CN105863588A - Balanced injection and recovery method of thickened oil thermal recovery horizontal well - Google Patents

Balanced injection and recovery method of thickened oil thermal recovery horizontal well Download PDF

Info

Publication number
CN105863588A
CN105863588A CN201610280362.XA CN201610280362A CN105863588A CN 105863588 A CN105863588 A CN 105863588A CN 201610280362 A CN201610280362 A CN 201610280362A CN 105863588 A CN105863588 A CN 105863588A
Authority
CN
China
Prior art keywords
horizontal well
section
horizontal
tubular column
note
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610280362.XA
Other languages
Chinese (zh)
Other versions
CN105863588B (en
Inventor
徐家年
刘虹利
王郑库
李凤霞
张振军
史海涛
黄显德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University of Science and Technology
Original Assignee
Chongqing University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University of Science and Technology filed Critical Chongqing University of Science and Technology
Priority to CN201610280362.XA priority Critical patent/CN105863588B/en
Publication of CN105863588A publication Critical patent/CN105863588A/en
Application granted granted Critical
Publication of CN105863588B publication Critical patent/CN105863588B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Extraction Or Liquid Replacement (AREA)

Abstract

The invention relates to a balanced injection and recovery method of a thickened oil thermal recovery horizontal well. The method comprises steps as follows: before well completion of the horizontal well, a horizontal well section is designed section by section according to the permeability and oil saturation distribution of horizontal sections; the flow intensity of the horizontal sections is designed through comprehensive consideration of steam injection, production and wellbore flowing of the horizontal sections designed in the step 1; the sand blocking accuracy of a sand control screen pipe is designed according to distribution of the sand granularity of the stratum; a completion pipe string is designed and tripped in according to design results of steps 1 to 3; an injection and recovery integrated pipe string is designed and tripped in, steam injection is performed on the horizontal well section, and steam can be injected into corresponding well sections from flowing control devices of the section; the injection and recovery integrated pipe string is tripped out, a conventional production pipe string is tripped in for production, output liquids of all the segmentation sections can flow into a wellbore from respective flowing control devices. The balanced injection and recovery method of the thermal recovery horizontal well is provided, can realize uniform steam injection inside a pipe and outside the pipe in the horizontal well section at the steam injection stage of the thermal recovery horizontal well, can balance the output liquids in the horizontal well section at the production stage and can also perform the sand control function.

Description

A kind of heavy crude heat extraction horizontal well equilibrium note mining method
Technical field
The present invention relates to a kind of heavy crude heat extraction horizontal well equilibrium note mining method.
Background technology
During heavy crude heat extraction horizontal well steam injection, owing to net horizontal section has certain length, Conventional steam injection string only one of which steam injection point, makes pressure skewness in horizontal segment tubing string, adds Upper reservoir heterogeneity, easily causes horizontal segment and inhales vapour inequality, form local and advance by leaps and bounds, occur Vapour is altered, and makes steam excessive, causes capacity loss.Certain viscous crude field horizontal well thermal recovery domestic is supervised Survey analysis shows, during horizontal well steam injection, " vapour is altered " is very serious, and more than 70% exists Vapour is altered in various degree, and horizontal segment is employed the well of inequality and accounted for 80%, has a strong impact on heavy crude heat extraction Horizontal well production effect.At present, both at home and abroad horizontal well thermal recovery horizontal segment is carried out uniform steam injection, Mainly take two ways, i.e. net horizontal section Double-pipe gas-injection and multiple spot steam injection.Net horizontal section is double Pipe steam injection technology, i.e. uses well head " double suspension ", tube-in-tube steam injection mode, and steam is from two Individual passage injects, and one is to be injected into horizontal segment toe-end from small size integral joint tubing, one It is to net horizontal section heel end from vacuum heat insulation tube and small size integral joint tubing annular injection;By ground Surface current amount is reconciled valve and is carried out flow-control, it is achieved two controls going out vapour point different displacements. Net horizontal section multiple spot steam injection technology is to install multiple steam injection valve on horizontal segment steam injection string, respectively Use steam umbrella to be separated between steam injection valve, make each net horizontal section form independent steam injection list Unit;Regulate horizontal segment each steam injection point steam injection amount by steam injection valve, thus the section of being up to the standard is uniform The purpose of steam injection.The shortcoming of net horizontal section Double-pipe gas-injection is, only two steam injection points, to length Horizontal segment uniform steam injection regulating power is limited.Multiple spot steam injection mode is due to the outer horizontal segment of screen casing not Splitting, steam is the most easily absorbed by low pressure, high permeability formation section, actual all to net horizontal section Even suction modulation limited use.Two kinds of steam injection mode net horizontal sections do not equalize production fluid and control dress Put, affected by horizontal segment permeability contrast, Wellbore Flow pressure drop, still result in during production Net horizontal section employs inequality, affects horizontal productivity.Two kinds of steam injection modes are both needed at horizontal segment Under enter steam injection string, working procedure is complicated, and operating risk is high.
Summary of the invention
The technical problem to be solved in the present invention is the drawbacks described above how overcoming prior art, carries For a kind of heavy crude heat extraction horizontal well equilibrium note mining method.
For solve above-mentioned technical problem, this heavy crude heat extraction horizontal well equilibrium note mining method include with Lower step,
Step 1: before horizontal well completion, according to horizontal segment permeability, oil saturation distribution, Net horizontal section is carried out segment design;
Step 2: the steam injection of the horizontal segment that combining step 1 is designed, production, Wellbore Flow, Design level section traffic intensity;
Step 3: carry out sand control screen sand block accuracy Design according to the distribution of stratum fineness of sand;
Step 4: according to the design result of step 1 to 3, design and under enter completion tubular column;
Step 5: design and under enter note and adopt integral tubular column, to net horizontal section steam injection, steam meeting Corresponding well section is injected from each section of flow control apparatus;
Step 6: tripping out note and adopt integral tubular column, lower conventional flow string produces, the respectively section of segmentation Production fluid can flow into pit shaft from respective flow control apparatus.
As optimizing, completion tubular column described in step 4 is by hanger, light sleeve pipe, resistance to height Temperature bore hole external packer of pipe, tune stream control sand sieve pipe group with flow control apparatus connect and form; Described high temperature resistant bore hole external packer of pipe is Expansion sealing, and described hanging packer hangs and seals, Described completion tubular column generally hangs sealing.
As optimizing, described in step 5, note is adopted in completion tubular column post intracavity under integral tubular column, Note is adopted and is provided with production packer between integral tubular column outer wall and completion tubular column inwall.
As optimizing, each section of Liquid output of described horizontal ends controls strong with flow control apparatus Degree is different and changes.
Designed by technique scheme, the invention provides one and be capable of thermal recovery level Uniform steam injection in well steam injection stage net horizontal section pipe, outside pipe;Production phase net horizontal section equalizes Production fluid, can play again the horizontal well thermal recovery equilibrium note mining method of sand-proof function simultaneously.
One heavy crude heat extraction horizontal well of the present invention equilibrium note mining method, enter under horizontal segment with The tune stream control sand sieve pipe of flow control apparatus, utilizes high-temperature resistant tube external packer to net horizontal section It is separated completion.Utilize note to adopt integral tubular column to carry out note and adopt, not be used under net horizontal section Two-tube, or the instrument such as small size oil pipe, steam umbrella, flow control valve, easy construction is reliable. During steam injection, flow control apparatus can be automatically adjusted the steam absorbing amount of each compartmented, can be automatically during production Regulate each compartmented Liquid output, thus realize full horizontal segment equilibrium note and adopt, well section of improving the standard Development degree, plays horizontal productivity advantage.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings one heavy crude heat extraction horizontal well of the present invention equilibrium note mining method is made Further illustrate:
Fig. 1 is the structural representation of the completion tubular column of this heavy crude heat extraction horizontal well equilibrium note mining method Figure;
Fig. 2 is that the note of this heavy crude heat extraction horizontal well equilibrium note mining method adopts the structure of integral tubular column Schematic diagram.
In figure: 8-completion tubular column, 1-hanger, 2-light sleeve pipe, 3-is high temperature resistant bore hole pipe covering Stream control sand sieve pipe, 6-production packer, 7-is adjusted with flow control apparatus, 5-every device, 4- Note adopts integral tubular column, 8-completion tubular column.
Detailed description of the invention
Step 1: before horizontal well completion, according to horizontal segment permeability, oil saturation distribution, Net horizontal section is carried out segment design;
Step 2: the steam injection of the horizontal segment that combining step 1 is designed, production, Wellbore Flow, Design level section traffic intensity;
Step 3: carry out sand control screen sand block accuracy Design according to the distribution of stratum fineness of sand;
Step 4: according to the design result of step 1 to 3, design and under enter completion tubular column 8;Institute State completion tubular column 8 by hanger 1, light sleeve pipe 2, high temperature resistant bore hole external packer of pipe 3, band The tune stream control sand sieve pipe 5 groups having flow control apparatus 4 connects and forms;Described high temperature resistant bore hole pipe External packer 3 is Expansion sealing, and described hanging packer 1 hangs and seals, described completion tubular Post 8 generally hangs sealing;
Step 5: design and under enter note and adopt integral tubular column 7, to net horizontal section steam injection, steam Corresponding well section can be injected from each section of flow control apparatus;Described note adopts integral tubular column 7 times in complete Well casing post 8 post intracavity, note is adopted and is provided with between integral tubular column 7 outer wall and completion tubular column 8 inwall Production packer 6;
Step 6: tripping out note and adopt integral tubular column 7, lower conventional flow string produces, and respectively splits Section production fluid can flow into pit shaft from respective flow control apparatus.
Each section of Liquid output of described horizontal ends controls intensity difference with flow control apparatus 4 and changes.
It can be that professional and technical personnel in the field are real that above-mentioned embodiment is intended to illustrate the present invention Now or use, above-mentioned embodiment is modified for those skilled in the art will It is apparent from, therefore the present invention includes but not limited to above-mentioned embodiment, any meet this power Profit claim or description describe, and meet and principles disclosed herein and novelty, creativeness The method of feature, technique, product, within each falling within protection scope of the present invention.

Claims (4)

1. a heavy crude heat extraction horizontal well equilibrium note mining method, is characterized in that: the method comprises the following steps,
Step 1: before horizontal well completion, according to horizontal segment permeability, oil saturation distribution, to horizontal well Duan Jinhang segment design;
Step 2: the steam injection of the horizontal segment that combining step 1 is designed, production, Wellbore Flow, design level Section traffic intensity;
Step 3: carry out sand control screen sand block accuracy Design according to the distribution of stratum fineness of sand;
Step 4: according to the design result of step 1 to 3, design and under enter completion tubular column (8);
Step 5: design and under enter note and adopt integral tubular column (7), to net horizontal section steam injection, steam can be from each section Flow control apparatus injects corresponding well section;
Step 6: tripping out note and adopt integral tubular column (7), lower conventional flow string produces, each segmentation section production fluid Pit shaft can be flowed into from respective flow control apparatus.
Heavy crude heat extraction horizontal well the most according to claim 1 equilibrium note mining method, is characterized in that: step Completion tubular column (8) described in rapid 4 is by hanger (1), light sleeve pipe (2), high temperature resistant bore hole external packer of pipe (3), tune stream control sand sieve pipe (5) group with flow control apparatus (4) connects and forms;Described high temperature resistant naked Eye external packer of pipe (3) is Expansion sealing, and described hanging packer (1) hangs and seals, described completion tubular Post (8) generally hangs sealing.
Heavy crude heat extraction horizontal well the most according to claim 1 equilibrium note mining method, is characterized in that: step Note described in rapid 5 is adopted in completion tubular column (8) post intracavity under integral tubular column (7), and note adopts integral tubular column (7) Production packer (6) it is provided with between outer wall and completion tubular column (8) inwall.
Heavy crude heat extraction horizontal well the most according to claim 1 equilibrium note mining method, is characterized in that: described Each section of Liquid output of horizontal ends controls intensity difference with flow control apparatus (4) and changes.
CN201610280362.XA 2016-04-28 2016-04-28 A kind of heavy crude heat extraction horizontal well equilibrium note mining method Expired - Fee Related CN105863588B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610280362.XA CN105863588B (en) 2016-04-28 2016-04-28 A kind of heavy crude heat extraction horizontal well equilibrium note mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610280362.XA CN105863588B (en) 2016-04-28 2016-04-28 A kind of heavy crude heat extraction horizontal well equilibrium note mining method

Publications (2)

Publication Number Publication Date
CN105863588A true CN105863588A (en) 2016-08-17
CN105863588B CN105863588B (en) 2019-07-26

Family

ID=56629979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610280362.XA Expired - Fee Related CN105863588B (en) 2016-04-28 2016-04-28 A kind of heavy crude heat extraction horizontal well equilibrium note mining method

Country Status (1)

Country Link
CN (1) CN105863588B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547603A (en) * 2018-02-28 2018-09-18 中国石油天然气股份有限公司 A kind of water flood recovery integrated pipe column and water injection oil extraction method
CN110630234A (en) * 2018-06-21 2019-12-31 中国石油天然气股份有限公司 Steam injection method for heavy oil thermal recovery well
CN111411927A (en) * 2020-03-30 2020-07-14 中国石油大学(华东) Method for adjusting steam injection mode in steam huff and puff process
CN111946314A (en) * 2019-05-15 2020-11-17 中国石油天然气股份有限公司 Injection and extraction control pipe column for thickened oil horizontal well
CN115247543A (en) * 2021-04-28 2022-10-28 中国石油化工股份有限公司 Method for accurately injecting steam in fixed-point segmented water shutoff and dislocation mode of heavy oil reservoir horizontal well

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101718190A (en) * 2009-12-08 2010-06-02 安东石油技术(集团)有限公司 Completed well body structure with temporary plugging function screen pipe and well completion method for suspending screen pipe at tail pipe
CN101892827A (en) * 2010-04-30 2010-11-24 钟立国 Optimized steam injection technology for horizontal well in segments
CN102108851A (en) * 2010-12-30 2011-06-29 中国石油天然气股份有限公司 Horizontal well steam injection method and system
CN202064920U (en) * 2011-06-01 2011-12-07 中国石油天然气股份有限公司 Pipe column for segmentation well completion technology of thickened oil horizontal well
CN102536172A (en) * 2012-02-23 2012-07-04 石云夫 Sectional production tubular pile for horizontal well
CN102852502A (en) * 2012-04-18 2013-01-02 中国石油天然气股份有限公司 Intelligent steam distribution process pipe column for horizontal steam injection well
CN204041030U (en) * 2014-05-15 2014-12-24 成都北方石油勘探开发技术有限公司 With the horizontal well in segments completion tubular column of the close screen casing of variable orifice
CN104481484A (en) * 2014-12-26 2015-04-01 东营市福利德石油科技开发有限责任公司 Horizontal well segmented intermittent steam huff and puff injection-production integrated pipe column
CN204283379U (en) * 2014-12-08 2015-04-22 众通(北京)能源技术有限公司 Screen casing completes oil well intelligent water control pipe post
CN204283367U (en) * 2014-12-08 2015-04-22 众通(北京)能源技术有限公司 Horizontal well Intelligent water-controlled completion tubular column

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101718190A (en) * 2009-12-08 2010-06-02 安东石油技术(集团)有限公司 Completed well body structure with temporary plugging function screen pipe and well completion method for suspending screen pipe at tail pipe
CN101892827A (en) * 2010-04-30 2010-11-24 钟立国 Optimized steam injection technology for horizontal well in segments
CN102108851A (en) * 2010-12-30 2011-06-29 中国石油天然气股份有限公司 Horizontal well steam injection method and system
CN202064920U (en) * 2011-06-01 2011-12-07 中国石油天然气股份有限公司 Pipe column for segmentation well completion technology of thickened oil horizontal well
CN102536172A (en) * 2012-02-23 2012-07-04 石云夫 Sectional production tubular pile for horizontal well
CN102852502A (en) * 2012-04-18 2013-01-02 中国石油天然气股份有限公司 Intelligent steam distribution process pipe column for horizontal steam injection well
CN204041030U (en) * 2014-05-15 2014-12-24 成都北方石油勘探开发技术有限公司 With the horizontal well in segments completion tubular column of the close screen casing of variable orifice
CN204283379U (en) * 2014-12-08 2015-04-22 众通(北京)能源技术有限公司 Screen casing completes oil well intelligent water control pipe post
CN204283367U (en) * 2014-12-08 2015-04-22 众通(北京)能源技术有限公司 Horizontal well Intelligent water-controlled completion tubular column
CN104481484A (en) * 2014-12-26 2015-04-01 东营市福利德石油科技开发有限责任公司 Horizontal well segmented intermittent steam huff and puff injection-production integrated pipe column

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547603A (en) * 2018-02-28 2018-09-18 中国石油天然气股份有限公司 A kind of water flood recovery integrated pipe column and water injection oil extraction method
CN110630234A (en) * 2018-06-21 2019-12-31 中国石油天然气股份有限公司 Steam injection method for heavy oil thermal recovery well
CN110630234B (en) * 2018-06-21 2021-11-02 中国石油天然气股份有限公司 Steam injection method for heavy oil thermal recovery well
CN111946314A (en) * 2019-05-15 2020-11-17 中国石油天然气股份有限公司 Injection and extraction control pipe column for thickened oil horizontal well
CN111411927A (en) * 2020-03-30 2020-07-14 中国石油大学(华东) Method for adjusting steam injection mode in steam huff and puff process
CN111411927B (en) * 2020-03-30 2022-07-29 中国石油大学(华东) Method for adjusting steam injection mode in steam huff and puff process
CN115247543A (en) * 2021-04-28 2022-10-28 中国石油化工股份有限公司 Method for accurately injecting steam in fixed-point segmented water shutoff and dislocation mode of heavy oil reservoir horizontal well
CN115247543B (en) * 2021-04-28 2024-04-09 中国石油化工股份有限公司 Fixed-point segmented water shutoff and dislocation accurate steam injection method for horizontal well of heavy oil reservoir

Also Published As

Publication number Publication date
CN105863588B (en) 2019-07-26

Similar Documents

Publication Publication Date Title
CN105863588A (en) Balanced injection and recovery method of thickened oil thermal recovery horizontal well
CN204283367U (en) Horizontal well Intelligent water-controlled completion tubular column
CN204041022U (en) A kind of twofold whirl water pumping gas production downhole tool
CN204283379U (en) Screen casing completes oil well intelligent water control pipe post
CN103184859B (en) For quarrying apparatus and the method for single-well injection-production
CN106968601B (en) Exploit the casing programme and method of dry-hot-rock geothermal resource
CN101892827B (en) Optimized steam injection technology for horizontal well in segments
CN205778790U (en) Stratified Waterflooding and injection and extraction system
WO2016082188A1 (en) Hot dry rock multi-cycle heating system and production method therefor
CN204266939U (en) A kind of water and oil control second completion pipe string combination
CN206917640U (en) The steady oil system of offshore oilfield horizontal well automatic control water
CN108708700A (en) A kind of method of SAGD technology application effects in improvement heterogeneous reservoir
CN110107264A (en) A kind of gaslift suitable for gas well Life cycle water pumping gas production
CN204941480U (en) The horizontal well completion sleeve pipe of segmentation exploitation and the tubing string of formation thereof can be realized
CN105952378A (en) Tree-shape structure well drilling and completion and yield increasing method
CN107269255A (en) A kind of method and device that fine and close oil is exploited by the displacement of reservoir oil between cluster
CN112012706A (en) Offshore thickened oil steam huff-puff injection-production integrated device
CN103867172B (en) Injection-production system and injection-production method
CN110630234B (en) Steam injection method for heavy oil thermal recovery well
CN205577962U (en) Long horizontal well double -flow -passage of viscous crude sprays and annotates vapour device
CN203239303U (en) Extraction device used for injection and extraction of same well
CN207161062U (en) A kind of directional well Adaptive Second segmentation control water completion tubular column
CN105672967A (en) Tubular column for SAGD double horizontal well and oil production method of tubular column
CN113803050A (en) Self-adaptive inflow control device, intelligent well completion pipe string and well completion method
CN204283388U (en) Horizontal well even steam injection tubing string

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190726