CN105887891A - 深地下室支护的施工方法 - Google Patents
深地下室支护的施工方法 Download PDFInfo
- Publication number
- CN105887891A CN105887891A CN201610288430.7A CN201610288430A CN105887891A CN 105887891 A CN105887891 A CN 105887891A CN 201610288430 A CN201610288430 A CN 201610288430A CN 105887891 A CN105887891 A CN 105887891A
- Authority
- CN
- China
- Prior art keywords
- basement
- layers
- layer
- construction
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
Abstract
本发明公开了一种深地下室支护的施工方法,其特征是施工步骤包括:(1)施工一层钢立柱基础桩、二层钢立柱基础桩,施工一层钢立柱、二层钢立柱;(2)施工地下室支护排桩;(3)施工地下室止水帷幕,采用水泥搅拌桩作为地下室止水帷幕;(4)施工一层地下室内圈环梁、一层地下室外圈环梁;(5)施工一层对撑、角撑;(6)坑内土方开挖至二层地下室内圈环梁底部施工标高;(7)施工二层地下室内圈环梁、二层地下室外圈环梁;(8)施工二层对撑;(9)坑内土方开挖至三层地下室底板底部施工标高;(10)施工地下室底板;(11)施工地下室混凝土外墙;(12)拆除二层地下室内圈环梁、二层地下室外圈环梁、二层对撑;(13)施工二层地下室楼板;(14)拆除一层地下室内圈环梁、一层地下室外圈环梁、一层对撑;(15)施工一层地下室楼板。
Description
技术领域
本发明涉及深地下室支护的施工方法,适用于建筑施工领域。
背景技术
目前城市开发建设中,城市里土地资源呈现寸土寸金的情况,地下室越做越深,同时地下室施工时周边环境保护的要求越来越高,对闹市区的深地下室施工任何确保地下室施工的安全是工程领域的难题,尤其是三层以上地下室的施工安全更难处理。
发明内容
本发明是提供一种深地下室支护,解决深地下室支护施工安全的问题。
为此,本发明中一层钢立柱基础桩、二层钢立柱基础桩利用工程桩,内圈环梁根据工程桩布置情况进行设置。钢立柱基础桩利用工程桩后,可以明显降低施工成本。外圈环梁根据地下室平面情况进行布置,外圈环梁与支护排桩的内侧相切,外圈环梁是椭圆形或者圆形。
一层地下室内圈环梁所形成的面积为7~18M2,二层地下室内圈环梁所形成的面积为20~35M2,本发明中一层地下室内圈环梁所形成的面积比二层地下室内圈环梁所形成的面积小可以大大扩大挖土时挖土机的施工作业空间。一层地下室内圈环梁和二层地下室内圈环梁截面尺寸相同,一层地下室内圈环梁和二层地下室内圈环梁高度均为500~700mm,一层地下室外圈环梁和二层地下室外圈环梁高度均为500~700mm。一层对撑、二层对撑和角撑采用混凝土梁或者钢梁,一层钢立柱截面和二层钢立柱截面相同,一层钢立柱和二层钢立柱截面为正方形,正方形边长为800~1000mm。一层对撑设置在一层地下室内圈环梁和外圈环梁之间,二层对撑设置在二层地下室内圈环梁和外圈环梁之间,角撑位于一层地下室内角部位置。
本发明中一层地下室内圈环梁和二层地下室内圈环梁设置混凝土连系梁进行联接,混凝土连系梁的上联接部位处于一层地下室内圈环梁和一层对撑的交接处,混凝土连系梁的下联接部位处于二层地下室内圈环梁和二层对撑的交接处,以增加支护体系的刚度。
施工步骤包括:
(1)施工一层钢立柱基础桩、二层钢立柱基础桩,施工一层钢立柱、二层钢立柱。
(2)施工地下室支护排桩。
(3)施工地下室止水帷幕,采用水泥搅拌桩作为地下室止水帷幕。
(4)施工一层地下室内圈环梁、一层地下室外圈环梁。
(5)施工一层对撑、角撑。
(6)坑内土方开挖至二层地下室内圈环梁底部施工标高。
(7)施工二层地下室内圈环梁、二层地下室外圈环梁。
(8)施工二层对撑。
(9)坑内土方开挖至三层地下室底板底部施工标高。
(10)施工地下室底板。
(11)施工地下室混凝土外墙。
(12)拆除二层地下室内圈环梁、二层地下室外圈环梁、二层对撑。
(13)施工二层地下室楼板。
(14)拆除一层地下室内圈环梁、一层地下室外圈环梁、一层对撑。
(15)施工一层地下室楼板。
本发明不限于三层地下室,可以用此技术方案推广至四层地下室。
本发明有以下有益效果:
(1)地下室支护体系及周边建筑物安全稳定,有效控制了水平位移,能保证地下室施工过程中的出土安全及顺利施工,结构满足地下室施工安全稳定的要求。
(2)本发明相对传统地下室施工,大大减少了支撑杆件,钢筋混凝土用量大幅度减少,工程成本降低。
(3)由于地下室施工对撑数量远少于传统地下室施工,地下室土方开挖空间大,且有利于反铲挖土施工,可以大大加大施工进度。
附图说明
图1为一层地下室支护平面布置图,图2为二层地下室支护平面布置图。
附图标记:1、一层地下室内圈环梁,2、一层钢立柱,3、一层对撑,4、一层地下室外圈环梁,5、角撑,6、二层地下室内圈环梁,7、二层钢立柱,8、二层对撑,9、二层地下室外圈环梁。
具体实施方式
某工程地下室位于闹市区,深度为15.4m,基坑周长为418m,地下室周边环境对地下室施工要求较高,西北侧为市政路,有很多地下管道,东南侧为6层办公楼,办公楼基础采用水泥搅拌桩,结构情况不佳。
本发明中一层钢立柱2基础桩、二层钢立柱7基础桩利用工程桩,内圈环根据工程桩布置情况进行设置。外圈环梁根据地下室平面情况进行布置,外圈环梁与支护排桩的内侧相切,外圈环梁是椭圆形或者圆形。一层地下室内圈环梁1所形成的面积为9.6M2,二层地下室内圈环梁6所形成的面积为25.8M2。一层地下室内圈环梁1和二层地下室内圈环梁6截面尺寸相同,一层地下室内圈环梁1和二层地下室内圈环梁6高度均为600mm,一层地下室外圈环梁4和二层地下室外圈环梁9高度均为600mm。一层对撑3、二层对撑8和角撑5采用混凝土梁或者钢梁,一层钢立柱2截面和二层钢立柱7截面相同,一层钢立柱2和二层钢立柱7截面为正方形,正方形边长为900mm。
本实施例中一层地下室内圈环梁1和二层地下室内圈环梁6设置混凝土连系梁进行联接,混凝土连系梁的上联接部位处于一层地下室内圈环梁1和一层对撑3的交接处,混凝土连系梁的下联接部位处于二层地下室内圈环梁6和二层对撑8的交接处。
本实施例施工步骤包括:
(1)施工一层钢立柱2基础桩、二层钢立柱7基础桩,施工一层钢立柱2、二层钢立柱7。
(2)施工地下室支护排桩。
(3)施工地下室止水帷幕,采用水泥搅拌桩作为地下室止水帷幕。
(4)施工一层地下室内圈环梁1、一层地下室外圈环梁4。
(5)施工一层对撑3、角撑5。
(6)坑内土方开挖至二层地下室内圈环梁6底部施工标高。
(7)施工二层地下室内圈环梁6、二层地下室外圈环梁9。
(8)施工二层对撑8。
(9)坑内土方开挖至三层地下室底板底部施工标高。
(10)施工地下室底板。
(11)施工地下室混凝土外墙。
(12)拆除二层地下室内圈环梁6、二层地下室外圈环梁9、二层对撑8
(13)施工二层地下室楼板。
(14)拆除一层地下室内圈环梁1、一层地下室外圈环梁4、一层对撑3。
(15)施工一层地下室楼板。
地下室施工过程中深层土体位移在12mm以内,对撑轴力未超过1500KN,周围建筑物结构稳定,施工效果较好。
Claims (1)
1.一种深地下室支护的施工方法,其特征是一层钢立柱基础桩、二层钢立柱基础桩利用工程桩,内圈环梁根据工程桩布置情况进行设置;外圈环梁根据地下室平面情况进行布置,外圈环梁与支护排桩的内侧相切,外圈环梁是椭圆形或者圆形;
施工步骤包括:
(1)施工一层钢立柱基础桩、二层钢立柱基础桩,施工一层钢立柱、二层钢立柱;
(2)施工地下室支护排桩;
(3)施工地下室止水帷幕,采用水泥搅拌桩作为地下室止水帷幕;
(4)施工一层地下室内圈环梁、一层地下室外圈环梁;
(5)施工一层对撑、角撑;
(6)坑内土方开挖至二层地下室内圈环梁底部施工标高;
(7)施工二层地下室内圈环梁、二层地下室外圈环梁;
(8)施工二层对撑;
(9)坑内土方开挖至三层地下室底板底部施工标高;
(10)施工地下室底板;
(11)施工地下室混凝土外墙;
(12)拆除二层地下室内圈环梁、二层地下室外圈环梁、二层对撑;
(13)施工二层地下室楼板;
(14)拆除一层地下室内圈环梁、一层地下室外圈环梁、一层对撑;
(15)施工一层地下室楼板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610288430.7A CN105887891A (zh) | 2016-04-16 | 2016-04-16 | 深地下室支护的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610288430.7A CN105887891A (zh) | 2016-04-16 | 2016-04-16 | 深地下室支护的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105887891A true CN105887891A (zh) | 2016-08-24 |
Family
ID=56702014
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610288430.7A Pending CN105887891A (zh) | 2016-04-16 | 2016-04-16 | 深地下室支护的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105887891A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108930273A (zh) * | 2017-07-30 | 2018-12-04 | 叶长青 | 地下室支护施工技术 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100813664B1 (ko) * | 2006-12-12 | 2008-03-14 | 장지건 | 단면 2차 모멘트가 강화된 흙막이 시공 방법 |
CN101666095A (zh) * | 2009-09-11 | 2010-03-10 | 朱奎 | 不规则基坑支护及施工方法 |
KR20120002868U (ko) * | 2010-10-18 | 2012-04-26 | 이진욱 | 토류벽 보강지지용 연결부재 |
CN104695447A (zh) * | 2015-03-13 | 2015-06-10 | 朱奎 | 深地下室支护 |
CN204849821U (zh) * | 2015-06-05 | 2015-12-09 | 朱奎 | 三层地下室支护构造 |
-
2016
- 2016-04-16 CN CN201610288430.7A patent/CN105887891A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100813664B1 (ko) * | 2006-12-12 | 2008-03-14 | 장지건 | 단면 2차 모멘트가 강화된 흙막이 시공 방법 |
CN101666095A (zh) * | 2009-09-11 | 2010-03-10 | 朱奎 | 不规则基坑支护及施工方法 |
KR20120002868U (ko) * | 2010-10-18 | 2012-04-26 | 이진욱 | 토류벽 보강지지용 연결부재 |
CN104695447A (zh) * | 2015-03-13 | 2015-06-10 | 朱奎 | 深地下室支护 |
CN204849821U (zh) * | 2015-06-05 | 2015-12-09 | 朱奎 | 三层地下室支护构造 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108930273A (zh) * | 2017-07-30 | 2018-12-04 | 叶长青 | 地下室支护施工技术 |
CN108930274A (zh) * | 2017-07-30 | 2018-12-04 | 叶长青 | 地下室支护施工方法 |
CN108951655A (zh) * | 2017-07-30 | 2018-12-07 | 叶长青 | 预应力张拉情况下的地下室支护施工方法 |
CN108951654A (zh) * | 2017-07-30 | 2018-12-07 | 叶长青 | 不同开挖深度地下室支护施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103321231B (zh) | 基坑支护施工方法 | |
CN203654294U (zh) | 一种逆作法中基坑的支护结构 | |
CN204418187U (zh) | 地铁保护区域土钉墙结合双排桩深基坑复合支护结构 | |
CN105155554A (zh) | 一种拱形支护体系的深基坑 | |
JP5555643B2 (ja) | 山留め支保工の構造およびその施工方法 | |
KR100813664B1 (ko) | 단면 2차 모멘트가 강화된 흙막이 시공 방법 | |
KR101879141B1 (ko) | 태양광 발전 장치용 기초 보강 구조물 | |
JP6454674B2 (ja) | 止水作業空間の構築方法 | |
JP2013256793A (ja) | 地下構造の施工方法及び地下構造 | |
CN103103988A (zh) | 利用中心岛楼板水平支撑结构的基坑施工方法 | |
CN205975658U (zh) | 钢平台塔吊基础 | |
CN205742216U (zh) | 一种用于软弱地质基坑放坡开挖组合式支护结构 | |
KR20080005109A (ko) | 수평 아치형 구조재에 의한 흙막이 벽체 단위 지보구조 및이를 시공하는 방법 | |
CN205557537U (zh) | 一种基坑支护结构 | |
JP2015025292A (ja) | 建物の構築方法、及び建物 | |
CN103541371A (zh) | 热力管沟跨越预留地铁车站的承托平台及其施工方法 | |
CN102220764B (zh) | 深基坑支护体系的施工方法 | |
JP5259510B2 (ja) | 擁壁及びその施工方法 | |
CN104695447B (zh) | 深地下室支护 | |
CN106120805A (zh) | 危房环境下的超深基坑支护的施工方法 | |
CN105887891A (zh) | 深地下室支护的施工方法 | |
CN106013174A (zh) | 一种基坑支护斜向支撑方法及斜向支撑结构 | |
CN205776258U (zh) | 一种深基坑桩锚支护体系 | |
AU2020100004A4 (en) | A Method Of Constructing A Column, A Subterranean Structure, And A Structure Made From The Method | |
CN103711123A (zh) | 竹节式砂浆桩及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160824 |
|
WD01 | Invention patent application deemed withdrawn after publication |