CN105785243A CN201610217229.XA CN201610217229A CN105785243A CN 105785243 A CN105785243 A CN 105785243A CN 201610217229 A CN201610217229 A CN 201610217229A CN 105785243 A CN105785243 A CN 105785243A
Authority
CN
China
Prior art keywords
insulator
flashover
icing
ice
risk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610217229.XA
Other languages
Chinese (zh)
Other versions
CN105785243B (en
Inventor
卢恩泽
王海涛
谷山强
赵淳
郭钧天
�田�浩
陶汉涛
吴大伟
章涵
张磊
陈玥
何君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STATE GRID JIANGXI ELECTRIC POWER Co
State Grid Corp of China SGCC
Wuhan NARI Ltd
Original Assignee
STATE GRID JIANGXI ELECTRIC POWER Co
State Grid Corp of China SGCC
Wuhan NARI Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STATE GRID JIANGXI ELECTRIC POWER Co, State Grid Corp of China SGCC, Wuhan NARI Ltd filed Critical STATE GRID JIANGXI ELECTRIC POWER Co
Priority to CN201610217229.XA priority Critical patent/CN105785243B/en
Publication of CN105785243A publication Critical patent/CN105785243A/en
Application granted granted Critical
Publication of CN105785243B publication Critical patent/CN105785243B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
    • G01R31/1227Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials
    • G01R31/1245Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials of line insulators or spacers, e.g. ceramic overhead line cap insulators; of insulators in HV bushings
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • G08B21/182Level alarms, e.g. alarms responsive to variables exceeding a threshold
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • G08B21/185Electrical failure alarms

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Insulators (AREA)

Abstract

The invention discloses an evaluation method for an insulator icing flashover risk of an ultrahigh voltage alternating-current transmission line. The method comprises: S1, carrying out meteorological and line basic data collection; S2, carrying out determination of an insulator icing flashover initial condition; S3, carrying out insulator icing flashover voltage calculation; and S4, carrying out insulator icing flashover risk evaluation. According to the invention, on the basis of the real-time meteorological data, an insulator icing flashover risk is evaluated by combining basic data of the ultrahigh voltage alternating-current transmission line and the powerful guidance can be provided for disaster prevention and reduction of the power grid operation management department. The method can be realized simply with high feasibility; and the prediction result has the high reference value.

Description

A kind of ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment
Technical field
The invention belongs to electrical network to prevent and reduce natural disasters field, particularly relate to a kind of ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment.
Background technology
UHV transmission has the advantage that transmission capacity is big, power transmission distance is remote, power transmission efficiency is high, it has also become the main electric energy mode of movement of the problems such as Energy Base improves day by day and line corridor is nervous all the more is alleviated with load center skewness weighing apparatus, transmission line capability in China." 12 " period, State Grid Corporation of China invests 500,000,000,000 yuan, built and at the UHV transmission line built 40,000 kilometers, transmission line capability 4.3 hundred million kilovolt-amperes, gradually forms the energy source configuration general layout in " transferring electricity from the west to the east, north and south mutually for, on national network ".In UHV transmission line process of construction, due to line corridor growing tension, increasing track section needs through locations with a varied topography such as high mountain high hill, valley, rivers, inevitably it is subject to the impact of the atmospheric environments such as ice and snow, low pressure, High aititude, filth, there is the risk of icing flashover in insulator, power grid operation constitutes direct threat.
Southeast Shanxi-Nanyang-Jingmen UHVAC demonstration project, as First extra high voltage line, there occurs 3 icing flashover faults altogether since on January 6th, 2009 formally puts into operation.By accident conditions are analyzed, show that failure cause is as follows: the 1st fault (2010-02-1612:41) is that typical covering ice for insulator flashover, wire and the icing situation on insulator are all very serious;The edge flashing fault that 2nd fault (2012-03-0109:47) occurs when ice dissolution and low temperature high humidity for contaminated insulator;3rd time fault (2012-03-0220:25) belongs to glaze icing flashover fault, and covering ice for insulator bridge joint degree is 60%~70%, has reached serious icing form.The insulator chain length of 3 icing flashover accidents is 10.5m, and height above sea level is 664.5~831m, and site pollution degree is c~d level.
It can be seen that the factor such as covering ice for insulator flashover and the icing degree of insulator, dunghill concentration, air pressure is closely related from UHVAC demonstration project ice sudden strain of a muscle accident.Mountain area at height above sea level about 500~1000m, particularly in c level and above gradation for surface pollution area, the probability of extra high voltage line insulator generation icing flashover is relatively big, needs to consider the weather environment residing for insulator contamination situation, icing situation and insulator in carrying out powerline ice-covering flashover risk assessment processes.
In real work, history ice sudden strain of a muscle data are mainly based upon for powerline ice-covering flashover risk assessment or icing on-line monitoring information realizes.But, the historical data dodged about UHV transmission line ice is few, and the risk evaluation model representativeness thus set up is not strong, and the error of assessment result is also bigger;In addition, for the on-Line Monitor Device scarcity of icing on UHV transmission line, and carry the extra high voltage line of bulk transmission grid not have a power failure as grid power and carry out the installation of icing on-Line Monitor Device, and Electromagnetic Environment of UHV AC Transmission Lines is severe, the properly functioning of on-Line Monitor Device and data communication requirements is significantly high, so causing being difficult to based on the icing flashover methods of risk assessment of on-line monitoring information.Therefore, it is necessary to set up one for ultrahigh voltage alternating current transmission lines practical, icing flashover methods of risk assessment accurately and reliably, dodge the real-time management and control of risk for realizing ice and ice damage emergence treatment scheme offer technological means is provided in advance, and can according to assessment result shaft tower that flashover risk class is higher, tune can be taked in advance to climb, change serial type, use coating, winter cleans the Flash Decontamination Measurements such as filthy before icing, contribute to fundamentally reducing the probability of happening of ice disaster weather ultrahigh voltage alternating current transmission lines icing flashover fault, improve electric power netting safe running stability.
Summary of the invention
The technical problem to be solved in the present invention is in that feature few for ultrahigh voltage alternating current transmission lines history ice sudden strain of a muscle data, about icing on-Line Monitor Device scarcity, thering is provided the method that the real time meteorological data of a kind of basic data according to ultrahigh voltage alternating current transmission lines and location realizes covering ice for insulator flashover risk assessment, the operational reliability and fine-grained management level for improving ultrahigh voltage alternating current transmission lines provides practical, technological means accurately and reliably.
The technical solution adopted for the present invention to solve the technical problems is:
The present invention provides a kind of ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment, comprises the following steps:
S1, meteorology and line tower foundation data collection: investigate the basic data of ultrahigh voltage alternating current transmission lines to be assessed, and obtained the real time meteorological data in transmission line of electricity corridor along the line by the automatic meteorological observing station of meteorological department or the microclimate on-Line Monitor Device of grid company;
S2, covering ice for insulator flashover initial conditions judge: judging whether to meet icing condition according to the meteorological data of insulator place to be assessed section, the insulator for meeting icing condition further determines whether the risk that there is icing flashover;
S3, Flashing Voltage in Ice Coated Insulator calculate: when insulator exists the risk of icing flashover, the icing weight of estimation insulator, and the correction formula substituting into the flashover voltage of the insulator calculates insulator flashover voltage value under ice coating state;
S4, covering ice for insulator flashover risk assessment: contrasted with when the actual motion voltage at front insulator two ends by Flashing Voltage in Ice Coated Insulator value of calculation, calculate covering ice for insulator probability of flashover, and carry out the division of flashover risk class according to the size of probability of flashover.
Further, in the step S1 of the present invention, the basic data of transmission line of electricity includes shaft tower information, line information, insulation configuration information, insulator contamination information and special handling information;Real time meteorological data includes the median radius of wind speed, wind direction, temperature, humidity, air pressure, rainfall, raindrop.
Further, temperature when transmission line of electricity starts in the step S2 of the present invention icing, humidity and air speed value are as the condition judging insulator whether icing.
Further, the step S2 of the present invention judges whether the risk of icing flashover according to the filthy situation before the type of insulator, special handling measure and icing.
Further, in the step S3 of the present invention, extra-high voltage insulator icing weight estimation formula is:
m = N [ B I n ( Σ i = 1 H ζ · β · γ · L W C · v i ρ Δ T ) - C ]
In formula, N is the sheet number of insulator;ζ is water droplet capture coefficient;β water droplet collision coefficient;γ is freezing fraction;LWC is Liquid water content;viIt is the wind speed in the i-th time period, m/s;Δ T is meteorological data collection interval, h;H is the hourage that insulator location meteorological data reaches icing condition;ρ is the iced insulator of insulator, g/cm3;B and C is the constant relevant with insulator structure pattern, can be obtained by trial curve matching.
Further, the step S3 of the present invention considers affect the principal element of covering ice for insulator flashover, air pressure when being specially the equivalent salt density before covering ice for insulator, equivalent grey close and icing, Liquid water content, temperature, icing weight.
Further, in the step S3 of the present invention, Flashing Voltage in Ice Coated Insulator computing formula is:
U f = A ( E S D D ) - a × ( N S D D ) - b × ( 1 - H 45.1 ) 5.36 n × [ 1 + 0.02 ( t - 20 ) ] - w t × ( 1 - m 45.1 ) 5.36 α
Wherein, A is the constant relevant with insulator pattern, material, air pressure, Liquid water content, voltage type etc.;A, b respectively salt close effect characteristics index close, grey;Equivalent salt density and the equivalence ash of ESDD, NSDD respectively insulator surface are close, mg/cm2;H is the height above sea level of shaft tower;N is air pressure, Liquid water content effect characteristics index, takes 0.53 in engineer applied;T is ambient temperature, DEG C;WtFor temperature Intrusion Index, engineering exchanges and generally takes 0.2, it is possible to obtained by result of the test;M is covering ice for insulator weight, kg;α is the characteristic index value that icing ghost image rings.
Further, in the step S3 of the present invention covering ice for insulator flashover method for calculating probability particularly as follows:
The flashover voltage Normal Distribution rule of--icing insulator, i.e. U~N (μ, σ2), wherein μ represents flashover voltage U50%, σ is standard deviation, and the unified mean standard deviation σ % that IEC/IC28 recommends is 10%.It is made under working voltage different--icing insulator U corresponding to probability of flashover accordingly50%Flashover voltage curve, searches UfCorresponding numerical value, can obtain the icing flashover probability of insulator.
Further, carrying out the risk stratification criteria for classifying according to covering ice for insulator probability of flashover in the step S4 of the present invention is:
P < 10%, for safe level;10% < P < 30%, for low-risk level;30% < P < 70%, for risk level;P > 70%, for excessive risk level.
The beneficial effect comprise that: the ultrahigh voltage alternating current transmission lines icing flashover real-time assessment of the present invention and method for early warning, based on the calculating to ultrahigh voltage alternating current transmission lines icing flashover probability of the current weather condition, it is achieved thereby that the real-time assessment to ultrahigh voltage alternating current transmission lines icing flashover;According to Weather Forecast Information, in advance the icing flashover risk class on certain period interior lines road following can be carried out early warning, for the guidance that the work offer of preventing and reducing natural disasters of relevant operating management department is strong;The present invention uses simply, and feasibility is strong, it was predicted that precision is high;It addition, the present invention can provide reference for the drafting of ultrahigh voltage alternating current transmission lines icing flashover risk prog chart.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described, in accompanying drawing:
Fig. 1 is the flow chart of ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment of the present invention;
Fig. 2 is the flow chart of the ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment of the embodiment of the present invention;
Fig. 3 is the flow chart of the icing flashover probability calculation of the ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment of the embodiment of the present invention;
Fig. 4 is the curve chart of the ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment of the embodiment of the present invention.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein is only in order to explain the present invention, is not intended to limit the present invention.
As it is shown in figure 1, the ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment of the embodiment of the present invention, comprise the following steps:
S1, meteorology and line tower foundation data collection: investigate the basic data of ultrahigh voltage alternating current transmission lines to be assessed, and obtained the real time meteorological data in transmission line of electricity corridor along the line by the automatic meteorological observing station of meteorological department or the microclimate on-Line Monitor Device of grid company;
S2, covering ice for insulator flashover initial conditions judge: judging whether to meet icing condition according to the meteorological data of insulator place to be assessed section, the insulator for meeting icing condition further determines whether the risk that there is icing flashover;
S3, Flashing Voltage in Ice Coated Insulator calculate: when insulator exists the risk of icing flashover, the icing weight of estimation insulator, and the correction formula substituting into the flashover voltage of the insulator calculates insulator flashover voltage value under ice coating state;
S4, covering ice for insulator flashover risk assessment: contrasted with when the actual motion voltage at front insulator two ends by Flashing Voltage in Ice Coated Insulator value of calculation, calculate covering ice for insulator probability of flashover, and carry out the division of flashover risk class according to the size of probability of flashover.
As shown in Figures 2 and 3, in one particular embodiment of the present invention, according to the basic data of ultrahigh voltage alternating current transmission lines to be assessed and the real time meteorological data of insulator location, covering ice for insulator probability of flashover is calculated, and complete ultrahigh voltage alternating current transmission lines covering ice for insulator flashover risk assessment according to respective risk grading standard, specifically include following steps:
Step 1: meteorological and line tower foundation data collection: investigate the basic data of ultrahigh voltage alternating current transmission lines to be assessed, and obtained the real time meteorological data in transmission line of electricity corridor along the line by the automatic meteorological observing station of meteorological department or the microclimate on-Line Monitor Device of grid company.For being provided with the shaft tower of microclimate on-Line Monitor Device, it is possible to replace obtaining meteorological data from automatic meteorological observing station, for data such as the meteorology that cannot obtain, filths, it is possible to use close on the on-line monitoring information approximate substitution of low-voltage-grade circuit.
The data added up such as table 1:
The basic document of table 1 ultrahigh voltage alternating current transmission lines
Shaft tower information Pole and tower design drawing, residing features of terrain, residing dirty district attribute
Line information Line account data, circuit geographic area
Insulation configuration information Insulator model, insulator material, insulator serial type, insulator creep distance, structure height
Special handling information Whether have RTV coating, whether adjust climb, last time cleans the time
Step 2: covering ice for insulator flashover initial conditions judge: judging whether to meet icing condition according to the meteorological data of insulator place to be assessed section, the insulator for meeting icing condition further determines whether the risk that there is icing flashover.
The necessary meteorological condition of covering ice for insulator is: 1. have the congealable temperature of foot, namely less than 0 DEG C;2. having higher humidity, namely relative air humidity is typically in more than 85%;3. there is the wind speed that water in air can be made to drip motion, namely more than lm/s.When relative air humidity is little or calm and wind speed is only small, even if air themperature is below 0 DEG C, insulator does not occur icing phenomenon substantially.So for assessment time ambient temperature more than 0 DEG C or relative air humidity less than 85% or wind speed less than lm/s in the case of, it is believed that icing will not be there is.
Ultrahigh voltage alternating current transmission lines insulator chain is longer, and the electrical safety nargin left is high, and therefore icing flashover typically occurs in ice-melting phase.Within ambient temperature time period less than 0 DEG C, covering ice for insulator cannot melt and cause that the probability of flashover is less, only need to complete the estimation of icing weight;Composite insulator has good effect antifouling, anti-icing, it is believed that the probability that icing flashover occurs is relatively low, it is not necessary to its icing flashover risk is estimated;Filth is the key factor affecting covering ice for insulator flashover, according to UHVAC demonstration project operating experience, the probability of c level and above gradation for surface pollution area generation icing flashover is relatively big, and for the insulator in the following gradation for surface pollution area of c level, it is believed that its icing flashover risk is level of security.
Step 3: Flashing Voltage in Ice Coated Insulator calculates: when insulator exists the risk of icing flashover, the icing weight of estimation insulator, and the correction formula substituting into the flashover voltage of the insulator calculate insulator flashover voltage value under ice coating state.
The icing weight specific formula for calculation of insulator is as follows:
m = N &lsqb; B I n ( &Sigma; i = 1 H &zeta; &CenterDot; &beta; &CenterDot; &gamma; &CenterDot; L W C &CenterDot; v i &rho; &Delta; T ) - C &rsqb;
In formula, N is the sheet number of insulator;ζ is water droplet capture coefficient;β is water droplet collision coefficient;γ is freezing fraction;LWC is Liquid water content;viIt is the wind speed in the i-th time period, m/s;Δ T is meteorological data collection interval, h;H is the hourage that insulator location meteorological data reaches icing condition;ρ is the iced insulator of insulator, g/cm3;B and C is the constant relevant with insulator structure pattern, can be obtained by trial curve matching.
Insulator water droplet capture coefficient ζ is relevant with factors such as wind speed and drop diameter d, and its mathematic(al) representation is:
&zeta; = ( 1 + Cv 1 v d ) - 1
In formula: v1For the kinematic viscosity of air, during glaze, take v1=13.2 × 10-6m2/s;C is constant, and glaze takes C=1.64 often.
Obviously, wind speed is big, and when drop diameter is big, the inertia force of water droplet is big, and the capture coefficient of insulator is just big.Being typically in wind speed when glaze is formed, v < 10m/s, the median particle volume diameter of supercooling water droplet is between 20~30 μm, and therefore, ζ value is between 0.7~0.9.
The relational expression of Liquid water content LWC and rainfall P (mm) is:
LWC=0.067P0 . 846
Insulator water droplet collision coefficient β is that in air under certain Liquid water content LWC and in certain time t, the quantity N that water droplet and insulator collide and initial position are in insulator at the projected area S coming on flow path directionprInterior all water droplet quantity NprRatio, can be obtained by emulation experiment.
