CN105862711B - A kind of hydraulic reclamation device and method for being used to cover mud sealing stabilization by drainage - Google Patents
A kind of hydraulic reclamation device and method for being used to cover mud sealing stabilization by drainage Download PDFInfo
- Publication number
- CN105862711B CN105862711B CN201610212726.0A CN201610212726A CN105862711B CN 105862711 B CN105862711 B CN 105862711B CN 201610212726 A CN201610212726 A CN 201610212726A CN 105862711 B CN105862711 B CN 105862711B
- Authority
- CN
- China
- Prior art keywords
- hydraulic reclamation
- mud
- construction
- foundation ditch
- playpipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/18—Reclamation of land from water or marshes
Abstract
The invention discloses a kind of hydraulic reclamation device and method for being used to cover mud sealing stabilization by drainage, including bottom plate, operating room, hose storage case, injection hydraulic reclamation mechanism and angle-adjusting mechanism, solar panels component is provided with the top surface of operating room, injection hydraulic reclamation mechanism includes split flow pump, playpipe and shower nozzle, shower nozzle connects split flow pump by playpipe, split flow pump is fixedly connected on the front end of operating room, and playpipe passes through angle-adjusting mechanism connecting bottom board.Its construction method includes:Preparation of construction, construction of dredging, flowing line laying, seal construction, the pre- hydraulic reclamation of bottom, dredge fill, construction detection and final acceptance of construction.The present invention is simple in construction, practical, can not only realize the dredge fill to different depth foundation ditch, and effectively increase the hydraulic reclamation quality of whole foundation ditch, and its intensity and firmness all reach the requirement of setting, and construction procedure is simple, flexible and convenient operation.
Description
Technical field
The present invention relates to a kind of hydraulic reclamation device and method for being used to cover mud sealing stabilization by drainage.
Background technology
It is increasingly in short supply with China's land resource, in the case where not influenceing the situation of economy and society sound development, littoral
The land reclamation in area obtains extensive concern.But at the same time, because coastal region is by sedimentary facies, the equal Soft Clay bar in strand
Part limits, and is the higher mud and silt clay of water content to barged-in fill, selects which kind of suitable method for processing foundation and such as
What is effectively constructed, and turns into urgent problem.
China State Intellectual Property Office announce it is secondary cover mud sealing vacuumize reinforce hydraulic reclamation indigenous method (application number:
201210409346.8 publication No.:102888835, date of publication:2013.1.23), this method process includes:In reclaimed ground
On directly set drain bar, barged-in fill mud face is pressed close in drain bar upper end, and drain bar and flexible pipe is vacuumized with snap joint connection, after
It is continuous to squeeze into drain bar to snap joint and squeeze into 60~80cm below mud face, using hydraulic reclamation mud layer more than snap joint as once close
Sealing, pumped vacuum systems has been laid with after the guard system that catchments, ground preloading has been vacuumized to stablize vacuum, when vacuum declines
Existing crack gas leak phenomenon, then done in stabilization zone and enclose dirt bed that low bank between fields hydraulic reclamation highly is 60~80cm as secondary seal layer, and side
Hydraulic reclamation side vacuum pre-press reinforcing, reach design standard until reinforcing.Although it can realize that hydraulic reclamation is reinforced, in practice of construction process
In it is complex, and the hydraulic reclamation of whole foundation ditch is of low quality, and service life is shorter.
The content of the invention
It is a kind of for covering mud sealing stabilization by drainage present invention aims at being provided for the deficiency present in prior art
Hydraulic reclamation device and method technical scheme, can not only realize the dredge fill to different depth foundation ditch, and effectively improve
The hydraulic reclamation quality of whole foundation ditch, its intensity and firmness all reach the requirement of setting, and construction procedure is simple, operate flexibly side
Just.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme that:
A kind of hydraulic reclamation device for being used to cover mud sealing stabilization by drainage, it is characterised in that:Including bottom plate, operating room, flexible pipe storage
Deposit case, injection hydraulic reclamation mechanism and angle-adjusting mechanism, operating room and hose storage case to be respectively positioned on the top surface of bottom plate, hose storage
Pipe joint is provided with the side of case, solar panels component is provided with the top surface of operating room, injection hydraulic reclamation mechanism includes dividing
Pump, playpipe and shower nozzle are flowed, shower nozzle connects split flow pump by playpipe, and split flow pump is fixedly connected on the front end of operating room, sprays
Pipe passes through angle-adjusting mechanism connecting bottom board, and roller is provided with the bottom surface of bottom plate;, can will be defeated when without using defeated mud hose
Mud hose is placed in hose storage case, it is necessary to which just taking-up when using, is convenient for carrying, while is easy to directly carry out with pipe joint
Connection, injection hydraulic reclamation mechanism can be adjusted according to the situation of reality by angle-adjusting mechanism, improve the hydraulic reclamation effect of mud
Rate, hydraulic reclamation device can be moved to setting position by roller, it is not necessary to moved with loop wheel machine, improve the spirit of hydraulic reclamation device
Activity, the dredge fill of diverse location can be met.
Further, solar panels component includes solar panels and support bar, solar panels by support bar attended operation room,
Solar panels to split flow pump and operating room provide electric energy after can converting solar energy into electrical energy, it is not necessary to external power supply, improve
The working range of hydraulic reclamation device, while can realize the continuous work of split flow pump.
Further, split flow pump includes the first connecting pole, the second connecting pole, diversion mechanism and support base, the first connecting pole
One end is provided with motor mounting flange, and the other end of the first connecting pole connects the second connecting pole, diversion mechanism position by radiating groove
In the other end of the second connecting pole, the bottom of radiating groove is provided with support base, and the both sides of support base are provided with level board, and first connects
Connect post and the second connecting pole is connected on level board by locating support, the end set of diversion mechanism has charging flange, drives
Dynamic motor connects split flow pump by motor mounting flange, and drives mud to be conveyed in split flow pump, while in radiating groove
Heat abstractor effectively reduces the temperature of split flow pump, extends the service life of split flow pump, and support base and level board improve shunting
The stability of pump, prevent from causing the junction of discharging flange to leak due to rocking, improve the security of hydraulic reclamation device.
Further, be provided with shock absorption bar in radiating groove, shock absorption bar can be effectively reduced because of heat abstractor and caused by shake
It is dynamic, improve the job stability of split flow pump.
Further, diversion mechanism includes four groups of symmetrical discharging flanges, and discharging opening, position are provided with the flange that discharges
Water-in flange is provided between two groups of discharging flanges of top, water law is provided with out between underlying two groups of discharging flanges
Orchid, the design of four groups of discharging flanges can not can be changed in time with one group wherein during normal work, ensure the continuous of mud
Conveying, improves the operating efficiency of hydraulic reclamation device, while the inside of split flow pump can be entered by water-in flange and water-output flange
Row cleaning, extend the service life of split flow pump.
Further, injection channel is provided with shower nozzle, the both sides up and down of injection channel are provided with booster body, supercharger
Structure includes stripper plate and pressuring plate, and pressuring plate is evenly distributed on stripper plate, and stripper plate passes through trip bolt and two expansion links
It is connected on the inwall of shower nozzle, two expansion links are symmetrically distributed in the both sides of trip bolt, and booster body is squeezed by adjusting two
Spacing between pressing plate, and then realize and the spacing of upper and lower two groups of pressuring plates is adjusted, realized when mud convey be pressurized or
Decompression.
Further, the angle between pressuring plate and stripper plate is a, and angle a scope is the ゜ of 120 ゜~135, this angular range
Pressure size is inside more easily controlled, the output speed of mud is met the needs of actual hydraulic reclamation.
Further, angle-adjusting mechanism includes fixed plate, lifting support and positioning snap ring, and positioning snap ring is socketed in playpipe
On, positioning snap ring is connected plate by lifting support, and fixed plate is located on the top surface of bottom plate, when the injection for needing to change mud
During position, drive positioning snap ring to move up and down by adjusting lifting support, and then adjust the height of playpipe, realize the near of mud
Journey or long-range injection, improve the practicality of hydraulic reclamation device.
Use a kind of method for being used to cover the hydraulic reclamation device of mud sealing stabilization by drainage described above, it is characterised in that including such as
Lower step:
(1) preparation of construction
Construction location is cleared up according to the requirement of construction drawing first, and construction equipment is checked,
Carry out safe practice to tell somebody what one's real intentions are work, it is ensured that cover being normally carried out for mud construction;
(2) dredge construction
Bagger is lifted to construction location first, construction site is divided into several 8m × 8m rectangle grid, is dug
Mud machine is in order excavated rectangle grid, completes to carry out the excavation of next rectangle grid after a rectangle grid excavates,
The bottom of foundation ditch is rammed while excavation and put down, and draining tube seat is opened up with drilling tool, it is 3~4m to make the spacing between draining tube seat,
The deep holes of 1~1.5m are set in the cross one another position of draining tube seat, are covered the end in hole with plastic cloth, in foundation ditch
On inwall compacting pressing is carried out with rammer compacter;
(3) flowing line is laid
The drainpipe of bottom of foundation ditch is laid first, and position is actually opened up according to draining tube seat, corresponding drainpipe is pressed
Order is laid, and is connected adjacent drainpipe with threeway or four-way connecting tube in the cross one another position of draining tube seat
Connect, and encapsulation process is carried out in junction, drainpipe is between same level, then in the hole covered with plastic cloth
Fix a drainpipe, drainpipe is vertically connected on the bottom surface of threeway or four-way connecting tube, on threeway or the top of four-way connecting tube
The drainpipe of horizontal distribution is vertically arranged on face, the top of drainpipe is higher than foundation ditch 1~1.5m of mouth, while in adjacent level point
It is attached between the drainpipe of cloth by steel wire rope, the drainpipe positioned at the horizontal distribution of margin of foundation pit is direct by steel wire rope
It is connected in the side wall wall soil of foundation ditch, and is poured into a mould with concrete;
(4) seal construction
Encapsulation process is carried out to the opening on its top according to the position of the drainpipe of horizontal distribution in order, first will sealing
Then cover buckle is socketed in the locking end of closure with tight loop, tightens trip bolt with screwdriver, make on the top of drainpipe
Between closure and drainpipe without Relative friction untill;
(5) the pre- hydraulic reclamation of bottom
Hydraulic reclamation device is moved to and is fixed positioned at 10~15m of margin of foundation pit position, then by the one of defeated mud hose
End is fixedly connected in the pipe joint of hydraulic reclamation device, and the other end is directly cheated with mud and connected, and then passes through angle-adjusting mechanism
The angle of playpipe is adjusted, the position for spraying shower nozzle alignment needs, the slush pump on defeated mud hose is then opened, cheats mud
Interior mud is input in hydraulic reclamation device by defeated mud hose, is sprayed mud through shower nozzle by playpipe in the presence of split flow pump
Hydraulic reclamation position is incident upon, playpipe is rotated while continuous injection according to the requirement of setting, mud is entered along the bottom of foundation ditch
Row injection, when underlayer thickness reaches 40~60cm, that is, stops blowing-filling sludge when covering drainpipe, finally with rammer compacter by foundation ditch
Bottom mud compacting;
(6) dredge fill
After the mud compacting of bottom, hydraulic reclamation device is moved to the point midway of margin of foundation pit, then by playpipe
Shower nozzle is directed at foundation ditch, starts slush pump, mud is entered hydraulic reclamation device by defeated mud hose, then open split flow pump, make mud
Hydraulic reclamation is carried out to foundation ditch through shower nozzle by playpipe, when on split flow pump corresponding discharging opening block and can not normal work when, it is logical
Cross and be attached playpipe with others discharging flanges again, realize continuous dredge fill, playpipe is right successively from left to right
Rectangle grid carries out hydraulic reclamation, while controls in shower nozzle the spacing between two pressuring plates up and down, according to the actual size of foundation ditch with
Depth, adjusts the hydraulic reclamation speed of mud, and the solar components on hydraulic reclamation device give split flow pump to provide electric energy, it is continuously worked,
When the loading of the rectangle grid close to hydraulic reclamation device reaches 50~80cm depth, adjust the position of hydraulic reclamation device or change spray
The angle position of pipe is penetrated, hydraulic reclamation is carried out to other rectangle grids, until the mud depth in whole foundation ditch reaches 50~80cm,
The dredge fill of top layer is finally carried out, until whole foundation ditch hydraulic reclamation finishes;
(7) construction detection
After dredge fill terminates, the position of foundation ditch hydraulic reclamation is corrected by level meter and measurement equipment, makes foundation ditch
Overall construction reaches the standard of setting, and the position for occurring being recessed to hydraulic reclamation position carries out repairing hydraulic reclamation, finally in the upper of foundation ditch
One layer of geotextiles of side's covering;
(8) final acceptance of construction
After dredge fill reaches sets requirement, first defeated mud hose is cleared up, and is recycled in chest, then uses clear water
The outside of hydraulic reclamation device is cleaned, and water-in flange is connected with water pipe, while opens water-output flange, makes current to split flow pump
Inside be rinsed, reclaimed after drying.
The present invention is by adopting the above-described technical solution, have the advantages that:
1st, using this hydraulic reclamation device, adjusted by spraying hydraulic reclamation mechanism according to the situation of reality through angle-adjusting mechanism
It is whole, the hydraulic reclamation efficiency of mud is improved, hydraulic reclamation device can be moved to setting position by roller, it is not necessary to be moved with loop wheel machine
It is dynamic, the flexibility of hydraulic reclamation device is improved, the dredge fill of diverse location can be met, substantially increase hydraulic reclamation device uses spirit
Activity;
2nd, the design of four groups of discharging flanges can not can be changed in time with one group wherein during normal work, ensure mud
Continuous conveying, improve the operating efficiency of hydraulic reclamation device, while can be to split flow pump by water-in flange and water-output flange
Inside is cleaned, and extends the service life of split flow pump;
3rd, when needing to change the eject position of mud, drive positioning snap ring to move up and down by adjusting lifting support, enter
And the height of playpipe is adjusted, the short range of mud or long-range injection are realized, improves the practicality of hydraulic reclamation device;
4th, the inventive method can realize the hydraulic reclamation to different terrain foundation ditch, and not only efficiency of construction is high, short construction period, and
Safety and reliability, the quality of foundation ditch hydraulic reclamation is effectively increased, reduce the labor intensity of operating personnel.
The present invention is simple in construction, practical, can not only realize the dredge fill to different depth foundation ditch, and effectively
The hydraulic reclamation quality of whole foundation ditch is improved, its intensity and firmness all reach the requirement of setting, and construction procedure is simple, and operation is flexible
It is convenient.
Brief description of the drawings
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is that the structure of hydraulic reclamation device in a kind of hydraulic reclamation device and method that stabilization by drainage is sealed for covering mud of the present invention is shown
It is intended to;
Fig. 2 is the structural representation of shower nozzle in the present invention;
Fig. 3 is the structural representation of split flow pump in the present invention.
In figure:1- bottom plates;2- operating rooms;3- hose storage casees;4- solar panels;5- support bars;6- pipe joints;7- points
Flow pump;8- playpipes;9- shower nozzles;10- fixed plates;11- lifting supports;12- positioning snap rings;13- injection channels;14- stripper plates;
15- pressuring plates;16- expansion links;17- trip bolts;The connecting poles of 18- first;19- motor mounting flanges;20- feeds flange;21-
Second connecting pole;22- radiating grooves;23- support bases;24- discharging flanges;25- discharging openings;26- water-in flanges;27- level boards;
28- locating supports;29- shock absorption bars;30- water-output flanges;31- rollers.
Embodiment
As shown in Figure 1 to Figure 3, it is a kind of hydraulic reclamation device for being used to cover mud sealing stabilization by drainage of the present invention, including bottom plate 1,
Operating room 2, hose storage case 3, injection hydraulic reclamation mechanism and angle-adjusting mechanism, operating room 2 and hose storage case 3 are respectively positioned on bottom plate
On 1 top surface, pipe joint 6 is provided with the side of hose storage case 3, solar panel group is provided with the top surface of operating room 2
Part, solar panels component include solar panels 4 and support bar 5, and solar panels 4 pass through the attended operation room 2 of support bar 5, solar energy
Plate 4 to split flow pump 7 and operating room 2 provides electric energy after can converting solar energy into electrical energy, it is not necessary to external power supply, improves and blows
The working range of action, while the continuous work of split flow pump 7 can be realized.
Injection hydraulic reclamation mechanism includes split flow pump 7, playpipe 8 and shower nozzle 9, and shower nozzle 9 connects split flow pump 7 by playpipe 8, point
Stream pump 7 is fixedly connected on the front end of operating room 2, split flow pump 7 include the first connecting pole 18, the second connecting pole 21, diversion mechanism and
Support base 23, one end of the first connecting pole 18 are provided with motor mounting flange 19, and the other end of the first connecting pole 18 passes through radiating
Groove 22 connects the second connecting pole 21, and diversion mechanism is located at the other end of the second connecting pole 21, and the bottom of radiating groove 22 is provided with branch
Seat 23 is supportted, the both sides of support base 23 are provided with level board 27, and the first connecting pole 18 and the second connecting pole 21 pass through locating support
28 are connected on level board 27, and the end set of diversion mechanism has charging flange 20, and motor passes through motor mounting flange 19
Split flow pump 7 is connected, and drives mud to be conveyed in split flow pump 7, while the heat abstractor in radiating groove 22 effectively reduces
The temperature of split flow pump 7, extending the service life of split flow pump 7, support base 23 and level board 27 improve the stability of split flow pump 7,
Prevent from causing the junction of discharging flange 24 to leak due to rocking, improve the security of hydraulic reclamation device, radiating groove 22
Inside be provided with shock absorption bar 29, shock absorption bar 29 can be effectively reduced because of heat abstractor and caused by vibration, improve the work of split flow pump 7
Make stability, diversion mechanism includes four groups of symmetrical discharging flanges 24, and discharging opening 25, position are provided with the flange 24 that discharges
Water-in flange 26 is provided between two groups of discharging flanges 24 of top, is provided between underlying two groups of discharging flanges 24
Water-output flange 30, the design of four groups of discharging flanges 24 can not can be changed in time with one group wherein during normal work, ensure
The continuous conveying of mud, the operating efficiency of hydraulic reclamation device is improved, while can be right by water-in flange 26 and water-output flange 30
The inside of split flow pump 7 is cleaned, and extends the service life of split flow pump 7, injection channel 13, injection channel are provided with shower nozzle 9
13 both sides up and down are provided with booster body, and booster body includes stripper plate 14 and pressuring plate 15, and pressuring plate 15 is uniformly distributed
On stripper plate 14, stripper plate 14 is connected on the inwall of shower nozzle 9 by trip bolt 17 and two expansion links 16, and two flexible
Bar 16 is symmetrically distributed in the both sides of trip bolt 17, and booster body passes through the spacing between adjusting two stripper plates 14, Jin Ershi
Now the spacing of upper and lower two groups of pressuring plates 15 is adjusted, supercharging or decompression, pressuring plate 15 and extruding are realized when mud conveys
Angle between plate 14 is a, and angle a scope is the ゜ of 120 ゜~135, is more easily controlled pressure size in this angular range, makes silt
The output speed of mud meets the needs of actual hydraulic reclamation.
Playpipe 8 includes fixed plate 10, lifting support 11 by angle-adjusting mechanism connecting bottom board 1, angle-adjusting mechanism
With positioning snap ring 12, positioning snap ring 12 is socketed on playpipe 8, and positioning snap ring 12 is connected plate 10 by lifting support 11,
Fixed plate 10 is located on the top surface of bottom plate 1, when needing to change the eject position of mud, is determined by adjusting lifting support 11 and driving
Position snap ring 12 moves up and down, and then adjusts the height of playpipe 8, realizes the short range of mud or long-range injection, improves hydraulic reclamation dress
The practicality put, roller 31 is provided with the bottom surface of bottom plate 1;When without using defeated mud hose, defeated mud hose can be placed on
, it is necessary to just be taken out when using in hose storage case 3, it is convenient for carrying, while is easy to directly be attached with pipe joint 6, sprays
Hydraulic reclamation mechanism can be adjusted according to the situation of reality by angle-adjusting mechanism, improve the hydraulic reclamation efficiency of mud, hydraulic reclamation dress
Setting position can be moved to by roller 31 by putting, it is not necessary to moved with loop wheel machine, improved the flexibility of hydraulic reclamation device, energy
Meet the dredge fill of diverse location.
Using a kind of method for being used to cover the hydraulic reclamation device of mud sealing stabilization by drainage described above, comprise the following steps:
(1) preparation of construction
Construction location is cleared up according to the requirement of construction drawing first, and construction equipment is checked, carries out peace
Full work of confiding a technological secret, it is ensured that cover being normally carried out for mud construction;
(2) dredge construction
Bagger is lifted to construction location first, construction site is divided into several 8m × 8m rectangle grid, is dug
Mud machine is in order excavated rectangle grid, completes to carry out the excavation of next rectangle grid after a rectangle grid excavates,
The bottom of foundation ditch is rammed while excavation and put down, and draining tube seat is opened up with drilling tool, it is 3~4m to make the spacing between draining tube seat,
The deep holes of 1~1.5m are set in the cross one another position of draining tube seat, are covered the end in hole with plastic cloth, in foundation ditch
On inwall compacting pressing is carried out with rammer compacter;
(3) flowing line is laid
The drainpipe of bottom of foundation ditch is laid first, and position is actually opened up according to draining tube seat, corresponding drainpipe is pressed
Order is laid, and is connected adjacent drainpipe with threeway or four-way connecting tube in the cross one another position of draining tube seat
Connect, and encapsulation process is carried out in junction, drainpipe is between same level, then in the hole covered with plastic cloth
Fix a drainpipe, drainpipe is vertically connected on the bottom surface of threeway or four-way connecting tube, on threeway or the top of four-way connecting tube
The drainpipe of horizontal distribution is vertically arranged on face, the top of drainpipe is higher than foundation ditch 1~1.5m of mouth, while in adjacent level point
It is attached between the drainpipe of cloth by steel wire rope, the drainpipe positioned at the horizontal distribution of margin of foundation pit is direct by steel wire rope
It is connected in the side wall wall soil of foundation ditch, and is poured into a mould with concrete;
(4) seal construction
Encapsulation process is carried out to the opening on its top according to the position of the drainpipe of horizontal distribution in order, first will sealing
Then cover buckle is socketed in the locking end of closure with tight loop, is tightened trip bolt 17 with screwdriver on the top of drainpipe,
Untill making between closure and drainpipe without Relative friction;
(5) the pre- hydraulic reclamation of bottom
Hydraulic reclamation device is moved to (the defeated production of suction of hydraulic reclamation device is fixed positioned at 10~15m of margin of foundation pit position
Rate is as described in Table 1), then one end of defeated mud hose is fixedly connected in the pipe joint 6 of hydraulic reclamation device, the other end directly with
The connection of mud hole, the angle of playpipe 8 is then adjusted by angle-adjusting mechanism, shower nozzle 9 is directed at the position that needs spray, connect
The slush pump opened on defeated mud hose, the mud in mud hole is input to by defeated mud hose in hydraulic reclamation device, is shunting
In the presence of pump 7 mud is sprayed to hydraulic reclamation position by playpipe 8 through shower nozzle 9, continuously sprayed according to the requirement of setting
Playpipe 8 is rotated simultaneously, mud is sprayed along the bottom of foundation ditch, when underlayer thickness reaches 40~60cm, that is, covers
Stop blowing-filling sludge during drainpipe, finally tamped the bottom mud of foundation ditch with rammer compacter;
It is mainly relevant with soil property, shunting pump characteristics and pepeline characteristic that hydraulic reclamation device inhales defeated productivity ratio
W=Q × ρ
In formula:Defeated productivity ratio (the m of suction of W --- hydraulic reclamation device3/h);
Q --- working flow (m in shunting pump conduit3/h);
ρ --- mud concentration (%)
Parameter | 4500m3/h |
Shunt working flow (m in pump conduit3/h) | 17500 |
Mud concentration (%) | 25 |
Defeated productivity ratio (the m of suction of hydraulic reclamation device3/h) | 4375 |
The defeated productivity ratio of suction of the hydraulic reclamation device of table 1
(6) dredge fill
After the mud compacting of bottom, hydraulic reclamation device is moved to the point midway of margin of foundation pit, then by playpipe 8
Shower nozzle 9 is directed at foundation ditch, starts slush pump, mud is entered hydraulic reclamation device by defeated mud hose, then opens split flow pump 7, makes silt
Mud by playpipe 8 through shower nozzle 9 to foundation ditch carry out hydraulic reclamation, when on split flow pump 7 corresponding discharging opening 25 block and can not normal work
When making, by the way that playpipe 8 is attached with others discharging flanges 24 again, continuous dredge fill is realized, playpipe 8 is from a left side
Turn right and hydraulic reclamation is carried out to rectangle grid successively, while control the spacing above and below in shower nozzle 9 between two pressuring plates 15, according to foundation ditch
Actual size and depth, adjust the hydraulic reclamation speed of mud, the solar components on hydraulic reclamation device give split flow pump 7 to provide electric energy,
It is continuously worked, when the loading of the rectangle grid close to hydraulic reclamation device reaches 50~80cm depth, adjust hydraulic reclamation device
Position or change the angle position of playpipe 8, hydraulic reclamation is carried out to other rectangle grids, until the mud in whole foundation ditch is deep
Degree reaches 50~80cm, finally carries out the dredge fill of top layer, when the mud sprayed at shower nozzle is more sparse, by defeated mud hose
Suction mud port move to the position farther out in mud hole, and the port of defeated mud hose vertically with inhaling mud face, is then inserted into silt
Below mud at 50~60cm, until whole foundation ditch hydraulic reclamation finishes;
(7) construction detection
After dredge fill terminates, the position of foundation ditch hydraulic reclamation is corrected by level meter and measurement equipment, makes foundation ditch
Overall construction reaches the standard of setting, and the position for occurring being recessed to hydraulic reclamation position carries out repairing hydraulic reclamation, finally in the upper of foundation ditch
One layer of geotextiles of side's covering;
(8) final acceptance of construction
After dredge fill reaches sets requirement, first defeated mud hose is cleared up, and is recycled in chest, then uses clear water
The outside of hydraulic reclamation device is cleaned, and water-in flange 26 is connected with water pipe, while opens water-output flange 30, makes current to dividing
The inside of stream pump 7 is rinsed, and is reclaimed after drying.
The inventive method quality control:
(1) select and appoint experienced operating personnel to be constructed, overall process, tracking mode management are carried out to hydraulic reclamation foundation ditch, in time
The quality of blowing-filling sludge is checked and controlled, ensures that foundation ditch hydraulic reclamation is constructed according to the technical requirements of regulation;
(2) material property of drainpipe should meet requirement of engineering;
(3) it must assure that electric power is without interruption when carrying out the continuous construction of hydraulic reclamation, must not power off halfway.
The inventive method safety measure:
(1) construction cable must carry out " Three-phase five-wire " system.All electrical equipments must install electricity-leakage-proof protectors, own
Distribution box, plug-in strip case must use meet regulation requirement lock case.Pass in and out the necessary fix tightly of power line of lock case, blend rubber
Sheath is protected;
(2) fixed power source line should try one's best aerial, when can not make somebody a mere figurehead, it is necessary to which, using water proof rubber cable, the cable that mops floor is necessary
Meet resistance to pressure request, forbid must have strict using the old cable or underproof product, all cable connectors of aging
Anticreep measure, and with rod by joint erector from the ground;
(3) either electrician or operation work, necessary Liang Rentong hilllocks on duty on duty, forbid one on duty.It must adhere to periodically
Safety inspection system.Row line and electrical equipment inspection should be entered after high wind, heavy rain immediately.
The inventive method environmental practice:
(1) control construction waste water, mud discharge, will set special row pond or bucket, there is professional's processing;
(2) forbid constructing in strong wind weather, measure is gone along with sb. to guard him in construction;
(3) construction machinery will avoid carrying on construction work at night;
(4) oil plant will be placed on defined position, there is special messenger's keeping;
(5) there must not be pyrotechnics around combustibles in constructing;
(6) job site reasonable Arrangement, field hold clean and tidy, closure construction, and discarded object is cleared up in time, and scene is arranged in a organized way
Water;
(7) the existing environmental protection pertinent regulations of strict implement country and corporate environment defence program file, have prevented damage
Surrounding environment and the phenomenon of health of human body occur.
The specific embodiment of the present invention is these are only, but the technical characteristic of the present invention is not limited thereto.It is any with this hair
Based on bright, to realize essentially identical technique effect, made ground simple change, equivalent substitution or modification etc., all cover
Among protection scope of the present invention.
Claims (7)
- A kind of 1. hydraulic reclamation device for being used to cover mud sealing stabilization by drainage, it is characterised in that:Including bottom plate, operating room, hose storage Case, injection hydraulic reclamation mechanism and angle-adjusting mechanism, the operating room and the hose storage case are respectively positioned on the top surface of the bottom plate On, pipe joint is provided with the side of the hose storage case, solar panels component is provided with the top surface of the operating room, The injection hydraulic reclamation mechanism includes split flow pump, playpipe and shower nozzle, and the shower nozzle connects the split flow pump by the playpipe, The split flow pump is fixedly connected on the front end of the operating room, and the split flow pump includes the first connecting pole, the second connecting pole, shunting Mechanism and support base, one end of first connecting pole are provided with motor mounting flange, and the other end of first connecting pole leads to Cross radiating groove and connect second connecting pole, the diversion mechanism is located at the other end of second connecting pole, the shunting machine Structure includes four groups of symmetrical discharging flanges, discharging opening is provided with the discharging flange, described in above two groups Water-in flange is provided between discharging flange, water-output flange is provided between the flange that discharged described in underlying two groups, it is described The bottom of radiating groove is provided with the support base, and the both sides of the support base are provided with level board, first connecting pole and institute State the second connecting pole to be connected on the level board by locating support, the end set of the diversion mechanism has charging method Orchid, the playpipe connect the bottom plate by the angle-adjusting mechanism, roller are provided with the bottom surface of the bottom plate.
- A kind of 2. hydraulic reclamation device for being used to cover mud sealing stabilization by drainage according to claim 1, it is characterised in that:It is described too Positive energy board component includes solar panels and support bar, and the solar panels pass through the support bar and connect the operating room.
- A kind of 3. hydraulic reclamation device for being used to cover mud sealing stabilization by drainage according to claim 1, it is characterised in that:It is described to dissipate Shock absorption bar is provided with heat channel.
- A kind of 4. hydraulic reclamation device for being used to cover mud sealing stabilization by drainage according to claim 1, it is characterised in that:The spray Injection channel is provided with head, the both sides up and down of the injection channel are provided with booster body, and the booster body includes squeezing Pressing plate and pressuring plate, the pressuring plate are evenly distributed on the stripper plate, and the stripper plate is stretched by trip bolt and two Contracting bar is connected on the inwall of the shower nozzle, and two expansion links are symmetrically distributed in the both sides of the trip bolt.
- A kind of 5. hydraulic reclamation device for being used to cover mud sealing stabilization by drainage according to claim 4, it is characterised in that:The increasing Angle between pressing plate and the stripper plate is a, and the scope of the angle a is the ゜ of 120 ゜~135.
- A kind of 6. hydraulic reclamation device for being used to cover mud sealing stabilization by drainage according to claim 1, it is characterised in that:The angle Degree adjustment mechanism includes fixed plate, lifting support and positioning snap ring, and the positioning snap ring is socketed on the playpipe, described fixed Position snap ring connects the fixed plate by the lifting support, and the fixed plate is located on the top surface of the bottom plate.
- 7. using a kind of method for being used to cover the hydraulic reclamation device of mud sealing stabilization by drainage as claimed in claim 1, its feature exists In comprising the following steps:(1) preparation of constructionConstruction location is cleared up according to the requirement of construction drawing first, and construction equipment is checked, carries out safe skill Art is told somebody what one's real intentions are work, it is ensured that covers being normally carried out for mud construction;(2) dredge constructionBagger is lifted to construction location first, construction site is divided into several 8m × 8m rectangle grid, bagger Rectangle grid is excavated in order, completes to carry out the excavation of next rectangle grid after a rectangle grid excavates, is excavating While, rams the bottom of foundation ditch flat, and opens up draining tube seat with drilling tool, it is 3~4m to make the spacing between draining tube seat, is being arranged The cross one another position of water pipe ditch sets the deep holes of 1~1.5m, is covered the end in hole with plastic cloth, in the inwall of foundation ditch On with rammer compacter carry out compacting pressing;(3) flowing line is laidThe drainpipe of bottom of foundation ditch is laid first, position is actually opened up according to draining tube seat, by corresponding drainpipe in order Laid, be attached adjacent drainpipe with threeway or four-way connecting tube in the cross one another position of draining tube seat, and Encapsulation process is carried out in junction, drainpipe is between same level, is then installed in the hole covered with plastic cloth Drainpipe, drainpipe is set to be vertically connected on the bottom surface of threeway or four-way connecting tube, on the top surface of threeway or four-way connecting tube The drainpipe of horizontal distribution is vertically arranged, the top of drainpipe is higher than foundation ditch 1~1.5m of mouth, while in adjacent level distribution It is attached between drainpipe by steel wire rope, the drainpipe positioned at the horizontal distribution of margin of foundation pit is directly connected to by steel wire rope In the side wall wall soil of foundation ditch, and poured into a mould with concrete;(4) seal constructionEncapsulation process is carried out to the opening on its top in order according to the position of the drainpipe of horizontal distribution, cover buckle will be sealed first On the top of drainpipe, the locking end of closure is then socketed in tight loop, trip bolt is tightened with screwdriver, makes sealing Lid drainpipe between without Relative friction untill;(5) the pre- hydraulic reclamation of bottomHydraulic reclamation device is moved to and is fixed positioned at 10~15m of margin of foundation pit position, then consolidates one end of defeated mud hose Surely it is connected in the pipe joint of hydraulic reclamation device, the other end is directly cheated with mud and connected, and is then adjusted by angle-adjusting mechanism The angle of playpipe, the position for spraying shower nozzle alignment needs, then opens the slush pump on defeated mud hose, makes in mud hole Mud is input in hydraulic reclamation device by defeated mud hose, in the presence of split flow pump by mud by playpipe through shower nozzle spray to Hydraulic reclamation position, playpipe is rotated while continuous injection according to the requirement of setting, mud is sprayed along the bottom of foundation ditch Penetrate, when underlayer thickness reaches 40~60cm, that is, stop blowing-filling sludge when covering drainpipe, finally with rammer compacter by the bottom of foundation ditch Layer mud compacting;(6) dredge fillAfter the mud compacting of bottom, hydraulic reclamation device is moved to the point midway of margin of foundation pit, then by the shower nozzle of playpipe Foundation ditch is directed at, starts slush pump, mud is entered hydraulic reclamation device by defeated mud hose, then open split flow pump, pass through mud Playpipe carries out hydraulic reclamation through shower nozzle to foundation ditch, when corresponding discharging opening blocking on split flow pump and can not normal work when, pass through by Playpipe is attached with others discharging flange again, realizes continuous dredge fill, playpipe is from left to right successively to rectangle Grid carries out hydraulic reclamation, while controls in shower nozzle the spacing between two pressuring plates up and down, according to the actual size and depth of foundation ditch, The hydraulic reclamation speed of mud is adjusted, the solar components on hydraulic reclamation device give split flow pump to provide electric energy, it is continuously worked, when close When the loading of the rectangle grid of hydraulic reclamation device reaches 50~80cm depth, adjust the position of hydraulic reclamation device or change playpipe Angle position, hydraulic reclamation is carried out to other rectangle grids, until the mud depth in whole foundation ditch reaches 50~80cm, it is most laggard The dredge fill of row top layer, until whole foundation ditch hydraulic reclamation finishes;(7) construction detectionAfter dredge fill terminates, the position of foundation ditch hydraulic reclamation is corrected by level meter and measurement equipment, makes foundation ditch overall Construction reach the standard of setting, the position for occurring being recessed to hydraulic reclamation position carries out repairing hydraulic reclamation, finally covered above foundation ditch One layer of geotextiles of lid;(8) final acceptance of constructionAfter dredge fill reaches sets requirement, first defeated mud hose is cleared up, and is recycled in chest, then with clear water to blowing The outside of action is cleaned, and connects water-in flange with water pipe, while opens water-output flange, makes current in split flow pump Portion is rinsed, and is reclaimed after drying.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610212726.0A CN105862711B (en) | 2016-04-06 | 2016-04-06 | A kind of hydraulic reclamation device and method for being used to cover mud sealing stabilization by drainage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610212726.0A CN105862711B (en) | 2016-04-06 | 2016-04-06 | A kind of hydraulic reclamation device and method for being used to cover mud sealing stabilization by drainage |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105862711A CN105862711A (en) | 2016-08-17 |
CN105862711B true CN105862711B (en) | 2018-02-09 |
Family
ID=56636140
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610212726.0A Active CN105862711B (en) | 2016-04-06 | 2016-04-06 | A kind of hydraulic reclamation device and method for being used to cover mud sealing stabilization by drainage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105862711B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109505071B (en) * | 2019-01-28 | 2023-07-14 | 浙江坤腾智能科技股份有限公司 | Knitting machine and processing method thereof |
CN109505068B (en) * | 2019-01-28 | 2023-11-10 | 浙江坤腾智能科技股份有限公司 | Stitch device for knitting machine |
CN110258690A (en) * | 2019-06-28 | 2019-09-20 | 中交天航港湾建设工程有限公司 | Anti-extrusion become silted up in hydraulic reclamation area dissipates paving construction energy dissipator and energy-dissipating system and construction method |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2827104B2 (en) * | 1996-03-11 | 1998-11-18 | 不動建設株式会社 | Soft viscous ground improvement method |
CN101235635B (en) * | 2008-02-05 | 2010-09-08 | 北京光彩恒溢科技有限公司 | Blowing filling sludge ground-making construction technique and device thereof |
CN100572688C (en) * | 2008-07-14 | 2009-12-23 | 河北建设勘察研究院有限公司 | The method of consolidating soft soil ground foundation by dynamic pre drainage consolidation |
CN201738297U (en) * | 2010-04-20 | 2011-02-09 | 武汉华荣科技发展有限责任公司 | Construction device for filling silt and reclaiming land |
CN103063819A (en) * | 2013-01-04 | 2013-04-24 | 天津大学 | Application method of indoor simulation device for migration and conversion of pollutant in artificial shore zone |
CN105155511B (en) * | 2015-09-18 | 2017-02-22 | 平顶山市公路工程公司 | Rotating drum type swirl curing and stirring device and dredged sludge hydraulic reclamation method |
-
2016
- 2016-04-06 CN CN201610212726.0A patent/CN105862711B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105862711A (en) | 2016-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105862711B (en) | A kind of hydraulic reclamation device and method for being used to cover mud sealing stabilization by drainage | |
AU2020286274B2 (en) | Aquifer connection method for inner dump in open-pit mine | |
CN104533449B (en) | A kind of tunnel excavation stand and apply the adit construction method of this stand | |
CN103643672A (en) | Vacuum preloading foundation treatment construction method | |
CN108915696A (en) | A kind of tunnel complete set mechanical equipment Construction Organization Method | |
CN109056694B (en) | Method for treating dredger fill through combination of shearing pressurization and vacuum preloading | |
CN106192665A (en) | A kind of sponge urban road rain infiltration system and construction method thereof | |
CN103015400A (en) | Efficient quick method for treating separated directly-connected vacuum preloaded foundation | |
CN107079786A (en) | A kind of automatic irrigation system and method planted for wild rice stem | |
CN107090851A (en) | The inverted side-wall construction method of downtown area open cut groove | |
CN105113562A (en) | Water knife mud suction device applied to hardened soil body structure | |
CN105804048B (en) | A kind of soft foundation drain bar reinforcement means | |
CN106613769A (en) | Underground pipe irrigation system and construction method thereof for sponge city | |
CN104404979A (en) | H-shaped pile slab wall construction method | |
CN112095644A (en) | Deep foundation pit water intercepting and draining device and construction method thereof | |
CN209053021U (en) | A kind of groove and tognue type precast concrete culvert pipe retaining wall and its artificial digging pile | |
CN212272234U (en) | High-strength combined template for open groove section of large-section inclined shaft | |
CN109056879A (en) | A kind of riverway sludge cleaning plant and construction method | |
CN104652412A (en) | Method for treating soft soil foundation through deep compound vacuum pre-compaction | |
CN111549802A (en) | Hanging net guniting equipment for slope protection and using method | |
CN104480905A (en) | Upstream surface structure of concrete face rockfill dam for preventing face from disengagement and construction method thereof | |
CN209687506U (en) | Wear river shallow buried covered excavation electric power tunnel constructing structure | |
CN208949951U (en) | A kind of riverway sludge cleaning plant | |
CN109024147B (en) | Comprehensive recycling system for sandbar water source and construction method thereof | |
CN112095578A (en) | Closed pressurization type vacuum preloading construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Xueying Inventor after: Chen Honggang Inventor after: Yang Xuchang Inventor after: Qiu Huiping Inventor after: Liu Min Inventor before: Liu Xueying Inventor before: Lou Jun Inventor before: Zhou Xujie |