CN205688455U - A kind of powerhouse of hydropower station stator foundation structure - Google Patents

A kind of powerhouse of hydropower station stator foundation structure Download PDF

Info

Publication number
CN205688455U
CN205688455U CN201620528413.1U CN201620528413U CN205688455U CN 205688455 U CN205688455 U CN 205688455U CN 201620528413 U CN201620528413 U CN 201620528413U CN 205688455 U CN205688455 U CN 205688455U
Authority
CN
China
Prior art keywords
stator
steel box
foundation
locating piece
stator base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620528413.1U
Other languages
Chinese (zh)
Inventor
江礼为
后开祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201620528413.1U priority Critical patent/CN205688455U/en
Application granted granted Critical
Publication of CN205688455U publication Critical patent/CN205688455U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of powerhouse of hydropower station stator foundation structure, including stator base (1), stator base top is provided with locating piece (2), and locating piece top is provided with stator sole plate (3);Steel box (4) it is provided with in stator base, the bottom of steel box side is provided with grout pipe (5), the top of steel box side is provided with grout outlet (6), foundation bolt (7) it is provided with in steel box, foundation bolt (7) end is equipped with nut (8) and packing ring (9), foundation bolt top is connected through the bolt hole on locating piece and stator sole plate with nut, has poured second stage concrete (10) between steel box and foundation bolt.This utility model globality is relatively strong, improves stator foundation and machine pier rigidity, reduces the vibration of unit, runs for unit long-term safety and provides guarantee.This utility model material requested is conventional material, easily purchases, simple in construction, and convenient and quick construction, convenient maintenance, can be easily accomplished the laying of foundation bolt.

Description

A kind of powerhouse of hydropower station stator foundation structure
Technical field
This utility model relates to a kind of powerhouse of hydropower station stator foundation structure, belongs to Hydropower Station Construction technical field.
Background technology
In powerhouse of hydropower station, stator foundation subjects huge quiet dynamic load for a long time, and stress is complex.Stator base at present Plinth frequently with structural shape be the pit that the reserved second phase pours foundation bolt in the stator base that a phase pours, bury lower margin underground Pouring second stage concrete after bolt again, this structural shape of the prior art does not only exist asking of pit the least formwork erection difficulty Topic, but also also exist that intensity is relatively low, shock resistance effect is poor and the problem such as complex of constructing.The most existing water power The structure of Factory Building stator foundation of standing or not ideal, still can not meet the needs of use.
Summary of the invention
The purpose of this utility model is, it is provided that a kind of powerhouse of hydropower station stator simple, structural integrity is stronger of constructing Base structure, so that the fixed effect of foundation bolt is effectively ensured, thus overcomes the deficiencies in the prior art.
The technical solution of the utility model is achieved in that
A kind of powerhouse of hydropower station stator foundation structure of the present utility model, including stator base, stator base top is provided with Locating piece, locating piece top is provided with stator sole plate;Being provided with steel box in stator base, the bottom of steel box side is provided with grout pipe, The top of steel box side is provided with grout outlet, is provided with foundation bolt in steel box, and foundation bolt two ends are equipped with nuts and washers, lower margin Bolt end head is connected through the bolt hole on locating piece and stator sole plate with nut, has poured two between steel box and foundation bolt Phase concrete.
In aforementioned structure, described grout pipe and grout outlet are right-angle elbow pipe, and one end is welded with steel box, and the other end is from stator Pedestal top is stretched out.
In aforementioned structure, described steel box be shaped as up-small and down-big taper or wedge shape.
In aforementioned structure, described stator base and locating piece are reinforced concrete structure, and stator base top is provided with scarce Mouthful, the reinforcing bar in locating piece is fixed on indentation, there with the reinforcement welding in stator base.
Owing to have employed technique scheme, compared with prior art, this utility model globality is relatively strong for this utility model, Can be effectively improved stator foundation and machine pier rigidity, and reduce the vibration of unit, run for unit long-term safety and provide guarantor Barrier.It addition, this utility model material requested is conventional material, easily purchase, simple in construction, and convenient and quick construction, convenient Maintenance, can be easily accomplished the laying of foundation bolt.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Being labeled as in figure: 1 stator base, 2 locating pieces, 3 stator sole plates, 4 steel boxes, 5 grout pipes, 6 grout outlets, 7 foundation bolts, 8 nuts, 9 packing rings, 10 second stage concretes.
Detailed description of the invention
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings, but not as new to this practicality Any restriction of type.
A kind of powerhouse of hydropower station stator foundation structure of the present utility model, as it is shown in figure 1, a kind of powerhouse of hydropower station stator base Plinth structure, including stator base 1, stator base 1 top is provided with locating piece 2, and locating piece 2 top is provided with stator sole plate 3;Stator Being provided with steel box 4 in pedestal 1, the bottom of steel box 4 side is provided with grout pipe 5, and the top of steel box 4 side is provided with grout outlet 6, steel box 4 Inside being provided with foundation bolt 7, foundation bolt 7 two ends are equipped with nut 8 and packing ring 9, and foundation bolt 7 top is through locating piece 2 and determines Bolt hole on sub-soleplate 3 is connected with nut 8, has poured second stage concrete 10 between steel box 4 and foundation bolt 7.Grout pipe 5 Being right-angle elbow pipe with grout outlet 6, one end is welded with steel box 4, and the other end stretches out from stator base 1 top.Being shaped as of steel box 4 Up-small and down-big taper or wedge shape.Stator base 1 and locating piece 2 are reinforced concrete structure, and stator base 1 top is provided with scarce Mouthful, the reinforcing bar in locating piece 2 is fixed on indentation, there with the reinforcement welding in stator base 1.
Of the present utility model a kind of powerhouse of hydropower station stator foundation casting method for said structure is: will be pre-machined Get well and be provided with the steel box 4 of grout pipe 5 and the taper of grout outlet 6 or wedge shape and put into and also do not carry out the stator base that fist stage concrete pours In seat 1, make, on the reinforcing bar of the fist stage concrete that steel box 4 is fixed on stator base 1, then to carry out a phase coagulation of stator base 1 Soil pours, and after the fist stage concrete of stator base 1 has poured, foundation bolt 7 is put into steel box 4, and by solid for locating piece 2 It is scheduled on the top of foundation bolt 7, in the stator base 1 simultaneously reinforcing bar in locating piece 2 and fist stage concrete poured Reinforcement welding is together;Pour wait the fist stage concrete pouring stator base 1 complete and after reaching design age, pass through grout pipe 5 pour second stage concrete 10 in steel box 4, make second stage concrete 10 fill up in steel box 4.In order to reach preferably to pour effect Really, when pouring second stage concrete 10 by grout pipe 5 in steel box 4, make the serosity pouring second stage concrete 10 by steel box 4 Lower curtate is in the milk toward eminence order, until serosity Reperfu-sion 1~2 minutes serosity after grout outlet 6 overflows, until the serosity overflowed For grouting can be terminated after underflow.
Embodiment
This when being embodied as, can first process the steel box 4 of wedge-type shape, at steel box 4 one STH also such as shown in Fig. 1 Welding grout pipe 5 and grout outlet 6;Then foundation bolt 7 is put into steel box 4 and fixes with locating piece 2;Locating piece 2 is reinforcing bar Xoncrete structure, the reinforcement welding in the stator base 1 that the reinforcing bar in locating piece 2 and fist stage concrete have poured is fixed;Treat Fist stage concrete pours complete after reaching design age, pours closely knit by grout pipe 5 slip casting in steel box 4.The steel box 4 of wedge shape Size can provide foundation bolt diameter, length to determine according to producer.

Claims (4)

1. a powerhouse of hydropower station stator foundation structure, including stator base (1), it is characterised in that: at stator base (1) top Being provided with locating piece (2), locating piece (2) top is provided with stator sole plate (3);Steel box (4), steel box (4) it is provided with in stator base (1) The bottom of side is provided with grout pipe (5), and the top of steel box (4) side is provided with grout outlet (6), and steel box is provided with foundation bolt in (4) (7), foundation bolt (7) two ends are equipped with nut (8) and packing ring (9), and foundation bolt (7) top passes locating piece (2) and stator Bolt hole on soleplate (3) is connected with nut (8), has poured second stage concrete between steel box (4) and foundation bolt (7) (10).
Powerhouse of hydropower station stator foundation structure the most according to claim 1, it is characterised in that: described grout pipe (5) and pulp Pipe (6) is right-angle elbow pipe, and one end is welded with steel box (4), and the other end stretches out from stator base (1) top.
Powerhouse of hydropower station stator foundation structure the most according to claim 1, it is characterised in that: being shaped as of described steel box (4) Up-small and down-big taper or wedge shape.
Powerhouse of hydropower station stator foundation structure the most according to claim 1, it is characterised in that: described stator base (1) and fixed Position block (2) is reinforced concrete structure, and stator base (1) top is provided with breach, the reinforcing bar in locating piece (2) and stator base (1) reinforcement welding in is fixed on indentation, there.
CN201620528413.1U 2016-06-02 2016-06-02 A kind of powerhouse of hydropower station stator foundation structure Active CN205688455U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620528413.1U CN205688455U (en) 2016-06-02 2016-06-02 A kind of powerhouse of hydropower station stator foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620528413.1U CN205688455U (en) 2016-06-02 2016-06-02 A kind of powerhouse of hydropower station stator foundation structure

Publications (1)

Publication Number Publication Date
CN205688455U true CN205688455U (en) 2016-11-16

Family

ID=57260633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620528413.1U Active CN205688455U (en) 2016-06-02 2016-06-02 A kind of powerhouse of hydropower station stator foundation structure

Country Status (1)

Country Link
CN (1) CN205688455U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862909A (en) * 2016-06-02 2016-08-17 中国电建集团贵阳勘测设计研究院有限公司 Stator base structure of hydropower house and pouring method of stator base structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862909A (en) * 2016-06-02 2016-08-17 中国电建集团贵阳勘测设计研究院有限公司 Stator base structure of hydropower house and pouring method of stator base structure

Similar Documents

Publication Publication Date Title
CN203462583U (en) Super high-rise exposed column foot
CN205530344U (en) Utility tunnel is pour to split type no mould
CN104032856A (en) Horizontal connection node of prefabricated shear wall
CN106400982A (en) Stirrup-densified splicing joint for fabricated reinforced concrete columns
CN107023032A (en) A kind of cast-in-place method of pipe gallery
CN105971007A (en) Split type non-formwork pouring underground comprehensive pipe gallery
CN205688455U (en) A kind of powerhouse of hydropower station stator foundation structure
CN205662838U (en) Prestressing force joint construction of pier is assembled to prefabricated segment
CN103452328B (en) Post brutal bracing means and method is subtracted for reinforced concrete member
CN107503382A (en) End head formwork fixes rubber water-proof band structure and its construction method
CN105862909B (en) A kind of powerhouse of hydropower station stator foundation structure and its casting method
CN106468075A (en) A kind of toilet pipe sleeve fixing meanss
CN206844097U (en) Low clearance diaphragm wall reinforcement cage structure under a kind of high-voltage line
CN203603253U (en) Detachable steel corbel structure on reinforced concrete column
CN109780322A (en) A kind of reinforcement means of pouring heavy-caliber steel pipe side template
CN206467580U (en) A kind of reinforced bridge pier
CN206359881U (en) A kind of assembled hollow steel pipe constrains armored concrete pillar height pier
CN202755362U (en) Prestressed concrete pile
CN207032011U (en) A kind of assembled steel tube constrains reinfored concrete line frame bridge pier
CN206359882U (en) A kind of assembled solid steel tube constrains reinforced column squat pier
CN205604289U (en) Can resist single storehouse underground pipe gallery of large deformation
CN104908150B (en) A kind of piping shaft making template and the method based on factorial praluction piping shaft
CN204875839U (en) Mould is pour on iron tower basis
CN107143137A (en) Cast-in-situ template structure and construction method at a kind of sandwich exterior wall J-shaped wall of prefabricated concrete structure
CN209874083U (en) Vertical mechanical connection structure of assembled shear force wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant