CN105821737A - Water permeable ground system and paving method - Google Patents

Water permeable ground system and paving method Download PDF

Info

Publication number
CN105821737A
CN105821737A CN201610171313.2A CN201610171313A CN105821737A CN 105821737 A CN105821737 A CN 105821737A CN 201610171313 A CN201610171313 A CN 201610171313A CN 105821737 A CN105821737 A CN 105821737A
Authority
CN
China
Prior art keywords
permeable
water
water permeable
bar
pervious
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610171313.2A
Other languages
Chinese (zh)
Inventor
胡俊峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Renchuang ecological environmental protection Polytron Technologies Inc
Original Assignee
Suzhou Lejuyitang Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Lejuyitang Electronic Technology Co Ltd filed Critical Suzhou Lejuyitang Electronic Technology Co Ltd
Priority to CN201610171313.2A priority Critical patent/CN105821737A/en
Publication of CN105821737A publication Critical patent/CN105821737A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/04Pavings made of prefabricated single units made of bricks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/06Sets of paving elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention provides a water permeable ground system which comprises a water permeable base layer. A water permeable face layer is arranged on the water permeable base layer and comprises a cobble gravel layer, a fixing grid, water permeable bricks and water permeable strips. The cobble gravel layer is laid in the fixing grid. Fixing columns are arranged at the upper portion of the fixing grid. The water permeable bricks are installed on the fixing columns. Gaps are formed between the adjacent water permeable bricks. The side walls of the adjacent water permeable bricks and the gaps between the adjacent water permeable bricks form a clamping structure jointly. The water permeable strips are made of a micropore water permeable elastic material and clamped in the gaps. By the adoption of the water permeable ground system, water seeps downwards through the water permeable bricks and the water permeable strips at the same time, the water permeable strips can be conveniently replaced after being aged or blocked, and therefore the service life of the whole water permeable ground system is prolonged. The invention further provides a paving method for the water permeable ground. Due to the fact that the fixing grid is additionally arranged, a leveling layer is not needed, the water permeable bricks are unified in height and equal in interval, and the construction speed is high.

Description

A kind of pervious surface system and method for paving
Technical field
The present invention relates to road pavement technical field, especially relate to a kind of pervious surface system and method for paving.
Background technology
Along with the development of urban construction, non-pervious surface decoration area is increasing, and environment is severely impacted, and the phenomenon such as urban heat land effect, flood, depletion of groundwater is on the rise.Therefore, increasing urban water-through ground extremely urgent, the product such as permeable Ceramic Tiles, pervious concrete brick, sand base water-permeable brick arises at the historic moment.
But, owing to current city environmental pollution is the most serious, dust and other particulate matters are more, the new various water-permeable bricks laid have comparatively ideal permeable effect, after a period of time, the particulate matter such as foreign material and dust is easy to permeable hole contamination and plugging, and permeable hole is difficult to clear up, and water permeable ability drastically declines.A lot of pervious surface system water permeable abilities after one-year age only have about 10%, almost lose pervious function.
Summary of the invention
It is an object of the invention to provide a kind of pervious surface system and method for paving, to solve technical problem of serious failure after pervious surface present in prior art uses a period of time.
The present invention provides a kind of pervious surface system, including porous base course, described porous base course be arranged above with permeable surface layer;Described permeable surface layer includes ovum metalling, fixed mesh, water-permeable brick and permeable bar;Described ovum metalling is laid in fixed mesh, and described fixed mesh top is provided with the fixing post of projection, and described water-permeable brick is fixed on fixing post;Described water-permeable brick is made up of the seepy material possessing pore structure, is provided with gap between two pieces of adjacent water-permeable bricks, and the sidewall of adjacent water-permeable brick forms card together with gap and sets structure;Permeable bar is made up of microporous permeable elastomeric material, is fastened in gap.
Further, the material of described fixed mesh is plastics or cement.
Further, the one during described water-permeable brick is pervious concrete brick, permeable Ceramic Tiles or sand base water-permeable brick.
Further, formation inclined-plane or sunk structure at the bottom surface outer rim that described water-permeable brick connects with described porous base course, the cross section of described sunk structure is rectangular or circular arc.
Further, the end face of described water-permeable brick is identical with bottom surface size and shape, and its side is formed groove structure, and the cross section of described groove structure is trapezoidal, circular arc or rectangle.
Further, described permeable bar is fastened in the gap of two pieces of described water-permeable bricks, and the upper surface of described permeable bar is less than the upper surface of described water-permeable brick.
Further, described permeable bar is solid permeable rubber strip or hollow permeable rubber strip, is covered with permeable micropore, and at least contains hydrophilic macromolecule composition inside described permeable rubber strip material.
Further, the material of described permeable bar comprises Nano titanium dioxide;Or the surface of described permeable bar scribbles Nano titanium dioxide;Or the material of described permeable bar comprises nanometer level silver oxide;Or the surface of described permeable bar scribbles nanometer level silver oxide.
Further, the one during the material of described porous base course is at least sandstone compound, pervious concrete.For porous base course, there is certain load-bearing requirements, non-driving ground need not pour, load-bearing requirements is relatively low, sandstone compound etc. can be used to constitute, on driving ground, then porous base course can pour with the pervious concrete of respective strengths grade, or first laying sandstone compound pours pervious concrete again.
A kind of pervious surface system that the present invention provides, in use, impurity can filter and stay surface, and water can flow through water-permeable brick and permeable bar, and porous base course has permeable ability, water continues to flow through porous base course, flows ultimately in soil or is flowed in gutter by surge tank.
The permeable bar that a kind of pervious surface system that the present invention provides is used comprises in the material or surface scribbles Nano titanium dioxide (TiO2), titanium dioxide is under the irradiation of light or produces similar photosynthetic light-catalyzed reaction, produce the extremely strong free hydroxy of oxidability and active oxygen, there is the strongest photoredox function, the various organic compound of classification and part inorganic matter can be aoxidized, thus resolve into free of contamination water and titanium dioxide by covering the dirt on permeable bar surface, possess self-cleaning ability.
The permeable bar that a kind of pervious surface system that the present invention provides is used comprises in the material or surface scribbles nanometer level silver oxide, and nanometer level silver oxide has the strongest long-acting bactericidal effect, makes antibacterial cannot survive in permeable bar, it is to avoid some diseases produces.
It is known that all water-permeable bricks all cannot be avoided after being trampled for a long time being blocked by earth dust, but use the pervious surface system of the present invention can keep the water penetration in gap by regularly cleaning or replacing permeable bar.First because permeable bar surface is less than water-permeable brick surface, so will not being trampled and strongly being filled in mud, second because permeable bar is also equipped with elasticity, so being easy to when cleaning with giant remove surface dirt, 3rd permeable article can also pull out replacing easily, summing up above three, it is low that this pervious surface system has maintenance cost, the feature that service life is longer.
The present invention also provides for the method for paving of a kind of pervious surface, comprises the following steps:
1) porous base course is laid on the concrete on the ground of compacting or with surge tank;
2) fixed mesh is set on described porous base course, described ovum metalling is laid in fixed mesh;
3) on fixing post protruding on fixed mesh, water-permeable brick, preset clearance between adjacent described water-permeable brick are installed;
4) in reserved described gap, permeable bar is installed.
The method for paving of a kind of pervious surface system that the present invention provides, can be according to road or the width x length in place, size, uses the fixed mesh of disparate modules to be combined assembly, meets design requirement.Because of its specific network, in actual pavement construction, workmen can effectively ignore the construction of screed-coat, accelerating construction progress, and water-permeable brick surfacing after constructing, and spacing is uniform, greatly facilitates the installation of follow-up permeable bar.
Accompanying drawing explanation
In order to be illustrated more clearly that the specific embodiment of the invention or technical scheme of the prior art, the accompanying drawing used required in detailed description of the invention or description of the prior art will be briefly described below, apparently, accompanying drawing in describing below is some embodiments of the present invention, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
The top view of a kind of pervious surface system that Fig. 1 provides for the embodiment of the present invention;
The schematic diagram of the permeable surface layer of a kind of pervious surface system that Fig. 2 provides for the embodiment of the present invention;
The schematic diagram of the fixed mesh of a kind of pervious surface system that Fig. 3 provides for the embodiment of the present invention;
The sectional view of a kind of pervious surface system that Fig. 4 provides for the embodiment of the present invention;
The sectional view of a kind of pervious surface system that Fig. 5 provides for the embodiment of the present invention;
The sectional view of a kind of pervious surface system that Fig. 6 provides for the embodiment of the present invention;
The sectional view of a kind of pervious surface system that Fig. 7 provides for the embodiment of the present invention;
The sectional view of a kind of pervious surface system that Fig. 8 provides for the embodiment of the present invention;
The sectional view of a kind of pervious surface system that Fig. 9 provides for the embodiment of the present invention;
The FB(flow block) of the method for paving of a kind of pervious surface that Figure 10 provides for the embodiment of the present invention;
The bottom schematic view of a kind of water-permeable brick that Figure 11 provides for the embodiment of the present invention;
The bottom schematic view of a kind of water-permeable brick that Figure 12 provides for the embodiment of the present invention;
The bottom schematic view of a kind of water-permeable brick that Figure 13 provides for the embodiment of the present invention;
The bottom schematic view of a kind of water-permeable brick that Figure 14 provides for the embodiment of the present invention.
Reference
1-porous base course;2-water-permeable brick;The permeable bar of 3-;4-fixed mesh;
5-fixes post;6-fixes groove.
Detailed description of the invention
Below in conjunction with accompanying drawing, technical scheme is clearly and completely described, it is clear that described embodiment is a part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of protection of the invention.
In describing the invention, it should be noted that, orientation or the position relationship of the instruction such as term " " center ", " on ", D score, "left", "right", " vertically ", " level ", " interior ", " outward " be based on orientation shown in the drawings or position relationship; be for only for ease of the description present invention and simplifying and describe; rather than instruction or imply indication device or element must have specific orientation, with specific azimuth configuration and operation, be therefore not considered as limiting the invention.Additionally, term " first ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that instruction or hint relative importance.
In describing the invention, it should be noted that unless otherwise clearly defined and limited, term " is installed ", " being connected ", " connection " should be interpreted broadly, and connects for example, it may be fixing, it is also possible to be to removably connect, or be integrally connected;Can be to be mechanically connected, it is also possible to be electrical connection;Can be to be joined directly together, it is also possible to be indirectly connected to by intermediary, can be the connection of two element internals.For the ordinary skill in the art, above-mentioned term concrete meaning in the present invention can be understood with concrete condition.
Embodiment 1
The top view of a kind of pervious surface system that Fig. 1 provides for the embodiment of the present invention.As depicted in figs. 1 and 2, the permeable surface layer of a kind of pervious surface system that the present embodiment provides includes fixed mesh 4, the ovum metalling (the most visible) being filled in fixed mesh 4, multiple water-permeable bricks 2, and multiple permeable bar 3;
As it is shown on figure 3, the fixing post 5 raised up is arranged at the top of fixed mesh 4.The shape of fixing post 5 can be cylinder, square column, strip sheet, and cross etc. does not limit to its concrete shape.
It is understood that 4 grid cells in Fig. 3, its fixing post shapes is mutually different is can to have different shapes for the fixing post of explanation.As a rule, in same fixed mesh, the fixing post shapes of each grid cell is identical.
Such as Figure 11, shown in 12,13,14, corresponding each fixing post 5, being designed with the fixing groove 6 upwards caved in bottom each water-permeable brick 2, the shape of fixing groove 6 can be cylinder, square column, strip sheet, and cross etc. does not limit to its concrete shape.Fixing post 5 and fixing groove 6 one_to_one corresponding, match each other.
It is understood that there may also be multiple fixing groove bottom one piece of water-permeable brick, fixing groove does not the most limit the center being in water-permeable brick.
Can accurately be controlled by mating of fixing post 5 and fixing groove 6, the position of water-permeable brick 2 and height, facilitate construction.
The plurality of water-permeable brick 2 is arranged with array way, is all separated by permeable bar 3 between the water-permeable brick 2 that any two is interdependent.The side of water-permeable brick 2 is inclined-plane, and from the top of water-permeable brick to bottom (one end connected with porous base course 1), the side of water-permeable brick 2 tilts inside it, the gap formed between two the most adjacent water-permeable bricks 2 also has the structure that bottom is big and top is little, and this structure makes to form card between adjacent two water-permeable brick and sets structure.As shown in Figure 4, the both sides of permeable bar 3 connect with adjacent two pieces of water-permeable bricks 2, and permeable bar 3 is microporous permeable elastomeric material, solid construction, shape of cross section is trapezoidal, sets planform with the card between water-permeable brick 2 and mates, up-narrow and down-wide, what permeable bar 3 can consolidate is fastened in gap.
Further, in this enforcement, the upper surface of permeable bar 3 can be less than the upper surface of water-permeable brick 2, say, that can form a shallow slot in the surface of permeable bar 3.
The when of it is understood that two permeable bars 3 intersect, coupling specific environment can be cut out by scene, it is also possible to the specific cross shaped head of overall customization.
A kind of pervious surface system that the present invention provides, in use, impurity rests on water-permeable brick 2 and permeable bar 3 surface to this pervious surface system, and water flows to ovum metalling by water-permeable brick 2 and permeable bar 3, then flow in porous base course 1, flow ultimately in soil or flowed in gutter by surge tank.
The permeable bar 3 that the pervious surface system that the present invention provides is used comprises the most in the material or surface scribbles Nano titanium dioxide (TiO2), titanium dioxide is under the irradiation of light or produces similar photosynthetic light-catalyzed reaction, produce the extremely strong free hydroxy of oxidability and active oxygen, there is the strongest photoredox function, the various organic compound of classification and part inorganic matter can be aoxidized, thus resolve into free of contamination water and titanium dioxide by covering the dirt on permeable bar surface, possess self-cleaning ability.
The permeable bar 3 that the pervious surface system that the present invention provides is used comprises the most in the material or surface scribbles nanometer level silver oxide, and nanometer level silver oxide has the strongest long-acting bactericidal effect, makes antibacterial cannot survive in permeable bar 3, it is to avoid some diseases produces.
All of pervious surface system, all cannot avoid the phenomenon that water-permeable brick 2 is blocked by dust, but use the pervious surface system of the present invention can keep the water penetration in gap by regularly cleaning or replacing permeable bar 3.First because the surface of permeable bar 3 is less than the surface of water-permeable brick 2, so will not being trampled and strongly being filled in mud, second because permeable bar 3 is also equipped with elasticity, so being easy to when cleaning with giant remove surface dirt, replacing can also be pulled out easily for 3rd permeable article 3, summing up above three, it is low that this pervious surface system has maintenance cost, the feature that service life is longer.
Embodiment 2
As it is shown in figure 5, the present embodiment is similar to Example 1, the most permeable bar 3 shape of cross section is inverted T shape, and the edge of water-permeable brick 2 also respective change, to mate permeable strip, facilitates permeable bar 3 to may be inserted into and be firmly fastened in gap.
In the present embodiment, the outer rim along water-permeable brick 2 bottom surface (surface connected with porous base course 1) is hollowed out forming the sunk structure that cross section is rectangular, thus the cross section of water-permeable brick 2 is T-shaped.Corresponding with this, it is the formation of the draw-in groove that cross section is inverted T-shaped between two adjacent water-permeable bricks 2, the permeable shape of cross section of bar 3 matches with the draw-in groove of this inverted T-shaped, thus permeable bar can be closely knit is buckled in draw-in groove.
The when of it is understood that two permeable bars 3 intersect, coupling specific environment can be cut out by scene, it is also possible to the specific cross shaped head of overall customization.
Embodiment 3
Seeing Fig. 6, the present embodiment is similar to Example 1, and the most permeable bar 3 shape of cross section is rectangle, and the edge of water-permeable brick 2 also respective change, to mate permeable strip, facilitates permeable bar 3 to may be inserted into and be firmly fastened in gap.
In the present embodiment, the degree of depth of the shallow slot that permeable bar 3 surface is formed is the height of water-permeable brick 2 and deducts the height of the sunk structure of formation at the outer rim of water-permeable brick 2 bottom surface.
The when of it is understood that two permeable bars 3 intersect, coupling specific environment can be cut out by scene, it is also possible to the specific cross shaped head of overall customization.
Embodiment 4
Seeing Fig. 7, the present embodiment is similar to Example 1, and the most permeable bar 3 shape of cross section is lower arrowhead form, and the edge of water-permeable brick 2 also respective change, to mate permeable strip, facilitates permeable bar 3 to may be inserted into and be firmly fastened in gap.
In the present embodiment, being formation groove structure on the side of water-permeable brick 2, the upper surface of water-permeable brick 2 and bottom surface have identical size, and from the side of water-permeable brick 2 to its inner recess.In the present embodiment, the cross section of this groove is trapezoidal.
The when of it is understood that two permeable bars 3 intersect, coupling specific environment can be cut out by scene, it is also possible to the specific cross shaped head of overall customization.
Embodiment 5
Seeing Fig. 8, the pervious surface system of the present embodiment is similar to the pervious surface system of embodiment 3, and its difference is, the cross section of the sunk structure formed at the outer rim of water-permeable brick 2 bottom surface is 1/4 circle.Permeable bar 3 is microporous permeable elastomeric material, hollow-core construction, and its shape of cross section is semicircle, and the edge of water-permeable brick 2 also respective change, to mate permeable strip, facilitates permeable bar 3 to may be inserted into and be firmly fastened in gap.
The when of it is understood that two permeable bars 3 intersect, coupling specific environment can be cut out by scene, it is also possible to the specific cross shaped head of overall customization.
The hollow permeable bar 3 of the present embodiment, compares solid permeable bar more cost-effective.
Embodiment 6
See Fig. 9, the present embodiment is similar to Example 4, and except for the difference that the groove on water-permeable brick 2 side is the circular arc less than 180 degree, and permeable bar 3 shape of cross section is circular, the edge of water-permeable brick 2 also respective change, to mate permeable strip, facilitates permeable bar 3 to may be inserted into and be firmly fastened in gap.
The when of it is understood that two permeable bars 3 intersect, coupling specific environment can be cut out by scene, it is also possible to the specific cross shaped head of overall customization.
The hollow permeable bar 3 of the present embodiment, compares solid permeable bar more cost-effective.
Such as Figure 10, the embodiment of the present invention also provides for the method for paving of a kind of pervious surface, comprises the following steps:
1) porous base course 1 is laid on the concrete on the ground of compacting or with surge tank;Porous base course 1 requires to decide whether to use pervious concrete to pour according to weighted design;
2) installing fixed mesh 4 on described porous base course 1, and be laid in fixed mesh 4 by ovum metalling, ovum rubble uses the single grating of particle diameter 5-10mm, and maximum particle diameter is less than 15mm, and the thickness of ovum metalling is 30-40mm;
3) being arranged on by water-permeable brick 2 on fixed mesh 4 fixing post 5 above, the thickness of water-permeable brick 2 is 60-100mm, preset clearance between adjacent described water-permeable brick 2;
4) permeable bar 3 is installed in reserved described gap, the upper surface 2-10mm lower than the upper surface of water-permeable brick 2 of permeable bar 3;Gap width between water-permeable brick 2 is 5-10mm, and gap is unsuitable wide, and as at pavement, narrower gap, it can be avoided that pedestrian directly tramples on permeable bar 3, reduces the probability trampled, and increases the comfort of walking.
Permeable bar 3 is fastened between water-permeable brick 2, and in the maintenance in later stage, permeable bar 3 can individually be drawn out replacing.
The method for paving of a kind of pervious surface system that the present invention provides, can be according to road or the width x length in place, size, uses the fixed mesh of disparate modules to be combined assembly, meets design and requires to use.Because of its specific network, in actual pavement construction, workmen can effectively ignore the construction of screed-coat, accelerating construction progress, and water-permeable brick surfacing after constructing, and spacing is uniform, greatly facilitates the installation of follow-up permeable bar.
Last it is noted that various embodiments above is only in order to illustrate technical scheme, it is not intended to limit;Although the present invention being described in detail with reference to foregoing embodiments, it will be understood by those within the art that: the technical scheme described in foregoing embodiments still can be modified by it, or the most some or all of technical characteristic is carried out equivalent;And these amendments or replacement, do not make the essence of appropriate technical solution depart from the scope of various embodiments of the present invention technical scheme.

Claims (11)

1. a pervious surface system, it is characterised in that include porous base course, described porous base course be arranged above with permeable surface layer;Described permeable surface layer includes ovum metalling, fixed mesh, water-permeable brick and permeable bar;Described ovum metalling is laid in fixed mesh, and described fixed mesh top is provided with fixing post, and described water-permeable brick is fixed on fixing post;Described water-permeable brick is made up of the seepy material possessing pore structure, is provided with gap between two pieces of adjacent water-permeable bricks, and the sidewall of adjacent water-permeable brick forms card together with gap and sets structure;Permeable bar is made up of microporous permeable elastomeric material, is fastened in described gap.
Pervious surface system the most according to claim 1, it is characterized in that, described fixed mesh top is provided with the fixing post raised up, and is provided with the fixing groove upwards caved in bottom described water-permeable brick, and described water-permeable brick is fixed on described fixing post by described fixing groove correspondence.
Pervious surface system the most according to claim 1, it is characterised in that each corresponding polylith water-permeable brick of described fixed mesh;Multiple fixed meshes can mutually splice;The material of described fixed mesh is plastics or cement.
Pervious surface system the most according to claim 1, it is characterised in that described water-permeable brick is the one in pervious concrete brick, permeable Ceramic Tiles or sand base water-permeable brick.
Pervious surface system the most according to claim 1, it is characterised in that formation inclined-plane or sunk structure at the bottom surface outer rim that described water-permeable brick connects with described porous base course, the cross section of described sunk structure is triangular in shape, rectangle or circular arc.
6. according to the pervious surface system described in claim 1, it is characterised in that the end face of described water-permeable brick is identical with bottom surface size and shape, its side being formed with groove structure, the cross section of described groove structure is trapezoidal, circular arc or rectangle.
7., in described in, permeable bar is fastened on the gap of two pieces of described water-permeable bricks, the upper surface of described permeable bar is less than the upper surface of described water-permeable brick.
Pervious surface system the most according to claim 1, it is characterised in that described permeable bar is solid or hollow permeable rubber strip, is covered with permeable micropore inside described permeable rubber strip material, and containing hydrophilic macromolecule composition.
Pervious surface system the most according to claim 8, it is characterised in that comprise Nano titanium dioxide in the material of described permeable bar;Or the surface of described permeable bar scribbles Nano titanium dioxide;Or the material of described permeable bar comprises nanometer level silver oxide;Or the surface of described permeable bar scribbles nanometer level silver oxide.
Pervious surface system the most according to claim 1, it is characterised in that the material of described porous base course is at least the one in sandstone compound, pervious concrete.
The method for paving of 11. 1 kinds of pervious surfaces, it is characterised in that comprise the following steps:
1) porous base course is laid on the concrete on the ground of compacting or with surge tank;
2) fixed mesh is set on described porous base course, described ovum metalling is laid in fixed mesh;
3) on fixing post protruding on fixed mesh, water-permeable brick, preset clearance between adjacent described water-permeable brick are installed;
4) in reserved described gap, permeable bar is installed.
CN201610171313.2A 2016-03-23 2016-03-23 Water permeable ground system and paving method Pending CN105821737A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610171313.2A CN105821737A (en) 2016-03-23 2016-03-23 Water permeable ground system and paving method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610171313.2A CN105821737A (en) 2016-03-23 2016-03-23 Water permeable ground system and paving method

Publications (1)

Publication Number Publication Date
CN105821737A true CN105821737A (en) 2016-08-03

Family

ID=56524995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610171313.2A Pending CN105821737A (en) 2016-03-23 2016-03-23 Water permeable ground system and paving method

Country Status (1)

Country Link
CN (1) CN105821737A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638221A (en) * 2017-01-06 2017-05-10 岭南新科生态科技研究院(北京)有限公司 Permeable paving system and paving method for removing oil stain in runoff rainwater
CN106758636A (en) * 2017-03-17 2017-05-31 孔文艺 A kind of permeable pavement band for being easy to permeable pavement pavement preservation and permeable pavement road surface
CN106882937A (en) * 2017-03-01 2017-06-23 河海大学 A kind of fiber and steel bar reinforced self-cleaning water permeable building block and preparation method thereof
CN108532865A (en) * 2018-05-10 2018-09-14 周雅婷 Environment protection tile
CN111535110A (en) * 2020-04-27 2020-08-14 台州市市政基础设施开发集团有限公司 Road and construction method thereof
CN111809472A (en) * 2020-07-15 2020-10-23 孙亚 Different-terrain self-adaptive rapid installation road

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1904207A (en) * 2005-07-28 2007-01-31 黄庆辉 Ground brick and positioning lattice board composition and its pavement construction method
CN101445340A (en) * 2008-12-30 2009-06-03 程卫国 Self-cleaning water permeable brick and preparation method thereof
CN102433819A (en) * 2011-10-10 2012-05-02 苏鸣 Semi-flexible structure permeable street and pavement method thereof
CN104727201A (en) * 2015-03-20 2015-06-24 吕国兵 Water-permeable ground system and pavement method
KR101600320B1 (en) * 2015-06-17 2016-03-07 주식회사 부강 Sidewalk structure with draining and city water functions

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1904207A (en) * 2005-07-28 2007-01-31 黄庆辉 Ground brick and positioning lattice board composition and its pavement construction method
CN101445340A (en) * 2008-12-30 2009-06-03 程卫国 Self-cleaning water permeable brick and preparation method thereof
CN102433819A (en) * 2011-10-10 2012-05-02 苏鸣 Semi-flexible structure permeable street and pavement method thereof
CN104727201A (en) * 2015-03-20 2015-06-24 吕国兵 Water-permeable ground system and pavement method
KR101600320B1 (en) * 2015-06-17 2016-03-07 주식회사 부강 Sidewalk structure with draining and city water functions

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638221A (en) * 2017-01-06 2017-05-10 岭南新科生态科技研究院(北京)有限公司 Permeable paving system and paving method for removing oil stain in runoff rainwater
CN106882937A (en) * 2017-03-01 2017-06-23 河海大学 A kind of fiber and steel bar reinforced self-cleaning water permeable building block and preparation method thereof
CN106758636A (en) * 2017-03-17 2017-05-31 孔文艺 A kind of permeable pavement band for being easy to permeable pavement pavement preservation and permeable pavement road surface
CN106758636B (en) * 2017-03-17 2022-08-12 孔文艺 Permeable pavement belt convenient for maintenance of permeable pavement and permeable pavement
CN108532865A (en) * 2018-05-10 2018-09-14 周雅婷 Environment protection tile
CN111535110A (en) * 2020-04-27 2020-08-14 台州市市政基础设施开发集团有限公司 Road and construction method thereof
CN111535110B (en) * 2020-04-27 2022-02-01 台州市市政基础设施开发集团有限公司 Road and construction method thereof
CN111809472A (en) * 2020-07-15 2020-10-23 孙亚 Different-terrain self-adaptive rapid installation road
CN111809472B (en) * 2020-07-15 2022-06-17 孙亚 Different-terrain self-adaptive rapid installation road

Similar Documents

Publication Publication Date Title
CN105821737A (en) Water permeable ground system and paving method
CN105821736A (en) Water permeable ground system and paving method
CN104727201B (en) A kind of pervious surface system and method for paving
CN204174530U (en) Bridge rain drainage structure
CN105862547A (en) Water-permeable floor system and paving method
CN110747813A (en) Waterproof construction method for hydraulic engineering
CN106758636B (en) Permeable pavement belt convenient for maintenance of permeable pavement and permeable pavement
CN203008114U (en) Concrete ditch cover plate with holes
CN105887620A (en) Pervious area system and laying method
CN105862546A (en) Pavement brick
CN204551177U (en) A kind of pervious surface system
CN109322226A (en) The sponge urban water-through pavement of replaceable filter device
KR101838586B1 (en) Infiltration Sidewalk Block System Including Clearance Block
CN108867664A (en) A kind of road based on contrary sequence method changes bridge section foundation pit supporting construction and its construction method
CN206625118U (en) Full steel structure combines bridge plate urban viaduct
CN211713548U (en) Firm ecological permeable pavement of type
CN210238266U (en) Ribbed wall type bridge abutment
CN210194365U (en) Silica sand porous disk convenient to drainage
KR101096195B1 (en) Sidewalk block assembly system
CN208717919U (en) A kind of road based on contrary sequence method changes bridge section foundation pit supporting construction
CN108342972A (en) Full steel structure combines bridge plate urban viaduct and its construction technology
CN110067169A (en) A kind of porous precast assembly concrete road construction method
KR101425709B1 (en) Bottom Projection Footpath Block Case
KR20170143279A (en) Water permeable block assembly, water permeable system having this and construction method thereof
CN216663666U (en) Basic unit I-shaped brick that permeates water that is fit for different road surfaces

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Qin Shengyi

Inventor before: Hu Junfeng

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20171221

Address after: 246600, No. 1, general road, Yuexi Economic Development Zone, Anqing, Anhui

Applicant after: Renchuang ecological environmental protection Polytron Technologies Inc

Address before: Science and Technology City kolding road high tech Zone of Suzhou City, Jiangsu Province, No. 78 215163

Applicant before: Suzhou Le Juyitang Electronic Science and Technology Co., Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication