CN105862909B - A kind of powerhouse of hydropower station stator foundation structure and its casting method - Google Patents

A kind of powerhouse of hydropower station stator foundation structure and its casting method Download PDF

Info

Publication number
CN105862909B
CN105862909B CN201610385060.9A CN201610385060A CN105862909B CN 105862909 B CN105862909 B CN 105862909B CN 201610385060 A CN201610385060 A CN 201610385060A CN 105862909 B CN105862909 B CN 105862909B
Authority
CN
China
Prior art keywords
steel box
stator
stator base
locating piece
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610385060.9A
Other languages
Chinese (zh)
Other versions
CN105862909A (en
Inventor
江礼为
后开祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201610385060.9A priority Critical patent/CN105862909B/en
Publication of CN105862909A publication Critical patent/CN105862909A/en
Application granted granted Critical
Publication of CN105862909B publication Critical patent/CN105862909B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance

Abstract

The invention discloses a kind of powerhouse of hydropower station stator foundation structure and its casting methods, including stator base(1), stator base top is equipped with locating piece(2), locating piece top is equipped with stator sole plate(3);Steel box is equipped in stator base(4), the bottom of steel box side is equipped with grout pipe(5), the top of steel box side is equipped with grout outlet(6), steel box is interior to be equipped with foundation bolt(7), foundation bolt(7)End is equipped with nut(8)And washer(9), foundation bolt top pass through locating piece and stator sole plate on bolt hole connect with nut, poured second stage concrete between steel box and foundation bolt(10).Globality of the present invention is stronger, improves stator foundation and machine pier rigidity, reduces the vibration of unit, provides guarantee for the operation of unit long-term safety.Material requested of the present invention is common material, is easily purchased, and structure is simple, and convenient and quick construction, convenient to overhaul, can be easily accomplished the laying of foundation bolt.

Description

A kind of powerhouse of hydropower station stator foundation structure and its casting method
Technical field
The present invention relates to a kind of powerhouse of hydropower station stator foundation structure and its casting methods, belong to Hydropower Station Construction technology neck Domain.
Background technique
Stator foundation subjects huge quiet dynamic load for a long time in powerhouse of hydropower station, and stress is complex.Stator base at present Plinth frequently with structural shape be to reserve the second phase in the stator base that a phase pours to pour the pit slot of foundation bolt, bury lower margin Pour second stage concrete after bolt again, this structural shape in the prior art not asked there is only the too small formwork erection of pit slot is difficult Topic, but also that there is intensity is lower, shock resistance effect is poor and constructs the problems such as complex.Therefore existing water power The structure for workshop stator foundation of standing or not satisfactory, is not still able to satisfy the needs used.
Summary of the invention
The object of the present invention is to provide a kind of construction is simples, the stronger powerhouse of hydropower station stator foundation of structural integrity Structure and its casting method, the fixed effect of foundation bolt is effectively ensured, thus overcome the deficiencies in the prior art.
The technical proposal of the invention is realized in this way:
A kind of powerhouse of hydropower station stator foundation structure of the invention, including stator base, stator base top are equipped with positioning Block, locating piece top are equipped with stator sole plate;Steel box is equipped in stator base, the bottom of steel box side is equipped with grout pipe, steel box The top of side is equipped with grout outlet, is equipped with foundation bolt in steel box, foundation bolt both ends are equipped with nuts and washers, foundation bolt The bolt hole that top passes through on locating piece and stator sole plate is connect with nut, and it is mixed that the second phase has been poured between steel box and foundation bolt Solidifying soil.
In aforementioned structure, the grout pipe and grout outlet are right-angle elbow pipe, and one end and steel box weld, and the other end is from stator It is stretched out at the top of pedestal.
In aforementioned structure, the shape of the steel box is up-small and down-big taper or wedge shape.
In aforementioned structure, the stator base and locating piece are reinforced concrete structure, are equipped with and lack at the top of stator base Mouthful, the reinforcement welding in reinforcing bar and stator base in locating piece is fixed on indentation, there.
A kind of powerhouse of hydropower station stator foundation casting method of the invention for above structure is, by it is pre-processed simultaneously The steel box of taper or wedge shape equipped with grout pipe and grout outlet, which is put into, not to carry out in the stator base that fist stage concrete pours also, makes Steel box is fixed on the reinforcing bar of the fist stage concrete of stator base, then carries out the fist stage concrete for pouring stator base, undetermined After the completion of the fist stage concrete of sub-base pours, foundation bolt is put into steel box, and locating piece is fixed on foundation bolt Top, while by the reinforcing bar in locating piece together with the reinforcement welding in the stator base that fist stage concrete pours completion;To The fist stage concrete for pouring stator base pours finish and reach design age after, it is mixed that the second phase is poured into steel box by grout pipe Solidifying soil fills up second stage concrete in steel box.
Effect preferably is poured in order to reach, when pouring second stage concrete into steel box by grout pipe, makes to pour two The slurries of phase concrete are in the milk from the lower curtate of steel box toward eminence sequence, 1~2 point of Reperfu- sion after slurries are from grout outlet spilling Clock slurries can terminate to be in the milk after the slurries overflowed are underflow.
By adopting the above-described technical solution, compared with prior art, the present invention globality of the present invention is stronger, it can be effective Ground improves stator foundation and machine pier rigidity, and reduces the vibration of unit, provides guarantee for the operation of unit long-term safety.In addition, Material requested of the present invention is common material, is easily purchased, and structure is simple, and convenient and quick construction, convenient to overhaul, can be easily complete At the laying of foundation bolt.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Label in figure be:1-stator base, 2-locating pieces, 3-stator sole plates, 4-steel boxes, 5-grout pipes, 6-grout outlets, 7-foundation bolts, 8-nuts, 9-washers, 10-second stage concretes.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples, but not as to of the invention any Limitation.
A kind of powerhouse of hydropower station stator foundation structure of the invention, as shown in Figure 1, a kind of powerhouse of hydropower station stator foundation knot Structure, including stator base 1 are equipped with locating piece 2 at the top of stator base 1, are equipped with stator sole plate 3 at the top of locating piece 2;Stator base Steel box 4 is equipped in 1, the bottom of 4 side of steel box is equipped with grout pipe 5, and the top of 4 side of steel box is equipped with grout outlet 6, sets in steel box 4 There is foundation bolt 7,7 both ends of foundation bolt are equipped with nut 8 and washer 9, and 7 top of foundation bolt passes through locating piece 2 and stator base Bolt hole on plinth plate 3 is connect with nut 8, and second stage concrete 10 has been poured between steel box 4 and foundation bolt 7.Grout pipe 5 and go out Slurry pipe 6 is right-angle elbow pipe, and one end and steel box 4 weld, and the other end stretches out at the top of stator base 1.The shape of steel box 4 is upper small Big taper or wedge shape down.Stator base 1 and locating piece 2 are reinforced concrete structure, are equipped with notch at the top of stator base 1, The reinforcement welding in reinforcing bar and stator base 1 in locating piece 2 is fixed on indentation, there.
A kind of powerhouse of hydropower station stator foundation casting method of the invention for above structure is:By it is pre-processed simultaneously The steel box 4 of taper or wedge shape equipped with grout pipe 5 and grout outlet 6, which is put into, does not carry out the stator base 1 that fist stage concrete pours also It is interior, it is fixed on steel box 4 on the reinforcing bar of the fist stage concrete of stator base 1, the fist stage concrete for then carrying out stator base 1 pours It builds, after the completion of the fist stage concrete of stator base 1 pours, foundation bolt 7 is put into steel box 4, and locating piece 2 is fixed on The top of foundation bolt 7, while the reinforcing bar in locating piece 2 is poured into the reinforcing bar in the stator base 1 of completion with fist stage concrete Weld together;Fist stage concrete wait pour stator base 1 pours finish and reach design age after, by grout pipe 5 to Second stage concrete 10 is poured in steel box 4, fills up second stage concrete 10 in steel box 4.Effect preferably is poured in order to reach, When pouring second stage concrete 10 into steel box 4 by grout pipe 5, make the slurries for pouring second stage concrete 10 by the low of steel box 4 Portion is in the milk toward eminence sequence, 1~2 minute slurries of Reperfu- sion after slurries are from the spilling of grout outlet 6, until the slurries overflowed are It can terminate to be in the milk after underflow.
Embodiment
This example as shown in Figure 1, when it is implemented, the steel box 4 of wedge-type shape can be processed first, 4 one side opening of steel box simultaneously Weld grout pipe 5 and grout outlet 6;Then foundation bolt 7 is put into steel box 4 and is fixed with locating piece 2;Locating piece 2 is reinforcing bar Concrete structure, the reinforcing bar in locating piece 2 pour the reinforcement welding in the stator base 1 of completion with fist stage concrete and fix;To Fist stage concrete pours finish and reach design age after, by grout pipe 5 into steel box 4 slip casting pour it is closely knit.The steel box 4 of wedge shape Size can provide foundation bolt diameter according to producer, length determines.

