CN105923740B - The application method of ecological purification module, ecological purification component and ecological purification module - Google Patents

The application method of ecological purification module, ecological purification component and ecological purification module Download PDF

Info

Publication number
CN105923740B
CN105923740B CN201610390635.6A CN201610390635A CN105923740B CN 105923740 B CN105923740 B CN 105923740B CN 201610390635 A CN201610390635 A CN 201610390635A CN 105923740 B CN105923740 B CN 105923740B
Authority
CN
China
Prior art keywords
water
frame structure
water blocking
ecological purification
purification module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610390635.6A
Other languages
Chinese (zh)
Other versions
CN105923740A (en
Inventor
张俊
周璟
唐陈杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Three Gorges Technology Co ltd
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Original Assignee
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Investigation Design and Research Institute Co Ltd SIDRI filed Critical Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority to CN201610390635.6A priority Critical patent/CN105923740B/en
Publication of CN105923740A publication Critical patent/CN105923740A/en
Application granted granted Critical
Publication of CN105923740B publication Critical patent/CN105923740B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/02Aerobic processes
    • C02F3/10Packings; Fillings; Grids
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Water Supply & Treatment (AREA)
  • Hydrology & Water Resources (AREA)
  • Microbiology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Biotechnology (AREA)
  • Botany (AREA)
  • Revetment (AREA)
  • Biological Treatment Of Waste Water (AREA)

Abstract

The present invention provides the application method of a kind of ecological purification module, ecological purification component and ecological purification module, and the ontology of ecological purification module is hollow frame structure, and the inside of frame structure is equipped with Filler for water purification;The bottom of frame structure is equipped with bottom shutter, and the side that the two of them water supply stream of frame structure passes through is respectively meet water side and backwater side;Meeting water that side is equipped with can be along the first water blocking board group of the transverse shifting of frame structure, and backwater side is equipped with can be along the second flap group of the transverse shifting of frame structure;First water blocking board group is identical with the structure of second flap group, and the first water blocking board group includes at least two water blocking plates.The present invention can be realized ecological purification module and switched between purification pattern or renewal model by mobile first water blocking board group and second flap group.

