CN105863588B CN201610280362.XA CN201610280362A CN105863588B CN 105863588 B CN105863588 B CN 105863588B CN 201610280362 A CN201610280362 A CN 201610280362A CN 105863588 B CN105863588 B CN 105863588B
Authority
CN
China
Prior art keywords
section
horizontal
tubular column
note
steam injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610280362.XA
Other languages
Chinese (zh)
Other versions
CN105863588A (en
Inventor
徐家年
刘虹利
王郑库
李凤霞
张振军
史海涛
黄显德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University of Science and Technology
Original Assignee
Chongqing University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University of Science and Technology filed Critical Chongqing University of Science and Technology
Priority to CN201610280362.XA priority Critical patent/CN105863588B/en
Publication of CN105863588A publication Critical patent/CN105863588A/en
Application granted granted Critical
Publication of CN105863588B publication Critical patent/CN105863588B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Extraction Or Liquid Replacement (AREA)

Abstract

The present invention relates to a kind of heavy crude heat extraction horizontal well equilibriums to infuse mining method comprising following steps before horizontal well completion, are distributed according to horizontal segment permeability, oil saturation, carry out segment design to net horizontal section;The steam injection for the horizontal segment that combining step 1 is designed, production, Wellbore Flow, design level section traffic intensity;It is distributed according to stratum fineness of sand and carries out sand control screen sand block accuracy Design;According to the design result of step 1 to 3, simultaneously tripping in completion tubular column is designed;It designs and tripping in note adopts integral tubular column, to net horizontal section steam injection, steam can inject corresponding well section from each section of flow control apparatus;It acts note and adopts integral tubular column, lower routine flow string production, each section production fluid of dividing can flow into pit shaft from respective flow control apparatus.Providing one kind can be realized in horizontal well thermal recovery steam injection stage net horizontal section pipe, manages outer uniform steam injection;Production phase net horizontal section equilibrium produces liquid, while can play the horizontal well thermal recovery equilibrium note mining method of sand-proof function again.

Description

A kind of heavy crude heat extraction horizontal well equilibrium note mining method
Technical field
The present invention relates to a kind of heavy crude heat extraction horizontal well equilibriums to infuse mining method.
Background technique
During heavy crude heat extraction horizontal well steam injection, since net horizontal section has certain length, conventional steam injection string only has One steam injection point, is unevenly distributed pressure in horizontal segment tubing string, in addition reservoir heterogeneity, be easy to cause horizontal segment to inhale vapour not , it forms part to advance by leaps and bounds, channeling occurs, keeps steam excessive, causes capacity loss.Domestic certain viscous crude field horizontal well thermal recovery monitoring Analysis shows when horizontal well steam injection that " channeling " is very serious, and 70% or more there are different degrees of channeling, horizontal segments to employ not Equal well accounts for about 80%, seriously affects heavy crude heat extraction horizontal well production effect.Currently, both at home and abroad to horizontal well thermal recovery horizontal segment into The uniform steam injection of row, mainly takes two ways, i.e. net horizontal section Double-pipe gas-injection and multiple spot steam injection.Net horizontal section Double-pipe gas-injection skill Art uses well head " double suspensions ", tube-in-tube steam injection mode, steam is injected from two channels, and one is from small size without box cupling Oil pipe is injected into horizontal segment toe-end, one be from vacuum heat insulation tube and small size integral joint tubing annular injection to net horizontal section with End;Flow control is carried out by ground flow mediation valve door, realizes two controls for going out vapour point different displacements.Net horizontal section multiple spot note Vapour technology is that multiple steam injection valves are installed on horizontal segment steam injection string, is separated between each steam injection valve using steam umbrella, is made each Net horizontal section forms independent steam injection unit;By each steam injection point steam injection amount of steam injection valve regulation horizontal segment, to reach horizontal segment The purpose of uniform steam injection.The shortcomings that net horizontal section Double-pipe gas-injection is that only there are two steam injection points, is adjusted to the uniform steam injection of long horizontal sections Ability is limited.Multiple spot steam injection mode due to outside screen casing horizontal segment be not split, steam still easily by low pressure, hypertonic interval inhale It receives, uniformly suction modulation effect practical to net horizontal section is limited.Two kinds of steam injection mode net horizontal sections produce hydraulic control system dress without balanced It sets, is influenced by horizontal segment permeability contrast, Wellbore Flow pressure drop, when production still results in net horizontal section and employs unevenness, influences Horizontal productivity.Two kinds of steam injection modes are both needed in horizontal segment tripping in steam injection string, and working procedure is complicated, and operating risk is high.
Summary of the invention
The technical problem to be solved by the present invention is to how overcome the drawbacks described above of the prior art, a kind of heavy crude heat extraction water is provided Mining method is infused in horizontal well equilibrium.
In order to solve the above technical problems, this heavy crude heat extraction horizontal well equilibrium note mining method includes the following steps,
Step 1: before horizontal well completion, being distributed according to horizontal segment permeability, oil saturation, net horizontal section is segmented Design;
Step 2: the steam injection for the horizontal segment that combining step 1 is designed, production, Wellbore Flow, design level section traffic intensity;
Step 3: being distributed according to stratum fineness of sand and carry out sand control screen sand block accuracy Design;
Step 4: according to the design result of step 1 to 3, designing simultaneously tripping in completion tubular column;
Step 5: designing and tripping in note adopts integral tubular column, to net horizontal section steam injection, steam can be from each section of flow control apparatus Inject corresponding well section;
Step 6: acting note and adopt integral tubular column, lower routine flow string production, each section production fluid of dividing can be from respective flowing Control device flows into pit shaft.
As optimizing, completion tubular column described in step 4 is by hanger, light casing, high temperature resistant naked eye external packer of pipe, band There is the tune flow control sand sieve pipe group of flow control apparatus to connect;The high temperature resistant naked eye external packer of pipe is Expansion sealing, described Hanging packer suspension sealing, the completion tubular column generally hang sealing.
As optimizing, note described in step 5 is adopted intracavitary in completion tubular column column under integral tubular column, and note adopts integral tubular column outer wall Production packer is equipped between completion tubular column inner wall.
As optimizing, each section of Liquid output of the horizontal ends is different with flow control apparatus control intensity and changes.
It designs through the above technical solution, the present invention provides one kind can be realized horizontal well thermal recovery steam injection stage horizontal well In section pipe, manage outer uniform steam injection;Production phase net horizontal section equilibrium produces liquid, while can play the horizontal well thermal recovery of sand-proof function again Equilibrium note mining method.
Mining method is infused in a kind of heavy crude heat extraction horizontal well equilibrium of the present invention, has the tune of flow control apparatus in horizontal segment tripping in Flow control sand sieve pipe has been separated well to net horizontal section using high-temperature resistant tube external packer.Integral tubular column is adopted using note to be infused It adopts, does not have to net horizontal section tripping in is two-tube or the tools such as small size oil pipe, steam umbrella, flow control valve, it is easy for construction reliable. Flow control apparatus can automatically adjust the steam absorbing amount of each compartmented when steam injection, and when production can automatically adjust each compartmented Liquid output, To realize that full horizontal segment equilibrium note is adopted, well section of improving the standard development degree plays horizontal productivity advantage.
Detailed description of the invention
A kind of present invention heavy crude heat extraction horizontal well equilibrium note mining method is described further with reference to the accompanying drawing:
Fig. 1 is the structural schematic diagram of the completion tubular column of this heavy crude heat extraction horizontal well equilibrium note mining method;
Fig. 2 is that the note of this heavy crude heat extraction horizontal well equilibrium note mining method adopts the structural schematic diagram of integral tubular column.
In figure: 8- completion tubular column, 1- hanger, 2- light casing, 3- high temperature resistant naked eye external packer of pipe, 4- are with flowing control Device processed, 5- tune flow control sand sieve pipe, 6- production packer, 7- note adopt integral tubular column, 8- completion tubular column.
Specific embodiment
Step 1: before horizontal well completion, being distributed according to horizontal segment permeability, oil saturation, net horizontal section is segmented Design;
Step 2: the steam injection for the horizontal segment that combining step 1 is designed, production, Wellbore Flow, design level section traffic intensity;
Step 3: being distributed according to stratum fineness of sand and carry out sand control screen sand block accuracy Design;
Step 4: according to the design result of step 1 to 3, designing simultaneously tripping in completion tubular column 8;The completion tubular column 8 is by hanging Device 1, light casing 2, high temperature resistant naked eye external packer of pipe 3,5 groups of pipe of tune flow control sand sieve with flow control apparatus 4 connect;Institute Stating high temperature resistant naked eye external packer of pipe 3 is Expansion sealing, and the suspension of hanging packer 1 sealing, the completion tubular column 8 is generally Suspension sealing;
Step 5: designing and tripping in note adopts integral tubular column 7, to net horizontal section steam injection, steam can be from each section of flow control apparatus Inject corresponding well section;It is described note adopt it is intracavitary in 8 column of completion tubular column under integral tubular column 7, note adopt 7 outer wall of integral tubular column and completion tubular column Production packer 6 is equipped between 8 inner walls;
Step 6: acting note and adopt integral tubular column 7, lower routine flow string production, each section production fluid of dividing can be from respective flowing Control device flows into pit shaft.
Each section of Liquid output of the horizontal ends controls intensity difference with flow control apparatus 4 and changes.
Above embodiment, which is intended to illustrate the present invention, to be realized or use for professional and technical personnel in the field, to above-mentioned Embodiment, which is modified, will be readily apparent to those skilled in the art, therefore the present invention includes but is not limited to Above embodiment, it is any to meet the claims or specification description, meet with principles disclosed herein and novelty, The method of inventive features, technique, product, fall within the scope of protection of the present invention.

Claims (2)

1. mining method is infused in a kind of heavy crude heat extraction horizontal well equilibrium, it is characterized in that: this approach includes the following steps,
Step 1: before horizontal well completion, being distributed according to horizontal segment permeability, oil saturation, segmentation is carried out to net horizontal section and is set Meter;
Step 2: the steam injection for the horizontal segment that combining step 1 is designed, production, Wellbore Flow, design level section traffic intensity;
Step 3: being distributed according to stratum fineness of sand and carry out sand control screen sand block accuracy Design;
Step 4: according to the design result of step 1 to 3, designing simultaneously tripping in completion tubular column (8), the completion tubular column (8) is by hanging Device (1), light casing (2), high temperature resistant naked eye external packer of pipe (3), the tune flow control sand sieve pipe (5) for having flow control apparatus (4) Group connects;The high temperature resistant naked eye external packer of pipe (3) is Expansion sealing, hanger (1) the suspension sealing, the complete well Tubing string (8) generally hangs sealing;
Step 5: designing and tripping in note adopts integral tubular column (7), to net horizontal section steam injection, steam can be infused from each section of flow control apparatus Enter corresponding well section;It is described note adopt it is intracavitary in completion tubular column (8) column under integral tubular column (7), note adopt integral tubular column (7) outer wall and complete well Production packer (6) are equipped between tubing string (8) inner wall;
Step 6: acting note and adopt integral tubular column (7), lower routine flow string production, each section production fluid of dividing can be from respective flowing control Device processed flows into pit shaft.
2. mining method is infused in heavy crude heat extraction horizontal well equilibrium according to claim 1, it is characterized in that: the smooth casing (2) Each section of Liquid output of horizontal ends is different with flow control apparatus (4) control intensity and changes.
CN201610280362.XA 2016-04-28 2016-04-28 A kind of heavy crude heat extraction horizontal well equilibrium note mining method Expired - Fee Related CN105863588B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610280362.XA CN105863588B (en) 2016-04-28 2016-04-28 A kind of heavy crude heat extraction horizontal well equilibrium note mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610280362.XA CN105863588B (en) 2016-04-28 2016-04-28 A kind of heavy crude heat extraction horizontal well equilibrium note mining method

Publications (2)

Publication Number Publication Date
CN105863588A CN105863588A (en) 2016-08-17
CN105863588B true CN105863588B (en) 2019-07-26

Family

ID=56629979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610280362.XA Expired - Fee Related CN105863588B (en) 2016-04-28 2016-04-28 A kind of heavy crude heat extraction horizontal well equilibrium note mining method

Country Status (1)

Country Link
CN (1) CN105863588B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547603B (en) * 2018-02-28 2021-03-30 中国石油天然气股份有限公司 Water injection and oil extraction integrated tubular column and water injection and oil extraction method
CN110630234B (en) * 2018-06-21 2021-11-02 中国石油天然气股份有限公司 Steam injection method for heavy oil thermal recovery well
CN111946314B (en) * 2019-05-15 2022-12-02 中国石油天然气股份有限公司 Injection and extraction control pipe column for thickened oil horizontal well
CN111411927B (en) * 2020-03-30 2022-07-29 中国石油大学(华东) Method for adjusting steam injection mode in steam huff and puff process
CN115247543B (en) * 2021-04-28 2024-04-09 中国石油化工股份有限公司 Fixed-point segmented water shutoff and dislocation accurate steam injection method for horizontal well of heavy oil reservoir

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892827A (en) * 2010-04-30 2010-11-24 钟立国 Optimized steam injection technology for horizontal well in segments
CN102108851A (en) * 2010-12-30 2011-06-29 中国石油天然气股份有限公司 Horizontal well steam injection method and system
CN202064920U (en) * 2011-06-01 2011-12-07 中国石油天然气股份有限公司 Sectional well completion process technology tubular column for thickened oil horizontal well
CN102536172A (en) * 2012-02-23 2012-07-04 石云夫 Sectional production tubular pile for horizontal well
CN102852502A (en) * 2012-04-18 2013-01-02 中国石油天然气股份有限公司 Intelligent steam distribution process pipe column of horizontal steam injection well
CN104481484A (en) * 2014-12-26 2015-04-01 东营市福利德石油科技开发有限责任公司 Horizontal well segmented intermittent steam huff and puff injection-production integrated pipe column

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101718190B (en) * 2009-12-08 2012-10-24 安东石油技术(集团)有限公司 Completed well body structure with temporary plugging function screen pipe and well completion method for suspending screen pipe at tail pipe
CN204041030U (en) * 2014-05-15 2014-12-24 成都北方石油勘探开发技术有限公司 With the horizontal well in segments completion tubular column of the close screen casing of variable orifice
CN204283367U (en) * 2014-12-08 2015-04-22 众通(北京)能源技术有限公司 Horizontal well Intelligent water-controlled completion tubular column
CN204283379U (en) * 2014-12-08 2015-04-22 众通(北京)能源技术有限公司 Screen casing completes oil well intelligent water control pipe post

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892827A (en) * 2010-04-30 2010-11-24 钟立国 Optimized steam injection technology for horizontal well in segments
CN102108851A (en) * 2010-12-30 2011-06-29 中国石油天然气股份有限公司 Horizontal well steam injection method and system
CN202064920U (en) * 2011-06-01 2011-12-07 中国石油天然气股份有限公司 Sectional well completion process technology tubular column for thickened oil horizontal well
CN102536172A (en) * 2012-02-23 2012-07-04 石云夫 Sectional production tubular pile for horizontal well
CN102852502A (en) * 2012-04-18 2013-01-02 中国石油天然气股份有限公司 Intelligent steam distribution process pipe column of horizontal steam injection well
CN104481484A (en) * 2014-12-26 2015-04-01 东营市福利德石油科技开发有限责任公司 Horizontal well segmented intermittent steam huff and puff injection-production integrated pipe column

Also Published As

Publication number Publication date
CN105863588A (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN105863588B (en) A kind of heavy crude heat extraction horizontal well equilibrium note mining method
CN204283367U (en) Horizontal well Intelligent water-controlled completion tubular column
CN204283379U (en) Screen casing completes oil well intelligent water control pipe post
CN101892827B (en) Horizontal well subsection optimization steam injection method
CN103939071B (en) Horizontal well steam flooding well pattern structure and steam flooding method
CN101233294A (en) System for cyclic injection and production from a well
CN206917640U (en) The steady oil system of offshore oilfield horizontal well automatic control water
CN204941480U (en) The horizontal well completion sleeve pipe of segmentation exploitation and the tubing string of formation thereof can be realized
CN206753554U (en) One kind can sand control become a mandarin Balance route surely oily device
CN112012706A (en) Offshore thickened oil steam huff-puff injection-production integrated device
CA2931882C (en) Method for forced steam cycle preheating dual horizontal well in middle-deep layer reservoir under a constant temperature difference
CN111075363A (en) Horizontal well segmentation water control pipe post
CN110630234B (en) Steam injection method for heavy oil thermal recovery well
CN205577962U (en) Long horizontal well double -flow -passage of viscous crude sprays and annotates vapour device
CN208749339U (en) A kind of tune flow control water installations
CN105672967A (en) Tubular column for SAGD (steam assisted gravity drainage) double-horizontal well and oil extraction method thereof
CN106285580A (en) A kind of underground throttle device
CN104100228B (en) Synchronous separate mining reversing valve
CN207177776U (en) Oil well sand washing pipe column and oil well sand washing system
CN205638401U (en) Double-horizontal-well steam-assisted gravity oil drainage three-pipe steam injection pipe column
CN107304664B (en) Capillary bundle oil and gas production device and method
CN202914059U (en) Steam injection distributing process pipe column of SAGD steam injection well
CN206592109U (en) Intelligent sand control water-control sieve tube
CN104389570A (en) Uniform steam injection pipe column for horizontal well
CN213331032U (en) Balanced liquid extracting device for spiral pump in horizontal well pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190726