CN105839851B - 采用分段连接形成的预制框架柱的施工方法 - Google Patents
采用分段连接形成的预制框架柱的施工方法 Download PDFInfo
- Publication number
- CN105839851B CN105839851B CN201610226431.9A CN201610226431A CN105839851B CN 105839851 B CN105839851 B CN 105839851B CN 201610226431 A CN201610226431 A CN 201610226431A CN 105839851 B CN105839851 B CN 105839851B
- Authority
- CN
- China
- Prior art keywords
- prefabricated frame
- frame trestle
- trestle
- section
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
- E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
- E04C5/165—Coaxial connection by means of sleeves
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
采用分段连接形成的预制框架柱的施工方法,涉及建筑工程技术领域,进行预制框架柱钢筋绑扎,并将相对的相邻段预制框架柱的纵向钢筋的端部分别采用直螺纹套筒连接后,再分别对各段预制框架柱进行混凝土浇筑,待各段预制框架柱定型后,做好框架柱连接的顺序及上下端标记,拆除各直螺纹套筒,再到现场按标记的顺序及上下端,采用直螺纹套筒将相邻的预制框架柱纵向钢筋进行连接,然后进行相邻的两段预制框架柱之间的混凝土补浇。此法降低了柱子连接成本,节点连接质量可靠,等同于现浇混凝土结构节点,抗震性能好。
Description
技术领域
本发明涉及建筑工程技术领域,特别以多段预制框架柱连接形成的支撑柱的施工技术。
背景技术
国家规程采用的预制构件受力钢筋的连接方式,采用了在美国和日本等地震多发国家得到普遍应用的钢筋套筒灌浆连接技术。钢筋套筒灌浆连接的原理是透过铸造的中空型套筒,钢筋从两端开口穿入套筒内部,不需要搭接或融接,钢筋与套筒间填充高强度微膨胀结构性砂浆,即完成钢筋续接动作。其连接的机理主要是砂浆受到套筒的围束作用,加上本身具有微膨胀特性,来增强与钢筋、套筒内侧间的正向作用力,钢筋即由该正向力与粗糙表面产生之摩擦力,来传递钢筋应力。
制作套筒的材料使用碳素结构钢或合金结构钢材料,并用机械加工办法制作而成,与之匹配的灌浆料要具有高强、早强、无收缩和微膨胀的特性,所以灌浆套筒连接接头造价较高。
发明内容
本发明目的是提出一种能降低工程造价的采用分段连接形成的预制框架柱的施工方法。
本发明技术方案是:分别进行预制框架柱钢筋绑扎,并将相对的相邻段预制框架柱的纵向钢筋的端部分别采用直螺纹套筒连接后,再分别对各段预制框架柱进行混凝土浇筑,待各段预制框架柱定型后,做好框架柱连接的顺序及上下端标记,拆除各直螺纹套筒,再到现场按标记的顺序及上下端,采用直螺纹套筒将相邻的预制框架柱纵向钢筋进行连接,然后进行相邻的两段预制框架柱之间的混凝土补浇。
本发明将直螺纹套筒连接用于预制框架柱的连接,通过钢筋与直螺纹套筒的机械咬合作用,将一根钢筋的作用力传递给另一根钢筋。
因预制柱安装时稍有偏差直螺纹套筒无法对位施拧,所以为保证施工精度,制作时采用长线法,将几段柱子浇筑前先用直螺纹套筒连接到位,混凝土拆模时再退出,到施工现场安装时可准确就位,直螺纹套筒施拧到位后,此部位采用后浇混凝土。此技术取代套筒灌浆连接方式,大大降低了柱子连接成本,节点连接质量可靠,等同于现浇混凝土结构节点,抗震性能好,并且更为经济合理,得于降低工程造价成本。
进一步地,为了提高纵向钢筋的使用效率,提高各段预制框架柱的连接牢度和作用力的传递精准度,本发明各段预制框架柱的纵向钢筋数量相同,且以固定端预制框架柱的纵向钢筋为基准,采用同一直螺纹套筒连接的相邻的两段预制框架柱的纵向钢筋布置在同一轴线上。
同时,为了有利于在楼板上进行各段连接补浇混凝土时实现排气,提高混凝土浇筑密实,提高相邻的预制框架柱连接牢度,本发明在对各段预制框架柱进行混凝土浇筑时,布置在固定端预制框架柱的一侧的各预制框架柱用于连接前一段预制框架柱的混凝土端面呈凸出的锥形。
所述锥形的端部至底部的距离为20mm。上柱端部设置成锥形,将后浇注混凝土和预制柱子更有效的连接,且有利于混凝土浇注密实,克服了混凝土浇注后水平端因混凝土硬化收缩而造成混凝土不密实的缺陷。
具体实施方式
施工步骤:
1、长线法制作各预制框架柱,制作按每层制作柱构件,分段安装钢筋,从固定端向另一端绑扎,通过固定端板限制钢筋的位置,使纵向受力钢筋按设计的图纸要求准确对位,可一次性浇筑多层同一轴线的柱子。
2、相邻预制框架柱的端部钢筋采用直螺纹套筒连接,用于连接的钢筋端部设计有与直螺纹套筒配合的螺纹。用专用的扳手旋转连接直螺纹套筒,被连接在同一段直螺纹套筒两端的两根钢筋旋转至不能再转动为止,使两根被连接钢筋的钢筋端头在连接套筒中间对顶锁紧。
3、在有墙的位置支设木模,对各段预制框架柱进行混凝土浇筑。
上下段预制框架柱连接处,预制框架柱制作时位于上方的预制框架柱的下端的混凝土端面呈凸出20mm的锥形,有利于混凝土浇筑时排气,使混凝土浇筑密实。各段预制框架柱在模板上口高出浇筑面50mm。采用混凝土从此处浇筑,利用高度压力差使混凝土浇筑顶面密实。
5、待各段预制框架柱定型后,拆除各模板,再做好框架柱连接的顺序及上下端标记,分别退出各直螺纹套筒,取得各段预制框架柱。
6、施工现场安装时,注意按制作时每个面的标识一致进行安装,先安装最下段的固定段预制框架柱,再依标记的顺序依次安装各上段段预制框架柱。
下段预制框架柱、框架梁和叠合楼板,标高、轴线、垂直度经校准合格后,安装上段预制框架柱。上段预制框架柱标高和轴线初步就位后,在框架梁上设置临时支撑进行固定和微调,校准到位后,用专用的扳手旋转连接套筒,使两根被连接钢筋的钢筋丝头在连接套筒中间对顶锁紧。然后在相邻的两段预制框架柱之间的楼板上向下补浇混凝土。
7、梁柱核心区箍筋设置:梁柱核心区箍筋应按设计及规范要求加密布置。上柱吊装前应将加密区的箍筋先套入下柱,安装梁时,将箍筋上提,放置在梁腰筋上,防止梁就位后,箍筋无法放置。
Claims (1)
1.采用分段连接形成的预制框架柱的施工方法,其特征在于:分别进行预制框架柱钢筋绑扎,并将相对的相邻段预制框架柱的纵向钢筋的端部分别采用直螺纹套筒连接后,再分别对各段预制框架柱进行混凝土浇筑,待各段预制框架柱定型后,做好框架柱连接的顺序及上下端标记,拆除各直螺纹套筒,再到现场按标记的顺序及上下端,采用直螺纹套筒将相邻的预制框架柱纵向钢筋进行连接,然后进行相邻的两段预制框架柱之间的混凝土补浇;
各段预制框架柱的纵向钢筋数量相同,且以固定端预制框架柱的纵向钢筋为基准,采用同一直螺纹套筒连接的相邻的两段预制框架柱的纵向钢筋布置在同一轴线上;
对各段预制框架柱进行混凝土浇筑时,布置在固定端预制框架柱的一侧的各预制框架柱用于连接前一段预制框架柱的混凝土端面呈凸出的锥形;
上下段预制框架柱连接处,预制框架柱制作时位于上方的预制框架柱的下端的混凝土端面呈凸出20mm的锥形,有利于混凝土浇筑时排气,使混凝土浇筑密实;各段预制框架柱在模板上口高出浇筑面50mm,采用混凝土从此处浇筑,利用高度压力差使混凝土浇筑顶面密实。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610226431.9A CN105839851B (zh) | 2016-04-13 | 2016-04-13 | 采用分段连接形成的预制框架柱的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610226431.9A CN105839851B (zh) | 2016-04-13 | 2016-04-13 | 采用分段连接形成的预制框架柱的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105839851A CN105839851A (zh) | 2016-08-10 |
CN105839851B true CN105839851B (zh) | 2018-08-17 |
Family
ID=56597602
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610226431.9A Active CN105839851B (zh) | 2016-04-13 | 2016-04-13 | 采用分段连接形成的预制框架柱的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105839851B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106869405B (zh) * | 2017-03-29 | 2023-05-16 | 汉嘉设计集团股份有限公司 | 预制混凝土柱、混凝土组合柱及其制造方法 |
CN109707107A (zh) * | 2019-01-08 | 2019-05-03 | 杨秀敏 | 一种混凝土预制水平构件连接方法 |
CN114753634A (zh) * | 2022-03-24 | 2022-07-15 | 中国二十冶集团有限公司 | 一种混凝土结构半装配式施工方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201236416Y (zh) * | 2008-07-18 | 2009-05-13 | 徐尉 | 居民住房用预制件及预制件房屋 |
CN101886386B (zh) * | 2010-07-10 | 2011-07-20 | 中铁六局集团有限公司 | 一种钢筋混凝土钻孔灌注桩钢筋笼对接施工方法 |
CN201746981U (zh) * | 2010-07-28 | 2011-02-16 | 中国京冶工程技术有限公司 | 预制钢筋混凝土构件之间的钢筋连接结构 |
CN102383530A (zh) * | 2011-09-08 | 2012-03-21 | 张吉华 | 装配式建筑用预制钢筋砼结构柱 |
CN103437344A (zh) * | 2013-08-28 | 2013-12-11 | 中交二公局第一工程有限公司 | 桩基钢筋笼结构及其施工工艺 |
CN104831812B (zh) * | 2014-11-27 | 2018-07-13 | 高阳 | 全装配式预制混凝土框架结构及其安装方法 |
CN205000554U (zh) * | 2015-09-25 | 2016-01-27 | 赵洪波 | 一种用于装配整体结构的混凝土柱 |
-
2016
- 2016-04-13 CN CN201610226431.9A patent/CN105839851B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105839851A (zh) | 2016-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106223360B (zh) | 采用桩撑支护体系的明挖装配整体式结构地铁站施工方法 | |
CN105386778B (zh) | 隧道暗挖衬砌施工台车及隧道暗挖衬砌施工方法 | |
CN106869321A (zh) | 一种加强的预制再生混凝土梁柱节点及其施工方法 | |
CN107587506A (zh) | 一种预制预应力锚杆杆件及施工工法 | |
CN106088326B (zh) | 基于3d打印的装配式框架柱结构 | |
KR100770574B1 (ko) | 프리스트레스된 철골철근 콘크리트 합성형 라멘교 및 그시공방법 | |
CN108487453B (zh) | 一种钢管混凝土柱与钢筋混凝土梁连接结构及其连接方法 | |
CN108385512A (zh) | 一种基于螺栓连接的模块化装配式空心高墩拼接构造及其作法 | |
CN105133487B (zh) | 使用复合式桥梁临时支座快速架设连续梁的施工方法 | |
CN105839851B (zh) | 采用分段连接形成的预制框架柱的施工方法 | |
CN106400982A (zh) | 一种箍筋加密的装配式钢筋混凝土柱与柱拼接节点 | |
CN104294920B (zh) | 一种u形钢混凝土组合梁与异形钢管混凝土柱的节点组件及制备方法 | |
CN209260897U (zh) | 装配式混凝土梁柱套筒组合连接节点 | |
CN106113230B (zh) | 用于梯段预制的非定型、可周转模板体系及其施工方法 | |
CN201924289U (zh) | 一种高墩大跨度连续刚构桥0号块托架结构 | |
CN108625477A (zh) | 一种装配式梁柱节点及其施工方法 | |
CN108547311A (zh) | 一种预制装配式型钢混凝土柱下独立基础 | |
CN106088640A (zh) | 对既有框架结构进行抽柱改造的方法 | |
CN209585431U (zh) | 框架柱模壳及免模板钢筋混凝土柱 | |
CN202945741U (zh) | 一种钢管免振混凝土柱 | |
CN108060789A (zh) | 一种既有砌体结构隔震加固的墙体托换方法 | |
CN214301846U (zh) | 一种上下分块的明挖隧道预制衬砌预应力连接结构 | |
CN106193455A (zh) | 一种超高性能混凝土圆柱永久模板及其制备方法 | |
CN108729466B (zh) | 一种构筑无锚钉砼挡墙的大模板支撑方法 | |
CN207920139U (zh) | 一种具有加固结构的钢筋混凝土轴心受压柱 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |