CN105803875A - Construction method for preparing foam-light-soil-poured high-speed rail subgrade - Google Patents

Construction method for preparing foam-light-soil-poured high-speed rail subgrade Download PDF

Info

Publication number
CN105803875A
CN105803875A CN201610147731.8A CN201610147731A CN105803875A CN 105803875 A CN105803875 A CN 105803875A CN 201610147731 A CN201610147731 A CN 201610147731A CN 105803875 A CN105803875 A CN 105803875A
Authority
CN
China
Prior art keywords
subgrade
lightweight soil
foam lightweight
soil
bottom layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610147731.8A
Other languages
Chinese (zh)
Inventor
陈忠平
汪建斌
韩健
陈俊霖
罗勇
朱孝帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG SHENGRUI TECHNOLOGY CO., LTD.
Sichuan Chuang Chuang Technology Co., Ltd.
Original Assignee
Guangdong Shengrui Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Shengrui Technology Co Ltd filed Critical Guangdong Shengrui Technology Co Ltd
Priority to CN201610147731.8A priority Critical patent/CN105803875A/en
Publication of CN105803875A publication Critical patent/CN105803875A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/005Making of concrete parts of the track in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/006Deep foundation of tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/08Deep or vertical foundation

Abstract

The invention discloses a construction method for preparing a foam-light-soil-poured high-speed rail subgrade. The construction method comprises the steps that the high-speed rail subgrade is divided into a subgrade bed surface layer and a subgrade bed bottom layer; subgrade groove excavation construction is performed according to the height of the high-speed rail subgrade; mixed raw materials of foam light soil of the subgrade bed bottom layer are proportioned; molding is performed in a mold of the subgrade bed bottom layer; demolding curing and drying are performed on the foam light soil formed in the subgrade bed bottom layer; mixed raw materials of foam light soil of the subgrade bed surface layer are proportioned; molding is performed in a mold of the subgrade bed surface layer; demolding curing and drying are performed on the foam light soil formed in the subgrade bed surface layer. The foam-light-soil high-speed rail subgrade is high in strength, stable in performance and not prone to sedimentation and deformation, it can be guaranteed that a high-speed train runs steadily and safely, and the maintenance cost during operation in the future is reduced.

Description

A kind of prepare the method that Foam lightweight soil builds high ferro subgrade construction
Technical field
The present invention relates to railway construction technical field, be specifically related to a kind of prepare the method that Foam lightweight soil builds high ferro subgrade construction.
Background technology
Foam lightweight material is to need to be referred to by air in foam oleo stock according to application by method chemically or physically, through reasonable maintenance molding, and formed containing tiny in a large number sealed porosity, and there is the cement-based gelling material of suitable intensity, its production method is typically with mechanical means and foam aqueous solution is prepared into foam, again foam is joined in the slip formed containing siliceous material, calcareous material, water and various additives etc., blended stirring, moulding by casting, maintenance a kind of porous material.
High-quality Foam lightweight soil has good durability (including fatigue-resistance characteristics, freeze-thaw cycle characteristic, drying and watering cycle characteristic), can be used for substituting backfill soil, often it is widely used in the roadbed stemming operations such as soft base Abutment Back fills, expressway extension, precipitous section, mountain area are filled, there is the technology economy advantage of uniqueness.Rail track is made up of base structure thing and the track structure of different characteristics, and these form structural interaction, mutual dependence for existence, collectively form a combination foundation circuit.Base structure thing is divided into again cast-in-place structural basis and fills architecture basics, cast-in-place structural basis is railway span river, the bridge that intermountain etc. must be provided with, the structures such as tunnel, fill architecture basics to be generally and fill graded broken stone or graded sand gravel mixes a certain amount of cement, fill the railway bed of the design forms such as AB material, the different base structure thing of both is in intensity, rigidity, deformation, the aspects such as material have very big difference, easily cause differential settlement, the diseases such as deformation, cause producing to impact to track structure when train passes through basis intersection, train is made again to produce big vibration in turn, cause train operation worsening condition, vehicle, track structure service life reduction, affect the steady and security problems that bullet train runs.It is thus desirable to consider a kind of high ferro roadbed construction method, there is provided a kind of compound intensity roadbed embankment material making basis high, stable performance to substitute based on this subgrade construction scheme or Part Substitution (arranging basement transition stage) fills structure roadbed, guarantee the current safety of bullet train, and reduce the maintenance cost during operation in the future.
Summary of the invention
For the deficiency of Foam lightweight soil construction in existing high ferro, the invention provides and a kind of prepare the method that Foam lightweight soil builds high ferro subgrade construction, by preparing the high ferro roadbed of composite bed, meet the requirement of existing high ferro roadbed.
The invention provides and a kind of prepare the method that Foam lightweight soil builds high ferro subgrade construction, comprise the steps:
High ferro roadbed is divided into surface layer of subgrade bed and bottom layer of subgrade, pre-sets the light-weight foamed soil layer in surface layer of subgrade bed and bottom layer of subgrade and build height;
Carry out foundation trench excavation construction according to high ferro roadbed height, and the base of the high ferro roadbed to build is cleared up, ensure that base is without rubbish and hydrops;
The mixed material in Foam lightweight soil in configuration bottom layer of subgrade, forms uniformly modified slip by Pulp preparation, adds foaming agent mixed foaming and formed in modified slip;
When foaming in bottom layer of subgrade, the Foam lightweight soil wet density formed reaches 560kg/m3To 580kg/m3, and when bubble rate reaches 69.5%, in the die for molding of bottom layer of subgrade;
The Foam lightweight soil that bottom layer of subgrade is formed carries out demoulding maintenance, dry;
When the subgrade strength detecting that bottom layer of subgrade is formed reaches more than 1MPa, the mixed material in Foam lightweight soil in configuration surface layer of subgrade bed, form uniformly modified slip by Pulp preparation, in modified slip, add foaming agent mixed foaming formed;
When foaming in surface layer of subgrade bed, the Foam lightweight soil wet density formed reaches 580kg/m3To 620kg/m3, and when bubble rate reaches 66.5%, in the die for molding of surface layer of subgrade bed;
The Foam lightweight soil that surface layer of subgrade bed is formed carries out demoulding maintenance, dry, and the subgrade strength forming lower roadbed reaches more than 1.2MPa.
In described surface layer of subgrade bed, the Foam lightweight soil of every cubic metre is formed with foaming agent mixed foaming by 344kg cement and 224kg water.
In described bottom layer of subgrade, the Foam lightweight soil of every cubic metre is formed with foaming agent mixed foaming by 310kg cement and 202kg water.
It is highly between 0.1m to 1.0m that light-weight foamed soil layer in described surface layer of subgrade bed is built, between the downward 0m to 1m in roadbed top;Described bottom layer of subgrade is at downward more than the 1.0m in roadbed top.
Described cement is composite Portland cement.
Described Foam lightweight soil flow valuve is 160mm to 180mm.
The Acidity of Aikalinity of described water is neutral.
The method adopting compound construction in the present invention, it is possible to achieve the downward 0~1.0m in roadbed top, subgrade strength can reach more than 1.2MPa;Downward more than the 1.0m in roadbed top, subgrade strength can reach more than 1.0MPa.The Foam lightweight soil high ferro subgrade strength constructed by the present invention is high, stable performance, not free settling, deformation, it is possible to ensure that bullet train runs steadily and safety, and reduce the maintenance cost during operation in the future.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, the accompanying drawing used required in embodiment or description of the prior art will be briefly described below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the premise not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the method flow diagram that the preparation Foam lightweight soil in the embodiment of the present invention builds high ferro subgrade construction.
Fig. 2 is the cross-sectional structure schematic diagram of the high ferro roadbed in the embodiment of the present invention;
Fig. 3 is the three-dimensional cross section structure schematic diagram of the high ferro roadbed in the embodiment of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, all other embodiments that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of protection of the invention.
Fig. 1 illustrates that the preparation Foam lightweight soil in the embodiment of the present invention builds the method flow diagram of high ferro subgrade construction, comprises the steps:
S101, high ferro roadbed is divided into surface layer of subgrade bed and bottom layer of subgrade, pre-sets the light-weight foamed soil layer in surface layer of subgrade bed and bottom layer of subgrade and build height;
In specific implementation process, being divided into upper and lower two-layer to carry out placement layer by layer on whole high ferro roadbed, thus ensureing the subgrade strength of different layers, building angle by ensureing in advance, convenient modeling and foundation trench excavation etc..
S102, carry out foundation trench excavation construction according to high ferro roadbed height, and the base of the high ferro roadbed to build is cleared up, ensure that base is without rubbish and hydrops;
The mixed material in Foam lightweight soil in S103, configuration bottom layer of subgrade, forms uniformly modified slip by Pulp preparation, adds foaming agent mixed foaming and formed in modified slip;
In specific implementation process, the first Foam lightweight soil in configuration bottom layer of subgrade, bottom layer of subgrade belongs to the bottom of high ferro roadbed, it is possible to first lay in the process laid, and carries out foaming by foaming agent and mixed material and is formed.
S104, when bottom layer of subgrade foams formed Foam lightweight soil wet density reach 560kg/m3To 580kg/m3, and when bubble rate reaches 69.5%, in the die for molding of bottom layer of subgrade;
In specific implementation process, set up the mould of bottom layer of subgrade, then whole Foam lightweight soil is carried out wet density and bubble rate detection, when reaching corresponding moisturt register and bubble rate, again through the mould molding of bottom layer of subgrade.In this bottom layer of subgrade, the Foam lightweight soil of every cubic metre is formed with foaming agent mixed foaming by 310kg cement and 202kg water.
S105, the Foam lightweight soil that bottom layer of subgrade is formed carry out demoulding maintenance, dry;
In specific implementation process, it is possible to adopt some modes to carry out demoulding maintenance, in order to make whole base course rapid shaping, it is also possible to suitably adopt drying device to be acted upon, it is ensured that the rapidity of whole time.
S106, when the subgrade strength detecting that bottom layer of subgrade is formed reaches more than 1MPa, the mixed material in Foam lightweight soil in configuration surface layer of subgrade bed, form uniformly modified slip by Pulp preparation, in modified slip, add foaming agent mixed foaming formed;
In demoulding maintenance, in dry process, the subgrade strength of the whole bottom layer of subgrade of periodic detection, when the subgrade strength of bottom layer of subgrade reaches more than 1MPa, Foam lightweight soil in configuration surface layer of subgrade bed, bottom layer of subgrade belongs to the bottom of high ferro roadbed, it is possible to first lay in the process laid, and carries out foaming by foaming agent and mixed material and is formed.
S107, when surface layer of subgrade bed foams formed Foam lightweight soil wet density reach 580kg/m3To 620kg/m3, and when bubble rate reaches 66.5%, in the die for molding of surface layer of subgrade bed;
In specific implementation process, set up the mould of surface layer of subgrade bed, then whole Foam lightweight soil is carried out wet density and bubble rate detection, when reaching corresponding wet density and bubble rate, again through the mould molding of surface layer of subgrade bed.In this surface layer of subgrade bed, the Foam lightweight soil of every cubic metre is formed with foaming agent mixed foaming by 344kg cement and 224kg water.
S108, the Foam lightweight soil that surface layer of subgrade bed is formed carry out demoulding maintenance, dry, and the subgrade strength forming lower roadbed reaches more than 1.2MPa.
In demoulding maintenance, dry process, the subgrade strength of the whole bottom layer of subgrade of periodic detection, the subgrade strength at bottom layer of subgrade reaches more than 1.2MPa.
It should be noted that in specific implementation process, the light-weight foamed soil layer in surface layer of subgrade bed is built highly between 0.1m to 1.0m, and such as 0.1m, 0.5m, 0.8m, 1m etc., the light-weight foamed soil layer in this surface layer of subgrade bed is between the downward 0m to 1m in roadbed top.This bottom layer of subgrade is at downward more than the 1.0m in roadbed top.Cement in the embodiment of the present invention is composite Portland cement, and the Foam lightweight soil flow valuve scope in whole construction is between 160mm to 180mm, it is possible to be the situation such as flow valuve 160mm, 170mm, 180mm.In whole Foam lightweight soil foaming process, the Acidity of Aikalinity of water is neutral.
To sum up, the method adopting compound construction in the present invention, it is possible to achieve the downward 0~1.0m in roadbed top, subgrade strength can reach more than 1.2MPa;Downward more than the 1.0m in roadbed top, subgrade strength can reach more than 1.0MPa.The Foam lightweight soil high ferro subgrade strength constructed by the present invention is high, stable performance, not free settling, deformation, it is possible to ensure that bullet train runs steadily and safety, and reduce the maintenance cost during operation in the future.
The preparation the Foam lightweight soil above embodiment of the present invention provided is built the method for high ferro subgrade construction and is described in detail, principles of the invention and embodiment are set forth by specific case used herein, and the explanation of above example is only intended to help to understand method and the core concept thereof of the present invention;Simultaneously for one of ordinary skill in the art, according to the thought of the present invention, all will change in specific embodiments and applications, in sum, this specification content should not be construed as limitation of the present invention.

Claims (7)

1. prepare the method that Foam lightweight soil builds high ferro subgrade construction for one kind, it is characterised in that comprise the steps:
High ferro roadbed is divided into surface layer of subgrade bed and bottom layer of subgrade, pre-sets the light-weight foamed soil layer in surface layer of subgrade bed and bottom layer of subgrade and build height;
Carry out foundation trench excavation construction according to high ferro roadbed height, and the base of the high ferro roadbed to build is cleared up, ensure that base is without rubbish and hydrops;
The mixed material in Foam lightweight soil in configuration bottom layer of subgrade, forms uniformly modified slip by Pulp preparation, adds foaming agent mixed foaming and formed in modified slip;
When foaming in bottom layer of subgrade, the Foam lightweight soil wet density formed reaches 560kg/m3To 580kg/m3, and when bubble rate reaches 69.5%, in the die for molding of bottom layer of subgrade;
The Foam lightweight soil that bottom layer of subgrade is formed carries out demoulding maintenance, dry;
When the subgrade strength detecting that bottom layer of subgrade is formed reaches more than 1MPa, the mixed material in Foam lightweight soil in configuration surface layer of subgrade bed, form uniformly modified slip by Pulp preparation, in modified slip, add foaming agent mixed foaming formed;
When foaming in surface layer of subgrade bed, the Foam lightweight soil wet density formed reaches 580kg/m3To 620kg/m3, and when bubble rate reaches 66.5%, in the die for molding of surface layer of subgrade bed;
The Foam lightweight soil that surface layer of subgrade bed is formed carries out demoulding maintenance, dry, and the subgrade strength forming lower roadbed reaches more than 1.2MPa.
2. the method that preparation Foam lightweight soil as claimed in claim 1 builds high ferro subgrade construction, it is characterised in that in described surface layer of subgrade bed, the Foam lightweight soil of every cubic metre is formed with foaming agent mixed foaming by 344kg cement and 224kg water.
3. the method that preparation Foam lightweight soil as claimed in claim 1 builds high ferro subgrade construction, it is characterised in that in described bottom layer of subgrade, the Foam lightweight soil of every cubic metre is formed with foaming agent mixed foaming by 310kg cement and 202kg water.
4. the method that preparation Foam lightweight soil as claimed in claim 1 builds high ferro subgrade construction, it is characterised in that it is highly between 0.1m to 1.0m that the light-weight foamed soil layer in described surface layer of subgrade bed is built, between the downward 0m to 1m in roadbed top;Described bottom layer of subgrade is at downward more than the 1.0m in roadbed top.
5. the method that preparation Foam lightweight soil as claimed in claim 1 builds high ferro subgrade construction, it is characterised in that described cement is composite Portland cement.
6. the method that the preparation Foam lightweight soil as described in any one of claim 1 to 5 builds high ferro subgrade construction, it is characterised in that described Foam lightweight soil flow valuve is 160mm to 180mm.
7. the method that the preparation Foam lightweight soil as described in any one of claim 1 to 5 builds high ferro subgrade construction, it is characterised in that the Acidity of Aikalinity of described water is neutral.
CN201610147731.8A 2016-03-15 2016-03-15 Construction method for preparing foam-light-soil-poured high-speed rail subgrade Pending CN105803875A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610147731.8A CN105803875A (en) 2016-03-15 2016-03-15 Construction method for preparing foam-light-soil-poured high-speed rail subgrade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610147731.8A CN105803875A (en) 2016-03-15 2016-03-15 Construction method for preparing foam-light-soil-poured high-speed rail subgrade

Publications (1)

Publication Number Publication Date
CN105803875A true CN105803875A (en) 2016-07-27

Family

ID=56468508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610147731.8A Pending CN105803875A (en) 2016-03-15 2016-03-15 Construction method for preparing foam-light-soil-poured high-speed rail subgrade

Country Status (1)

Country Link
CN (1) CN105803875A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108179667A (en) * 2017-11-30 2018-06-19 中铁四局集团有限公司 The construction monitoring method of high-speed railway Foam lightweight soil roadbed

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103467038A (en) * 2013-08-30 2013-12-25 浙江省建工集团有限责任公司 Foam lightweight soil high-speed rail roadbed
JP5496755B2 (en) * 2010-04-15 2014-05-21 電気化学工業株式会社 Concrete ballast method for ballast roadbed
CN104131502A (en) * 2014-07-07 2014-11-05 广东盛瑞土建科技发展有限公司 Construction method for widening road in rapid erection manner
CN104746390A (en) * 2015-03-13 2015-07-01 西南交通大学 Foam lightweight concrete railroad bed structure
CN105155383A (en) * 2015-07-31 2015-12-16 中交二公局第三工程有限公司 Construction process of bubble light soil

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5496755B2 (en) * 2010-04-15 2014-05-21 電気化学工業株式会社 Concrete ballast method for ballast roadbed
CN103467038A (en) * 2013-08-30 2013-12-25 浙江省建工集团有限责任公司 Foam lightweight soil high-speed rail roadbed
CN104131502A (en) * 2014-07-07 2014-11-05 广东盛瑞土建科技发展有限公司 Construction method for widening road in rapid erection manner
CN104746390A (en) * 2015-03-13 2015-07-01 西南交通大学 Foam lightweight concrete railroad bed structure
CN105155383A (en) * 2015-07-31 2015-12-16 中交二公局第三工程有限公司 Construction process of bubble light soil

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王国英: "泡沫轻质土在S5高速公路路基拓宽工程中的应用", 《上海公路》 *
蔡景红: "谈泡沫轻质土在昌九快速路改造工程中的应用", 《山西建筑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108179667A (en) * 2017-11-30 2018-06-19 中铁四局集团有限公司 The construction monitoring method of high-speed railway Foam lightweight soil roadbed

Similar Documents

Publication Publication Date Title
CN103866670B (en) Fabricated vehicle bearing pavement and construction method thereof
CN103726425B (en) Foam lightweight soil construction method
CN108103871B (en) Construction method of roadbed foam concrete filling technology adjacent to existing subway facility
CN104746390B (en) Foam lightweight concrete railroad bed structure
CN109440571A (en) The construction method for building road is faced in a kind of laying of prefabricated board
CN111764216A (en) Construction method and application of fabricated concrete road plate
CN102587243A (en) Urban road water permeability cement concrete pavement structure and construction process thereof
CN104652371B (en) The glue of crossing set up based on old dam coagulates rock-fill dams and construction method thereof
CN104047236A (en) Repair method of vehicle bump pavement of bridgehead
CN212404694U (en) Assembled water drainage road surface structure of preventing
CN110983892A (en) Foamed light soil and pouring construction process thereof
CN202482730U (en) Permeable brick
CN103696339A (en) Preparation method for partial water permeation floor tiles and partial water permeation floor tiles
CN204825520U (en) Railway subtracts vibration isolation and fills ditch structure
CN105803875A (en) Construction method for preparing foam-light-soil-poured high-speed rail subgrade
CN105735151B (en) A kind of method for repairing road surface
CN104047213B (en) A kind of method for repairing road surface that can solve hard stratum and Soft Soil Layer sinking speed difference
CN104047237B (en) A kind of method for repairing road surface
CN110306671B (en) Construction method of multi-arch closed structure
CN104695315B (en) Frame structure of deep foundation pit under existing railway and layered jacking method for construction of frame structure
CN204715136U (en) A kind of road-bridge transition section road structure
CN111676739A (en) Foam light soil structure applied to large-scale filling engineering and construction method
CN105862560B (en) The method repaired at the Bridge back wall of environmentally safe road pavement
CN207567570U (en) A kind of Foam lightweight soil railway bed transition section structure
CN106320374A (en) Steel pipe column for subway station and construction process of steel pipe column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180918

Address after: 511447 Unit D5, Fifth Floor, Innovation Park, Chuangqi Road, Guanqiao Village, Shilou Town, Panyu District, Guangzhou City, Guangdong Province

Applicant after: GUANGDONG SHENGRUI TECHNOLOGY CO., LTD.

Applicant after: Sichuan Chuang Chuang Technology Co., Ltd.

Address before: 510000 5D unit 1, Qinghua science park, Guan Qiao village, Shi Lou Town, Panyu District, Guangzhou, Guangdong

Applicant before: GUANGDONG SHENGRUI TECHNOLOGY CO., LTD.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160727