN105926780B true CN105926780B (zh) | 2018-11-06 |
Family
ID=56829742
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610507657.6A Expired - Fee Related CN105926780B (zh) | 2016-07-01 | 2016-07-01 | 双圆钢管混凝土柱的梁柱节点及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105926780B (zh) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107246109B (zh) * | 2017-03-12 | 2019-04-16 | 东北石油大学 | 实复式钢管混凝土组合柱组合梁构成的框架及其施工方法 |
CN106884478B (zh) * | 2017-03-17 | 2022-10-25 | 中铁工程设计咨询集团有限公司 | 上翼缘贯通-柱内插式组合框架结构连接节点、组合框架 |
CN107217851A (zh) * | 2017-07-05 | 2017-09-29 | 安徽送变电工程公司 | 钢管砼柱混凝土顶升灌注装置及其施工工艺 |
CN107338872B (zh) * | 2017-08-23 | 2019-02-05 | 青岛理工大学 | 双套筒钢结构梁柱节点及安装方法 |
CN109339250B (zh) * | 2018-11-21 | 2024-01-05 | 福建工程学院 | 节点加强型拼装钢管混凝土连接结构及其施工方法 |
CN111733986B (zh) * | 2020-07-13 | 2021-04-20 | 青岛理工大学 | 内置frp筋连接装置的双钢管混凝土梁柱节点及安装方法 |
CN114411980B (zh) * | 2022-02-25 | 2023-08-18 | 东南大学 | 一种中空夹层内加劲外环板式钢管混凝土梁柱节点 |
CN114962411A (zh) * | 2022-06-09 | 2022-08-30 | 浙江东南网架股份有限公司 | 球面网壳结构环槽铆钉安装方法 |
CN115075380B (zh) * | 2022-07-19 | 2023-06-20 | 华东交通大学 | 一种中空夹层钢管陶瓷节点结构及其节点处理方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09209450A (ja) * | 1996-02-07 | 1997-08-12 | Daiwa House Ind Co Ltd | 柱・梁接合構造およびこれを用いた鉄骨架構 |
JP2001262706A (ja) * | 2000-03-23 | 2001-09-26 | Nippon Steel Corp | 柱梁の接合構造 |
JP2008095499A (ja) * | 2007-12-28 | 2008-04-24 | East Japan Railway Co | 柱梁接合構造 |
CN102661002A (zh) * | 2012-05-07 | 2012-09-12 | 山东科技大学 | 双圆钢管混凝土柱与钢梁的连接节点及施工方法 |
CN203034611U (zh) * | 2012-12-04 | 2013-07-03 | 中国一冶集团有限公司 | 实现钢管混凝土强柱弱梁节点的装置 |
CN203440916U (zh) * | 2013-06-28 | 2014-02-19 | 成都科创佳思科技有限公司 | 钢管节点装置 |
CN104032838A (zh) * | 2014-05-26 | 2014-09-10 | 湖北弘毅钢结构工程有限公司 | 一种钢管混凝土柱与梁连接节点 |
CN105714984A (zh) * | 2016-01-28 | 2016-06-29 | 广东工业大学 | 内置圆管带拉筋的方形及异形钢管混凝土柱及其施工方法 |
CN205907823U (zh) * | 2016-07-01 | 2017-01-25 | 山东科技大学 | 双圆钢管混凝土柱的梁柱节点 |
-
2016
- 2016-07-01 CN CN201610507657.6A patent/CN105926780B/zh not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09209450A (ja) * | 1996-02-07 | 1997-08-12 | Daiwa House Ind Co Ltd | 柱・梁接合構造およびこれを用いた鉄骨架構 |
JP2001262706A (ja) * | 2000-03-23 | 2001-09-26 | Nippon Steel Corp | 柱梁の接合構造 |
JP2008095499A (ja) * | 2007-12-28 | 2008-04-24 | East Japan Railway Co | 柱梁接合構造 |
CN102661002A (zh) * | 2012-05-07 | 2012-09-12 | 山东科技大学 | 双圆钢管混凝土柱与钢梁的连接节点及施工方法 |
CN203034611U (zh) * | 2012-12-04 | 2013-07-03 | 中国一冶集团有限公司 | 实现钢管混凝土强柱弱梁节点的装置 |
CN203440916U (zh) * | 2013-06-28 | 2014-02-19 | 成都科创佳思科技有限公司 | 钢管节点装置 |
CN104032838A (zh) * | 2014-05-26 | 2014-09-10 | 湖北弘毅钢结构工程有限公司 | 一种钢管混凝土柱与梁连接节点 |
CN105714984A (zh) * | 2016-01-28 | 2016-06-29 | 广东工业大学 | 内置圆管带拉筋的方形及异形钢管混凝土柱及其施工方法 |
CN205907823U (zh) * | 2016-07-01 | 2017-01-25 | 山东科技大学 | 双圆钢管混凝土柱的梁柱节点 |
Also Published As
Publication number | Publication date |
---|---|
CN105926780A (zh) | 2016-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105926780B (zh) | 双圆钢管混凝土柱的梁柱节点及施工方法 | |
US10167623B2 (en) | Prefabricated reinforced concrete-filled steel pipe sleeve joint | |
US20190271144A1 (en) | Assemblable structural column joint connection using fiber-reinforced concrete filled round double steel tubes and mounting method thereof | |
CN102661002B (zh) | 双圆钢管混凝土柱与钢梁的连接节点的施工方法 | |
CN107299683B (zh) | 复式钢管混凝土柱装配式对接节点及连接方法 | |
CN104032838A (zh) | 一种钢管混凝土柱与梁连接节点 | |
CN101914952A (zh) | 中空钢管混凝土柱与钢梁的连接节点及其施工方法 | |
CN109339250B (zh) | 节点加强型拼装钢管混凝土连接结构及其施工方法 | |
CN203977582U (zh) | 一种钢管混凝土柱与梁连接节点 | |
CN105714984B (zh) | 内置圆管带拉筋的方形及异形钢管混凝土柱及其施工方法 | |
CN105507426A (zh) | 半穿心牛腿加腋型复式钢管混凝土柱-钢梁节点 | |
CN103334499A (zh) | 一种梁柱节点连接装置 | |
CN203174885U (zh) | 提高钢管和混凝土握裹力的钢管混凝土柱 | |
CN106836491B (zh) | 一种高强度钢管混凝土柱梁节点结构及其施工方法 | |
CN105625575A (zh) | 一种斜交圆管相贯面内插板转接构造 | |
CN203361354U (zh) | 一种梁柱节点连接装置 | |
CN105569188A (zh) | 方形薄壁钢管混凝土柱与钢梁装配式节点结构及其施工方法 | |
CN203307937U (zh) | 一种混凝土柱与钢梁刚性节点构造 | |
CN205421715U (zh) | 一种新型高强工字承载梁 | |
CN205907823U (zh) | 双圆钢管混凝土柱的梁柱节点 | |
CN108104263A (zh) | 一种新型装配式钢-再生混凝土混合框架结构体系 | |
CN105297895A (zh) | 复式钢管混凝土柱-钢梁半穿心加腋型节点 | |
CN106639151A (zh) | 内置x型对拉钢板式焊接矩形钢管混凝土柱及施工方法 | |
CN108301560B (zh) | 一种内置高强角钢的钢管混凝土柱及其施工方法 | |
CN204212406U (zh) | 一种单侧加固施工大钢模 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181106 Termination date: 20210701 |