Claims (1)

1. a kind of casting method of powerhouse of hydropower station stator foundation structure, the powerhouse of hydropower station stator foundation structure includes stator Pedestal(1), in stator base(1)Top is equipped with locating piece(2), locating piece(2)Top is equipped with stator sole plate(3);Stator base Seat(1)It is interior to be equipped with steel box(4), steel box(4)The bottom of side is equipped with grout pipe(5), steel box(4)The top of side is equipped with grout outlet (6), steel box(4)It is interior to be equipped with foundation bolt(7), foundation bolt(7)Both ends are equipped with nut(8)And washer(9), foundation bolt (7)Top passes through locating piece(2)And stator sole plate(3)On bolt hole and nut(8)Connection, steel box(4)With foundation bolt (7)Between poured second stage concrete(10);Grout pipe(5)And grout outlet(6)It is right-angle elbow pipe, one end and steel box(4)Weldering It connects, the other end is from stator base(1)Top is stretched out;Steel box(4)Shape be up-small and down-big taper or wedge shape;Stator base (1)And locating piece(2)It is reinforced concrete structure, stator base(1)Top is equipped with notch, locating piece(2)Interior reinforcing bar with Stator base(1)Interior reinforcement welding is fixed on indentation, there;It is characterized in that:The powerhouse of hydropower station stator foundation structure is poured Building method is:By it is pre-processed and be equipped with grout pipe(5)And grout outlet(6)Taper or wedge shape steel box(4)It is put into also not Carry out the stator base that fist stage concrete pours(1)It is interior, make steel box(4)It is fixed on stator base(1)Fist stage concrete steel On muscle, then carry out pouring stator base(1)Fist stage concrete, to stator base(1)Fist stage concrete pour after the completion of, By foundation bolt(7)It is put into steel box(4)It is interior, and by locating piece(2)It is fixed on foundation bolt(7)Top, while by locating piece (2)Interior reinforcing bar and fist stage concrete pours the stator base of completion(1)Interior reinforcement welding is together;Stator base to be poured (1)Fist stage concrete pour and finish and reach design age after, pass through grout pipe(5)To steel box(4)Inside pour the second stage of coagulation Soil(10), make second stage concrete(10)Fill up steel box(4)Interior;Passing through grout pipe(5)To steel box(4)It is mixed inside to pour the second phase Solidifying soil(10)When, make to pour second stage concrete(10)Slurries by steel box(4)Lower curtate be in the milk toward eminence sequence, to slurries From grout outlet(6)1~2 minute slurries of Reperfu- sion after spilling can terminate to be in the milk after the slurries overflowed are underflow.
CN201610385060.9A 2016-06-02 2016-06-02 A kind of powerhouse of hydropower station stator foundation structure and its casting method Active CN105862909B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610385060.9A CN105862909B (en) 2016-06-02 2016-06-02 A kind of powerhouse of hydropower station stator foundation structure and its casting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610385060.9A CN105862909B (en) 2016-06-02 2016-06-02 A kind of powerhouse of hydropower station stator foundation structure and its casting method

Publications (2)

Publication Number Publication Date
CN105862909A CN105862909A (en) 2016-08-17
CN105862909B true CN105862909B (en) 2018-11-23

Family

ID=56675725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610385060.9A Active CN105862909B (en) 2016-06-02 2016-06-02 A kind of powerhouse of hydropower station stator foundation structure and its casting method

Country Status (1)

Country Link
CN (1) CN105862909B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107327020A (en) * 2017-07-06 2017-11-07 能诚集团有限公司 A kind of concrete component attachment structure
CN111576477B (en) * 2020-06-08 2021-09-24 重庆水轮机厂有限责任公司 Fixing and pouring method for stator foundation plate of hydraulic generator

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000110173A (en) * 1998-10-07 2000-04-18 Sekisui Chem Co Ltd Execution of foundation and foundation structure
CN201224888Y (en) * 2008-07-12 2009-04-22 中冶京唐建设有限公司 Large-scale bolt construction built-in steel sleeve
CN102660960A (en) * 2012-05-18 2012-09-12 中国水利水电第十四工程局有限公司 Detachment-free foundation bolt hole device of stator foundation and grouting method
CN203788069U (en) * 2014-03-25 2014-08-20 杭州力源发电设备有限公司 Hydro generator stator base plate structure
CN105089023A (en) * 2015-04-14 2015-11-25 中国电建集团贵阳勘测设计研究院有限公司 Improving method for concrete floor of hydropower house and structure of concrete floor
CN205688455U (en) * 2016-06-02 2016-11-16 中国电建集团贵阳勘测设计研究院有限公司 A kind of powerhouse of hydropower station stator foundation structure

Also Published As

Publication number Publication date
CN105862909A (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN205530344U (en) Utility tunnel is pour to split type no mould
CN105862909B (en) A kind of powerhouse of hydropower station stator foundation structure and its casting method
CN205086170U (en) Pre -buried tub of positioner
CN103061504A (en) Concrete board pipeline installation reserved hole construction mould and construction method
CN105649213B (en) A kind of construction method of intensive cloth muscle area large-scale steel structure built-in fitting
CN203807931U (en) Connecting structure for prefabricated pier and foundation
CN201362959Y (en) Floor slab preformed hole device
CN107503382A (en) End head formwork fixes rubber water-proof band structure and its construction method
CN205688455U (en) A kind of powerhouse of hydropower station stator foundation structure
CN204126264U (en) Threading service sleeve setting tool
CN106468075A (en) A kind of toilet pipe sleeve fixing meanss
CN209703838U (en) Steel bar connecting structure between reinforcing bar connector and precast concrete
CN204940860U (en) One prevents Form floating part
CN208267362U (en) A kind of constructing device of deformation joint concrete wall formwork
CN206844097U (en) Low clearance diaphragm wall reinforcement cage structure under a kind of high-voltage line
CN109667388A (en) Steel bar connecting structure between reinforcing bar connector and precast concrete
CN205421891U (en) Builder's jack back seat U type embedded ring
CN204492185U (en) Seal closure formula water power pre-buried hole sleeve die
CN208633518U (en) Prestressed concrete laminated floor slab hangs mould pouring construction structure
CN204875839U (en) Mould is pour on iron tower basis
CN102051888B (en) Method for constructing built-in foundation bolt regulating hole of equipment foundation
CN202672701U (en) Overhanging scaffold pre-buried ring capable of being repeatedly used
CN203640284U (en) Split bolt capable of being repeatedly used
CN207378395U (en) A kind of two-part hoist engine basis pre embedded bolt
CN207092546U (en) A kind of subsiding crack both sides shear wall formwork for placing frame being easily installed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant