CN103603508A - Plugging, pouring and reinforcing construction method of pile foundation in underground air-raid shelter - Google Patents
Plugging, pouring and reinforcing construction method of pile foundation in underground air-raid shelter Download PDFInfo
- Publication number
- CN103603508A CN103603508A CN201310579875.7A CN201310579875A CN103603508A CN 103603508 A CN103603508 A CN 103603508A CN 201310579875 A CN201310579875 A CN 201310579875A CN 103603508 A CN103603508 A CN 103603508A
- Authority
- CN
- China
- Prior art keywords
- shelter
- bomb shelter
- construction
- pile foundation
- bomb
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 57
- 230000003014 reinforcing effect Effects 0.000 title abstract 2
- 239000011449 brick Substances 0.000 claims description 29
- 239000002689 soil Substances 0.000 claims description 15
- 239000004575 stone Substances 0.000 claims description 15
- 238000009412 basement excavation Methods 0.000 claims description 8
- 230000007123 defense Effects 0.000 claims description 8
- 239000011435 rock Substances 0.000 claims description 8
- 238000005259 measurement Methods 0.000 claims description 4
- 230000002787 reinforcement Effects 0.000 claims description 4
- 230000010410 reperfusion Effects 0.000 claims description 4
- 238000004140 cleaning Methods 0.000 claims description 3
- 238000009415 formwork Methods 0.000 claims description 3
- 238000005070 sampling Methods 0.000 claims description 3
- 230000011218 segmentation Effects 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 3
- 238000001514 detection method Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 3
- 230000010412 perfusion Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 210000002219 extraembryonic membrane Anatomy 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention relates to a plugging, pouring and reinforcing construction method of a pile foundation in an underground air-raid shelter, which comprises the steps of firstly detecting the underground air-raid shelter, drawing an air-raid shelter walking pattern, carrying out hole detection on a pile foundation superposed on or close to the air-raid shelter walking pattern, confirming a pile position influenced by the air-raid shelter, then carrying out support erection and support in the air-raid shelter to prevent collapse, carrying out segmented plugging around the pile foundation and an air-raid shelter building retaining wall in the air-raid shelter, and carrying out concrete pouring construction on the pile foundation, wherein the concrete strength is improved by one grade compared with the design strength, and finally carrying out concrete pouring and filling on the underground air-raid shelter after the concrete pouring of the pile foundation reaches the design strength. The method solves the construction difficulty of underground air-raid shelter treatment, improves the construction efficiency and accelerates the construction progress.
Description
Technical field
The present invention relates to a kind of engineering construction method, relate in particular to the reinforced construction method of a kind of pile foundation in underground shelter.
Background technology
Bomb shelter is during the war of resistance, in order to hide the bombing of enemy's artillery fire, is used for the safety of the protection person, property and the cave of excavating.At the beginning of the bomb shelter of Chongqing City starts from war of resistance outburst, major part is brick wall, the rectangular slab of stone, also has concrete structure.But along with urban renewal and along with the loss of some data, many bomb shelters go out of use and are buried in the end, ground.Because this type bomb shelter physical features of living in is complicated, shape is long and narrow, when exploring early stage, is difficult to find, in foundation construction process, is just found, and processes construction experience few for underground chambers such as underground shelters, and difficulty of construction is large.
Summary of the invention
The object of the invention is to be to solve a difficult problem for the underground shelter that affects foundation construction.
For addressing the above problem, scheme of the present invention is: the shutoff reperfusion reinforcement construction method of a kind of pile foundation in underground shelter is provided, mainly comprises following construction sequence:
A) underground shelter is surveyed, drawn bomb shelter and move towards figure;
B) moved towards on figure to overlap in bomb shelter or near pile foundation is carried out inspecting hole, confirm the stake position of bomb shelter impact;
C) in inside, bomb shelter, carrying out support body sets up to support and prevents from caving in;
D) in inside, bomb shelter, around pile foundation, bomb shelter, build barricade by laying bricks or stones and carry out segmentation shutoff;
E) pile foundation is carried out to filling concrete construction, wherein concrete strength improves a grade than design strength;
F) until pile foundation concreting, complete and again underground shelter is carried out to filling concrete after reaching design strength and tamp.
