CN105839479B - A kind of Novel sleeper and its manufacturing method - Google Patents

A kind of Novel sleeper and its manufacturing method Download PDF

Info

Publication number
CN105839479B
CN105839479B CN201610314530.2A CN201610314530A CN105839479B CN 105839479 B CN105839479 B CN 105839479B CN 201610314530 A CN201610314530 A CN 201610314530A CN 105839479 B CN105839479 B CN 105839479B
Authority
CN
China
Prior art keywords
billet
sleeper
lower layer
novel
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610314530.2A
Other languages
Chinese (zh)
Other versions
CN105839479A (en
Inventor
韩时捷
王施恩
吴庆飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai International Port Group Co Ltd
CCCC Third Harbor Consultants
Original Assignee
Shanghai International Port Group Co Ltd
CCCC Third Harbor Consultants
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai International Port Group Co Ltd, CCCC Third Harbor Consultants filed Critical Shanghai International Port Group Co Ltd
Priority to CN201610314530.2A priority Critical patent/CN105839479B/en
Publication of CN105839479A publication Critical patent/CN105839479A/en
Application granted granted Critical
Publication of CN105839479B publication Critical patent/CN105839479B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B23/00Easily dismountable or movable tracks, e.g. temporary railways; Details specially adapted therefor
    • E01B23/10Shiftable tracks for heavy loads, e.g. carrying excavators
    • E01B23/12Sleepers

Abstract

The invention discloses a kind of Novel sleepers, the Novel sleeper includes a sleeper body, pre-buried lower layer's billet, lower layer's billet bottom welding dowel and nut in the sleeper body, 4 outside of the nut is equipped with casing, upper layer billet is equipped with above lower layer's billet, bolt is connect from above through the upper layer billet and lower layer's billet and with nut, and bolt is adjustable.The quantity of the dowel requires to configure according to lower layer's billet top working load.The invention also discloses a kind of manufacturing methods of Novel sleeper;The configuration of the present invention is simple, it is easy to implement, in-site installation efficiency and construction quality can be improved, while saving engineering initial investment expense and later maintenance renewal cost.

Description

A kind of Novel sleeper and its manufacturing method
Technical field
The present invention relates to concrete sleepers, specifically, being a kind of Novel sleeper and its manufacturing method, can run harbour thereon Harbour automation fortune loop wheel machine structure.
Background technology
Foreign mountain Phase IV project will turn domestic largest automation port area into, and heap place is intended using high-speed cruising It automates rail gantry crane and carries out handling operation.It is big for foreign mountain Phase IV project land-based area residual settlement amount, to track installation precision It is required that high objective present situation, it is proposed that a kind of novel tie structure organically combines adjustable pedestal and conventional sleeper, to reach Initial investment is compared with province under the premise of guarantee high-precision and efficiently adjustment and the later stage is without the purpose for needing to change maintenance adjustment.
Invention content
The object of the present invention is to provide one kind ensure high-precision and efficiently adjustment under the premise of initial investment relatively save and the later stage Nothing needs to change Novel sleeper of maintenance and preparation method thereof.
To achieve the above object, the technical solution adopted by the present invention is that:
A kind of Novel sleeper, the Novel sleeper include a sleeper body, pre-buried lower layer's billet in the sleeper body, Dowel and nut are welded in lower layer's billet bottom, and casing is equipped on the outside of the nut, is equipped with above lower layer's billet Upper layer billet, bolt are connect from above through the upper layer billet and lower layer's billet and with nut, and bolt is adjustable Section.
Further, lower layer's billet is embedded in sleeper, and the connection type of the two uses dowel form.
Further, the casing selects hard PVC casing.
Further, the bolt connects bolt using hexagonal.
Further, the quantity of the dowel requires to configure according to lower layer's billet top working load.
The another technical solution of the present invention, the manufacturing method of Novel sleeper include the following steps:
(1)Dowel and nut are welded in lower layer's billet bottom;
(2)Nut outer sheath wraps up in hard PVC casing and fixation;
(3)The lower layer's billet processed is embedded in sleeper;
(4)Upper and lower layer billet is fixedly connected with hexagonal connection bolt after the cast-in-place molding of sleeper.
Advantageous effect
Heretofore described lower layer's billet is embedded in sleeper, is anchored using the conventional bolt of dowel form substitution; The setting of the nut and hard PVC casing of the welding of pre-buried lower layer's billet bottom solves the connection bolt body of rod can only upward, rail Road is influenced repeatedly to replace during adjusting by track equipment use to be limited.Structural texture of the present invention is simple, easy to implement, can carry High in-site installation efficiency and construction quality, while saving engineering initial investment expense and later maintenance renewal cost.
Description of the drawings
Attached drawing 1 is a kind of floor map of Novel sleeper of the present invention.
Attached drawing 2 is the sectional view in direction shown in line A-A in Fig. 1.
Reference numeral and component part involved in attached drawing is as follows:
1. 2. lower layer's billet of sleeper body
3. 4. nut of hard PVC casing
5. billet 6. hexagonal in upper layer connects bolt
7. dowel.
Specific implementation mode
With reference to example and with reference to attached drawing, the invention will be further described.
Embodiment 1
Referring to Fig.1, schematic diagram shown in 2, Fig. 2 are the sectional views in direction shown in line A-A in Fig. 1.The Novel sleeper includes Sleeper body 1, lower layer's billet 2, hard PVC casing 3, nut 4, upper layer billet 5, hexagonal connection bolt 6, dowel 7.
Lower layer's steel pads 2 plates and requires configuration certain amount anchor rib 7 according to top working load, is connected using welding manner It connects;The needs of bolt 6 connects is connected by hexagonal to meet levels billet simultaneously, is correspondingly connected in lower layer's billet bottom Matching nut 4 is welded in the position of bolt aperture, and wraps up in hard PVC casing 3 in nut overcoat, to ensure connection bolt and concrete The isolation of structure.
Embodiment 2
The manufacturing method of the present invention includes the following steps:
(1)Dowel and nut are welded in lower layer's billet bottom;
(2)Nut outer sheath wraps up in hard PVC casing and fixation;
(3)The lower layer's billet processed is embedded in sleeper;
(4)Upper and lower layer billet is fixedly connected with hexagonal connection bolt after the cast-in-place molding of sleeper.
The structure of track foundation of the present invention is simple, easy to implement, and in-site installation efficiency and construction quality can be improved.

Claims (6)

1. a kind of Novel sleeper, the Novel sleeper includes a sleeper body, it is characterised in that:It is buried in advance in the sleeper body Layer billet, lower layer's billet bottom welding dowel and nut, the nut outside are equipped with casing, lower layer's billet Top is equipped with upper layer billet, and bolt is connect from above through the upper layer billet and lower layer's billet and with nut, Bolt is adjustable;The upper layer steel plate washer is parallel four side row, and two angles of the installation bolt of the upper layer steel plate washer are equipped with circle All chamferings, two adjustable pedestals have reached dual regulation, and deformation is used for a long time in the track being mounted on sleeper, can also be by double Section is resetted, the combination of adjustable pedestal and routine sleeper has been reached, initial stage throwing under the premise of ensureing high-precision and efficiently adjustment The small and later stage is provided without the purpose for needing to change maintenance adjustment.
2. Novel sleeper as described in claim 1, it is characterised in that:Lower layer's billet is embedded in sleeper, the two Connection type use dowel form.
3. Novel sleeper as described in claim 1, it is characterised in that:The casing selects hard PVC casing.
4. Novel sleeper as described in claim 1, it is characterised in that:The bolt connects bolt using hexagonal.
5. Novel sleeper as described in claim 1, it is characterised in that:The quantity of the dowel, according to lower layer's steel pad Plate top working load requires configuration.
6. such as the manufacturing method of any one Novel sleeper of claim 1-4, include the following steps:
(1)Dowel and nut are welded in lower layer's billet bottom;
(2)Nut outer sheath wraps up in hard PVC casing and fixation;
(3)The lower layer's billet processed is embedded in sleeper;
(4)Upper and lower layer billet is fixedly connected with hexagonal connection bolt after the cast-in-place molding of sleeper.
CN201610314530.2A 2016-05-13 2016-05-13 A kind of Novel sleeper and its manufacturing method Active CN105839479B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610314530.2A CN105839479B (en) 2016-05-13 2016-05-13 A kind of Novel sleeper and its manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610314530.2A CN105839479B (en) 2016-05-13 2016-05-13 A kind of Novel sleeper and its manufacturing method

Publications (2)

Publication Number Publication Date
CN105839479A CN105839479A (en) 2016-08-10
CN105839479B true CN105839479B (en) 2018-10-16

Family

ID=56591815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610314530.2A Active CN105839479B (en) 2016-05-13 2016-05-13 A kind of Novel sleeper and its manufacturing method

Country Status (1)

Country Link
CN (1) CN105839479B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107338687A (en) * 2017-08-28 2017-11-10 华东交通大学 A kind of combined type sleeper

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB132428A (en) *
JP2002309502A (en) * 2001-04-18 2002-10-23 Sekisui Chem Co Ltd Method for redriving screw spike into composite sleeper
CN201292488Y (en) * 2008-11-12 2009-08-19 铁道第三勘察设计院集团有限公司 Medium low speed magnetic floating line rail fastener
CN201627122U (en) * 2009-06-22 2010-11-10 东守金 Reinforced concrete sleeper for mine
CN204703012U (en) * 2015-05-22 2015-10-14 中交第三航务工程勘察设计院有限公司 Dual adjustable formula track foundation
CN205617162U (en) * 2016-05-13 2016-10-05 中交第三航务工程勘察设计院有限公司 Novel sleeper

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004021091A1 (en) * 2004-04-29 2006-10-19 Bwg Gmbh & Co. Kg Attachment for a rail and arrangement for attaching rails

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB132428A (en) *
JP2002309502A (en) * 2001-04-18 2002-10-23 Sekisui Chem Co Ltd Method for redriving screw spike into composite sleeper
CN201292488Y (en) * 2008-11-12 2009-08-19 铁道第三勘察设计院集团有限公司 Medium low speed magnetic floating line rail fastener
CN201627122U (en) * 2009-06-22 2010-11-10 东守金 Reinforced concrete sleeper for mine
CN204703012U (en) * 2015-05-22 2015-10-14 中交第三航务工程勘察设计院有限公司 Dual adjustable formula track foundation
CN205617162U (en) * 2016-05-13 2016-10-05 中交第三航务工程勘察设计院有限公司 Novel sleeper

Also Published As

Publication number Publication date
CN105839479A (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN206646417U (en) A kind of multispan concrete simply supported beam bridge integral jacking system
CN107761997A (en) A kind of assembled steel plate concrete combined shear wall bolt fastening structure and method
CN207120331U (en) It is a kind of to build the mould geometrical clamp for pouring and being used during mould
CN105569374B (en) A kind of building is closely comprehensive at a distance to shift place system
CN106245670B (en) Exposed steel column base construction method
CN105951537A (en) Rib column distributed turnout foundation structure of middle-low speed magnetic levitation low-arranged line
CN201377089Y (en) Outer ring wall elastic foundation of one hundred and fifty square storage tanks
CN105839479B (en) A kind of Novel sleeper and its manufacturing method
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN108412087A (en) Improve the prefabricated reinforcement structure and loam wall of loam wall globality
CN207314150U (en) A kind of device for being used to accurately adjust precast beam bottom pre-embedded steel slab longitudinal slope
CN207567842U (en) A kind of electric power pylon foundation bolt damages reinforced structure
CN206562792U (en) Overlapping for existing structure strengthening reconstruction changes antitorque structure
CN106049760B (en) Precast concrete suspension column and its construction, maintaining method are quickly repaired after shake
CN205617162U (en) Novel sleeper
CN109322298A (en) Vibrating and impacting construction of ballast pile unit and construction method with bottom discharge
CN204101553U (en) A kind of Large stone body frost heaving performance testing device
CN106812065A (en) A kind of concrete freely-supported pre-stressed box girder construction process
CN206986918U (en) A kind of asymmetric template for blower fan crab-bolt foundation grouting
CN109184741A (en) A kind of high-bearing capacity shield tunnel segment joint structure
CN205617160U (en) Low distributed switch foundation structure of circuit rib post that puts of moderate -low speed magnetic levitation
CN205740100U (en) Walking tower crane underframe typhoon protection coupling arrangement
CN114717956A (en) Bridge pier column diaphragm construction umbrella-type support system
CN202672174U (en) Cone-shaped upright foundation of frozen soil region
CN202416370U (en) Inspection well cover support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No. 831 zhaojiaman Road, Xuhui District, Shanghai

Applicant after: CCCC Third Harbor Consultants Co., Ltd.

Applicant after: Shanghai International Port (Group) Co., Ltd.

Address before: 200032 831 Zhaojia Bang Road, Xuhui District, Shanghai

Applicant before: CCCC Third Harbor Consultants Co., Ltd.

Applicant before: Shanghai International Port (Group) Co., Ltd.

GR01 Patent grant
GR01 Patent grant