CN105821730B - The temporary support structures and its construction method quickly widened applied to place - Google Patents

The temporary support structures and its construction method quickly widened applied to place Download PDF

Info

Publication number
CN105821730B
CN105821730B CN201610316678.XA CN201610316678A CN105821730B CN 105821730 B CN105821730 B CN 105821730B CN 201610316678 A CN201610316678 A CN 201610316678A CN 105821730 B CN105821730 B CN 105821730B
Authority
CN
China
Prior art keywords
reinforcing bar
anchor pole
support structures
temporary support
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610316678.XA
Other languages
Chinese (zh)
Other versions
CN105821730A (en
Inventor
王海涛
宋词
张景元
涂兵雄
何永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Jiaotong University
Original Assignee
Dalian Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Jiaotong University filed Critical Dalian Jiaotong University
Priority to CN201610316678.XA priority Critical patent/CN105821730B/en
Publication of CN105821730A publication Critical patent/CN105821730A/en
Application granted granted Critical
Publication of CN105821730B publication Critical patent/CN105821730B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C21/00Apparatus or processes for surface soil stabilisation for road building or like purposes, e.g. mixing local aggregate with binder
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of temporary support structures quickly widened applied to place and its construction methods, including anchor pole, concrete topping, sandbag, bar-mat reinforcement, reinforcing bar pawl, reinforcing bar crotch, horizontal be equidistantly inserted into the slopes of former rock side slope of the slopes section of multiple anchor poles is fixed, overhanging section of reinforcing bar both sides of the anchor pole are equidistantly connected to multiple reinforcing bar pawls, run through the sandbag for having and filling rubble on the reinforcing bar pawl, overhanging section of end of each anchor pole is connected by bar-mat reinforcement, the gap location of anchor pole and sandbag is filled with gravelly soil, and concrete topping is injected at bar-mat reinforcement.The temporary support structures of the present invention quickly widened applied to place and its construction method, main supporting construction is formed by anchor pole, transverse steel, sandbag and gravelly soil is filled with, can quickly support the temporary support structures widened, it can shorten the construction period and reduce project cost.

Description

The temporary support structures and its construction method quickly widened applied to place
Technical field
The present invention relates to Geotechnical Engineering field, the engineerings such as civil building, highway, railway quickly add for rock matter place Width more particularly to a kind of temporary support structures quickly widened applied to place and its construction method.
Background technology
At present, with the development of engineering construction, building is higher and higher, increasing, and all kinds of engineering grounds are also increasing, But often construction operation area is restricted at top of the slope, people live range suffer restraints, emergency dealing work can not and When progress, need to widen building yard, but it is domestic so far be not also to the technology for solving such case very into It is ripe, there are a kind of effective temporary support structures quickly widened to be developed to change the status quo.
Invention content
The it is proposed of the present invention in view of the above problems, and a kind of gib knot quickly widened applied to place of research and design Structure and its construction method widen technology temporarily for solving the disadvantage that existing engineering construction does not have to building yard progress.This It is as follows to invent the technological means used:
A kind of temporary support structures quickly widened applied to place, including anchor pole, concrete topping, sandbag, bar-mat reinforcement With reinforcing bar pawl, horizontal be equidistantly inserted into the slopes of former rock side slope of the slopes section of multiple anchor poles is fixed, the anchor pole Overhanging section of reinforcing bar both sides are equidistantly welded with multiple reinforcing bar pawls, run through the sandbag for having and filling rubble on the reinforcing bar pawl, each Overhanging section of end of anchor pole is connected by bar-mat reinforcement, and the gap location of anchor pole and sandbag is filled with gravelly soil, is injected at bar-mat reinforcement Concrete topping.
It is fixed on as the preferably described bar-mat reinforcement on the reinforcing bar crotch that overhanging section of end of anchor pole have.
As being provided with multiple transverse steels for reinforcement structure intensity on preferred anchor pole.
Anchor pole as the arrangement setting of the preferred bottom is close to the concrete foundation of former rock side slope bottom.
A kind of construction method of temporary support structures quickly widened applied to place, includes the following steps:
(1), prepare before construction, first carry out the base treatment on wide field ground to be added, then processed outside anchor pole according to design requirement Stretch section reinforcing bar and reinforcing bar pawl, and by reinforcing bar pawl uniform welding in the reinforcing bar both sides of overhanging section of anchor pole;
(2), it when constructing, first carries out bottom anchor pole and constructs between slopes, according to design requirement in protolith matter side slope slopes Horizontal direction drilling, slopes section reinforcing bar in anchor pole is stretched into anchor hole fixed.
(3), after the early strong slurry injected in anchor hole is solidified to prescribed strength, anchor is applied in the interior sandbag for filling rubble On the reinforcing bar pawl of overhanging section of bar.
(4), by transverse steel respectively with overhanging section of reinforcing bar horizontal direction square crossing connection of anchor pole.
(5), it is filled up using gravelly soil and covers sandbag gap location.
(6), bar-mat reinforcement is laid with, the reinforcing bar crotch connection that bar-mat reinforcement is made to be reserved with overhanging section of end of anchor pole, and to bar-mat reinforcement Locate gunite concrete face layer.
(7), after the completion of every layer of construction, above-mentioned construction procedure is repeated, until construction is completed.
It is stretched into anchor hole as slopes section reinforcing bar in the anchor pole described in preferred steps (2) after fixing, to anchor hole and anchor pole The early strong slurry of gap location injection.
It is no more than 3m as distance between the transverse steel described in preferred steps (4).
It is paved and is flattened by the way of man-computer cooperation as preferred steps (5) medium stone soil.
As the reinforcing bar pawl described in preferred steps (1) on anchor pole between be divided into 300mm-500mm, the length of reinforcing bar pawl For 150mm-200mm, reinforcing bar pawl vertical direction setting is fixedly welded on anchor pole reinforcing bar, and make the same anchor of reinforcing bar pawl Bar reinforcing bar axis is vertical.
Diameter as the preferably described gravelly soil filler is not more than 15cm.
Compared with the prior art, the temporary support structures and its construction party of the present invention quickly widened applied to place Method forms main supporting construction by anchor pole and transverse steel, is filled with sandbag and gravelly soil, can quickly support what is widened Temporary support structures can shorten the construction period and reduce project cost.
Description of the drawings
Fig. 1 is the overall structure diagram of the present invention.
Fig. 2 is the vertical view of the present invention.
Fig. 3 is the partial schematic diagram of the present invention.
Fig. 4 is reinforcing bar crotch of the present invention and bar-mat reinforcement connection figure.
Fig. 5 is the structure diagram of bar-mat reinforcement of the present invention.
Fig. 6 is the schematic diagram of construction procedure of the present invention (1) and (2).
Fig. 7 is the schematic diagram of construction procedure of the present invention (3) and (4).
Fig. 8 is the schematic diagram of construction procedure of the present invention (5) and (6).
Wherein:1st, anchor pole, 2, transverse steel, 3, concrete topping, 4, sandbag, 5, bar-mat reinforcement, 6, former rock side slope, 7, steel Muscle pawl, 8, concrete foundation, 9, reinforcing bar crotch.
Specific embodiment
As Figure 1-Figure 8, a kind of temporary support structures quickly widened applied to place, including anchor pole 1, concrete surface Layer 3, sandbag 4, bar-mat reinforcement 5 and reinforcing bar pawl 7, the horizontal slope for being equidistantly inserted into former rock side slope 6 of slopes section of multiple anchor poles 1 Fixed in vivo, overhanging section of reinforcing bar both sides of the anchor pole 1 are equidistantly welded with multiple reinforcing bar pawls 7, run through on the reinforcing bar pawl 7 There is the sandbag 4 for filling rubble, overhanging section of end of each anchor pole 1 is connected by bar-mat reinforcement 5, and the gap location of anchor pole 1 and sandbag 4 is filled out Filled with gravelly soil, concrete topping 3 is injected at bar-mat reinforcement 5, supporting construction intensity after molding is high, and speed of application is fast, can It shortens the construction period, and project cost can be reduced.
The bar-mat reinforcement 5 is fixed on the reinforcing bar crotch 9 that 1 overhanging section of end of anchor pole has.It is provided on anchor pole 1 multiple For the transverse steel 2 of reinforcement structure intensity.The anchor pole 1 of bottom arrangement setting is close to the concrete of former 6 bottom of rock side slope Basis 8.
1 reinforcing bar of anchor pole of the present invention is divided into two parts, and a part is the slopes section stretched into side slope anchor hole, and a part is to stretch Go out overhanging section of side slope, overhanging section of upper welded reinforcement pawl.Anchor pole reinforcing bar and 2 horizontal vertical interconnection of transverse steel.
As Figure 1-Figure 8, a kind of construction method of temporary support structures quickly widened applied to place, using inverse work Method includes the following steps:
(1), prepare before construction, first carry out the base treatment on wide field ground to be added, then processed outside anchor pole according to design requirement Stretch section reinforcing bar 1 and reinforcing bar pawl 7, and by 7 uniform welding of reinforcing bar pawl in the reinforcing bar both sides of overhanging section of anchor pole;As preferred steps (1) reinforcing bar pawl 7 described on anchor pole 1 between be divided into 300mm-500mm, being preferably spaced on anchor pole 1 of reinforcing bar pawl 7 500mm, the length of reinforcing bar pawl 7 is 150mm-200mm, and the length of reinforcing bar pawl 7 is preferably 150mm, the vertical side of the reinforcing bar pawl 7 It to setting, is fixedly welded on 1 reinforcing bar of anchor pole, and makes reinforcing bar pawl 7 vertical with 1 reinforcing bar axis of anchor pole.
(2), it when constructing, first carries out bottom anchor pole 1 and constructs between slopes, according to design requirement on former 6 slope of rock side slope The horizontal direction drilling of body is stretched into slopes section reinforcing bar in anchor pole 1 fixed in anchor hole;As the anchor described in preferred steps (2) The slopes section reinforcing bar of bar 1 is stretched into anchor hole after fixation, to the early strong slurry of the gap location of anchor hole and anchor pole 1 injection.
(3), when the morning injected in anchor hole, slurry is solidified to prescribed strength by force, and anchor is applied in the interior sandbag 4 for filling rubble On the reinforcing bar pawl 7 of overhanging section of bar, after placing, sandbag 4 is aligned.
(4), by transverse steel respectively with 1 overhanging section of reinforcing bar horizontal direction square crossing connection of anchor pole;As preferred steps (4) distance is no more than 3m between the transverse steel described in, and the spacing between transverse steel is preferably 3m, will be laterally every 3m distances Reinforcing bar and each 1 overhanging section of bar connecting of anchor pole, for enhancing the rigidity of supporting construction, sandbag 4, anchor pole reinforcing bar 1 and lateral steel Muscle 2 forms main supporting construction.
(5), it is filled up using gravelly soil and covers 4 gap location of sandbag;Man-machine knot is used as preferred steps (5) medium stone soil The mode of conjunction is paved and is flattened, paving thickness uniformity, surfacing;Wherein, the 1.5m ranges away from concrete topping 3 It is interior to use Manual.
Gravelly soil filler, which is preferentially selected, the preferable sandy soil of certain grading, water penetration, broken (gravel) stone class soil, to ensure muscle Larger frictional force can be played between band and filler, it is ensured that stable structure;Diameter as the preferably described gravelly soil filler is not More than 15cm.
(6), bar-mat reinforcement 5 is laid with, the reinforcing bar crotch 9 that bar-mat reinforcement 5 is reserved with 1 overhanging section of end of anchor pole is made to connect, and to steel Gunite concrete face layer 3 at muscle net 5;
(7), after the completion of every layer of construction, above-mentioned construction procedure is repeated, until construction is completed.
During support construction of the present invention, carry out the vertical and horizontal displacement of top of the slope, periphery earth's surface Vertical Settlement and The monitoring of surface cracks to ensure the safety of side slope, during support construction of the present invention, is realized and is shortened the construction period, reduces The purpose of project cost.
The present invention can be used in all kinds of engineering grounds and widen in supporting construction temporarily, in the particular embodiment, such as Fig. 6 institutes Show, the slope height of former rock side slope 6 is 8.0m, and the width that need to widen is 4m.
Before widening construction, former rock side slope 6 has used prestress anchorage cable+overall length caking property suspension roof support to complete, now former 6 outside of rock side slope is widened.
As shown in Figure 1, in work progress, first using concrete foundation 8, the base treatment on wide field ground to be added is carried out, then The anchor pole 1 for stretching out slopes section is processed according to design requirement, every 500mm 1 overhanging section of anchor pole reinforcing bar both sides weld length The reinforcing bar pawl 7 of 150mm, direction is vertically perpendicular to reinforcing bar axis;The construction of most one row's anchor pole 1 of bottom is carried out again, first on protolith matter side 6 slopes design position of slope carries out drilling construction, 1 reinforcing bar of anchor pole being put into after processing, the early strong slurry of anchor hole injection.
As shown in fig. 7, after slurry reaches some strength, 1 overhanging section of anchor pole is applied in the interior sandbag 4 for filling rubble On reinforcing bar pawl 7;Every 3m distances by transverse steel 2 and each 1 overhanging section of bar connecting of anchor pole, for enhancing the firm of supporting construction Degree.
As shown in figure 8, the gap location of sandbag 4 is filled up and covered with gravelly soil, paved by the way of man-computer cooperation With pressing;Reserved steel bar crotch 9 is answered in 1 overhanging section of end of anchor pole, for being connect with the bar-mat reinforcement 5 in gunite concrete face layer 3; Bar-mat reinforcement 5 is laid with, after completing the connection with reserved steel bar crotch 9, carries out the construction of gunite concrete face layer 3;Every layer has been constructed Cheng Hou repeats above-mentioned construction procedure, until construction is completed.
Wherein, concrete topping 3 of the present invention is using C25 gunite concrete injection moldings, the thickness of concrete topping 3 For 150mm, it is built-in with 8@of φ, 150 × 150 bar-mat reinforcements;The top of the slope of former rock side slope 6 uses C25 gunite concrete injection moldings, The thickness of top of the slope concrete layer be 250mm, 8@of built-in bilayer φ, 150 × 150 bar-mat reinforcements.
It should be noted that forbidding preloading in the range of former 6 top of the slope 6m of rock side slope, the outer preloading value of 6m ranges must not surpass Cross 10kPa.
During construction, along with the vertical and horizontal displacement of former 6 top of the slope of rock side slope, periphery earth's surface Vertical Settlement And the monitoring of surface cracks.
Monitoring and warning value is:Horizontal or vertical accumulation displacement reaches 2mm/d up to 30mm or rate of displacement.It is following when occurring Situation for the moment, it is necessary to carry out danger warning immediately, and cope with the protection object in supporting construction and surrounding enviroment take it is emergent Treatment measures.
(1) monitoring data reach monitoring and warning value.
(2) shift value of supporting construction or the periphery soil body significantly increases suddenly.
Engineering construction and during use, should carry out walkaround inspection by special messenger daily, to supporting construction, construction operating mode, periphery Environment, monitoring facilities carry out walkaround inspection, and Construction Party and other relevant units should be notified in time with dangerous situation by such as noting abnormalities.
The temporary support structures of the present invention quickly widened applied to place and its construction method, had both accelerated construction Speed simplifies construction technology, and reduces engineering cost, and the place after widening can be used as temporary building place, life field And emergency dealing temporary road etc..
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (10)

1. a kind of temporary support structures quickly widened applied to place, it is characterised in that including anchor pole, concrete topping, sand Bag, bar-mat reinforcement and reinforcing bar pawl, the slopes section of multiple anchor poles is horizontal to be equidistantly inserted into fixed in the slopes of former rock side slope, institute Overhanging section of reinforcing bar both sides for stating anchor pole are equidistantly welded with multiple reinforcing bar pawls, run through the sand for having and filling rubble on the reinforcing bar pawl Bag, overhanging section of end of each anchor pole connected by bar-mat reinforcement, and the gap location of anchor pole and sandbag is filled with gravelly soil, at bar-mat reinforcement It is injected with concrete topping.
2. the temporary support structures according to claim 1 quickly widened applied to place, it is characterised in that:The steel Muscle net is fixed on the reinforcing bar crotch that overhanging section of end of anchor pole has.
3. the temporary support structures according to claim 1 or 2 quickly widened applied to place, it is characterised in that:Anchor pole On be provided with multiple transverse steels for reinforcement structure intensity.
4. the temporary support structures according to claim 3 quickly widened applied to place, it is characterised in that:The bottom is arranged The anchor pole of row setting is close to the concrete foundation of former rock side slope bottom.
5. a kind of construction method of temporary support structures quickly widened applied to place, it is characterised in that include the following steps:
(1), prepare before construction, first carry out the base treatment on wide field ground to be added, overhanging section of anchor pole is then processed according to design requirement Reinforcing bar and reinforcing bar pawl, and reinforcing bar pawl is equidistantly welded in the reinforcing bar both sides of overhanging section of anchor pole;
(2), construct when, first carry out bottom anchor pole construct between slopes, according to design requirement protolith matter side slope slopes water Square to drilling, slopes section reinforcing bar in anchor pole is stretched into fixed in anchor hole;
(3), it is applied in the interior sandbag for filling rubble on the reinforcing bar pawl of overhanging section of anchor pole;
(4), by transverse steel respectively with overhanging section of reinforcing bar horizontal direction square crossing connection of anchor pole;
(5), it is filled up using gravelly soil and covers sandbag gap location;
(6), bar-mat reinforcement is laid with, the reinforcing bar crotch connection that bar-mat reinforcement is made to be reserved with overhanging section of end of anchor pole, and to being sprayed at bar-mat reinforcement Penetrate concrete topping;
(7), after the completion of every layer of construction, above-mentioned construction procedure is repeated, until construction is completed.
6. the construction method of temporary support structures according to claim 5 quickly widened applied to place, feature exist In:
Slopes section reinforcing bar is stretched into anchor hole after fixation in anchor pole described in step (2), is injected to the gap location of anchor hole and anchor pole Early strong slurry.
7. the construction method of temporary support structures according to claim 5 quickly widened applied to place, feature exist In:
Distance is no more than 3m between transverse steel described in step (4).
8. the construction method of temporary support structures according to claim 5 quickly widened applied to place, feature exist In:
Step (5) medium stone soil is paved and is flattened by the way of man-computer cooperation.
9. the construction method of temporary support structures according to claim 5 quickly widened applied to place, feature exist In:
Reinforcing bar pawl described in step (1) on anchor pole between be divided into 300mm-500mm, the length of reinforcing bar pawl is 150mm- 200mm, reinforcing bar pawl vertical direction setting, is fixedly welded on anchor pole reinforcing bar, and make reinforcing bar pawl with anchor pole reinforcing bar axis Line is vertical.
10. the construction method of temporary support structures according to claim 5 quickly widened applied to place, feature exist In:The diameter of the gravelly soil filler is not more than 15cm.
CN201610316678.XA 2016-05-12 2016-05-12 The temporary support structures and its construction method quickly widened applied to place Active CN105821730B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610316678.XA CN105821730B (en) 2016-05-12 2016-05-12 The temporary support structures and its construction method quickly widened applied to place

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610316678.XA CN105821730B (en) 2016-05-12 2016-05-12 The temporary support structures and its construction method quickly widened applied to place

Publications (2)

Publication Number Publication Date
CN105821730A CN105821730A (en) 2016-08-03
CN105821730B true CN105821730B (en) 2018-06-12

Family

ID=56529911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610316678.XA Active CN105821730B (en) 2016-05-12 2016-05-12 The temporary support structures and its construction method quickly widened applied to place

Country Status (1)

Country Link
CN (1) CN105821730B (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205617175U (en) * 2016-05-12 2016-10-05 大连交通大学 Be applied to temporary support structure of widening fast in place

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1067453C (en) * 1995-12-29 2001-06-20 曾宪明 Foundation pit slope flat anchor spray net supporting method
JPH1150475A (en) * 1997-07-30 1999-02-23 Free Kogyo Kk Execution of concrete structure and form plate
CN102352632B (en) * 2011-07-29 2013-09-18 重庆大学 Anchor rod sheet pile combined structure and method for reinforcing high filling body on one side of slope
CN203007960U (en) * 2013-01-14 2013-06-19 金华职业技术学院 Novel side slope shotcreting-bolting support structure
CN203654303U (en) * 2013-12-18 2014-06-18 中国矿业大学(北京) Side slope reinforcing structure
CN204590048U (en) * 2015-04-30 2015-08-26 中国建筑第四工程局有限公司 A kind of high slope rockmass structure

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205617175U (en) * 2016-05-12 2016-10-05 大连交通大学 Be applied to temporary support structure of widening fast in place

Also Published As

Publication number Publication date
CN105821730A (en) 2016-08-03

Similar Documents

Publication Publication Date Title
CN106522242B (en) For soft stratum close to underground structure foundation pit supporting system construction method
CN106801417B (en) Tunnel Passing structures steel pipe isolation pile stratum consolidation system and its construction method
CN101838998B (en) Prestressed anchor cable pile sliding wall along river road shoulder and construction method thereof
CN106498950B (en) Anchor head is placed in the implementation method of the Pile-Anchor Supporting for Deep Excavation system of pile body
CN203741868U (en) Reinforced concrete retaining wall structure with combined anchor wire
CN103334357B (en) Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method
CN103924501B (en) Reinforcement construction method in the cement pavement local failure reparation of a kind of rural area
CN104195911A (en) Widened embankment structure with beside-water cliff high retaining wall fill section and construction method of widened embankment structure
CN109372011A (en) Large-volume prestressed beam underpinning structure and the method for carrying out pile foundation underpinning with the structure
CN206844120U (en) It is a kind of be adapted to adjacent foundation pits supporting to draw anchor cable structure
CN107190602A (en) A kind of river degradation section pile formula foam concrete light road bank structure and construction method
CN103572765A (en) Treatment and construction method of bridge site river bank expansive soil landslide positions
CN103046446A (en) Highway reconstruction and extension project joint portion treatment structure
CN110374111A (en) A kind of slope cooperates with support system with steel pipe piled anchor
CN206408630U (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body
CN105239475B (en) Track strengthening structure under complicated existing railway line in culvert jack-in process
CN210262555U (en) Light soil road structure
CN203334154U (en) Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct
CN103850692A (en) Shield construction protection method for annular flyover
CN204551491U (en) A kind of side slope protection greening structure
CN104196036B (en) Foundation pit supporting structure and method based on old underground outdoor wall structure
CN109281239A (en) Ribbed abutments in road operation state bore slope cutting method
CN209211459U (en) Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA
CN105821730B (en) The temporary support structures and its construction method quickly widened applied to place
CN111305182A (en) Soft foundation reinforcement construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant