CN105862946A CN201610214608.3A CN201610214608A CN105862946A CN 105862946 A CN105862946 A CN 105862946A CN 201610214608 A CN201610214608 A CN 201610214608A CN 105862946 A CN105862946 A CN 105862946A
Authority
CN
China
Prior art keywords
air defense
waste
old people
civil air
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610214608.3A
Other languages
Chinese (zh)
Other versions
CN105862946B (en
Inventor
王军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201610214608.3A priority Critical patent/CN105862946B/en
Publication of CN105862946A publication Critical patent/CN105862946A/en
Application granted granted Critical
Publication of CN105862946B publication Critical patent/CN105862946B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1628Shapes rectangular
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The invention discloses a construction method for a large deep foundation pit support during encountering of a waste civil air defense. During encountering of the waste civil air defense in construction of a grouting pile of the foundation pit support, an inlet of the waste civil air defense is found first, underground water in the waste civil air defense is pumped completely, and the position of the constructed grouting pile is measured in a locating mode; a hole is drilled in the top of the waste civil air defense, the located position of the constructed grouting pile is led into the ground of the waste civil air defense, and in the position, 300 mm away from the pile edge of the grouting pile, a square brick wall is built to the top face of the waste civil air defense; then C15 fine aggregate concrete is poured into the brick wall square to the top face of the waste civil air defense; and after the C15 fine aggregate concrete is finally set, drilling grouting pile construction are constructed. Compared with a traditional method that after a waste civil air defense is removed, compact filling is constructed again, and then a drilling grouting pile is constructed, according to the construction method for the large deep foundation pit support during encountering of the waste civil air defense, the construction period is shortened, the cost is reduced, and the surrounding environment is not influenced.

Description

Large Scale Deep Foundation Pit Support meets waste and old people's air defense construction method
Technical field
The present invention relates to Large Scale Deep Foundation Pit Support and meet waste and old people's air defense construction method, belong to civil engineering foundation pit supporting construction field.
Background technology
Along with developing rapidly of urban construction, high-rise, high-rise building gets more and more, therewith, large deep foundation pit engineering is the most increasing, Large Scale Deep Foundation Pit Support is typically mainly constructed plus prestressed anchor or concrete inner supporting structure with cast-in-situ bored pile, during supporting construction, also complicated landform and the barrier of left over by history can be run into, such as, the waste and old civil air defense constructions and installations in past, elongated when running into waste and old people's air defense and other barriers in work progress, it is all to abolish the mode tamped, but, waste and old people's air defense is in underground, full subsoil water can be amassed for a long time, it is particularly at position, city proper, abolish and can affect neighbouring town road, the problems such as neighboring buildings and corresponding environment.
Summary of the invention
The technical problem to be solved in the present invention is the defect overcoming prior art, Large Scale Deep Foundation Pit Support is provided to meet waste and old people's air defense construction method, mainly solve cast-in-situ bored pile meet the hole such as waste and old people's air defense cannot the situation of pore-forming, the method is safe and reliable, do not affect surrounding enviroment, and duration, cost-effective can be accelerated.
In order to solve above-mentioned technical problem, the invention provides following technical scheme:
Large Scale Deep Foundation Pit Support of the present invention meets waste and old people's air defense construction method, when pattern foundation pit supporting structure filling pile construction runs into waste and old people's air defense, first find waste and old people's air defense entrance, subsoil water inside it is exhausted, the bored concrete pile position of construction is measured in location, a hole is bored at waste and old people's air defense top, it is located position and is incorporated into waste and old people's air defense ground, away from the 300mm of grout pile limit, build square brick wall by laying bricks or stones to waste and old people's air defense end face, C15 pea gravel concreten extremely waste and old people's air defense end face is poured into again in brick wall square, after treating that C15 pea gravel concreten reaches final set, then bored pile construction.
As a preferred technical solution of the present invention, one 600 × 600mm hole is bored at described waste and old people's air defense top.
As a preferred technical solution of the present invention, described in build 500mm thickness brick wall by laying bricks or stones.
The present invention is reached to provide the benefit that: this Large Scale Deep Foundation Pit Support meets waste and old people's air defense construction method, than traditional abolish waste and old people's air defense after tamp construction drill bored concrete pile again from newly, the reduction of erection time, reduce cost, and do not affect surrounding enviroment.
Accompanying drawing explanation
Accompanying drawing is for providing a further understanding of the present invention, and constitutes a part for description, is used for together with embodiments of the present invention explaining the present invention, is not intended that limitation of the present invention.In the accompanying drawings:
Fig. 1 is that Large Scale Deep Foundation Pit Support meets waste and old people's air defense construction method floor map;
Fig. 2 is that waste and old people's air defense is built by laying bricks or stones and tamped rear generalized section;
Fig. 3 is generalized section after waste and old people's air defense bored pile construction;
In figure: 1, waste and old people's air defense;2,500mm thickness brick wall;3, C15 pea gravel concreten;4, bored concrete pile;5,600 × 600 hole.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are illustrated, it will be appreciated that preferred embodiment described herein is merely to illustrate and explains the present invention, is not intended to limit the present invention.
Embodiment 1
As Figure 1-3, Large Scale Deep Foundation Pit Support disclosed by the invention meets waste and old people's air defense construction method, when pattern foundation pit supporting structure filling pile construction runs into waste and old people's air defense 1, first find waste and old people's air defense 1 entrance, subsoil water inside it is exhausted, bored concrete pile 4 position of construction is measured in location, a hole is bored at waste and old people's air defense 1 top, it is located position and is incorporated into waste and old people's air defense 1 ground, away from 4 from bored concrete pile limit 300mm, build square brick wall by laying bricks or stones to waste and old people's air defense 1 end face, C15 pea gravel concreten 3 is poured into again to waste and old people's air defense 1 end face in brick wall square, after treating that C15 pea gravel concreten 3 reaches final set, cast-in-situ bored pile 4 is constructed again, one 600 × 600mm hole 5 is bored at described waste and old people's air defense 1 top, described build 500mm thickness brick wall 2 by laying bricks or stones.
Concrete: when pattern foundation pit supporting structure bored concrete pile 4 construction runs into waste and old people's air defense 1, first find waste and old people's air defense 1 entrance, subsoil water inside it is exhausted, bored concrete pile 4 position of construction is measured in location, 600 × 600mm hole 5 is bored at waste and old people's air defense 1 top, it is located position and is incorporated into waste and old people's air defense 1 ground, away from 4 from bored concrete pile limit 300mm, build 500mm thickness brick wall 2(square respectively by laying bricks or stones) to waste and old people's air defense 1 end face, making 4 limits of bored concrete pile is 300mm from building brick clear spacing by laying bricks or stones, in brick wall square, pour into C15 microlith coagulation 3 soil again tamp to waste and old people's air defense 1 end face, after treating that C15 microlith coagulation 3 soil reaches final set, cast-in-situ bored pile 4 is constructed again, thus solve the waste and old people's air defense 1 of chance and cannot construct.
The present invention than traditional abolish waste and old people's air defense 1 after tamp, from newly, bored concrete pile 4 of constructing again, the reduction of erection time, reduce cost, strengthen quality and safety, and do not affect periphery town road, building and relevant environment etc., successful implementation in Engineering Projects.
Last it is noted that the foregoing is only the preferred embodiments of the present invention, it is not limited to the present invention, although the present invention being described in detail with reference to previous embodiment, for a person skilled in the art, technical scheme described in foregoing embodiments still can be modified by it, or wherein portion of techniques feature is carried out equivalent.All within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (3)