Further, construction sequence comprises, enter the exploration that carry out inside, bomb shelter, and to carrying out inspecting hole construction in the channel range of bomb shelter, inspecting hole is from the stake position being affected by bomb shelter passage, visit point and arrange that the drawing of drawing according to preliminary survey carries out inspecting hole construction along bomb shelter channel direction at interval of 1m, after inspecting hole completes by the accurate orienting response in bomb shelter to after on ground, at channel position, carry out after new perforate construction, again to top, hole in bomb shelter, at the bottom of hole, absolute altitude and hole apex distance carry out actual measurement from the soil thickness of present situation terrace, determine again the embedding rock degree of depth and the rigidity angle of all skirt piles, and continue to reconnoitre trend and the expanded range in bomb shelter, earthen fill zone, two ends, cavern,
First to existing the stake in bomb shelter to carry out excavation construction, dregs after top, bomb shelter soil excavation completes in timely cleaning bomb shelter, this position position line is introduced to bottom, bomb shelter simultaneously, in the position line of stake position, bottom, bomb shelter, preparing the basic embedding petrosa of construction divides, according to code requirement, when basis enters embedding rock stratum, carry out a core sampling, after realistic requirement to be tested, then carry out basic embedding petrosa and divide and expand bottom application work;
After pile hole forming, first stake is constructed, in Nei Duizhuan hole site, bomb shelter, build brick loose tool by laying bricks or stones and carry out formwork construction, after laying, carry out concrete construction; During concreting, answer placement layer by layer, build 1m thick at every turn, after concrete initial set, build again, during concreting, answer vibration compacting;
In people's air defense room, between stake and stake, build shale brick by laying bricks or stones, shale brick is built by laying bricks or stones to top, and the space concreting between shale brick and soil layer is filled and vibration compacting, and the while is also as the strong point of this unsettled soil layer; To the cavern of inside, bomb shelter and passage, adopting concrete to pour into after pile foundation construction completes tamps.
Of the present invention is to be applicable to the underground underground shelter processing construction method that has bomb shelter and have the highrise building of good ground build-in condition, has solved underground shelter and has processed difficulty of construction, has improved efficiency of construction, has accelerated construction speed.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail:
Fig. 1 is that pile foundation and bomb shelter are related to schematic diagram;
Fig. 2 is that in room, bomb shelter, brick fetal membrane is built schematic diagram by laying bricks or stones;
Fig. 3 is room, bomb shelter perfusion schematic diagram;
In figure: 1, stake, 2, bomb shelter, 3, perforate, 4, concreting, 5, brick masonry, 6, stake hole.
The specific embodiment
Below in conjunction with concrete case study on implementation, the present invention is described as follows: as shown in Figure 1, enter the exploration that carry out inside, bomb shelter, bomb shelter inner room site survey is comparatively accurate, but its bomb shelter channel position exploration accuracy is not high.For guaranteeing bomb shelter channel position, newly open cavity and be positioned at top, bomb shelter, by take the drawing that preliminary survey draws, it is foundation, to carrying out inspecting hole construction in the channel range of bomb shelter, inspecting hole, from the stake position being affected by bomb shelter passage, is visited point and is arranged that the drawing of drawing according to preliminary survey carries out inspecting hole construction along bomb shelter channel direction at interval of 1m.After inspecting hole completes by the accurate orienting response in bomb shelter to after on ground, at channel position, carry out after new perforate construction, again absolute altitude at the bottom of bomb shelter Nei Dongding, hole and hole apex distance are carried out to actual measurement from the soil thickness of present situation terrace, determine again the embedding rock degree of depth of all skirt piles and rigidity angle etc., and continue to find out trend and the expanded range in bomb shelter, earthen fill zone, two ends, cavern.
According to having bomb shelter under first clear and definite which stake of exploration, first this part stake is carried out to excavation construction.When constructor digs pile driving construction, should fasten seat belts, construction equipment is also applied rope and is lifted, so as not to when construction bottom rock-soil cave in and cause security incident.Dregs after top, bomb shelter soil excavation completes in timely cleaning bomb shelter, measurement group is simultaneously introduced bottom, bomb shelter by this position position line, prepares the basic embedding petrosa of construction and divide in the position line of stake position, bottom, bomb shelter.According to code requirement, when entering embedding rock stratum, basis carries out a core sampling, and after realistic requirement to be tested, then carry out basic embedding petrosa and divide and expand bottom application work.
After pile hole forming, first stake is constructed as shown in Figure 2.Because stake causes hand excavated pile not to be shaped through position, bomb shelter without soil layer, so build brick loose tool by laying bricks or stones in Nei Duizhuan hole site, bomb shelter, carry out formwork construction, after laying, carry out concrete construction.For convenience of constructor, pass in and out bomb shelter and construction operation, on this top, room, bomb shelter, offer a hole again, construction method, by manual digging pile construction, guarantees that this hole location does not affect other stakes and grade beam construction.
Underground garage position is positioned at passage top, bomb shelter, if bomb shelter passage is not directly communicated with garage pile foundation in the ideal situation, and adjacent segment is apart from being greater than 500mm, inside, bomb shelter is not processed; If underground garage pile foundation and bomb shelter passage connect, adopt above-mentioned form of construction work to construct to hole digging pile; If pile foundation and bomb shelter passage adjacent segment run through, distance is not less than 500mm, during for assurance pile foundation excavation, do not dig through and avoid mud stone in bomb shelter to cause the impact of sedimentation on stake after underground water soaks with bomb shelter, swollen hole while preventing from building pile concrete, first carries out filling concrete to people's air defense channel interior subregion.People's air defense passage is poured into, because this passage garage pile foundation is not communicated with people's air defense passage, must be on the ground during perfusion again perforate lead to people's air defense passage.In inside, bomb shelter, be positioned at new perforate both sides 1.5m scope and carry out concreting, strength grade of concrete is identical with the strength grade of concrete of stake.Before concreting, should build in inside, bomb shelter shale brick barricade by laying bricks or stones.Within the scope of concreting, bomb shelter bottom dregs is cleaned out, and answers placement layer by layer during concreting, builds 1m thick at every turn, after concrete initial set, builds again.During concreting, answer vibration compacting.
The standard width of a room in an old-style house and clear height for underground shelter chamber are large, first setting up supporting frame supports and to avoid bomb shelter and collapse, again the assorted soil in room is removed clean, in people's air defense room, between stake and stake, build shale brick by laying bricks or stones, shale brick is built by laying bricks or stones to top, space concreting between shale brick and soil layer is filled and vibration compacting, simultaneously also as the strong point of this unsettled soil layer.
As shown in Figure 3, to the cavern of inside, bomb shelter and passage, adopting concrete to pour into after pile foundation construction completes tamps.
For bomb shelter stake processing, Xu Yu designing unit confers the embedding rock degree of depth that is clearly positioned at bomb shelter stake and how to calculate (generally according to the bottom of room, bomb shelter or passage, starting at), carry out again the excavation of the embedding rock degree of depth of designing requirement, with and stake pore-forming after to the account form at rigidity angle of stake around.
Claims (2)
1. the shutoff reperfusion reinforcement construction method of pile foundation in underground shelter, is characterized in that comprising following construction sequence:
A) underground shelter is surveyed, drawn bomb shelter and move towards figure;
B) moved towards on figure to overlap in bomb shelter or near pile foundation is carried out inspecting hole, confirm the stake position of bomb shelter impact;
C) in inside, bomb shelter, carrying out support body sets up to support and prevents from caving in;
D) in inside, bomb shelter, around pile foundation, bomb shelter, build barricade by laying bricks or stones and carry out segmentation shutoff;
E) pile foundation is carried out to filling concrete construction, wherein concrete strength improves a grade than design strength;
F) until pile foundation concreting, complete and again underground shelter is carried out to filling concrete after reaching design strength and tamp.
2. the shutoff reperfusion reinforcement construction method of a kind of pile foundation according to claim 1 in underground shelter, it is characterized in that: enter the exploration that carry out inside, bomb shelter, and to carrying out inspecting hole construction in the channel range of bomb shelter, inspecting hole is from the stake position being affected by bomb shelter passage, visit point and arrange that the drawing of drawing according to preliminary survey carries out inspecting hole construction along bomb shelter channel direction at interval of 1m, after inspecting hole completes by the accurate orienting response in bomb shelter to after on ground, at channel position, carry out after new perforate construction, again to top, hole in bomb shelter, at the bottom of hole, absolute altitude and hole apex distance carry out actual measurement from the soil thickness of present situation terrace, determine again the embedding rock degree of depth and the rigidity angle of all skirt piles, and continue to reconnoitre trend and the expanded range in people's air defense hole, earthen fill zone, two ends, bomb shelter,
First to existing the stake in bomb shelter to carry out excavation construction, dregs after top, bomb shelter soil excavation completes in timely cleaning bomb shelter, this position position line is introduced to bottom, bomb shelter simultaneously, in the position line of stake position, bottom, bomb shelter, preparing the basic embedding petrosa of construction divides, according to code requirement, when basis enters embedding rock stratum, carry out a core sampling, after realistic requirement to be tested, then carry out basic embedding petrosa and divide and expand bottom application work;
After pile hole forming, first stake is constructed, in Nei Duizhuan hole site, bomb shelter, build brick loose tool by laying bricks or stones and carry out formwork construction, after laying, carry out concrete construction; During concreting, answer placement layer by layer, build 1m thick at every turn, after concrete initial set, build again, during concreting, answer vibration compacting;
In people's air defense room, between stake and stake, build shale brick by laying bricks or stones, shale brick is built by laying bricks or stones to top, and the space concreting between shale brick and soil layer is filled and vibration compacting, and the while is also as the strong point of this unsettled soil layer; To the cavern of inside, bomb shelter and passage, adopting concrete to pour into after pile foundation construction completes tamps.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310579875.7A CN103603508B (en) | 2013-11-19 | 2013-11-19 | Plugging, pouring and reinforcing construction method of pile foundation in underground air-raid shelter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310579875.7A CN103603508B (en) | 2013-11-19 | 2013-11-19 | Plugging, pouring and reinforcing construction method of pile foundation in underground air-raid shelter |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103603508A true CN103603508A (en) | 2014-02-26 |
CN103603508B CN103603508B (en) | 2016-06-08 |
Family
ID=50121763
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310579875.7A Expired - Fee Related CN103603508B (en) | 2013-11-19 | 2013-11-19 | Plugging, pouring and reinforcing construction method of pile foundation in underground air-raid shelter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103603508B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104674796A (en) * | 2015-03-06 | 2015-06-03 | 中国建筑第二工程局有限公司 | Template system of underground air-raid shelter cast-in-place pile and construction method thereof |
CN105862946A (en) * | 2016-04-06 | 2016-08-17 | 中国十七冶集团有限公司 | Construction method for large deep foundation pit support during encountering of waste civil air defense |
CN110144903A (en) * | 2019-06-05 | 2019-08-20 | 中国建筑第七工程局有限公司 | A kind of pattern foundation pit supporting structure meets the construction in bomb shelter |
CN112323823A (en) * | 2020-07-21 | 2021-02-05 | 中冶集团武汉勘察研究院有限公司 | Filling device and method for waste air-raid shelter of pile foundation construction site |
CN113982634A (en) * | 2021-12-11 | 2022-01-28 | 汕尾市广投建设工程有限公司 | Lining reinforcing frame and method for remedying hidden danger of existing civil air defense tunnel |
CN114197910A (en) * | 2021-12-09 | 2022-03-18 | 上海宝冶集团有限公司 | Air-raid shelter backfill plugging device and construction method thereof |
CN116084443A (en) * | 2022-11-30 | 2023-05-09 | 中建八局第二建设有限公司 | Construction method for building foundation on underground civil air defense hole |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1018608A (en) * | 1996-07-05 | 1998-01-20 | Fujita Corp | Earthquake resisting reinforcing method of existing reinforced concrete construction building |
CN102127974A (en) * | 2011-04-18 | 2011-07-20 | 上海现代建筑设计(集团)有限公司 | Design and construction method of additional cellar under existing building |
CN102409666A (en) * | 2011-11-30 | 2012-04-11 | 李海广 | Construction process for pile foundation in air-raid shelter trend |
CN103046765A (en) * | 2013-01-24 | 2013-04-17 | 李海广 | Construction process for continued application of air-raid shelter |
CN103195090A (en) * | 2013-04-15 | 2013-07-10 | 合肥建工集团有限公司 | Soft-form-shaped strut structure formed by filling concrete through small hole on underground cavity |
-
2013
- 2013-11-19 CN CN201310579875.7A patent/CN103603508B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1018608A (en) * | 1996-07-05 | 1998-01-20 | Fujita Corp | Earthquake resisting reinforcing method of existing reinforced concrete construction building |
CN102127974A (en) * | 2011-04-18 | 2011-07-20 | 上海现代建筑设计(集团)有限公司 | Design and construction method of additional cellar under existing building |
CN102409666A (en) * | 2011-11-30 | 2012-04-11 | 李海广 | Construction process for pile foundation in air-raid shelter trend |
CN103046765A (en) * | 2013-01-24 | 2013-04-17 | 李海广 | Construction process for continued application of air-raid shelter |
CN103195090A (en) * | 2013-04-15 | 2013-07-10 | 合肥建工集团有限公司 | Soft-form-shaped strut structure formed by filling concrete through small hole on underground cavity |
Non-Patent Citations (1)
Title |
---|
廖彬凯: "实例分析建筑桩基础工程中防空洞处理的施工技术", 《科技与企业》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104674796A (en) * | 2015-03-06 | 2015-06-03 | 中国建筑第二工程局有限公司 | Template system of underground air-raid shelter cast-in-place pile and construction method thereof |
CN105862946A (en) * | 2016-04-06 | 2016-08-17 | 中国十七冶集团有限公司 | Construction method for large deep foundation pit support during encountering of waste civil air defense |
CN110144903A (en) * | 2019-06-05 | 2019-08-20 | 中国建筑第七工程局有限公司 | A kind of pattern foundation pit supporting structure meets the construction in bomb shelter |
CN110144903B (en) * | 2019-06-05 | 2021-04-09 | 中国建筑第七工程局有限公司 | Construction method for foundation pit support in air defense cavity |
CN112323823A (en) * | 2020-07-21 | 2021-02-05 | 中冶集团武汉勘察研究院有限公司 | Filling device and method for waste air-raid shelter of pile foundation construction site |
CN114197910A (en) * | 2021-12-09 | 2022-03-18 | 上海宝冶集团有限公司 | Air-raid shelter backfill plugging device and construction method thereof |
CN113982634A (en) * | 2021-12-11 | 2022-01-28 | 汕尾市广投建设工程有限公司 | Lining reinforcing frame and method for remedying hidden danger of existing civil air defense tunnel |
CN116084443A (en) * | 2022-11-30 | 2023-05-09 | 中建八局第二建设有限公司 | Construction method for building foundation on underground civil air defense hole |
Also Published As
Publication number | Publication date |
---|---|
CN103603508B (en) | 2016-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103603508B (en) | Plugging, pouring and reinforcing construction method of pile foundation in underground air-raid shelter | |
KR20210148031A (en) | tunnel shaft and Construction Method forstructures according to the excavation. | |
CN107542108B (en) | A kind of reverse construction method of building basement structure | |
CN109026064B (en) | Construction method for large-span multi-arch tunnel with semi-bright and semi-dark | |
CN104196537A (en) | Construction method of three parallel metro tunnels with ultra-small clear distance | |
CN104099943B (en) | Diaphram wall and discarded underground civil defense engineering intersection processing method | |
CN109630127A (en) | A kind of construction method of rich water soft stratum ultra-deep shield vertical shaft | |
CN104060615B (en) | Newly-built foundation pit supporting construction is utilized to remove the construction method of underground obstacle | |
CN103255764A (en) | Construction method for vibrating sunken tube construction secant pile wall | |
CN108316339A (en) | A kind of construction method of water penetration geology large size arch bridge base | |
CN112832781A (en) | Tunnel construction process | |
CN113089652A (en) | Occlusive pile construction method and reinforced structure | |
CN102444143A (en) | Construction method for canceling out underground outdoor vertical face operation channel | |
CN103015431A (en) | Foundation pit supporting method for manual dig-hole cement-soil steel pile | |
CN110735436A (en) | cutting rock slope reinforced structure | |
CN106245655A (en) | Utilize the deep foundation pit supporting construction method of miniature steel pipe pile | |
CN115539048A (en) | Construction method for shallow-buried bias tunnel portal | |
CN102220764B (en) | Construction method of deep foundation pit bracing system | |
CN110424372A (en) | Along road interval method in a row remove obstacles after construct diaphram wall construction method | |
CN110080779A (en) | Tunnel tunnel bottom karst cave treatment construction method | |
AU2020100004B4 (en) | A Method Of Constructing A Column, A Subterranean Structure, And A Structure Made From The Method | |
RU2209268C1 (en) | Process of development of foundation pit | |
KR20170035321A (en) | Retaining wall construction method and retaining wall structure by the method | |
CN207267980U (en) | The formula sand of filling out is changed to shake ground | |
CN114439024A (en) | Steel pipe curtain auxiliary pile foundation pore-forming construction process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160608 Termination date: 20161119 |