CN105908764B - The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined - Google Patents
The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined Download PDFInfo
- Publication number
- CN105908764B CN105908764B CN201610382512.8A CN201610382512A CN105908764B CN 105908764 B CN105908764 B CN 105908764B CN 201610382512 A CN201610382512 A CN 201610382512A CN 105908764 B CN105908764 B CN 105908764B
- Authority
- CN
- China
- Prior art keywords
- wall
- retaining walls
- cut
- reinforced concrete
- plastic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
Description
Claims (1)
- A kind of 1. seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined, it is characterised in that:It is described anti- Ooze system architecture include core, reinforcings of three axes agitating pile cell wall, plastic concrete cut-off wall, Reinforced Concrete Retaining Walls, fill sand grow Pipe bag;Three axes agitating pile cell wall is set to reinforce to both sides below the plastic concrete cut-off wall top surface, three axes agitating pile cell wall adds Gu both sides set core, core both sides, which are set, fills sand long tube bag;Reinforced Concrete Retaining Walls are set at the top of the plastic concrete cut-off wall, and Reinforced Concrete Retaining Walls are set behind fills sand long tube Bag, Reinforced Concrete Retaining Walls and plastic concrete cut-off wall joint part dabbing, ensure construction joint waterproof quality;The both sides below plastic concrete cut-off wall top surface, first construct and core and fill sand long tube bag, then three axes agitating pile groove of constructing Wall is reinforced, plastic concrete cut-off wall of finally constructing;Cut-pff wall certain depth is removed using excavator or artificial chisel, is easy to construction steel Reinforced concrete barricade tenon;During construction reinforced bar concrete guard wall, Reinforced Concrete Retaining Walls set one of movement joint at a certain distance, Movement joint position sets rubber watertight strip;Sand long tube bag and its side slope protection are filled in construction to Reinforced Concrete Retaining Walls behind.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610382512.8A CN105908764B (en) | 2016-06-02 | 2016-06-02 | The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610382512.8A CN105908764B (en) | 2016-06-02 | 2016-06-02 | The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105908764A CN105908764A (en) | 2016-08-31 |
CN105908764B true CN105908764B (en) | 2017-12-26 |
Family
ID=56742900
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610382512.8A Expired - Fee Related CN105908764B (en) | 2016-06-02 | 2016-06-02 | The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105908764B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106836246B (en) * | 2016-12-20 | 2018-10-23 | 杭州江润科技有限公司 | Open trench tunnel crosses the construction method of section building enclosure |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202706042U (en) * | 2012-05-08 | 2013-01-30 | 上海市水利工程集团有限公司 | Improved rapid-construction causeway |
CN203905032U (en) * | 2014-05-05 | 2014-10-29 | 中铁第四勘察设计院集团有限公司 | Large pond cutting protection structure |
CN203977437U (en) * | 2014-05-28 | 2014-12-03 | 浙江省交通规划设计研究院 | The anti-cofferdam structure of breaking through water under a kind of built hydropower complex dam |
WO2015060714A1 (en) * | 2013-10-23 | 2015-04-30 | Huesker Synthetic Gmbh | Construction for protecting a dike |
-
2016
- 2016-06-02 CN CN201610382512.8A patent/CN105908764B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202706042U (en) * | 2012-05-08 | 2013-01-30 | 上海市水利工程集团有限公司 | Improved rapid-construction causeway |
WO2015060714A1 (en) * | 2013-10-23 | 2015-04-30 | Huesker Synthetic Gmbh | Construction for protecting a dike |
CN203905032U (en) * | 2014-05-05 | 2014-10-29 | 中铁第四勘察设计院集团有限公司 | Large pond cutting protection structure |
CN203977437U (en) * | 2014-05-28 | 2014-12-03 | 浙江省交通规划设计研究院 | The anti-cofferdam structure of breaking through water under a kind of built hydropower complex dam |
Also Published As
Publication number | Publication date |
---|---|
CN105908764A (en) | 2016-08-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103953008B (en) | A kind of modified mixed dam being applicable to Tailings Dam | |
CN103031836A (en) | Method for quickly building road on new reclamation sludge foundation | |
CN208650073U (en) | Cut and cover method subaqueous tunnel steel sheet-pile cofferdam construction | |
CN102061706A (en) | Assembly steel box cofferdam and construction method thereof | |
CN102561314A (en) | Prefabricated waterproof pile (WSP pile) and inserting and pulling construction method thereof | |
CN103696416A (en) | Novel foundation treatment method | |
CN106368176B (en) | The high dam structure being built on earth material scarcity area deeply covered layer | |
CN105604075B (en) | It is easy to the interim dock entrance cofferdam construction method and cofferdam structure recovered | |
CN105178342B (en) | Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing | |
CN201915414U (en) | Spliced steel box coefferdam | |
CN105908764B (en) | The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined | |
CN207469222U (en) | The pre-buried vacuum drainage system in reclamation by pumping filling area | |
CN203007961U (en) | Gabion cofferdam structure | |
CN103898915B (en) | Building small-area deep foundation pit anti-floating water stop construction method | |
CN212000919U (en) | Prevent structure that concrete face dam high toe wall destroyed | |
CN206736929U (en) | Protect the foundation pit structure of surrounding building | |
CN205662937U (en) | Anti -seepage system that plastic concrete cut -pff wall and reinforced concrete barricade combined together | |
CN202830916U (en) | Prefabricated waterproof pile | |
CN114855762B (en) | Device and method for closing and sealing tailings pond | |
CN203066089U (en) | Cofferdam combined by mold bag sand and steel sheet piles and used for hard strata | |
CN203080480U (en) | Upstream blanket structure of concrete face rockfill dam | |
CN204608701U (en) | A kind of gravity type quay being applicable to roadbed of alluvial silt | |
CN101614017B (en) | Construction method of deep water earth-rock cofferdam structure | |
CN203096696U (en) | High and low composite backwater weir | |
CN210636421U (en) | Underwater hollowing defect repairing device for navigation wall pile foundation of ship lock on gravel layer foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Zhijun Inventor after: Wang Yu Inventor after: Ma Chengming Inventor after: Shao Yang Inventor after: Xie Haijin Inventor after: Deng Shiping Inventor after: Guan Lei Inventor after: Li Yong Inventor after: Gong Xuedong Inventor after: Zhang Xiaohong Inventor after: Xu Xueying Inventor after: Hong Kairong Inventor after: Zhang Xichun Inventor after: Wang Qiulin Inventor after: Dong Xiaolong Inventor after: Guo Xiaolong Inventor after: Sun Chao Inventor after: Dong Jun Inventor after: Gao Kun Inventor after: Liu Min Inventor before: Dong Xiaolong Inventor before: Hu Bin Inventor before: Xie Haijin Inventor before: Deng Shiping Inventor before: Guan Lei Inventor before: Li Yong Inventor before: Gong Xuedong Inventor before: Zhang Xiaohong Inventor before: Wei Changqing Inventor before: Xu Xueying Inventor before: Zhang Xichun Inventor before: Deng Biao Inventor before: Zhang Xu Inventor before: Xing Yonghui Inventor before: Zhang Wei Inventor before: Li Zhijun Inventor before: Luo Wei Inventor before: Yang Guosheng Inventor before: Shao Yang Inventor before: Deng Xiaoxin |
|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171226 Termination date: 20210602 |