1. Large Scale Deep Foundation Pit Support meets waste and old people's air defense construction method, it is characterized in that, when pattern foundation pit supporting structure filling pile construction runs into waste and old people's air defense (1), first find waste and old people's air defense (1) entrance, subsoil water inside it is exhausted, bored concrete pile (4) position of construction is measured in location, a hole is bored at waste and old people's air defense (1) top, it is located position and is incorporated into waste and old people's air defense (1) ground, away from the 300mm of bored concrete pile (4) stake limit, build square brick wall by laying bricks or stones to waste and old people's air defense (1) end face, C15 pea gravel concreten (3) is poured into again to waste and old people's air defense (1) end face in brick wall square, after treating that C15 pea gravel concreten (3) reaches final set, cast-in-situ bored pile (4) construction again.
Large Scale Deep Foundation Pit Support the most according to claim 1 meets waste and old people's air defense construction method, it is characterised in that one 600 × 600mm hole (5) is bored at described waste and old people's air defense (1) top.
Large Scale Deep Foundation Pit Support the most according to claim 1 meet waste and old people's air defense construction method, it is characterised in that described in build 500mm thickness brick wall (2) by laying bricks or stones.
CN201610214608.3A 2016-04-06 2016-04-06 Large Scale Deep Foundation Pit Support meets waste and old people's air defense construction method Active CN105862946B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610214608.3A CN105862946B (en) 2016-04-06 2016-04-06 Large Scale Deep Foundation Pit Support meets waste and old people's air defense construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610214608.3A CN105862946B (en) 2016-04-06 2016-04-06 Large Scale Deep Foundation Pit Support meets waste and old people's air defense construction method

Publications (2)

Publication Number Publication Date
CN105862946A true CN105862946A (en) 2016-08-17
CN105862946B CN105862946B (en) 2018-01-02

Family

ID=56637061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610214608.3A Active CN105862946B (en) 2016-04-06 2016-04-06 Large Scale Deep Foundation Pit Support meets waste and old people's air defense construction method

Country Status (1)

Country Link
CN (1) CN105862946B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003293691A (en) * 2002-03-29 2003-10-15 Sumitomo Osaka Cement Co Ltd Limited filling method for hollow part
CN103603508A (en) * 2013-11-19 2014-02-26 中国建筑第二工程局有限公司 Plugging, pouring and reinforcing construction method of pile foundation in underground air-raid shelter

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003293691A (en) * 2002-03-29 2003-10-15 Sumitomo Osaka Cement Co Ltd Limited filling method for hollow part
CN103603508A (en) * 2013-11-19 2014-02-26 中国建筑第二工程局有限公司 Plugging, pouring and reinforcing construction method of pile foundation in underground air-raid shelter

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
廖彬凯: ""实例分析建筑桩基础工程中防空洞处理的施工技术"", 《科技与企业》 *

Also Published As

Publication number Publication date
CN105862946B (en) 2018-01-02

Similar Documents

Publication Publication Date Title
CN103741714B (en) Full-cover excavation top-down construction method for underground engineering
CN103603508B (en) Plugging, pouring and reinforcing construction method of pile foundation in underground air-raid shelter
CN108560536A (en) The continuous piling wall construction method of Soil-cement
CN105714769A (en) Construction method for anti-sliding cast-in-place pile
CN111734425A (en) Construction method of underground excavation tunnel for downwards passing through airport terminal building
CN111322087A (en) Construction method for soft soil highway tunnel entrance semi-open semi-hidden tunnel in mountainous area
CN110468938A (en) A kind of municipal drain pipeline construction method
CN107700497A (en) A kind of building basement pattern foundation pit supporting structure and earth excavation construction method
Onn et al. Jerusalem, The Old City, Wilson’s Arch and the Great Causeway
CN110080234B (en) Method for excavating secondary central island in deep foundation pit of soft soil foundation
CN114541408B (en) Front upper part wind-containing well structure of underground station end well and underpass construction method thereof
CN110512594A (en) The simple and easy method of churning driven opportunity cavity pore-forming
CN104213567A (en) Construction method for controlling sliding of slope section of underground pipeline
CN106013168A (en) Slag trough structure and construction method for same
KR101045932B1 (en) Composite steel sheet pile and this construction technique
CN105862946A (en) Construction method for large deep foundation pit support during encountering of waste civil air defense
RU2209268C1 (en) Process of development of foundation pit
CN111549784A (en) Construction process of foundation pit adjacent to building
CN113186768A (en) Construction method for improving roadbed backfill quality after existing line demolition of frame structure
CN114439024A (en) Steel pipe curtain auxiliary pile foundation pore-forming construction process
Mangushev et al. Construction of deep foundation ditch under a reconstructed multi-storey building on the main avenue of St. Petersburg
Wang et al. Design and construction of deep excavations in Shanghai
CN112983436A (en) Water-rich shield interval measuring point-of-delivery punching construction method
RU2762373C1 (en) Method for creating a geotechnical structure in the ground
Bezrodny et al. Preservation of urban historic centers

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant