Prior art keywords
steel
plate
cavity
node
coupled column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610342419.4A
Other languages
Chinese (zh)
Other versions
CN105839793A (en
Inventor
郝际平
刘斌
杨哲明
薛强
孙晓岭
樊春雷
黄育琪
陈永昌
王磊
何梦楠
尹伟康
刘瀚超
张峻铭
赵子健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201610342419.4A priority Critical patent/CN105839793B/en
Publication of CN105839793A publication Critical patent/CN105839793A/en
Application granted granted Critical
Publication of CN105839793B publication Critical patent/CN105839793B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/185Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

Multi-cavity steel tube concrete coupled column and girder steel rigid connection node and assembly method, steel plate including multi-cavity steel tube concrete coupled column two sides are arranged in, girder steel top flange is provided with upper cover plate, lower flange is provided with lower pallet, two angle cleats are provided at the web of girder steel, upper cover plate, lower pallet are connect with steel plate.Physical isolation between beam, column changes the Path of Force Transfer of conventional node, eliminate triaxial stress concentration, plastic hinge can not only be made by moving on on beam outside node, and eliminate the defect of the dependence of the edge of a wing tear failure of conventional node column and joint rotation ability to column web weakness plate area.Meet the design and principle of " strong column and weak beam, the strong weak component of node ".Node can be divided into 2 parts and be prefabricated in the factory respectively completions simultaneously, and in-site installation only need to be assembled simply, the simple assembling degree height of joint structure.

Description

Multi-cavity steel tube concrete coupled column and girder steel rigid connection node and assembly method
Technical field
The present invention relates to a kind of multi-cavity steel tube concrete composite column structure systems of construction engineering technical field, and in particular to A kind of multi-cavity steel tube concrete coupled column and girder steel rigid connection node and assembly method.
Background technique
Multi-cavity steel tube concrete coupled column combined structure system is as a kind of novel concrete filled steel tube composite column structure body System solves the problems, such as suspension column evagination in dwelling house system, while this new structural systen has given full play to steel pipe and concrete two The strong point of kind of material has many advantages, such as bearing capacity height, plasticity and good toughness, easy for construction.
What China " rectangular steel tube with concrete infilled technical regulation " (GECS159:2004) was provided at present is used for steel tube concrete Local soil type's zygostyle steel beam joint is mainly by the node for the forms such as internal partition formula, outer ring be board-like.But up to the present, steel in the prior art Pipe concrete coupled column is connect with steel beam joint to be had the disadvantage that
(1) when the edge of a wing of the internal partition in connection with inner diaphragm and beam is in same level, node meets rigid joint Requirement, but this node could be used when tubing string side is longer.Because the not only welding difficulty when side length is smaller, but also will harm Pipe inner concrete is hindered to pour, in addition in post jamb same place two sides melt-through weld, steel generate larger welding for flange of beam and internal partition Residual stress, so that the steel at node are easy to produce layering or brittle break.
(2) architectural appearance and use are influenced.Such as outer ring plate node, the node construction is simple, power transmission is clear, not by steel pipe The limitation of side length, but the intensity of sufficiently large horizontal ring flat-plate guarantee node is needed, steel using amount is bigger than inner diaphragm joint.And it is applied to When edge-corner column, horizontal ring flat-plate not only interferes the installation of wallboard, but also causes the prominent elevation of building of reinforcing ring, so that indoor exterior node There is salient angle at place, influences perception, needs to solve by decoration or furred ceiling.
(3) node mechanical property and the simplification of construction, economy cannot be satisfactory to both parties.In practical applications, some node classes Type mechanical property is preferable, the overall stiffness of node, but material utilization amount is big, and construction is complicated.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of multi-cavity steel tube concrete coupled columns and girder steel to be rigidly connected Node and assembly method, by using beam-ends and post jamb fate from full-height side plate, meet " strong column and weak beam, the strong weak structure of node The design principle of part ", while the penetration weld of conventional node is avoided when the node in-site installation, it is all made of the fillet welding of single direction Seam connection, weldquality is high, and joint structure is simple, and power transmission is clear, and assembly degree is high.
To achieve the above object, the invention is realized by the following technical scheme.
Multi-cavity steel tube concrete coupled column and girder steel rigid connection node, including be arranged in multi-cavity steel tube concrete coupled column The steel plate of two sides, girder steel top flange are provided with upper cover plate, and lower flange is provided with lower pallet, and two companies are provided at the web of girder steel Angle steel is connect, upper cover plate, lower pallet are connect with steel plate.
The multi-cavity steel tube concrete coupled column includes the sleeper positioned at both ends, is provided between two sleeper parallel Web passes through partition between web and connects.
The steel plate is welded on multi-cavity steel tube concrete coupled column by weld seam.
The upper cover plate is connect by fillet weld with steel plate.
The lower pallet is connect by fillet weld with steel plate.
Locating holes are offered on each steel plate, offer hole on angle cleat, by bolt by steel plate and joint angle Steel is fixed.
Angle cleat is connect by weld seam with steel plate.
The girder steel is steel I-beam.
The girder steel end is provided with ribbed stiffener.
A kind of assembly method of multi-cavity steel tube concrete coupled column and girder steel rigid connection node, first passes through weld seam for steel plate Multi-cavity steel tube concrete coupled column two sides are fixed on, obtain prefabricated multi-cavity steel tube concrete coupled column, then upper cover plate is welded It is connected on the steel I-beam top flange with ribbed stiffener, lower pallet is arranged on steel I-beam lower flange, by two angle cleats It is arranged at steel I-beam web, obtains prefabricated girder steel;Then by prefabricated multi-cavity steel tube concrete coupled column and steel Beam is transported to scene, by concreting in multi-cavity steel tube concrete coupled column, then prefabricated girder steel is hung from bottom to top It is attached to node region, so that lower pallet is contacted with steel plate, and is bolted to connection angle steel and steel plate, then using fillet weld point Steel plate is not connect with upper cover plate, steel plate is connect with lower pallet, and angle cleat is connect with steel plate by fillet weld, completes dress Match.
Compared with prior art, the beneficial effects of the present invention are embodied in:
(1) multi-cavity steel tube concrete column and girder steel dual-sided board rigid connection node connection type and mode of transfer force are unique, The use with full-height side plate is separated with post jamb due to beam-ends.Physical isolation between beam, column changes the power transmission of conventional node Path eliminates triaxial stress concentration, plastic hinge can not only be made by moving on on beam outside node, and eliminate conventional node column The defect of edge of a wing tear failure and joint rotation ability to the dependence in column web weakness plate area." strong column and weak beam, strong node are weak for satisfaction The design and principle of component ".
(2) due to the use of full-height dual-sided board (i.e. steel plate), multi-cavity steel tube concrete combines shaft and keeps integrality, makes Steel pipe inner concrete pours more convenient, be easily guaranteed that the pouring quality of nodes domains concrete.
(3) since side plate and concrete filled steel tube coupled column only pass through solder design in outer post jamb, do not have inside concrete filled steel tube There is weld seam, compared with conventional node, the joint structure is simple, reasonable stress.
(4) since girder steel only passes through upper cover plate, lower pallet and angle cleat for moment of flexure Shear transfer to dual-sided board, so that Girder steel can be separated with styletable, reduce the clear span of girder steel, can be reduced steel depth of beam to a certain extent, be met residential customer Demand to residential function.
(5) node assembling degree of the invention is high, steel pipe column, steel plate, girder steel, upper cover plate, lower pallet and angle cleat Can be prefabricated in the factory completion, reduce the welding workload of installation, and in-site installation need to only position assembly.Joint form is simple, dress It is high with degree is changed, it is quick and easy for installation.Due to being avoided when in-site installation using traditional penetration weld, traditional penetration weld is easy to make steel Material generates larger welding residual stress, so that the steel at node are easy to produce layering or brittle break.Node scene of the present invention It is all connected using unilateral fillet weld when installation, weldquality is easily guaranteed that, node connection is reliable.
Detailed description of the invention
Fig. 1 is cross-sectional view of the invention;
Fig. 2 is two-dimensional structure schematic diagram of the invention;
Fig. 3 is side view of the invention;
Fig. 4 is dual-sided board joint structure figure of the invention;
Fig. 5 is the schematic diagram of prefabricated multi-cavity steel tube concrete coupled column;
Fig. 6 is the schematic diagram of prefabricated girder steel.
Fig. 7 is assembling schematic diagram of the invention.
Fig. 8 is that schematic diagram is surrendered in lower flange on beam.
Fig. 9 is that beam-ends plastic hinge schematic diagram occurs.
Figure 10 is that cover board destroys schematic diagram.
Figure 11 is final destruction schematic diagram.
Figure 12 is hysteresis loop figure.
In figure, 1 is multi-cavity steel tube concrete coupled column, and 2 be girder steel, and 3 be steel plate, and 4 be upper cover plate, and 5 be lower pallet, and 6 are Angle cleat, 7 be bolt.
Specific embodiment
Elaborate with reference to the accompanying drawing to the embodiment of the present invention: the present embodiment is premised on technical solution of the present invention Under implemented, the detailed implementation method and specific operation process are given, but protection scope of the present invention be not limited to it is following Embodiment.
Referring to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, the present invention includes the steel plate 3 that multi-cavity steel tube concrete coupled column two sides are arranged in, I.e. 2 steel plate settings are in multi-cavity steel tube concrete coupled column two sides, and steel plate 3 is arranged by weld seam in multi-cavity steel tube concrete On coupled column.
Girder steel top flange is provided with upper cover plate 4, and lower flange is provided with lower pallet 5, and two companies are provided at the web of girder steel Connect angle steel 6, upper cover plate 4, lower pallet 5 are connect by fillet weld with steel plate 3, i.e., on girder steel lower flange respectively with upper cover plate and under Supporting plate welding, the overhanging end of the steel plate 3 of multi-cavity steel tube concrete coupled column two sides, angle cleat are connected to by upper and lower supporting plate Steel beam web plate is connect with steel plate 3, girder steel beam-ends is separated with styletable.
Multi-cavity steel tube concrete coupled column includes the sleeper positioned at both ends in the present invention, is provided between two sleeper equal Capable web is connected by partition between web, and concreting is wherein.
Locating holes are offered on each steel plate 3, offer hole on angle cleat 6, are passed through on steel plate by bolt 7 Hole in locating holes and angle cleat, steel plate and angle cleat are fixed.
The girder steel is steel I-beam, and the end of girder steel is provided with ribbed stiffener.
The assembly method of above-mentioned multi-cavity steel tube concrete coupled column and girder steel rigid connection node, referring to Fig. 5, in advance in steel Plate is fixed on multi-cavity steel tube concrete coupled column two sides by weld seam according to Design Orientation aperture, then by steel plate 3, obtains prefabricated Multi-cavity steel tube concrete coupled column hole is first opened up on angle cleat 6, then upper cover plate 4 is welded in and is had referring to Fig. 6 On the steel I-beam top flange of ribbed stiffener, lower pallet 5 is arranged on steel I-beam lower flange, and two settings of angle cleat 6 are existed At steel I-beam web, prefabricated girder steel is obtained;Referring to Fig. 7, then by prefabricated multi-cavity steel tube concrete coupled column and Girder steel is transported to scene, by concreting in multi-cavity steel tube concrete coupled column, then from bottom to top by prefabricated girder steel It is lifted into node region, so that lower pallet 5 is combined closely with steel plate 3, and is bolted to connection angle steel 6 and steel plate 3, is played It is fixed temporarily effect, is then again respectively connect steel plate 3 with upper cover plate 4 using fillet weld, steel plate 3 is connect with lower pallet 5, will even Angle steel 6 and steel plate 3 are connect by solder design, particularly: angle cleat a side is in contact with the web of steel I-beam, another Side and steel plate 3 weld, and complete assembly.
It can be prefabricated in the factory in the present invention and complete steel plate according to positioning welding in multi-cavity steel tube concrete coupled column two sides. First prefabricated girder steel, upper cover plate, lower pallet and angle cleat in factory, then in factory by upper cover plate according to design size It is welded in girder steel top flange and lower pallet and is welded on girder steel lower flange according to design size, angle cleat is welded according to positioning rule It is very little at steel beam web plate, the above process be in the factory shift to an earlier date it is prefabricated, save the inconvenience of field fabrication, improve effect Rate.When in-site installation, girder steel is lifted from bottom to top and is positioned at node region, angle cleat and multi-cavity steel tube concrete coupled column The steel plate of two sides passes through installation screw connection, the position of fixed girder steel.
Node of the present invention has two big innovations: beam-ends and post jamb fate are from the use with full-height side plate.Object between beam, column Reason isolation changes the Path of Force Transfer of conventional node, eliminates triaxial stress concentration, and plastic hinge can not only be made by moving outside node Onto beam, and eliminate the dependence of the edge of a wing tear failure of conventional node column and joint rotation ability to column web weakness plate area Defect.Meet the design and principle of " strong column and weak beam, the strong weak component of node ".Node can be divided into 2 parts respectively in factory simultaneously Prefabricated completion, in-site installation only need to be assembled simply, and the simple assembling degree of joint structure is high.
The anti-seismic performance of failure mode and node of the invention is illustrated below.
It is now to arrange the mechanical property for illustrating novel joint with multi-cavity steel tube concrete coupled column-girder steel U-shaped rigid joint. Finite element analysis is carried out to node using ABAQUS software, node column is the multi-cavity steel tube concrete coupled column of 200x600, Liang Cai With the welding H-bar of H350x150x6x10, dual-sided board and cover sheet thickness are with flange of beam the same as thick at node.Finite element analysis As a result as follows.
1. failure mode
Multi-cavity steel tube concrete coupled column-girder steel rigid connection node of the invention, due to using multi-cavity steel tube concrete Coupled column, steel pipe have stronger effect of contraction to concrete, and the bearing capacity and ductility of shaft entirety are relatively good, realize strong The weak beam of column, the design requirement of the strong weak component of node.The destruction sequence of connecting node of the invention is as illustrated in figs. 8-12.(1) work as water When flat external force, lower flange initially enters plasticity on node region beam-ends, and cover board and side plate are in addition to small part stress concentration Region surrender is outer, remaining most of region steel is still in elastic stage (as shown in Figure 8).(2) as external force increases, beam-ends is first Occur plastic hinge (as shown in Figure 9) first in other parts, deck portion region steel, which are surrendered, at this time enters the plastic stage, and side Plate is overseas except small part stress concentration region, and most of region steel are still in elastic stage.(3) since the reinforcing of steel material is made With when external force load persistently increases, cover board two sides and side plate join domain steel plate shearing are surrendered, and steel enter plasticity rank Section, node side plate major part region is still in elastic stage at this time, and only small part stress raiser steel plate surrender is (such as Figure 10 institute Show).(4) as shown in figure 11, being continuously increased with load, structure is finally destroyed, at this time lower flange buckling on beam-ends, and side plate Still only part enters the plastic stage, and the side plate of node region is most of still in elastic stage.
2. the anti-seismic performance of node
According to conceptual Design of Earthquake Resistance principle, structure should have multiple tracks and provide fortification against earthquakes line, avoid leading because partial component is destroyed It causes integral system to destroy, while also requiring structure that should have necessary intensity, good deformability and energy dissipation capacity.The present invention Rigid connection node pass through the node connector that full-height side plate and cover board are constituted in such a way that column is isolated with beam-ends To transmit beam-ends moment of flexure and shearing.
Due to above-mentioned destruction sequence, when geological process, there is plastic hinge first in beam-ends, consumes certain seismic energy Amount, back shroud shear yielding, further dissipate seismic energy, final when destroying, node region side plate only partially surrender into Enter plasticity, it is most of still in elastic stage.Overall structure meets the design principle of " strong column and weak beam, the strong weak component of node ".
Before ductility refers to structure or destroys, bearing capacity without being subjected to inelastic deformation ability under conditions of significant decrease, In the Aseismic Design of structure, Ductility Index is a key property.Multi-cavity steel tube concrete coupled column-girder steel U-shaped has just connect section The story drift of point is 7% -10%, meets China's code requirement.
When structure is in geological process, structure has the time-continuing process of an energy absorption and dissipation.When structure enters bullet When mecystasis, anti-seismic performance depends primarily on component energy dissipation capacity.The face that load phase curve is surrounded in hysteresis loop Product can reflect the size that structure absorbs energy;And the area that curve is surrounded when curve when unloading and load is Dissipated energy Amount.These energy be by the interior frictional resistance or local damage of material will quantitative change be heat energy dissipation into space.Lost A possibility that energy is more, and structure is destroyed are smaller.Due to above-mentioned destruction of a node sequence, beam-ends and cover board successively dissipate largely Seismic energy, final guarantee node have preferable energy dissipation capacity.As shown in figure 12, the hysteresis loop of node is full, does not have Apparent Draw shrinkage, dissipate a large amount of seismic energies, and the energy dissipation capacity of node is good, has stronger anti-seismic performance.

Claims (4)

1. multi-cavity steel tube concrete coupled column and girder steel rigid connection node, which is characterized in that mixed in multi-cavity steel tube including setting The steel plate (3) of solidifying local soil type's zygostyle two sides, girder steel top flange are provided with upper cover plate (4), and lower flange is provided with lower pallet (5), girder steel Web at be provided with two angle cleats (6), upper cover plate (4), lower pallet (5) are connect with steel plate (3);
The multi-cavity steel tube concrete coupled column includes the sleeper positioned at both ends, is provided with parallel abdomen between two sleeper Plate passes through partition between web and connects;
The steel plate (3) is welded on multi-cavity steel tube concrete coupled column by weld seam;
Locating holes are offered on each steel plate (3), angle cleat offers hole on (6), by bolt (7) by steel plate and company Angle steel is connect to fix;
The lower pallet (5) is connect by fillet weld with steel plate (3);
Angle cleat is connect by weld seam with steel plate (3);
The girder steel end is provided with ribbed stiffener;
Lower pallet (5) width is greater than steel plate spacing.
2. multi-cavity steel tube concrete coupled column according to claim 1 and girder steel rigid connection node, which is characterized in that institute Upper cover plate (4) are stated to connect by fillet weld with steel plate (3).
3. multi-cavity steel tube concrete coupled column according to claim 1 and girder steel rigid connection node, which is characterized in that institute Stating girder steel is steel I-beam.
4. a kind of assembly method of multi-cavity steel tube concrete coupled column and girder steel rigid connection node as described in claim 1, It is characterized in that, steel plate (3) is first fixed on multi-cavity steel tube concrete coupled column two sides by weld seam, prefabricated multi-cavity is obtained Concrete filled steel tube coupled column, then upper cover plate (4) is welded on the steel I-beam top flange with ribbed stiffener, lower pallet (5) is set It sets on steel I-beam lower flange, two angle cleats (6) is arranged at steel I-beam web, prefabricated girder steel is obtained; Then prefabricated multi-cavity steel tube concrete coupled column and girder steel are transported to scene, by concreting in multi-cavity steel tube coagulation In local soil type's zygostyle, then prefabricated girder steel is lifted into node region from bottom to top, so that lower pallet (5) is contacted with steel plate (3), And angle steel (6) and steel plate (3) are bolted to connection, then respectively connect steel plate (3) with upper cover plate (4) using fillet weld, Steel plate (3) is connect with lower pallet (5), and angle cleat (6) is connect with steel plate (3) by fillet weld, completes assembly.
CN201610342419.4A 2016-05-20 2016-05-20 Multi-cavity steel tube concrete coupled column and girder steel rigid connection node and assembly method Expired - Fee Related CN105839793B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610342419.4A CN105839793B (en) 2016-05-20 2016-05-20 Multi-cavity steel tube concrete coupled column and girder steel rigid connection node and assembly method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610342419.4A CN105839793B (en) 2016-05-20 2016-05-20 Multi-cavity steel tube concrete coupled column and girder steel rigid connection node and assembly method

Publications (2)

Publication Number Publication Date
CN105839793A CN105839793A (en) 2016-08-10
CN105839793B true CN105839793B (en) 2019-01-22

Family

ID=56593393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610342419.4A Expired - Fee Related CN105839793B (en) 2016-05-20 2016-05-20 Multi-cavity steel tube concrete coupled column and girder steel rigid connection node and assembly method

Country Status (1)

Country Link
CN (1) CN105839793B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165274B (en) * 2017-04-09 2019-04-05 北京工业大学 A kind of more high-rise assembled modularization Self-resetting steel construction H profile steel column frame systems
CN107119800B (en) * 2017-04-09 2019-04-05 北京工业大学 A kind of more high-rise assembled modularization Self-resetting steel construction square tube column frame systems
CN108678187A (en) * 2018-07-26 2018-10-19 西安建筑科技大学 A kind of dual-sided board adds the concrete column reinforcing joint of internal partition
CN109098352B (en) * 2018-10-24 2024-02-23 张云天 Prefabricated assembled steel pipe concrete column splicing structural member and construction method thereof
CN110016970A (en) * 2019-05-06 2019-07-16 河南绿建建筑科技有限公司 Steel concrete compound tube upper and lower side exempts from welding angle steel flange structure
CN113931324A (en) * 2021-11-22 2022-01-14 中建安装集团有限公司 Cross steel rib column full-bolt rigid connection node and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5660017A (en) * 1994-12-13 1997-08-26 Houghton; David L. Steel moment resisting frame beam-to-column connections
CN101525906A (en) * 2008-03-05 2009-09-09 株式会社Itec Connecting structure for steel frame columns and steel frame girders
CN202416586U (en) * 2012-02-07 2012-09-05 北京建筑工程学院 Beam-end cover plate reinforced-bolted splice joint for steel framework
CN204753817U (en) * 2015-06-24 2015-11-11 宿迁学院 Steel structure beam column joint
CN205637170U (en) * 2016-05-20 2016-10-12 西安建筑科技大学 Multicavity steel pipe -concrete composite post and girder steel rigid connection node

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5660017A (en) * 1994-12-13 1997-08-26 Houghton; David L. Steel moment resisting frame beam-to-column connections
CN101525906A (en) * 2008-03-05 2009-09-09 株式会社Itec Connecting structure for steel frame columns and steel frame girders
CN202416586U (en) * 2012-02-07 2012-09-05 北京建筑工程学院 Beam-end cover plate reinforced-bolted splice joint for steel framework
CN204753817U (en) * 2015-06-24 2015-11-11 宿迁学院 Steel structure beam column joint
CN205637170U (en) * 2016-05-20 2016-10-12 西安建筑科技大学 Multicavity steel pipe -concrete composite post and girder steel rigid connection node

Also Published As

Publication number Publication date
CN105839793A (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN105839793B (en) Multi-cavity steel tube concrete coupled column and girder steel rigid connection node and assembly method
CN105821968B (en) Multi-cavity steel tube concrete coupled column and girder steel U-shaped connecting node and assembly method
CN105863081B (en) Multi-cavity steel tube concrete coupled column and girder steel bolt connection node and assembly method
CN105863056B (en) A kind of dual-sided board bolt joint and assembly method for beam column
CN205975968U (en) A take curb plate bolt node for eccentric beam column
CN109537726A (en) Rectangle steel tubing string-H girder steel is bolted structures with semi-rigid joints and construction method entirely
CN105863080B (en) A kind of bilateral plate node and assembly method by lower flange connection
CN205677091U (en) A kind of bolted dual-sided board node
CN205677077U (en) Multi-cavity steel tube concrete coupled column is connected node with girder steel U-shaped
CN106013466B (en) A kind of bolted bilateral plate node and assembly method
CN205637170U (en) Multicavity steel pipe -concrete composite post and girder steel rigid connection node
CN205637172U (en) Multicavity steel pipe -concrete composite post and girder steel bolted connection node
CN205712508U (en) Run through iris type multi-chamber concrete filled steel tube coupled column steel beam joint
CN105863082B (en) T shapes run through iris type multi-chamber concrete filled steel tube coupled column steel beam joint and assembly method
CN106032683B (en) A kind of bolt connection node and assembly method for eccentric beam column
CN205712476U (en) A kind of dual-sided board bolt joint for beam column
CN205637143U (en) A bolted connection node for eccentric beam column
CN105821976A (en) Supporting inserted type beam column supporting two-sided plate joint
CN205637171U (en) Two curb plate nodes through lower flange connection
CN106436923B (en) A kind of three side plate nodes and assembly method for eccentric beam-to-column joint
CN205776787U (en) A kind of support plug-in type beam column supporting bilateral plate node
CN105839779B (en) A kind of band side plate bolt node and assembly method for eccentric beam column
CN205935235U (en) A three curb plate nodes for eccentric beam -column connection
CN208685814U (en) A kind of wall type steel core concrete column-H profile steel beam internal partition connecting node
CN204252397U (en) Corrugated steel web-compound section, concrete filled steel tube edge of a wing T-shaped post

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190122

CF01 Termination of patent right due to non-payment of annual fee