Description

The application method of ecological purification module, ecological purification component and ecological purification module
Technical field
The present invention relates to ecological environment field of engineering technology, more particularly to a kind of ecological purification module, ecological purification group The application method of part and ecological purification module.
Background technique
In current contamination water body treating, with current wetland, gravel bed, permeable dike etc. for representative, filled out by internal gravel etc. The technology and device for expecting the biological film process water body formed are obtained since it is good to the effect of water body treating, Construction and operation expense is low To being widely applied.But in the application it has also been found that these devices are easy to happen blocking, so that treatment scale and efficiency are influenced, Sometimes even these fillers are all taken out and updates ability raising efficiency.And permeable dike not only has permeable purification to promote water quality Demand, there are also the coordination requirements before dam between landscape water level and water flow.
Summary of the invention
In view of the foregoing deficiencies of prior art, the purpose of the present invention is to provide a kind of ecological purification modules, ecology The application method of purification assembly and ecological purification module, for solving the above-mentioned problems in the prior art.
In order to solve the above technical problem, the present invention provides a kind of ecological purification module, the sheet of the ecological purification module Body is hollow frame structure, and the inside of the frame structure is equipped with Filler for water purification;The bottom of the frame structure is equipped with bottom Shutter, the side that the two of them water supply stream of the frame structure passes through are respectively meet water side and backwater side;It is described to meet Water side is equipped with can be along the first water blocking board group of the transverse shifting of the frame structure, and the backwater side is equipped with can edge The second flap group of the transverse shifting of the frame structure;The knot of the first water blocking board group and the second flap group Structure is identical, and the first water blocking board group includes at least two water blocking plates.
Preferably, the water blocking plate includes several folding plate bodys.
Preferably, the top surface of the frame structure is equipped with inserts for the first water blocking board group and the second flap group The water fender jack entered.
Preferably, the first permeable screen is additionally provided on the side that meets water, the first permeable screen is in described first The inside of water blocking board group;The backwater side is equipped with the second permeable screen, and the second permeable screen is in the second gear The inside of water board group.
Preferably, the frame structure further include two be oppositely arranged block side, the two of side are blocked described in two Side meets water side and the backwater side is connect with described respectively;Each described block is equipped with side shutter on side.
Further, the top surface of the frame structure is equipped with the block piece jack for side shutter insertion.
Preferably, the bottom surface of the frame structure is equipped with several protruding parts, and the top surface of the frame structure is equipped with Several mounting holes corresponding with the protruding part.
The invention further relates to a kind of ecological purification components, and ecological purification module described at least two is along the frame knot The transverse direction of structure is sequentially connected, the side screening with ecological purification module junction described in another of each ecological purification module Baffle is removed.
The invention further relates to a kind of ecological purification component, ecological purification module described at least two along vertical direction according to Secondary connection, the protruding part of the frame structure in top are inserted in the mounting hole for the frame structure being below.
The invention further relates to a kind of application method of ecological purification module, the ecological purification module be may be configured as only Change mode or renewal model;When ecological purification module is purification pattern, the first water blocking board group and second water blocking Board group moves in the frame structure respectively along opposite direction, and the first water blocking board group is moved to the frame structure The side that meets water one of lateral ends, the second flap group is moved to its of the backwater side of the frame structure In a lateral ends;The side that meets water of the frame structure is divided into the first purification gear for covering the first water blocking board group Pool and the first purification flowing water area for not covering the first water blocking board group;The backwater side of the frame structure is divided into covering Second purification water blocking area of the second flap group and the second of the second flap group is not covered purify flowing water area, institute Stating the first purification flowing water area and second purification flowing water area is to be staggered;Water flow enters the life from the first purification flowing water area The inside of state cleaning module, the Filler for water purification of the ecological purification module make the impurity in water flow be stranded in the ecological purification mould In block, water flow is discharged from the second purification flowing water area;When ecological purification module is renewal model, the frame structure is had been moved into The side that meets water one of lateral ends the first water blocking board group at least one water blocking plate to the side that meets water Another lateral ends it is mobile, so that the water blocking plate in the first water blocking board group moved is moved to meet water and is updated position It sets;The side that meets water of the frame structure is divided into the first update water blocking area for covering the first water blocking board group and does not cover The first of the first water blocking board group updates flowing water area;Have been moved into the one of lateral of the backwater side of the frame structure At least one water blocking plate in the second flap group of end is mobile to another lateral ends of the backwater side, makes institute Water blocking plate in the mobile second flap group is moved to backwater and updates position;The backwater side quilt of the frame structure It is divided into the second update water blocking area for covering the second flap group and does not cover the second of the second flap group and updates Flowing water area;Described meet water updates position and the backwater to update position corresponding, so that described first updates flowing water area and described the Two update flowing water areas are to be staggered;Water flow updates the inside that flowing water area enters the ecological purification module from described first, stagnant It stays the impurity in the ecological purification module with water flow, updates flowing water area from described second and be discharged.
As described above, the application method of ecological purification module of the invention, ecological purification component and ecological purification module, tool There is following beneficial effect:
The ontology of ecological purification module of the invention is frame structure, and frame structure assumes responsibility for stablizing branch to total Support;It can be realized ecological purification module in purification pattern by mobile first water blocking board group and second flap group or update mould Switch between formula;Ecological purification module of the invention can connect into the structure of various ecological purification components in a manner of module; When at least two ecological purification modules are in turn connected to form ecological purification component along the transverse direction of frame structure, each ecological purification Module is removed with the side shutter of ecological purification module junction described in another;At least two ecological purification module edges Vertical direction when being in turn connected to form ecological purification component, the protruding part of the frame structure in top, which is inserted in, to be in In the mounting hole of the frame structure of lower section;Ecological purification module of the invention can be realized modularization operation, and have at The type time is short, the characteristics of adapting to and having a wide range of application, and the purification and water landscape that can be used for the water body of mobility construct.
Detailed description of the invention
Fig. 1 is shown as the schematic perspective view of the ecological purification module of embodiment 1.
Fig. 2 is shown as the overlooking structure diagram of the ecological purification module of embodiment 1.
Fig. 3 is shown as the structural schematic diagram of the water blocking plate of the ecological purification module of embodiment 1.
Fig. 4 is shown as the structural schematic diagram of the first permeable screen of the ecological purification module of embodiment 1.
Fig. 5 is shown as the structural schematic diagram of the side shutter of the ecological purification module of embodiment 1.
Fig. 6 is shown as setting the ecological purification module of embodiment 1 to the structural schematic diagram of purification pattern.
Fig. 7 is shown as setting renewal model for the ecological purification module of embodiment 1, and meets water and update position for the first list Side water inlet position, backwater update structural schematic diagram when position is the first unilateral water exit position.
Fig. 8 is shown as setting renewal model for the ecological purification module of embodiment 1, and meet water update position be second pair Side water inlet position, backwater update structural schematic diagram when position is the second intermediate water exit position.
Fig. 9 is shown as setting renewal model for the ecological purification module of embodiment 1, and meets water and update position in third Between intake position, backwater updates structural schematic diagram when position is third bilateral water exit position.
Drawing reference numeral explanation
10 frame structures
100 Filler for water purification
200 bottom shutters
301 meet water side
302 backwater sides
303 block side
305 top frames
306 bottom frameworks
307 vertical frames
310 first water blocking board groups
311 water blocking plates
3111 plate bodys
3112 knobs
320 second flap groups
330 first permeable screens
331 lateral grizzly bars
332 vertical grizzly bars
340 second permeable screens
350 side shutters
351 shield ontologies
352 watertight rubbers
401 water fender jacks
402 screen jacks
403 block piece jacks
404 water fender kerves
405 screen slots
406 block piece slots
510 protruding parts
520 mounting holes
610 first purification water blocking areas
620 first purification flowing water areas
630 second purification water blocking areas
640 second purification flowing water areas
710 first update water blocking area
720 first update flowing water area
730 second update water blocking area
740 second update flowing water area
810 article rubber water stops
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this explanation Content disclosed by book is understood other advantages and efficacy of the present invention easily.
Please refer to attached drawing.It should be clear that this specification structure depicted in this specification institute accompanying drawings, ratio, size etc., only to cooperate The revealed content of specification is not intended to limit the invention enforceable so that those skilled in the art understands and reads Qualifications, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, It does not influence still fall in disclosed technology contents under the effect of present invention can be generated and the purpose that can reach It obtains in the range of capable of covering.Meanwhile cited such as "upper", "lower", "left", "right", " centre " and " one " in this specification Term, be merely convenient to being illustrated for narration, rather than to limit the scope of the invention, the change of relativeness or Adjustment, under the content of no substantial changes in technology, when being also considered as the enforceable scope of the present invention.
Embodiment 1
As shown in Figures 1 to 7, the ontology of the ecological purification module of the present embodiment is hollow frame structure 10, frame knot The inside of structure 10 is equipped with Filler for water purification 100;
Frame structure 10 is parallel with four including being sequentially connected four top frames 305, sequentially connected four bottom frameworks 306 The upper end of the vertical frame 307 being arranged, each vertical frame 307 is connected with the junction of corresponding two top frames 305, each The lower end of vertical frame 307 is connected with the junction of corresponding two bottom frameworks 306;
The side of frame structure 10 includes that the stream that supplies water is set by the way that meet water side 301 and backwater side 302 and two are opposite That sets blocks side 303, two two sides for blocking side 303 respectively with meet water side 301 and backwater side 302 is connect, meet Water side 301, one of them block side 303, backwater side 302 and another block side 303 and be sequentially connected;
The bottom of frame structure 10 is equipped with bottom shutter 200, and the side 301 that meets water is equipped with can be along frame structure 10 First water blocking board group 310 of transverse shifting, backwater side 302 is equipped with can be along the second gear of the transverse shifting of frame structure 10 Water board group 320;
First water blocking board group 310 is identical with the structure of second flap group 320, and the first water blocking board group 310 includes at least two A water blocking plate 311.
The ontology of ecological purification module is frame structure 10, and frame structure 10, which undertakes, stablizes support to total;This In embodiment, frame structure 10 constructs cuboid-type structure by material of armored concrete;The bottom of frame structure 10 is equipped with bottom Layer shutter 200 makes the bottom impervious surface of this frame structure 10, and top is permeable face.The ecological purification of the present embodiment Module by mobile first water blocking board group 310 and second flap group 320 in use, can be realized ecological purification module and purified Switch between mode or renewal model.
Filler for water purification 100 is made of the gravel of different-grain diameter or Filler for water purification 100 is by different-grain diameter gravel and other net The combination of the stronger material of the property changed is constituted.
In order to adjust by the water level before ecological purification module and by the flow of ecological purification module, make water blocking plate 311 include several folding plate bodys 3111, and the folding of plate body 3111 is by manually controlling or by a folding controller It is controlled, being respectively on most marginal two plate bodys 3111 for water blocking plate 311 is equipped with knob 3112, folding controller Several plate bodys 3111 of 3112 pulling water blocking plate 311 of control knob or staff pull water blocking plate 311 manually Several plate bodys 3111 make flexible by water blocking plate 311 or move, to control the folding amplitude of water blocking plate 311;In this way, As long as controlling the folding amplitude of several plate bodys 3111 of water blocking plate 311, it will be able to the region for covering water blocking plate 311 Change, so that the flow of water flow be made also just accordingly to change.
The top surface of the top frame 305 of frame structure 10 is equipped with inserts for the first water blocking board group 310 and second flap group 320 The water fender jack 401 entered, water fender jack 401 are through-hole, and the first water blocking board group 310 and second flap group 320 can be distinguished It is inserted into water fender jack 401, so that the first water blocking board group 310 and second flap group 320 can be positioned at water fender jack In 401;In order to make the first water blocking board group 310 and second flap group 320 be able to maintain vertical state, the bottom of frame structure 10 The bottom surface of frame 306 is equipped with water fender kerve 404 corresponding with water fender jack 401, the first water blocking board group 310 and second gear After water board group 320 passes through water fender jack 401, the bottom of the first water blocking board group 310 and second flap group 320 is inserted in water blocking In board bottom slot 404.
In the present embodiment, the size of water fender jack 401 is corresponding to the size of water fender kerve 404, the first water blocking board group Size of the 310 complete folded thickness no more than the width direction of water fender jack 401, the first water blocking board group 310 folding completely Size of the thickness of poststack no more than the width direction of water fender kerve 404;The height of water blocking plate 311 is less than or equal to top frame 305 top surface to the distance between the bottom surface of water fender kerve 404;First water blocking board group 310 stretches the length after extending entirely can Reach 2/3 or more of the length of corresponding water fender jack 401, the horizontal length after the first water blocking board group 310 is shunk entirely is phase Answer 1/5 or less the length of water fender jack 401.The length direction of water fender jack 401 is laterally in the same direction with frame structure 10.
It meets water and is additionally provided with the first permeable screen 330 on side 301, the first permeable screen 330 is in the first water blocking board group 310 Inside;Backwater side 302 is equipped with the second permeable screen 340, and the second permeable screen 340 is in second flap group 320 Inside;First permeable screen 330 and the second permeable screen 340 are oppositely arranged;It is set on the top surface of the top frame 305 of frame structure 10 There is the screen jack 402 being inserted into for the first permeable screen 330 and the second permeable screen 340, the bottom framework 306 of frame structure 10 Top surface is equipped with screen slot 405, and the first permeable screen 330 is inserted into corresponding screen jack 402, and the first permeable screen 330 Bottom be inserted into corresponding screen slot 405;Second permeable screen 340 is inserted into corresponding screen jack 402, and the second permeable grid Corresponding screen slot 405 is inserted into the bottom of plate 340;The structure makes the position of the first permeable screen 330 and the first permeable screen 330 It sets and is positioned by screen jack 402 and screen slot 405.
First permeable screen 330 is identical with the structure of the second permeable screen 340, the height and gear of the first permeable screen 330 The height of water plate 311 is identical, and the first permeable screen 330 includes lateral grizzly bar 331 multiple parallel and being arranged at equal intervals, and Vertical grizzly bar 332 multiple parallel and being arranged at equal intervals, each vertical grizzly bar 332 is connect with multiple lateral grizzly bars 331, with shape At uniformly distributed permeable hole, the size of permeable hole is less than or equal to the minimum grain size of Filler for water purification 100, and the first permeable screen 330 is arranged Filler for water purification 100 can be stopped to leak out outward with the second permeable screen 340, the quantity root of lateral grizzly bar 331 and vertical grizzly bar 332 According to the first permeable screen 330 and the second permeable screen 340 stable structure it needs to be determined that.
Water fender jack 401 and screen jack 402 are rectangular configuration, the structure of water fender jack 401 and screen jack 402 Identical, 401 width of water fender jack is to take 5~10cm, the both ends of water fender jack 401 respectively with the frame structure 10 that is closer to The distance between outer boundary be 15cm or more, the length of water fender jack 401 can be determined according to module scale demand.Frame knot The height of the bottom framework 306 of structure 10 is determined according to stable structure demand, in the present embodiment, the bottom framework 306 of frame structure 10 Height is 10cm or more, and water fender kerve 404 is identical as the structure of screen slot 405, the size and water blocking of water fender jack 401 The size of board bottom slot 404 accordingly refers to, the length and width of water fender jack 401 and the length and width of water fender kerve 404 Be it is identical, the depth of water fender kerve 404 is 5cm.
It each blocks and is equipped with side shutter 350 on side 303.It is set on the top surface of the top frame 305 of frame structure 10 There is the block piece jack 403 for the insertion of two side shutters 350;The top surface of the bottom framework 306 of frame structure 10 is equipped with two The block piece slot 406 that a side shutter 350 is inserted into;Two side shutters 350 are inserted into corresponding block piece jack respectively In 403, and the bottom of two side shutters 350 is inserted into corresponding block piece slot 406.The structure hides two sides Be blocked part jack 403 and block piece slot 406 of the position of baffle 350 positions, while two sides shutter side shutter 350 can easily take out from block piece jack 403 and block piece slot 406.
Side shutter 350 includes shield ontology 351 and the watertight rubber 352 for being set to 351 two sides of shield ontology, side The height of shutter 350 is less than or equal to top surface to the distance between the bottom surface of block piece slot 406 of top frame 305.
The water blocking plate 311 to meet water on side 301 and backwater side 302, the first permeable screen 330 and of the present embodiment Two permeable screens 340 are to remove or install as needed, and two sides being arranged on side 303 of blocking being oppositely arranged hide Baffle 350 can be removed or be installed as needed, and the side of the present embodiment is blocked in the corresponding water blocking plate 311 of removal or side When plate 350, there is pervious function.
The bottom surface of the bottom framework 306 of frame structure 10 is equipped with several protruding parts 510, the top frame of frame structure 10 305 top surface is equipped with several mounting holes 520 corresponding with protruding part 510.In the present embodiment, protruding part 510 and mounting hole 520 quantity is four, and four protruding parts 510 are respectively arranged on four angles of the bottom surface of bottom framework 306, protruding part 510 Size:Length×width×height is 6cm × 6cm × 5cm;Four mounting holes 520 are respectively arranged at the top surface of top frame 305 Four angles on, the size of mounting hole 520:Length×width×height is 7cm × 7cm × 6cm.In the present embodiment, protrusion Part 510 is spud pile.
It is provided with article rubber water stop 810 between the bottom surface and protruding part 510 of bottom framework 306, article rubber water stop 810 in the present embodiment Quantity be 4, the both ends of every article rubber water stop 810 connect corresponding two protruding parts 510;Article rubber water stop 810 with a thickness of 0.5cm.The width of every article rubber water stop 810 is less than or equal to the width of protruding part 510, and the width of every article rubber water stop 810 is equal to The distance between two protruding parts 510.Article rubber water stop 810 can make the connection between the bottom surface of bottom framework 306 and protruding part 510 It is more stable.
Embodiment 2
As shown in Figure 1 to Figure 2, the ecological purification component of the present embodiment is by the ecological purification at least two embodiments 1 Module is sequentially connected along the transverse direction of frame structure 10, each ecological purification module with another ecological purification module junction Side shutter 350 be removed.The structure realizes the lateral connection of multiple ecological purification modules, is needed with adapting to different scales It asks;Being removed with the side shutter 350 of another ecological purification module junction for each ecological purification module, can make phase Water connection in adjacent two ecological purification modules;In order to avoid the Filler for water purification 100 in two neighboring ecological purification module is mutual Mobile, it is identical that the position of the side shutter 350 removed is inserted into the first permeable 330 structure of screen, but width and length The different intervening cascade plate of size, it is logical that intervening cascade plate can either make water flow, and Filler for water purification 100 can be stopped in two ecological purifications It is mutually mobile between module.
Embodiment 3
As shown in Figure 1 to Figure 2, the ecological purification component of the present embodiment is by the ecological purification at least two embodiments 1 Module is sequentially connected along vertical direction, and the protruding part 510 of the frame structure 10 in top is inserted in the frame being below In the mounting hole 520 of structure 10.The structure realizes the vertical connection of multiple ecological purification modules, is needed with adapting to different scales It asks.
Embodiment 4
As shown in Figure 1, Figure 2, Figure 6 shows, using the application method of the ecological purification module of embodiment 1, ecological purification module can It is set as purification pattern or renewal model;When ecological purification module is purification pattern, the first water blocking board group 310 and second gear Water board group 320 moves in frame structure 10 respectively along opposite direction, and the first water blocking board group 310 is moved to frame structure 10 The side 301 that meets water one of lateral ends, second flap group 320 is moved to the backwater side 302 of frame structure 10 One of lateral ends;The side 301 that meets water of frame structure 10, which is divided into, covers the first net of the first water blocking board group 310 Change water blocking area 610 and does not cover the first purification flowing water area 620 of the first water fender;The backwater side 302 of frame structure 10 is divided To cover the second purification water blocking area 630 of second flap group 320 and not covering the second purification flowing water area of second flap 640, the first purification flowing water area 620 and the second purification flowing water area 640 are to be staggered;Water flow from first purification flowing water area 620 into Enter the inside of ecological purification module, the Filler for water purification 100 of ecological purification module makes the impurity in water flow be stranded in ecological purification mould In block, water flow is discharged from the second purification flowing water area 640, and the arrow A in Fig. 6 indicates the flow direction of water at this time;
As shown in Figure 1, Figure 2, shown in Fig. 7 to Fig. 8, when ecological purification module is renewal model, frame structure 10 is had been moved into The side 301 that meets water one of lateral ends the first water blocking board group 310 at least one water blocking plate 311 to meeting water Another lateral ends of side 301 are mobile, are moved to the water blocking plate 311 in the first moved water blocking board group 310 and meet Water updates position;The side 301 that meets water of frame structure 10 is divided into the first update water blocking area for covering the first water blocking board group 310 710 and do not cover the first water blocking board group 310 first update flowing water area 720;Have been moved into the backwater side 302 of frame structure 10 One of lateral ends second flap group 320 at least one water blocking plate 311 to the another of backwater side 302 A lateral ends are mobile, so that the water blocking plate 311 in moved second flap group 320 is moved to backwater and update position;Frame The backwater side 302 of frame structure 10 is divided into the second update water blocking area 730 for covering second flap group 320 and does not cover the The second of two water blocking board groups 320 updates flowing water area 740;Meeting water, it is corresponding to backwater update position to update position, so that first updates Flowing water area 720 and the second update flowing water area 740 are to be staggered;Water flow updates flowing water area 720 from first and enters ecological purification mould The inside of block is stranded in the impurity in ecological purification module with water flow, updates flowing water area 740 from second and be discharged.
In the present embodiment, the quantity of the water blocking plate 311 of the first water blocking board group 310 is two, the first water blocking board group 310 The quantity of water blocking plate 311 is two;
It meets water and updates position for water inlet position among the first unilateral water inlet position, the second bilateral water inlet position or third; It is the first unilateral water exit position, the second intermediate water exit position or third bilateral water exit position that backwater, which updates position,;
As shown in Figure 1, Figure 2, shown in Fig. 7, when meeting water that update position be the first unilateral water inlet position, it is that backwater, which updates position, One unilateral water exit position, two water blocking plates 311 of the first water blocking board group 310 are to another transverse end for the side 301 that meets water Portion is mobile, and two water blocking plates 311 of the first water blocking board group 310 are moved to another lateral ends for the side 301 that meets water, this When, the position that two water blocking plates 311 of the first water blocking board group 310 reach is exactly the first unilateral water inlet position, and water energy is enough never It covers the first of two water blocking plates 311 of the first water blocking board group 310 and updates the inflow of flowing water area 720;Second flap group 320 Two water blocking plates 311 are mobile to another lateral ends of backwater side 302, and two gears of second flap group 320 Water plate 311 is moved to another lateral ends of backwater side 302, at this point, two water blocking plates of second flap group 320 311 positions reached are exactly the first unilateral water exit position, the enough two water blocking plates for never covering second flap group 320 of water energy The second of 311 updates flowing water area 740 and flows out, and the arrow B in Fig. 7 indicates the flow direction of water at this time;
As shown in Figure 1, Figure 2, shown in Fig. 8, when meet water update position be the second bilateral intake position when, it is that backwater, which updates position, Two intermediate water exit positions, two water blocking plates 311 of the first water blocking board group 310 are to another transverse end for the side 301 that meets water Portion is mobile, and two water blocking plates 311 of the first water blocking board group 310 are moved to the middle position for the side 301 that meets water, at this point, the The position that two water blocking plates 311 of one water blocking board group 310 reach is exactly the second bilateral water inlet position, the enough never coverings of water energy the The first of two water blocking plates 311 of one water blocking board group 310 updates flowing water area 720 and flows into, that is, water is from the first water blocking board group 310 two sides flow into;Another transverse end of one of water blocking plate 311 of second flap group 320 to backwater side 302 Portion is mobile, and one of water blocking plate 311 of the second flap group 320 of the movement is moved to the another of backwater side 302 A lateral ends, at this point, the position that two water blocking plates 311 of second flap group 320 reach is exactly to go out water level among second It sets, the second of the enough two water blocking plates 311 for never covering second flap group 320 of water energy updates flowing water area 740 and flow out, and is exactly Water is flowed out from the position between two water blocking plates 311 of second flap group 320, and the arrow C in Fig. 8 indicates the stream of water at this time To;
As shown in Figure 1, Figure 2, shown in Fig. 9, when meeting water that update position be water inlet position among third, it is that backwater, which updates position, Three bilateral water exit positions, another transverse direction of one of water blocking plate 311 of the first water blocking board group 310 to the side 301 that meets water End is mobile, and one of water blocking plate 311 of the first water blocking board group 310 of the movement is moved to the another of side 301 that meet water One lateral ends, at this point, the position that two water blocking plates 311 of the first water blocking board group 310 reach is exactly water inlet among third Position, the first of the enough two water blocking plates 311 for never covering the first water blocking board group 310 of water energy update flowing water area 720 and flow into, just It is that water is flowed into from the position between two water blocking plates 311 of the first water blocking board group 310;Two gears of second flap group 320 Water plate 311 is mobile to another lateral ends of backwater side 302, and two water blocking plates of second flap group 320 311 are moved to by the middle position of the water surface, at this point, the position that two water blocking plates 311 of second flap group 320 reach is exactly Third bilateral water exit position, the second of the enough two water blocking plates 311 for never covering second flap group 320 of water energy update flowing water Area 740 is flowed out, that is, water is flowed out from the two sides of second flap group 320, and the arrow D in Fig. 9 indicates the flow direction of water at this time.
Single ecological purification module height is 2.5m, length 3.0m, width 2.0m;Crossing water degree is 2.0m;It fills out Material partial size is 5~20cm.
By taking multiple averaging experimental data as an example:Water flow is 300m3/h, the solid suspension of outside body of water, ammonia nitrogen, total Phosphorus mean concentration is respectively 45mg/L, 0.55mg/L, 0.22mg/L, intercept the solid suspension of water body after filtration treatment unit, Ammonia nitrogen, total phosphorus mean concentration are respectively 11mg/L, 0.42mg/L, 0.13mg/L, thus removal rate is respectively 75%, 24%, 41%.
After certain time runs, after operational efficiency reduces, by opening a variety of self refresh modes, operational efficiency is basic It can return to original state.
Ecological purification module of the invention can connect into the structure of various ecological purification components in a manner of module;At least When two ecological purification modules are in turn connected to form ecological purification component along the transverse direction of frame structure 10, each ecological purification mould Block is removed with the side shutter 350 of another ecological purification module junction;At least two ecological purification modules along When vertical direction is in turn connected to form ecological purification component, the protruding part 510 of the frame structure 10 in top, which is inserted in, to be in In the mounting hole 520 of the frame structure 10 of lower section;Ecological purification module of the invention can be realized modularization operation, and have at The type time is short, the characteristics of adapting to and having a wide range of application, and the purification and water landscape that can be used for the water body of mobility construct.
To sum up, the present invention effectively overcomes various shortcoming in the prior art and has high industrial utilization value.
The above-described embodiments merely illustrate the principles and effects of the present invention, and is not intended to limit the present invention.It is any ripe The personage for knowing this technology all without departing from the spirit and scope of the present invention, carries out modifications and changes to above-described embodiment.Cause This, institute is complete without departing from the spirit and technical ideas disclosed in the present invention by those of ordinary skill in the art such as At all equivalent modifications or change, should be covered by the claims of the present invention.

Claims (10)

1. a kind of ecological purification module, which is characterized in that the ontology of the ecological purification module is hollow frame structure (10), The inside of the frame structure (10) is equipped with Filler for water purification (100);
The bottom of the frame structure (10) is equipped with bottom shutter (200), and the two of them of the frame structure (10) supply water The side that stream passes through is respectively backwater side (301) and backwater side (302);
The backwater side (301) is equipped with can be along the first water blocking board group of the transverse shifting of the frame structure (10) (310), the backwater side (302) be equipped with can be along the second flap group of the transverse shifting of the frame structure (10) (320);
The first water blocking board group (310) is identical with the structure of the second flap group (320), the first water blocking board group It (310) include at least two water blocking plates (311).
2. ecological purification module according to claim 1, it is characterised in that:The water blocking plate (311) includes several Folding plate body (3111).
3. ecological purification module according to claim 1, it is characterised in that:The top surface of the frame structure (10) is equipped with The water fender jack (401) being inserted into for the first water blocking board group (310) and the second flap group (320).
4. ecological purification module according to claim 1, it is characterised in that:Is additionally provided on the backwater side (301) One permeable screen (330), the first permeable screen (330) are in the inside of the first water blocking board group (310);The backwater Side (302) is equipped with the second permeable screen (340), and the second permeable screen (340) is in the second flap group (320) inside.
5. ecological purification module according to claim 1, it is characterised in that:
The frame structure (10) further include two be oppositely arranged block side (303), side (303) is blocked described in two Two sides are connect with the backwater side (301) and the backwater side (302) respectively;It is blocked on side (303) described in each It is equipped with side shutter (350).
6. ecological purification module according to claim 5, it is characterised in that:The top surface of the frame structure (10) is equipped with For the block piece jack (403) of the side shutter (350) insertion.
7. ecological purification module according to claim 1, it is characterised in that:The bottom surface of the frame structure (10) is equipped with Several protruding parts (510), the top surface of the frame structure (10) are equipped with several peaces corresponding with the protruding part (510) It fills hole (520).
8. a kind of ecological purification component, it is characterised in that:At least two ecological purification modules as claimed in claim 5 are along institute The transverse direction for stating frame structure (10) is sequentially connected, and each ecological purification module connects with ecological purification module described in another The side shutter (350) for meeting place is removed.
9. a kind of ecological purification component, it is characterised in that:At least two ecological purification modules as claimed in claim 7 are along perpendicular For histogram to being sequentially connected, the protruding part (510) of the frame structure (10) in top is inserted in the frame being below In the mounting hole (520) of frame structure (10).
10. using the application method of ecological purification module described in claim 1, it is characterised in that:The ecological purification module It may be configured as purification pattern or renewal model;
When ecological purification module is purification pattern, the first water blocking board group (310) and the second flap group (320) point It is not moved on the frame structure (10) along opposite direction, the first water blocking board group (310) is moved to the frame One of lateral ends of the backwater side (301) of structure (10), the second flap group (320) are moved to the frame One of lateral ends of the backwater side (301) of structure (10);The side that meets water (301) of the frame structure (10) is divided To cover the first purification water blocking area (610) of the first water blocking board group (310) and not covering the first water blocking board group (310) the first purification flowing water area (620);The backwater side (301) of the frame structure (10), which is divided into, covers described Second purification water blocking area (630) of two water blocking board groups (320) and the second purification stream for not covering the second flap group (320) Pool (640), first purification flowing water area (620) and second purification flowing water area (640) are to be staggered;Water flow is from One purification flowing water area (620) enters the inside of the ecological purification module, and the Filler for water purification (100) of the ecological purification module makes Impurity in water flow is stranded in the ecological purification module, and water flow is discharged from the second purification flowing water area (640);
When ecological purification module is renewal model, the side that meets water (301) of the frame structure (10) is had been moved into wherein At least one water blocking plate (311) in first water blocking board group (310) of one lateral ends is to the side that meets water (301) Another lateral ends is mobile, is moved to the water blocking plate (311) in the first water blocking board group (310) moved and meets water Update position;The side that meets water (301) of the frame structure (10), which is divided into, covers the of the first water blocking board group (310) One updates water blocking area (710) and does not cover the first update flowing water area (720) of the first water blocking board group (310);It has been moved into In the second flap group (320) of one of lateral ends of the backwater side (301) of the frame structure (10) at least One water blocking plate (311) is mobile to another lateral ends of the backwater side (301), makes the second gear moved Water blocking plate (311) in water board group (320) is moved to backwater and updates position;
The backwater side (301) of the frame structure (10), which is divided into, covers the second of the second flap group (320) more New water blocking area (730) and the second update flowing water area (740) for not covering the second flap group (320);The update that meets water Position is corresponding to backwater update position, so that described first updates flowing water area (720) and second update flowing water area It (740) is to be staggered;Water flow updates the inside that flowing water area (720) enter the ecological purification module from described first, is detained Impurity in the ecological purification module updates flowing water area (740) from described second and is discharged with water flow.
CN201610390635.6A 2016-06-03 2016-06-03 The application method of ecological purification module, ecological purification component and ecological purification module Active CN105923740B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610390635.6A CN105923740B (en) 2016-06-03 2016-06-03 The application method of ecological purification module, ecological purification component and ecological purification module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610390635.6A CN105923740B (en) 2016-06-03 2016-06-03 The application method of ecological purification module, ecological purification component and ecological purification module

Publications (2)

Publication Number Publication Date
CN105923740A CN105923740A (en) 2016-09-07
CN105923740B true CN105923740B (en) 2018-11-27

Family

ID=56833220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610390635.6A Active CN105923740B (en) 2016-06-03 2016-06-03 The application method of ecological purification module, ecological purification component and ecological purification module

Country Status (1)

Country Link
CN (1) CN105923740B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101428898A (en) * 2008-12-30 2009-05-13 湖州奥尼斯特复合材料制品有限公司 Ecological purifying device for waste water
CN202144473U (en) * 2011-06-27 2012-02-15 江苏淳盛农业科技发展有限公司 Composite biological filter tank treating domestic sewage
CN202880996U (en) * 2012-03-28 2013-04-17 王启明 Modularized dismountable constructed wetland
CN104229975A (en) * 2014-09-05 2014-12-24 湖北大学 Water purifying device for plate and frame biological filtering dam
ES2549553A1 (en) * 2014-04-28 2015-10-29 Ecocelta Galicia, S.L. Modular system of biological filtering for wastewater treatment (Machine-translation by Google Translate, not legally binding)
CN204897517U (en) * 2015-07-24 2015-12-23 上海勘测设计研究院有限公司 Aeration tank
CN105399211A (en) * 2015-12-19 2016-03-16 西安建筑科技大学 Control method of water seal and flow uniformity for modular constructed wetlands
CN105585107A (en) * 2016-02-03 2016-05-18 浙江裕腾百诺环保科技有限公司 Assembled emergency water purification soft dam and method for purifying minitype river course by using water purification soft dam
CN205838651U (en) * 2016-06-03 2016-12-28 上海勘测设计研究院有限公司 Ecological purification module and ecological purification assembly

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101428898A (en) * 2008-12-30 2009-05-13 湖州奥尼斯特复合材料制品有限公司 Ecological purifying device for waste water
CN202144473U (en) * 2011-06-27 2012-02-15 江苏淳盛农业科技发展有限公司 Composite biological filter tank treating domestic sewage
CN202880996U (en) * 2012-03-28 2013-04-17 王启明 Modularized dismountable constructed wetland
ES2549553A1 (en) * 2014-04-28 2015-10-29 Ecocelta Galicia, S.L. Modular system of biological filtering for wastewater treatment (Machine-translation by Google Translate, not legally binding)
CN104229975A (en) * 2014-09-05 2014-12-24 湖北大学 Water purifying device for plate and frame biological filtering dam
CN204897517U (en) * 2015-07-24 2015-12-23 上海勘测设计研究院有限公司 Aeration tank
CN105399211A (en) * 2015-12-19 2016-03-16 西安建筑科技大学 Control method of water seal and flow uniformity for modular constructed wetlands
CN105585107A (en) * 2016-02-03 2016-05-18 浙江裕腾百诺环保科技有限公司 Assembled emergency water purification soft dam and method for purifying minitype river course by using water purification soft dam
CN205838651U (en) * 2016-06-03 2016-12-28 上海勘测设计研究院有限公司 Ecological purification module and ecological purification assembly

Also Published As

Publication number Publication date
CN105923740A (en) 2016-09-07

Similar Documents

Publication Publication Date Title
CN108483670B (en) A kind of stage farmland hard Demonstration for Ecological Sanitation canal
CN105923740B (en) The application method of ecological purification module, ecological purification component and ecological purification module
WO2015164444A2 (en) A floating bioreactor module
SA517390580B1 (en) Filter Panel with A Controlled Liquid Lift, and A Drum Filter for Filtering Liquid
WO2014060102A1 (en) Systems comprising a plurality of shafts and connecting channel
CN207481415U (en) Printing screen plate and print system
CN205838651U (en) Ecological purification module and ecological purification assembly
CN104045161A (en) Method and system for purifying water
CN209865515U (en) Filtering sedimentation tank
CN208917802U (en) A kind of pollution of area source ecological intercepting ditch
CN103977611B (en) A kind of suspension filter system
US20150353398A1 (en) System for wastewater treatment using aquatic plants
CN113582349B (en) Multi-functional purifying box capable of self-adapting to water level change
CN207444016U (en) A kind of multilayer can natural separation aquatic products discarded object cultivating system
CN212610109U (en) Water body purification device for lake inlet and river inlet
CN210825535U (en) A float thing integrated purification device for sewage treatment plant
CN206127081U (en) Assembled collection rain corridor frame
CN110237706A (en) A kind of purification web plate with photocatalyst coating
CN206915955U (en) The cellular treatment tank of small modular
CN216418574U (en) Grating with adjustable density
CN106277290B (en) A kind of biology in situ strengthening and processing device not influencing creek flow characteristics and system and engineering method
CN103979657B (en) A kind of for the variable grid in treatment reaction pond
CN205838639U (en) Grid reaction device
CN219196188U (en) Water-saving sand-returning wastewater drainage canal of filter tank system
CN104399314B (en) Ejectment river water quality treatment system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221212

Address after: 200434 Shanghai city Hongkou District Yixian Road No. 388

Patentee after: SHANGHAI INVESTIGATION, DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Patentee after: Three Gorges Technology Co.,Ltd.

Address before: 200434 Shanghai city Hongkou District Yixian Road No. 388

Patentee before: SHANGHAI INVESTIGATION, DESIGN & RESEARCH INSTITUTE Co.,Ltd.