CN105908764B - The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined - Google Patents

The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined Download PDF

Info

Publication number
CN105908764B
CN105908764B CN201610382512.8A CN201610382512A CN105908764B CN 105908764 B CN105908764 B CN 105908764B CN 201610382512 A CN201610382512 A CN 201610382512A CN 105908764 B CN105908764 B CN 105908764B
Authority
CN
China
Prior art keywords
wall
retaining walls
cut
reinforced concrete
plastic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610382512.8A
Other languages
Chinese (zh)
Other versions
CN105908764A (en
Inventor
李志军
洪开荣
王秋林
董小龙
郭小龙
孙超
董军
高昆
刘敏
王瑜
马承明
邵阳
谢海金
邓世萍
管蕾
李勇
龚学栋
张小红
徐雪莹
张喜春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201610382512.8A priority Critical patent/CN105908764B/en
Publication of CN105908764A publication Critical patent/CN105908764A/en
Application granted granted Critical
Publication of CN105908764B publication Critical patent/CN105908764B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined, its structure include core, the reinforcing of three axes agitating pile cell wall, plastic concrete cut-off wall, Reinforced Concrete Retaining Walls, fill sand long tube bag.Seepage prevention system of the present invention can be in flood season rapid construction, and can guarantee that the combination against seepage system of anti-seepage effect.

Description

The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined
Technical field
The present invention relates to the seepage control system that a kind of plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined, belong to work Journey construction field.
Background technology
Hong Gu tunnels Dong An cofferdam in Nanchang City are that termination monoblock type both sides separate type fills sand long tube sack cofferdam, and it is wide that weir crest sets 8m Emergency Access, cope level 23.70m, Bottom Altitude 2.0m, weir body height about 21.7m.Cofferdam inslope slope ratio Respectively 1:2、1:2.5 and 1:2.5, outside side slope is respectively 1:2.5、1:2.5 and 1:3.0, respectively in 18.5m elevations and 10.0m elevations set plain stage of slope.Weir body below 18.2m elevations sets plastic concrete diaphragm wall as antiseepage structure body, and 18.2m~ The external side in 23.7m elevation scopes weir is clay core sloping core, and inner side is to fill sand long tube bag.
Influenceed by ship migration hysteresis in the range of cofferdam, cofferdam goes into operation serious hysteresis, and in April, 2015 is Nanchang Ganjiang River The spring flood that water level rises suddenly and sharply, on the occasion of rainy season in peach blossom flood season construction 18.2m elevation above Clay Microstructures and long tube bag back-up sand, According to working procedure arrangement, sand long tube bag is filled on the inside of first construction cofferdam, after treating its construction, is constructed filling above sand long tube bag Interim sidewalk, then carry out clay core sloping core on the outside of cofferdam and fill.The back-up sand of long tube bag construct when, using hydraulic pressure hydraulic giant by water with Sand presses 1:0.75 mixing pulping, then extracts mixing slurry filling using slush pump, and sand is consolidated into bleeding in long tube bag Rib body.
Former Jiangxi east embankment has been removed in foundation pit enclosure structure construction in Hong Gu tunnels Dong An cofferdam, and cofferdam is first of flood control body System, it is necessary to cofferdam construction is completed before the rise of spring flood water level, it is ensured that Nanchang old town flood control safety.Clay core sloping core Clay core sloping core can not be filled completion on the occasion of rainy season by construction before flood season arrives, and compaction quality can not meet it is impervious It is required that cofferdam will be unable to meet that flood control requires, on the one hand huge potential safety hazard will be caused to Nanchang old town people's lives and properties, The opposing party is flushing, and paddy tunnel will be unable to complete on schedule.
The content of the invention
The purpose of the present invention is to provide a kind of plastic concrete cut-off wall and armored concrete gear for prior art deficiency The seepage control system that wall is combined, can be in flood season rapid construction, and can guarantee that the combination against seepage system of anti-seepage effect, i.e., a kind of plasticity The seepage prevention system that concrete cut and Reinforced Concrete Retaining Walls are combined.
System architecture of the present invention is mixed including core, the reinforcing of three axes agitating pile cell wall, plastic concrete cut-off wall, reinforcing bar Coagulate native barricade, fill sand long tube bag;
The plastic concrete cut-off wall top surface sets three axes agitating pile cell wall to reinforce to both sides, and three axes agitating pile cell wall adds Gu both sides set core, core both sides, which are set, fills sand long tube bag;
Reinforced Concrete Retaining Walls are set at the top of the plastic concrete cut-off wall, and Reinforced Concrete Retaining Walls are set behind fills sand Long tube bag, Reinforced Concrete Retaining Walls and plastic concrete cut-off wall joint part dabbing, ensure construction joint waterproof quality;
Below plastic concrete cut-off wall top surface, first construct and core and fill sand long tube bag, then three axes agitating pile groove of constructing Wall is reinforced, plastic concrete cut-off wall of finally constructing;Cut-pff wall certain depth is removed using excavator or artificial chisel, is easy to construction steel Reinforced concrete barricade tenon;During construction reinforced bar concrete guard wall, Reinforced Concrete Retaining Walls set one of movement joint at a certain distance, Movement joint position sets rubber watertight strip;Sand long tube bag and its side slope protection are filled in construction to Reinforced Concrete Retaining Walls behind.
Beneficial effects of the present invention:Seepage control system of the present invention can be in flood season rapid construction, and can guarantee that anti-seepage effect.
Brief description of the drawings
Fig. 1 is that a kind of plastic concrete cut-off wall+Reinforced Concrete Retaining Walls are combined seepage control system drawing in side sectional elevation;
In figure:1. the reinforcing of core, 2. three axes agitating pile cell walls, 3. plastic concrete cut-off walls, 4. Reinforced Concrete Retaining Walls, 5. fill sand long tube bag.
Embodiment
System architecture of the present invention is mixed including core, the reinforcing of three axes agitating pile cell wall, plastic concrete cut-off wall, reinforcing bar Coagulate native barricade, fill sand long tube bag;
The seepage control system that the present invention is combined for plastic concrete cut-off wall and Reinforced Concrete Retaining Walls, 18.2m elevations with Upper clay core sloping core and its behind fill sand long tube bag and are adjusted to Reinforced Concrete Retaining Walls+fill sand long tube bag, armored concrete gear Wall plan-position is located at the top of plastic concrete cut-off wall, two kinds of concrete joint part dabbings, ensures construction joint waterproof quality.
The seepage control system operational procedure is as follows:
1st, the construction core of both sides below plastic concrete cut-off wall top surface and three axles stirring of constructing again is filled after sand long tube bag Stake cell wall is reinforced, plastic concrete cut-off wall of finally constructing;
2nd, cut-pff wall 500mm is removed using excavator and artificial chisel, is easy to construction reinforced bar concrete guard wall tenon.
3rd, during construction reinforced bar concrete guard wall, barricade sets one of movement joint every 12m, and movement joint position sets steel side rubber and stopped Water band.
4th, sand long tube bag and its side slope protection are filled in construction to Reinforced Concrete Retaining Walls behind.

Claims (1)

  1. A kind of 1. seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined, it is characterised in that:It is described anti- Ooze system architecture include core, reinforcings of three axes agitating pile cell wall, plastic concrete cut-off wall, Reinforced Concrete Retaining Walls, fill sand grow Pipe bag;
    Three axes agitating pile cell wall is set to reinforce to both sides below the plastic concrete cut-off wall top surface, three axes agitating pile cell wall adds Gu both sides set core, core both sides, which are set, fills sand long tube bag;
    Reinforced Concrete Retaining Walls are set at the top of the plastic concrete cut-off wall, and Reinforced Concrete Retaining Walls are set behind fills sand long tube Bag, Reinforced Concrete Retaining Walls and plastic concrete cut-off wall joint part dabbing, ensure construction joint waterproof quality;
    The both sides below plastic concrete cut-off wall top surface, first construct and core and fill sand long tube bag, then three axes agitating pile groove of constructing Wall is reinforced, plastic concrete cut-off wall of finally constructing;Cut-pff wall certain depth is removed using excavator or artificial chisel, is easy to construction steel Reinforced concrete barricade tenon;During construction reinforced bar concrete guard wall, Reinforced Concrete Retaining Walls set one of movement joint at a certain distance, Movement joint position sets rubber watertight strip;Sand long tube bag and its side slope protection are filled in construction to Reinforced Concrete Retaining Walls behind.
CN201610382512.8A 2016-06-02 2016-06-02 The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined Expired - Fee Related CN105908764B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610382512.8A CN105908764B (en) 2016-06-02 2016-06-02 The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610382512.8A CN105908764B (en) 2016-06-02 2016-06-02 The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined

Publications (2)

Publication Number Publication Date
CN105908764A CN105908764A (en) 2016-08-31
CN105908764B true CN105908764B (en) 2017-12-26

Family

ID=56742900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610382512.8A Expired - Fee Related CN105908764B (en) 2016-06-02 2016-06-02 The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined

Country Status (1)

Country Link
CN (1) CN105908764B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836246B (en) * 2016-12-20 2018-10-23 杭州江润科技有限公司 Open trench tunnel crosses the construction method of section building enclosure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202706042U (en) * 2012-05-08 2013-01-30 上海市水利工程集团有限公司 Improved rapid-construction causeway
CN203905032U (en) * 2014-05-05 2014-10-29 中铁第四勘察设计院集团有限公司 Large pond cutting protection structure
CN203977437U (en) * 2014-05-28 2014-12-03 浙江省交通规划设计研究院 The anti-cofferdam structure of breaking through water under a kind of built hydropower complex dam
WO2015060714A1 (en) * 2013-10-23 2015-04-30 Huesker Synthetic Gmbh Construction for protecting a dike

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202706042U (en) * 2012-05-08 2013-01-30 上海市水利工程集团有限公司 Improved rapid-construction causeway
WO2015060714A1 (en) * 2013-10-23 2015-04-30 Huesker Synthetic Gmbh Construction for protecting a dike
CN203905032U (en) * 2014-05-05 2014-10-29 中铁第四勘察设计院集团有限公司 Large pond cutting protection structure
CN203977437U (en) * 2014-05-28 2014-12-03 浙江省交通规划设计研究院 The anti-cofferdam structure of breaking through water under a kind of built hydropower complex dam

Also Published As

Publication number Publication date
CN105908764A (en) 2016-08-31

Similar Documents

Publication Publication Date Title
CN103953008B (en) A kind of modified mixed dam being applicable to Tailings Dam
CN103031836A (en) Method for quickly building road on new reclamation sludge foundation
CN208650073U (en) Cut and cover method subaqueous tunnel steel sheet-pile cofferdam construction
CN102061706A (en) Assembly steel box cofferdam and construction method thereof
CN102561314A (en) Prefabricated waterproof pile (WSP pile) and inserting and pulling construction method thereof
CN103696416A (en) Novel foundation treatment method
CN106368176B (en) The high dam structure being built on earth material scarcity area deeply covered layer
CN105604075B (en) It is easy to the interim dock entrance cofferdam construction method and cofferdam structure recovered
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN201915414U (en) Spliced steel box coefferdam
CN105908764B (en) The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined
CN207469222U (en) The pre-buried vacuum drainage system in reclamation by pumping filling area
CN203007961U (en) Gabion cofferdam structure
CN103898915B (en) Building small-area deep foundation pit anti-floating water stop construction method
CN212000919U (en) Prevent structure that concrete face dam high toe wall destroyed
CN206736929U (en) Protect the foundation pit structure of surrounding building
CN205662937U (en) Anti -seepage system that plastic concrete cut -pff wall and reinforced concrete barricade combined together
CN202830916U (en) Prefabricated waterproof pile
CN114855762B (en) Device and method for closing and sealing tailings pond
CN203066089U (en) Cofferdam combined by mold bag sand and steel sheet piles and used for hard strata
CN203080480U (en) Upstream blanket structure of concrete face rockfill dam
CN204608701U (en) A kind of gravity type quay being applicable to roadbed of alluvial silt
CN101614017B (en) Construction method of deep water earth-rock cofferdam structure
CN203096696U (en) High and low composite backwater weir
CN210636421U (en) Underwater hollowing defect repairing device for navigation wall pile foundation of ship lock on gravel layer foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Zhijun

Inventor after: Wang Yu

Inventor after: Ma Chengming

Inventor after: Shao Yang

Inventor after: Xie Haijin

Inventor after: Deng Shiping

Inventor after: Guan Lei

Inventor after: Li Yong

Inventor after: Gong Xuedong

Inventor after: Zhang Xiaohong

Inventor after: Xu Xueying

Inventor after: Hong Kairong

Inventor after: Zhang Xichun

Inventor after: Wang Qiulin

Inventor after: Dong Xiaolong

Inventor after: Guo Xiaolong

Inventor after: Sun Chao

Inventor after: Dong Jun

Inventor after: Gao Kun

Inventor after: Liu Min

Inventor before: Dong Xiaolong

Inventor before: Hu Bin

Inventor before: Xie Haijin

Inventor before: Deng Shiping

Inventor before: Guan Lei

Inventor before: Li Yong

Inventor before: Gong Xuedong

Inventor before: Zhang Xiaohong

Inventor before: Wei Changqing

Inventor before: Xu Xueying

Inventor before: Zhang Xichun

Inventor before: Deng Biao

Inventor before: Zhang Xu

Inventor before: Xing Yonghui

Inventor before: Zhang Wei

Inventor before: Li Zhijun

Inventor before: Luo Wei

Inventor before: Yang Guosheng

Inventor before: Shao Yang

Inventor before: Deng Xiaoxin

GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226

Termination date: 20210602