CN105844423A - 一种沉管隧道运营阶段健康状态的评估方法 - Google Patents

一种沉管隧道运营阶段健康状态的评估方法 Download PDF

Info

Publication number
CN105844423A
CN105844423A CN201610208064.XA CN201610208064A CN105844423A CN 105844423 A CN105844423 A CN 105844423A CN 201610208064 A CN201610208064 A CN 201610208064A CN 105844423 A CN105844423 A CN 105844423A
Authority
CN
China
Prior art keywords
factor
evaluation
immersed tube
layer
tube tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610208064.XA
Other languages
English (en)
Inventor
徐向春
蔡建中
刘松玉
郭俊
童立元
张国柱
刘睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201610208064.XA priority Critical patent/CN105844423A/zh
Publication of CN105844423A publication Critical patent/CN105844423A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明提供了一种沉管隧道运营阶段健康状态的评估方法,步骤为:对国内外已建沉管隧道的历史病害资料进行归纳分析,构建健康状态评价指标体系;利用层次分析法构建被评估沉管隧道的健康状态评估模型;采用改进的层次分析法确定各因素的相对于权重以及各因素包含的各评价指标在该因素中的相对权重;集成模糊综合评价的理念,基于预设的隧道健康状态评估标准,对建立的沉管隧道健康评估模型进行分级综合评价。本发明的综合考虑沉管隧道所处环境因素、结构应力、应变、裂缝等多方面因素,对沉管隧道运营过程中的健康状态进行定量的全面评估,为隧道的运营维护、决策提供了有力支持。

Description

一种沉管隧道运营阶段健康状态的评估方法
技术领域
本发明涉及一种沉管隧道运营期间隧道结构健康状态评估的方法。
背景技术
近年来,随着我国经济不断发展的需要,沉管隧道以其施工速度快、周期短、对基础强度要求不高、埋深浅、建成后不影响航道通航、水底隧道部分与岸上部分对接距离更短等优点,在国内外的越江隧道方案中被更多的采用,全世界己经修建了一百多条沉管隧道。
研究调查发现,在长期的自然环境和使用环境的双重作用下,已建隧道会随着使用不同程度地出现衬砌裂缝、变形以及渗漏水等病害。这些运营期间隧道出现的病害不仅危及到高速行车的安全与畅通,而且影响了隧道的使用寿命。对病害如不进行及时处治,会造成进一步损坏,甚至使隧道破坏,导致巨大的经济损失和不良的社会影响。
传统的结构劣化评定标准可以实现半定量半定性的结构劣化评估,现有的结构健康评估技术可以实现机构健康状态的定量评估,更多应用于大型桥梁、高层建筑中,盾构隧道及公路隧道中亦有一些学者进行过研究,但在沉管隧道结构中的应用尚未见文献发表。
发明内容
发明目的:针对现有评估技术的缺陷以及沉管隧道健康状态评估方面存在的空缺,本发明提供了一种基于改进层次分析、模糊综合评判集成的评估方法,以解决以上问题。
技术方案:为实现上述目的,本发明的一种沉管隧道运营阶段健康状态的评估方法,其特征在于,包括以下步骤:
步骤一:确定影响沉管隧道运营期安全的因素以及每个因素各自包含的评价指标;
步骤二:利用层次分析法对步骤一中确定的因素和评价指标进行归纳分析,构建沉管隧道健康状态评估模型,所述沉管隧道健康状态评估模型具有目标层、因素层以及指标层,所述目标层是对沉管隧道总体健康状态的评估目标,所述因素层是步骤一中所确定的所有因素,所述指标层包含步骤一中所确定的每个因素各自包含的评价指标;
步骤三:确定所述沉管隧道健康状态评估模型中因素层中各因素的相对权重、以及每个因素各自包含的指标层中的评价指标在该因素中的相对权重,构建权重矩阵;
步骤四:建立沉管隧道健康状态评价等级及各评判因素单因素评价标准;
步骤五:根据各评判因素单因素评价标准,确定评判过程中指标层各评价指标的隶属函数和模糊算子;
步骤六:利用各评价指标的隶属函数进行各因素的模糊评价,构建各评价指标的模糊关系矩阵;
步骤七:以各因素的评价指标的模糊关系矩阵和相对权重作为因素层健康评估的输入值,计算得到因素层各因素的健康评估数值;以因素层各因素的健康评估数值和相对权重作为沉管隧道总体健康评估的输入值,计算得到沉管隧道综合健康评估数值;根据沉管隧道综合健康评估数值对照预设的沉管隧道健康状态评价等级得到隧道综合健康等级。
进一步地,步骤一所确定的影响沉管隧道运营期安全的因素包括环境作用、结构应力、结构变形、结构裂缝、渗漏水五个因素;其中环境作用因素包含水位、覆盖层厚度两项评价指标,结构应力因素包含钢筋应力、混凝土应力、剪切键应力、锚索应力四项评价指标,结构变形因素包括隧道不均匀沉降、管段接头张开和变位、管段倾斜三项评价指标,结构裂缝因素包含裂缝长度,裂缝宽度两项评价指标,渗漏水因素包含渗漏速率,渗漏面积,渗漏水PH值三项评价指标。
进一步地,步骤三确定权重的方法为改进乘积标度法,该法在评价指标层中评价指标的重要性时,设置“相同”与“稍微大”两个评价等级,以此作为基础进行递进乘积分析确定因素层中各因素的相对权重、以及每个因素各自包含的指标层中的评价指标在该因素中的相对权重;如评价指标A比B“稍微大”时的权重比为a:b,则A比B为n个“稍微大”时,其权重比为a·(1+a)n-1:b·(1+b)n-1
进一步地,步骤四中建立的评价等级分为m级,m为正整数,确定健康评价标准集V={v1,v2,…vm},分别对应1,2…m级健康状态,其中v1对应(v1上,v1下)评价值区间,v2对应(v2上,v2下)评价值区间,以此类推,vm对应(vm上,vm下)评价值区间。
进一步地,步骤五中确定隶属函数的方法为模糊统计法或三分法或五点法或模糊分布法。
进一步地,步骤五中确定的模糊算子为主因素决定型或主因素突出型或不均衡平均型或加权平均型。
进一步地,步骤三中因素层中各因素的相对权重值的总和为1,每个因素各自包含的指标层中的评价指标在该因素中的相对权重的总和也为1。
有益效果:本发明提供的沉管隧道运营阶段健康状态的评估方法突破了目前规范中评判方法不能进行完全定量的瓶颈,也是首次给出对沉管隧道运营健康状态的系统化的评价方法,该方法的评价内容涵盖了沉管隧道的运营环境影响、结构内部应力、结构变形、裂缝、渗漏水等工程所关心的因素,为沉管隧道的运营安全、管理养护等工作提供了评价指导。
附图说明
附图1为本发明方法的流程示意图;
附图2为本发明方法中评估模型层次结构图;
附图3为本发明方法的隶属函数确定示意图。
具体实施方式
下面结合附图对本发明作更进一步的说明。
如图1所示,其步骤包括:
(1)通过监测取得现场原始数据。
(2)本发明实施例以红谷隧道区间段为例,具体监测数据如下:
表1某沉管隧道区间监测参数
(3)根据国内外工程实践和沉管隧道常见病害成因的理论分析,归纳总结出影响沉管隧道运营期安全的不利因素。
(4)利用层次分析法对选取的诸多评价指标和因素进行归纳分析,构建沉管隧道健康状态评估模型,如附图2所示,明确各指标和因素的隶属关系;模型从顶层至底层依次为目标层、因素层和指标层;目标层即是对沉管隧道总体健康状态的评估目标,因素层是对沉管隧道运营安全产生影响的五大因素,指标层包括了因素层中所包括的各个健康评价指标。因素层主要包括环境作用、结构应力、结构变形、结构裂缝、渗漏水五个因素,五个因素又包含指标层内的:水位、覆盖层厚度、钢筋应力、混凝土应力、剪力键应力、锚索应力、隧道不均匀沉降、管端接头张开、变位、管段倾斜、裂缝长度、裂缝宽度、渗漏速率、渗漏面积、渗漏水PH值等评价指标。
其中,剪力键应力包括水平剪力键应力、竖向剪力键应力;管段接头张开和变位包括接头张开、接头闭合、接头水平错动和接头竖向错动。
(5)利用改进的层次分析法-乘积标度法确定模型各层中相关指标的相对权重;
该法在评价指标重要性的两两比较时,不先划分过多的等级,而只设置两个等级,即评价指标A与评价指标B的重要性“相同”或“稍微大”,然后以此作为基础进行乘积分析。即如果A比B重要性“稍微大”,则ωA:ωB=1.354:1,A与B重要性相同,则ωA:ωB=1:1,A比B重要性“稍微大”还要“稍微大”,则ωA:ωB=1.354×(1+1.354):1×(1+1)=1.594:1;
本实施例通过乘积标度法主观给出权重值:
环境作用的两个指标的相对权重为:
ωA=(ωA1,ωA2)=(水位,覆盖层厚度)=(0.575,0.425)
结构应力的四个指标的相对权重为:
ωB=(ωB1,ωB2,ωB3,ωB4)=(钢筋应力,混凝土应力,剪切键应力,锚索应力)=(0.193,0.193,0.307,0.307)
ωB3=(ωB31,ωB32)=(水平剪力键应力,竖向剪力键应力)=(0.5,0.5)
结构变形的三个指标的相对权重为:
ωC=(ωC1,ωC2,ωC3)=(隧道不均匀沉降,管段接头张开和变位,管段倾斜)=(0.298,0.404,0.298)
ωC2=(ωC21,ωC22,ωC23,ωC23,ωC24)=(接头张开,接头闭合,水平错动,竖向错动)=(0.25,0.25,0.25,0.25)
ωD=(ωD1,ωD2)=(裂缝长度,裂缝宽度)=(0.5,0.5)
ωE=(ωE1,ωE2,ωE3)=(渗漏速率,渗漏面积,渗漏水PH值)=(0.438,0.323,0.239)
因素层五项的相对权重为:
ω=(ωA,ωB,ωC,ωD,ωE)=(环境作用,结构应力,结构变形,结构裂缝,渗漏水)=(0.175,0.2375,0.2375,0.175,0.175)。
(6)建立沉管隧道健康状态评价等级及各评判因素单因素评价标准;
本实施例所建立的评价等级及单因素评价标准参照方法见表2
表2指标层指标评价标准参照
所建立的沉管隧道综合评价等级如表3定量化。
表3隧道病害综合评价等级定量划分
(7)根据模糊综合评判方法的原理,确定评判过程中的隶属函数和模糊算子。
根据单一指标的评价等级准则建立隶属函数,如附图3所示:
水位A1
u A ( x ) = 1 x < 9 e - ( x - 9 10.8 ) 2 9 &le; x < 18 1 - e - ( x - 19.5 1.8 ) 2 18 &le; x < 19.5
u B ( x ) = 0 x < 9 , x > 22.5 1 - e - ( x - 9 10.8 ) 2 9 &le; x < 18 e - ( x - 19.5 1.8 ) 2 18 &le; x < 21 1 - e - ( x - 22.5 1.8 ) 2 21 &le; x < 22.5
u C ( x ) = 0 x < 19.5 , x > 34 1 - e - ( x - 19.5 1.8 ) 2 19.5 &le; x < 21 e - ( x - 22.5 1.8 ) 2 21 &le; x < 24 1 - e - ( x - 34 12 ) 2 24 &le; x < 34
u D ( x ) = 0 x < 22.5 1 - e - ( x - 22.5 1.8 ) 2 22.5 &le; x < 24 e - ( x - 34 12 ) 2 24 &le; x < 34 1 x &GreaterEqual; 34
依此类推,
渗漏水PH值E3
u A ( x ) = 1 x < 0.5 e - ( x - 0.5 0.6 ) 2 0.5 &le; x < 1 1 - e - ( x - 1.5 0.6 ) 2 1 &le; x < 1.5
u B ( x ) = 0 x < 0.5 , x > 2.5 1 - e - ( x - 0.5 0.6 ) 2 0.5 &le; x < 1 e - ( x - 1.5 0.6 ) 2 1 &le; x < 2 1 - e - ( x - 2.5 0.6 ) 2 2 &le; x < 2.5
u C ( x ) = 0 x < 1.5 , x > 4 1 - e - ( x - 1.5 0.6 ) 2 1.5 &le; x < 2 e - ( x - 2.5 0.6 ) 2 2 &le; x < 3 1 - e - ( x - 4 1.2 ) 2 3 &le; x < 4
u D ( x ) = 0 x < 2.5 1 - e - ( x - 2.5 0.6 ) 2 2.5 &le; x < 3 e - ( x - 4 1.2 ) 2 3 &le; x < 4 1 x &GreaterEqual; 4
通过对比,选用加权平均型模糊算子对实施例进行分析;
表4四种模糊算子的比较
(8)利用隶属函数进行单因素模糊评价,构建评判指标的模糊关系矩阵。
环境作用
结合隶属函数可以得到相应的隶属度分别为rA011=0,rA012=0.074,rA013=0.926,rA014=0,于是,
RA1=(0,0.074,0.926,0)
渗漏水PH
结合隶属函数可以得到相应的隶属度分别为rE031=1,rE032=0,rE033=0,rE034=0,于是,
RE3=(1,0,0,0)
(9)结合模糊综合评价法对建立的沉管隧道健康评估模型进行分级综合评价。
1)一级模糊综合评价
环境作用的一级模糊综合评价结果为
R A = &omega; A &times; R A 1 R A 2 = 0.575 0.425 &times; 0 0.074 0.926 0 0 1 0 0 = ( 0 , 0.4675 , 0.5324 , 0 )
结构应力的一级模糊综合评价结果为
R B = &omega; B &times; R A 1 R A 2 R A 3 R A 4 = 0.193 0.193 0.307 0.307 &times; 0 0.926 0.074 0 0 0.057 0.943 0 0.95 0.05 0 0 0.92 0.08 0 0 = ( 0.574 , 0.23 , 0.196 , 0 )
结构变形的一级模糊综合评价结果为
R C = &omega; C &times; R C 1 R C 2 R C 3 = 0.298 0.404 0.298 &times; 0 0.78 0.22 0 0.3425 0.5325 0.125 0 0.3 0.7 0 0 = ( 0.574 , 0.23 , 0.196 , 0 )
结构裂缝的一级模糊综合评价结果为
R D = &omega; D &times; R D 1 R D 2 = 0.5 0.5 &times; 1 0 0 0 1 0 0 0 = ( 1 , 0 , 0 , 0 )
渗漏水的一级模糊综合评价结果为
R E = &omega; E &times; R E 1 R E 2 R E 3 = 0.438 0.323 0.239 &times; 1 0 0 0 1 0 0 0 1 0 0 0 = ( 1 , 0 , 0 , 0 )
2)二级模糊综合评价
该区间沉管隧道结构安全状态的综合评估结果向量为
Z = &omega; Z &times; R A R B R C R D R E = 0.175 0.2375 0.2375 0.175 0.175 &times; 0 0.4675 0.5324 0 0.574 0.23 0.196 0 0.228 0.656 0.116 0 1 0 0 0 1 0 0 0 = ( 0.5405 , 0.2922 , 0.1673 , 0 )
则该沉管隧道监测区间的结构安全度为
F=0.5405×3.75+0.2922×3+0.1673×2+0×1.25
=3.24
综合评价结果表明,该区间结构运营安全状态等级为B级,需要加强监测,随时准备采取对策。
本发明的评价方法综合了沉管隧道所受环境因素影响以及隧道结构受力、变形等多项指标,采用改进的层次分析法、模糊综合评价的方法相集成,实现了对沉管隧道运营安全状态的定量评估。
以上所述仅是本发明的优选实施方式,应当指出:对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。

Claims (7)

1.一种沉管隧道运营阶段健康状态的评估方法,其特征在于,包括以下步骤:
步骤一:确定影响沉管隧道运营期安全的因素以及每个因素各自包含的评价指标;
步骤二:利用层次分析法对步骤一中确定的因素和评价指标进行归纳分析,构建沉管隧道健康状态评估模型,所述沉管隧道健康状态评估模型具有目标层、因素层以及指标层,所述目标层是对沉管隧道总体健康状态的评估目标,所述因素层是步骤一中所确定的所有因素,所述指标层包含步骤一中所确定的每个因素各自包含的评价指标;
步骤三:确定所述沉管隧道健康状态评估模型中因素层中各因素的相对权重、以及每个因素各自包含的指标层中的评价指标在该因素中的相对权重,构建权重矩阵;
步骤四:建立沉管隧道健康状态评价等级及各评判因素单因素评价标准;
步骤五:根据各评判因素单因素评价标准,确定评判过程中指标层各评价指标的隶属函数和模糊算子;
步骤六:利用各评价指标的隶属函数进行各因素的模糊评价,构建各评价指标的模糊关系矩阵;
步骤七:以各因素的评价指标的模糊关系矩阵和相对权重作为因素层健康评估的输入值,计算得到因素层各因素的健康评估数值;以因素层各因素的健康评估数值和相对权重作为沉管隧道总体健康评估的输入值,计算得到沉管隧道综合健康评估数值;根据沉管隧道综合健康评估数值对照预设的沉管隧道健康状态评价等级得到隧道综合健康等级。
2.根据权利要求1所述的一种沉管隧道运营阶段健康状态的评估方法,其特征在于,步骤一所确定的影响沉管隧道运营期安全的因素包括环境作用、结构应力、结构变形、结构裂缝、渗漏水五个因素;其中环境作用因素包含水位、覆盖层厚度两项评价指标,结构应力因素包含钢筋应力、混凝土应力、剪切键应力、锚索应力四项评价指标,结构变形因素包括隧道不均匀沉降、管段接头张开和变位、管段倾斜三项评价指标,结构裂缝因素包含裂缝长度,裂缝宽度两项评价指标,渗漏水因素包含渗漏速率,渗漏面积,渗漏水PH值三项评价指标。
3.根据权利要求1所述的一种沉管隧道运营阶段健康状态的评估方法,其特征在于,步骤三确定权重的方法为改进的乘积标度法,该法在评价指标层中评价指标的重要性时,设置“相同”与“稍微大”两个评价等级,以此作为基础进行递进分析确定因素层中各因素的相对权重、以及每个因素各自包含的指标层中的评价指标在该因素中的相对权重。
4.根据权利要求1所述的一种沉管隧道运营阶段健康状态的评估方法,其特征在于,步骤四中建立的评价等级分为m级,m为正整数,确定健康评价标准集V={v1,v2,…vm},分别对应1,2…m级健康状态,其中v1对应(v1上,v1下)评价值区间,v2对应(v2上,v2下)评价值区间,依此类推,vm对应(vm上,vm下)评价值区间。
5.根据权利要求1所述的一种沉管隧道运营阶段健康状态的评估方法,其特征在于,步骤五中确定隶属函数的方法为模糊统计法或三分法或五点法或模糊分布法。
6.根据权利要求1所述的一种沉管隧道运营阶段健康状态的评估方法,其特征在于,步骤五中确定的模糊算子为主因素决定型或主因素突出型或不均衡平均型或加权平均型。
7.根据权利要求1-6任一项所述的一种沉管隧道运营阶段健康状态的评估方法,其特征在于,步骤三中因素层中各因素的相对权重值的总和为1,每个因素各自包含的指标层中的评价指标在该因素中的相对权重的总和也为1。
CN201610208064.XA 2016-04-06 2016-04-06 一种沉管隧道运营阶段健康状态的评估方法 Pending CN105844423A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610208064.XA CN105844423A (zh) 2016-04-06 2016-04-06 一种沉管隧道运营阶段健康状态的评估方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610208064.XA CN105844423A (zh) 2016-04-06 2016-04-06 一种沉管隧道运营阶段健康状态的评估方法

Publications (1)

Publication Number Publication Date
CN105844423A true CN105844423A (zh) 2016-08-10

Family

ID=56597641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610208064.XA Pending CN105844423A (zh) 2016-04-06 2016-04-06 一种沉管隧道运营阶段健康状态的评估方法

Country Status (1)

Country Link
CN (1) CN105844423A (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106599363A (zh) * 2016-11-09 2017-04-26 广西大学 一种基于层次分析法评估海港混凝土构件健康指标的方法
CN106910002A (zh) * 2017-01-12 2017-06-30 同济大学 地铁隧道结构安全评估的方法
CN106919784A (zh) * 2017-01-19 2017-07-04 上海隧道工程有限公司 一种基于变权重的盾构隧道服役性能评价方法
CN107503336A (zh) * 2017-08-21 2017-12-22 中国铁路设计集团有限公司 一种富水软土地区地下结构服役期变形评价方法
CN107515025A (zh) * 2017-07-17 2017-12-26 西安理工大学 古城墙病害等级评估方法
CN108385727A (zh) * 2018-02-05 2018-08-10 山东大学 沉管法修建海底隧道合理埋深计算方法
CN109299886A (zh) * 2018-10-23 2019-02-01 上海同岩土木工程科技股份有限公司 基于集成数据库的地铁隧道结构安全状态数值分析方法
CN111815121A (zh) * 2020-06-17 2020-10-23 中建三局绿色产业投资有限公司 一种基于swmm模型的排水深隧系统运行管理评价方法
CN114353866A (zh) * 2021-12-21 2022-04-15 济南轨道交通集团有限公司 一种用于管廊结构健康状态的多元综合定量检测方法
CN117217562A (zh) * 2023-11-09 2023-12-12 交通运输部公路科学研究所 一种隧道涌水淹没-抽排水后的结构安全评价方法及系统

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW201346793A (zh) * 2012-05-11 2013-11-16 chun-zhi Zhang 產業供應鏈管理層次之分類方法
CN103472788A (zh) * 2013-09-06 2013-12-25 上海大学 基于bim的运营隧道维护健康监测管理方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW201346793A (zh) * 2012-05-11 2013-11-16 chun-zhi Zhang 產業供應鏈管理層次之分類方法
CN103472788A (zh) * 2013-09-06 2013-12-25 上海大学 基于bim的运营隧道维护健康监测管理方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
朱宝林等: "运营盾构隧道中评估指标权重的确定", 《运曹安全与节能环保的艘道及地下空间里交通基础设施建设第四届学术研讨会 论文集》 *
章勇等: "高水差条件下内河沉管隧道健康监测系统研究", 《人民长江》 *
罗鑫: "公路隧道健康状态诊断方法及系统的研究", 《中国博士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106599363A (zh) * 2016-11-09 2017-04-26 广西大学 一种基于层次分析法评估海港混凝土构件健康指标的方法
CN106910002A (zh) * 2017-01-12 2017-06-30 同济大学 地铁隧道结构安全评估的方法
CN106910002B (zh) * 2017-01-12 2021-01-26 同济大学 地铁隧道结构安全评估的方法
CN106919784A (zh) * 2017-01-19 2017-07-04 上海隧道工程有限公司 一种基于变权重的盾构隧道服役性能评价方法
CN107515025B (zh) * 2017-07-17 2020-01-14 西安理工大学 古城墙病害等级评估方法
CN107515025A (zh) * 2017-07-17 2017-12-26 西安理工大学 古城墙病害等级评估方法
CN107503336A (zh) * 2017-08-21 2017-12-22 中国铁路设计集团有限公司 一种富水软土地区地下结构服役期变形评价方法
CN108385727B (zh) * 2018-02-05 2020-02-14 山东大学 沉管法修建海底隧道合理埋深计算方法
CN108385727A (zh) * 2018-02-05 2018-08-10 山东大学 沉管法修建海底隧道合理埋深计算方法
CN109299886A (zh) * 2018-10-23 2019-02-01 上海同岩土木工程科技股份有限公司 基于集成数据库的地铁隧道结构安全状态数值分析方法
CN111815121A (zh) * 2020-06-17 2020-10-23 中建三局绿色产业投资有限公司 一种基于swmm模型的排水深隧系统运行管理评价方法
CN111815121B (zh) * 2020-06-17 2023-02-28 中建三局绿色产业投资有限公司 一种基于swmm模型的排水深隧系统运行管理评价方法
CN114353866A (zh) * 2021-12-21 2022-04-15 济南轨道交通集团有限公司 一种用于管廊结构健康状态的多元综合定量检测方法
CN114353866B (zh) * 2021-12-21 2023-11-03 济南轨道交通集团有限公司 一种用于管廊结构健康状态的多元综合定量检测方法
CN117217562A (zh) * 2023-11-09 2023-12-12 交通运输部公路科学研究所 一种隧道涌水淹没-抽排水后的结构安全评价方法及系统
CN117217562B (zh) * 2023-11-09 2024-01-23 交通运输部公路科学研究所 一种隧道涌水淹没-抽排水后的结构安全评价方法及系统

Similar Documents

Publication Publication Date Title
CN105844423A (zh) 一种沉管隧道运营阶段健康状态的评估方法
CN103426137B (zh) 一种排水管道缺陷定量化综合评估方法
CN103093400B (zh) 一种隧道施工中邻近建筑物安全性定量评价方法
CN109931109B (zh) 一种基于多元数据的隧道施工动态塌方安全综合预警方法
CN106021898A (zh) 一种地下水污染源强分级评价方法
CN106910002A (zh) 地铁隧道结构安全评估的方法
CN107145997A (zh) 一种高速铁路隧道结构状态评价方法
CN107687924A (zh) 一种桥梁的安全预警方法及系统
Lin et al. Risk assessment of tunnel construction based on improved cloud model
CN103177187A (zh) 基于可变模糊集理论的公路隧道健康状态动态评价方法
CN106296475A (zh) 隧道及地下工程突涌水灾害多类型证据合成评估方法
CN105654398A (zh) 基于百分制与多级指标体系的边坡施工评估方法
Yang et al. Risk assessment model of tunnel water inrush based on improved attribute mathematical theory
CN102590085B (zh) 一种拱坝施工期横缝性态辨识方法
CN114329748B (zh) 一种管廊复合式衬砌结构安全评价方法
CN109034619A (zh) 一种基于模糊综合层次分析的弃渣场安全评价方法
CN108829936A (zh) 基于t-s模糊神经网络的既有重力式挡土墙技术状态评估方法
CN107091085B (zh) 一种浅埋暗挖隧道地层稳定性的多参数判别方法
CN105719065B (zh) 一种复杂油藏储量品质分类综合评价方法
CN106777994A (zh) 一种隧道衬砌外水压力评价方法
Dai et al. Fuzzy comprehensive evaluation model for construction risk analysis in urban subway
White et al. Evaluation of load rating procedure for metal culverts under shallow soil covers
CN109299886A (zh) 基于集成数据库的地铁隧道结构安全状态数值分析方法
SHIRMOHAMMADI et al. APPLICATION OF FUZZY LOGIC FOR EVALUATION OF RESILIENT MODULUS PERFORMANCE OF STONE MASTIC ASPHALT.
CN111369051B (zh) 沥青路面车辙和坑槽病害的预测方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160810

RJ01 Rejection of invention patent application after publication