CN105908961A - Liftway combined type lifting operation frame - Google Patents

Liftway combined type lifting operation frame Download PDF

Info

Publication number
CN105908961A
CN105908961A CN201610242704.9A CN201610242704A CN105908961A CN 105908961 A CN105908961 A CN 105908961A CN 201610242704 A CN201610242704 A CN 201610242704A CN 105908961 A CN105908961 A CN 105908961A
Authority
CN
China
Prior art keywords
platform
pin hole
combined type
support body
lifting operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610242704.9A
Other languages
Chinese (zh)
Inventor
倪锋
张希
李星星
池敏华
瞿莺华
季方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Publication of CN105908961A publication Critical patent/CN105908961A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/06Stiff scaffolding clamps for connecting scaffold members of common shape
    • E04G7/20Stiff scaffolding clamps for connecting scaffold members of common shape for ends of members only, e.g. for connecting members in end-to-end relation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention provides a liftway combined type lifting operation frame comprising the following elements: a liftable steel platform; a platform sleeve welded on the liftable steel platform and provided with a first plug pin hole; a platform plug tube, wherein at least one end of the platform plug tube is provided with a second plug pin hole, and one end of the platform plug tube inserts into the platform sleeve; platform plug pins, wherein the platform plug tube and the platform sleeve are connected and fixed through the first plug pin hole, the second plug pin hole, and the platform plug pins; a horizontal lever connected with the platform plug tube. A floor or overhang steel tube scaffold normally erected in the liftway is not needed, and the steel tube scaffold can be repeatedly erected on the liftable platform; the liftway combined type lifting operation frame is simple in making, can be repeatedly cycled in usage, can be customized according to liftway sizes of projects and items, thus reducing steel equipment material mass input, reducing item cost, effectively preventing operation level high altitude falling conditions, and providing safety protection effect in the liftway.

Description

Elevator hoistways combined type lifting operation support body
Technical field
The present invention relates to a kind of elevator hoistways combined type lifting operation support body.
Background technology
At present, along with developing rapidly of modern architecture industry, the continuous renewal of construction techniques, high-rise and super High-rise class building accounting is relatively big, and elevator is essential as engineering public property equipment, and the elevator of this type of engineering Hoistway structure construction period from bottom to top of constructing is longer, and construction space is narrow, and routine is landed and overhanging type foot hands Though operating platform can meet construction demand, but in the relatively large number of engineering of hoistway, the workload set up is relatively Greatly, the steel equipment amount taken is the most more, and the inconvenience brought to construction when setting up and remove and potential safety hazard are the most relatively Many.In this case, as broken through routine, design is a kind of in elevator hoistways structure construction procedure Zhong Nengsui building The combination type hoistway crosshead body of layer lifting is necessary.
Summary of the invention
It is an object of the invention to provide a kind of elevator hoistways combined type lifting operation support body, it is possible to avoid at electricity Set up routinely in stair shaft road and land or overhang steel pin hands, repeat to set up steel pipe feet hands on hoistable platform.
For solving the problems referred to above, the present invention provides a kind of elevator hoistways combined type lifting operation support body, including:
Liftable steel platform;
Being welded in the platform casing pipe on described liftable steel platform, described platform casing pipe is provided with the first pin hole;
Platform intubates, and at least one end that described platform intubates is provided with the second pin hole, described platform intubate one End inserts in described platform casing pipe;
Platform latch, described platform intubates between platform casing pipe by described first pin hole, the second latch Hole and platform latch connect fixing;
Connect the horizon bar that described platform intubates.
Further, in above-mentioned elevator hoistways combined type lifting operation support body, described liftable steel platform Panel is embossed steel plates.
Further, in above-mentioned elevator hoistways combined type lifting operation support body, described horizon bar is also laid There is steel fabric sheet.
Further, in above-mentioned elevator hoistways combined type lifting operation support body, described platform latch is by lock Chain is connected with described platform casing pipe.
Further, in above-mentioned elevator hoistways combined type lifting operation support body, described elevator hoistways combination type Descending operation support body also includes:
Connector;
Prolongation intubates, and described prolongation is intubated and intubated with described platform by described connector or other prolongation intubates Connect.
Further, in above-mentioned elevator hoistways combined type lifting operation support body, described connector includes connecting Steel plate, connecting bolt and be respectively welded in the connection sleeve pipe on described junction steel plate two sides, wherein, each connection The 3rd pin hole it is provided with on sleeve pipe;
At least one end that each prolongation intubates is provided with the 4th pin hole, and wherein, described connection sleeve pipe is with described Extend to intubate and be attached fixing by the 3rd pin hole, the 4th pin hole and connecting bolt, described adapter sleeve Pipe and described platform are attached by described 3rd pin hole, the second pin hole and connecting bolt between intubating Fixing.
Further, in above-mentioned elevator hoistways combined type lifting operation support body, described elevator hoistways combination type Descending operation support body also includes:
Brace, is used for connecting described horizon bar and platform intubates, or is used for connecting described horizon bar and extending slotting Pipe.
Further, in above-mentioned elevator hoistways combined type lifting operation support body, described connecting bolt uses steel Muscle or band iron make variable cross-section, and the end diameter of described connecting bolt is less than tail diameter, described tail diameter Described 3rd pin hole and the 4th pin hole coincide.
Further, in above-mentioned elevator hoistways combined type lifting operation support body, described connecting bolt is by lock Chain is connected with described junction steel plate.
Further, in above-mentioned elevator hoistways combined type lifting operation support body, described platform latch uses steel Muscle or band iron make variable cross-section, and the end diameter of described platform latch is less than tail diameter, described tail diameter Described first pin hole and the second pin hole coincide.
Compared with prior art, present invention have the advantage that
1, make simply.This elevator hoistways combined operation support body material and job site framed bent pipe, foot hands Managing general, it is not necessary to prepare material separately, can gather materials on the spot, make on the spot, manufacture method is the simplest.As When intubating without elongated material, connector spreading can be passed through.For the latch of connecting insertion Yu sleeve pipe, can use Reinforcing bar or band iron make.
2, easy to use.After support body and hoistable platform are combined into one, available loop wheel machine entirety hangs liter, it is not necessary to Manually turn over and tear open.
3, material is saved.Comparing more conventional elevator hoistways operation support body, Combined shelf structure only needs a mark Quasi-floor material, circulation material is greatly saved.And the tubing after these processing can be changed whole after engineering terminates It is zero, is carried to next project and assembles follow-up continuous use, have detachable, the characteristic of repeatable utilization, Reduce engineering cost.
4, safe and reliable.Combined shelf body is supported on hoistable platform, and hoistable platform panel is embossed steel plates, I.e. at operating surface full closeding state formed above, have function of safety protection concurrently, the danger such as falling from high altitude in hoistway Source has obtained effective control.
5, the reduction of erection time.Support body becomes a kind of tool, relative to conventional support body, sets up workload significantly Reduce, reduce the structure construction cycle of elevator hoistways.
Accompanying drawing explanation
Fig. 1 is that the sleeve pipe horizontal layout of the elevator hoistways combined type lifting operation support body of one embodiment of the invention is shown It is intended to;
Fig. 2 is the close-up schematic view in Fig. 1 at C;
Fig. 3 is the elevational schematic view of the elevator hoistways combined type lifting operation support body of one embodiment of the invention;
Fig. 4 is the close-up schematic view in Fig. 3 at D.
Detailed description of the invention
Understandable for enabling the above-mentioned purpose of the present invention, feature and advantage to become apparent from, below in conjunction with the accompanying drawings and The present invention is further detailed explanation for detailed description of the invention.
As shown in figures 1-4, the present invention provides a kind of elevator hoistways combined type lifting operation support body, including:
Liftable steel platform 7;
Being welded in the platform casing pipe 8 on described liftable steel platform 7, described platform casing pipe 8 is provided with first and inserts Pin-and-hole 9;
Platform intubates 10, and described platform intubates at least one end of 10 and is provided with the second pin hole 11, described platform The one end intubating 10 is inserted in described platform casing pipe 8;
Platform latch 12, described platform intubate between 10 and platform casing pipe 8 by described first pin hole 9, Second pin hole 11 and platform latch 12 connect fixing;
Connect described platform and intubate the horizon bar 13 of 10.Concrete, the present invention is suitable for as elevator hoistways structure Construction stage interim operating level, in Fig. 1, welds the platform casing pipe 8 being provided with the first pin hole 9 here Being connected on liftable steel platform 7, as being welded on the frame of hoistable platform by platform casing pipe, casing inner diameter is big In equal to cannula outer diameter, the platform that end is again provided with the second pin hole 11 intubates the 10 described platforms of insertion In sleeve pipe, as in figure 2 it is shown, described platform intubate 10 and platform casing pipe 8 by described platform latch 12 even Connect fixing, connected by described horizon bar 13 between 10 as it is shown in figure 1, platform intubates, form a sky Between support body, the support body that described platform casing pipe 8 and horizon bar 13 are formed and hoistable platform 7 be combined into an entirety, By loop wheel machine with agent structure Synchronous lifting, can with constructing structure successively and on.
Preferably, the panel of described liftable steel platform is embossed steel plates, i.e. in operating surface full envelope formed above Closed state, has function of safety protection concurrently, and in hoistway, the dangerous matter sources such as falling from high altitude has obtained effective control.
Preferably, as it is shown on figure 3, be also equipped with steel fabric sheet 14 on described horizon bar 13, using as operation Face, facilitates personnel to construct and walks or construction windrow.
Preferably, as in figure 2 it is shown, described platform latch 12 is by chain 15 and described platform casing pipe 8 phase Even, to avoid described platform latch to lose.
Preferably, as shown in Figures 3 and 4, described elevator hoistways combined type lifting operation support body also includes:
Connector 16;
Extend and intubate 17, described prolongation intubate 17 by described connector 16 and described platform intubate 10 or its Its prolongation intubates 17 connections.Concrete, regulate with corresponding story height to realize the height of support body, as The height overall realizing support body is that story height adds protection height, here, can be real by the way of increasing prolongation and intubating 17 Existing, as shown in Figures 3 and 4, such as platform, to intubate 10 length inadequate, can complete knot at elevator hoistways 100 The position of structure face E and ready-built structure face more than F, is increased by the way of prolongation intubates 17 by connector 16 and connects Long, the two ends now needing described platform to intubate are equipped with the second pin hole, as it is shown on figure 3, whole support body Degree be story height G plus protection height H, certainly, as platform intubation length is enough, can be without connector Intubate with increasing prolongation.
Preferably, as shown in Figures 3 and 4, described connector 16 includes junction steel plate 18, connecting bolt and divides It is not welded in the connection sleeve pipe 19 on described junction steel plate two sides, wherein, each connection sleeve pipe is provided with the 3rd Pin hole 20;
Each prolongation intubates at least one end of 17 and is provided with the 4th pin hole 21, wherein, described connection sleeve pipe 19 intubate 17 with described prolongation is attached admittedly by the 3rd latch the 20, the 4th pin hole 21 and connecting bolt Fixed, described connection sleeve pipe 19 and described platform intubate to be inserted by described 3rd pin hole 20, second between 10 Pin-and-hole 11 and connecting bolt are attached fixing.
Preferably, described connecting bolt is connected with described junction steel plate by chain, to avoid described connection to insert Pin is lost.
Preferably, as shown in Figures 3 and 4, described elevator hoistways combined type lifting operation support body also includes:
Brace 22, is used for connecting described horizon bar and platform intubates, or is used for connecting described horizon bar and prolongation Intubate, constant to be further ensured that support body geometry.
Preferably, as shown in Fig. 2, described platform latch 12 uses reinforcing bar or band iron to make variable cross-section, institute The end diameter stating platform latch is less than tail diameter, and the first pin hole described in described tail diameter and second is inserted Pin-and-hole coincide, locked to ensure.
Preferably, described connecting bolt uses reinforcing bar or band iron to make variable cross-section, the end of described connecting bolt Diameter is less than tail diameter, and the 3rd pin hole described in described tail diameter and the 4th pin hole coincide, to ensure Locked.
The remarkable result that patent of the present invention is brought is:
1, make simply.This elevator hoistways combined operation support body material and job site framed bent pipe, foot hands Managing general, it is not necessary to prepare material separately, can gather materials on the spot, make on the spot, manufacture method is the simplest.As When intubating without elongated material, connector spreading can be passed through.For the latch of connecting insertion Yu sleeve pipe, can use Reinforcing bar or band iron make.
2, easy to use.After support body and hoistable platform are combined into one, available loop wheel machine entirety hangs liter, it is not necessary to Manually turn over and tear open.
3, material is saved.Comparing more conventional elevator hoistways operation support body, Combined shelf structure only needs a mark Quasi-floor material, circulation material is greatly saved.And the tubing after these processing can be changed whole after engineering terminates It is zero, is carried to next project and assembles follow-up continuous use, have detachable, the characteristic of repeatable utilization, Reduce engineering cost.
4, safe and reliable.Combined shelf body is supported on hoistable platform, and hoistable platform panel is embossed steel plates, I.e. at operating surface full closeding state formed above, have function of safety protection concurrently, the danger such as falling from high altitude in hoistway Source has obtained effective control.
5, the reduction of erection time.Support body becomes a kind of tool, relative to conventional support body, sets up workload significantly Reduce, reduce the structure construction cycle of elevator hoistways.
In sum, the present invention is suitable for as elevator hoistways structure construction stage interim operating level, it is possible to keep away Exempt to set up routinely in elevator hoistways and land or overhang steel pin hands, repeat to set up steel pipe on hoistable platform Foot hands, it makes simple, can repeatedly have enough to meet the need use, and can add according to the tunnel dimension of engineering and project is qualitative Work, reduce steel equipment and materials a large amount of put into thus reduce project cost, this kind of hoistway combined operation support body Effectively stop the situation of operation layer falling object from high altitude, the safety protection function in hoistway can have been played.
In this specification, each embodiment uses the mode gone forward one by one to describe, and what each embodiment stressed is With the difference of other embodiments, between each embodiment, identical similar portion sees mutually.
Obviously, those skilled in the art can carry out various change and modification without deviating from the present invention to invention Spirit and scope.So, if the present invention these amendment and modification belong to the claims in the present invention and Within the scope of equivalent technologies, then the present invention is also intended to change and including modification include these.

Claims (10)

1. an elevator hoistways combined type lifting operation support body, it is characterised in that including:
Liftable steel platform;
Being welded in the platform casing pipe on described liftable steel platform, described platform casing pipe is provided with the first pin hole;
Platform intubates, and at least one end that described platform intubates is provided with the second pin hole, described platform intubate one End inserts in described platform casing pipe;
Platform latch, described platform intubates between platform casing pipe by described first pin hole, the second latch Hole and platform latch connect fixing;
Connect the horizon bar that described platform intubates.
2. elevator hoistways combined type lifting operation support body as claimed in claim 1, it is characterised in that described The panel of liftable steel platform is embossed steel plates.
3. elevator hoistways combined type lifting operation support body as claimed in claim 1, it is characterised in that described Steel fabric sheet also it is equipped with on horizon bar.
4. elevator hoistways combined type lifting operation support body as claimed in claim 1, it is characterised in that described Platform latch is connected with described platform casing pipe by chain.
5. elevator hoistways combined type lifting operation support body as claimed in claim 1, it is characterised in that described Elevator hoistways combined type lifting operation support body also includes:
Connector;
Prolongation intubates, and described prolongation is intubated and intubated with described platform by described connector or other prolongation intubates Connect.
6. elevator hoistways combined type lifting operation support body as claimed in claim 5, it is characterised in that described Connector includes junction steel plate, connecting bolt and is respectively welded in the connection sleeve pipe on described junction steel plate two sides, Wherein, each connection sleeve pipe is provided with the 3rd pin hole;
At least one end that each prolongation intubates is provided with the 4th pin hole, and wherein, described connection sleeve pipe is with described Extend to intubate and be attached fixing by the 3rd pin hole, the 4th pin hole and connecting bolt, described adapter sleeve Pipe and described platform are attached by described 3rd pin hole, the second pin hole and connecting bolt between intubating Fixing.
7. the elevator hoistways combined type lifting operation support body as described in claim 5 or 6, it is characterised in that Described elevator hoistways combined type lifting operation support body also includes:
Brace, is used for connecting described horizon bar and platform intubates, or is used for connecting described horizon bar and extending slotting Pipe.
8. elevator hoistways combined type lifting operation support body as claimed in claim 6, it is characterised in that described Connecting bolt uses reinforcing bar or band iron to make variable cross-section, and the end diameter of described connecting bolt is less than tail diameter, 3rd pin hole described in described tail diameter and the 4th pin hole coincide.
9. elevator hoistways combined type lifting operation support body as claimed in claim 6, it is characterised in that described Connecting bolt is connected with described junction steel plate by chain.
10. elevator hoistways combined type lifting operation support body as claimed in claim 1, it is characterised in that institute Stating platform latch uses reinforcing bar or band iron to make variable cross-section, and the end diameter of described platform latch is straight less than afterbody Footpath, the first pin hole described in described tail diameter and the second pin hole coincide.
CN201610242704.9A 2015-12-28 2016-04-19 Liftway combined type lifting operation frame Pending CN105908961A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201511004960 2015-12-28
CN2015110049606 2015-12-28

Publications (1)

Publication Number Publication Date
CN105908961A true CN105908961A (en) 2016-08-31

Family

ID=56746536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610242704.9A Pending CN105908961A (en) 2015-12-28 2016-04-19 Liftway combined type lifting operation frame

Country Status (1)

Country Link
CN (1) CN105908961A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057295A (en) * 2018-08-27 2018-12-21 李伟苗 The manufacturing method of steel construction jacking system
CN109322477A (en) * 2018-11-19 2019-02-12 中国水利水电第十工程局有限公司 A kind of tool-type mobile steel platform in elevator

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007154540A (en) * 2005-12-06 2007-06-21 Japan Steels International Inc Temporary scaffolding unit
CN103046738A (en) * 2011-10-17 2013-04-17 陕西龙海工程建设有限公司 Scaffold
CN103938843A (en) * 2014-04-10 2014-07-23 重庆渝发建设有限公司 Telescopic steel platform used for elevator shaft
CN203977836U (en) * 2014-07-23 2014-12-03 山西一建集团有限公司 A kind of tool-type escalator building formwork platform
CN204662933U (en) * 2015-05-18 2015-09-23 中国建筑第六工程局有限公司 A kind of hoistway operation frame lift-type steel platform
CN204781927U (en) * 2015-07-16 2015-11-18 湖南省第六工程有限公司 Elevartor shaft formwork and elevartor shaft concrete placement operation platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007154540A (en) * 2005-12-06 2007-06-21 Japan Steels International Inc Temporary scaffolding unit
CN103046738A (en) * 2011-10-17 2013-04-17 陕西龙海工程建设有限公司 Scaffold
CN103938843A (en) * 2014-04-10 2014-07-23 重庆渝发建设有限公司 Telescopic steel platform used for elevator shaft
CN203977836U (en) * 2014-07-23 2014-12-03 山西一建集团有限公司 A kind of tool-type escalator building formwork platform
CN204662933U (en) * 2015-05-18 2015-09-23 中国建筑第六工程局有限公司 A kind of hoistway operation frame lift-type steel platform
CN204781927U (en) * 2015-07-16 2015-11-18 湖南省第六工程有限公司 Elevartor shaft formwork and elevartor shaft concrete placement operation platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057295A (en) * 2018-08-27 2018-12-21 李伟苗 The manufacturing method of steel construction jacking system
CN109057295B (en) * 2018-08-27 2021-06-01 长沙金久锌钢型材有限公司 Manufacturing method of steel structure lifting system
CN109322477A (en) * 2018-11-19 2019-02-12 中国水利水电第十工程局有限公司 A kind of tool-type mobile steel platform in elevator

Similar Documents

Publication Publication Date Title
CN104712143B (en) A kind of circular steel reinforced concrete chimney wall reverse mould construction method
CN104831939B (en) Bolt sphere solder sphere mixed node Long-span Cantilever spatial mesh structure construction method
CN204311719U (en) External hanging type scaffold
CN103362297B (en) A kind of attached lift scaffold constructure scheme
CN206971689U (en) Support operating platform that is detachable and recycling
CN207392716U (en) A kind of tool-type suspension scaffold
CN105908961A (en) Liftway combined type lifting operation frame
CN104234447B (en) Deep foundation ditch tool-type hangs stair
US20190093367A1 (en) Stair system and manufacturing
CN104278828B (en) A kind of concrete chimney dismantling operation platform
CN205502551U (en) Platform is suspended in midair in high altitude large -span vestibule construction
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN104533092B (en) The construction method of rack roofing furred ceiling
CN206360720U (en) A kind of novel flexible filling isolation barricade
CN104831928B (en) High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method
CN206220461U (en) A kind of packaged type I-steel hoistway operation platform
CN206233544U (en) Adjustable operation platform
CN205382718U (en) Sparse passway for escaping of steel platform die carrier system
CN208072906U (en) Underlying crossbearer frame-type scaffold
CN107905379A (en) Totally-enclosed layer construction method in high-rise building Core Walls Structure
CN206538993U (en) A kind of novel simple scaffold
CN205908001U (en) Operation platform standard module and operation platform
CN103835519A (en) Quick lap joint type protection system
CN206859617U (en) Supporting construction is reinforced for building
CN204627012U (en) A protection canopy that encorbelments of instrument formula for having outer scaffold frame building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160831