&beta; = N N S p r
The correction formula of Flashing Voltage in Ice Coated Insulator is:
U f = A ( E S D D ) - a &times; ( N S D D ) - b &times; ( 1 - H 45.1 ) 5.36 n &times; &lsqb; 1 + 0.02 ( t - 20 ) &rsqb; - w t &times; ( 1 - m 45.1 ) 5.36 &alpha;
Wherein, A is the constant relevant with insulator pattern, material, air pressure, Liquid water content, voltage type etc.;A, b respectively salt close effect characteristics index close, grey;Equivalent salt density and the equivalence ash of ESDD, NSDD respectively insulator surface are close, mg/cm2;H is the height above sea level of shaft tower;N is air pressure, Liquid water content effect characteristics index, takes 0.53 in engineer applied;T is ambient temperature, DEG C;WtFor temperature Intrusion Index, engineering exchanges and generally takes 0.2, it is possible to obtained by result of the test;M is covering ice for insulator weight, kg;α is the characteristic index value that icing ghost image rings, it is proposed that exchange takes 0.1.
Step 4: covering ice for insulator flashover risk assessment: Flashing Voltage in Ice Coated Insulator value of calculation is contrasted with when the actual motion voltage at front insulator two ends, calculate covering ice for insulator probability of flashover, and carry out the division of flashover risk class according to the size of probability of flashover.
As shown in Figure 4, as the pollution flashover of a kind of specific form, the flashover voltage Normal Distribution rule of--icing insulator, i.e. U~N (μ, σ2), wherein μ represents flashover voltage U50%, σ is standard deviation, and the unified mean standard deviation σ % that IEC/IC28 recommends is 10%.It is made under working voltage different--icing insulator U corresponding to probability of flashover accordingly50%Flashover voltage curve, searches UfCorresponding numerical value, can obtain the icing flashover probability of insulator.
The probability of icing flashover is there is when current weather, by such as the risk class criteria for classifying of table 2 below, it is achieved the assessment to ultrahigh voltage alternating current transmission lines covering ice for insulator flashover risk according to insulator.
The table 2 ultrahigh voltage alternating current transmission lines covering ice for insulator flashover risk class criteria for classifying
It should be appreciated that for those of ordinary skills, it is possible to improved according to the above description or converted, and all these are improved and convert the protection domain that all should belong to claims of the present invention.

Claims (10)

1. a ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment, it is characterised in that comprise the following steps:
S1, meteorology and line tower foundation data collection: investigate the basic data of ultrahigh voltage alternating current transmission lines to be assessed, and obtained the real time meteorological data in transmission line of electricity corridor along the line by the automatic meteorological observing station of meteorological department or the microclimate on-Line Monitor Device of grid company;
S2, covering ice for insulator flashover initial conditions judge: judging whether to meet icing condition according to the meteorological data of insulator place to be assessed section, the insulator for meeting icing condition further determines whether the risk that there is icing flashover;
S3, Flashing Voltage in Ice Coated Insulator calculate: when insulator exists the risk of icing flashover, the icing weight of estimation insulator, and the correction formula substituting into the flashover voltage of the insulator calculates insulator flashover voltage value under ice coating state;
S4, covering ice for insulator flashover risk assessment: contrasted with when the actual motion voltage at front insulator two ends by Flashing Voltage in Ice Coated Insulator value of calculation, calculate covering ice for insulator probability of flashover, and carry out the division of flashover risk class according to the size of probability of flashover.
2. ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment according to claim 1, it is characterized in that, in step S1, the basic data of transmission line of electricity includes shaft tower information, line information, insulation configuration information, insulator contamination information and special handling information;Real time meteorological data includes the median radius of wind speed, wind direction, temperature, humidity, air pressure, rainfall, raindrop.
3. ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment according to claim 1, it is characterised in that temperature when transmission line of electricity starts in step S2 icing, humidity and air speed value are as the condition judging insulator whether icing.
4. ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment according to claim 1, it is characterized in that, step S2 judges whether according to the filthy situation before the model of insulator, special handling measure and icing the risk of icing flashover.
5. according to the ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment described in claim 1, it is characterized in that, reaching in the time of icing condition at weather environment in step S3, the insulator for having icing flashover risk estimates its icing weight according to below equation:
m = N [ BIn ( &Sigma; i = 1 H &zeta; &CenterDot; &beta; &CenterDot; &gamma; &CenterDot; LWC &CenterDot; v i &rho; &Delta;T ) - C ]
In formula, N is the sheet number of insulator;ζ is water droplet capture coefficient;β water droplet collision coefficient;γ is freezing fraction;LWC is Liquid water content;viIt is the wind speed in the i-th time period, m/s;Δ T is meteorological data collection interval, h;H is the hourage that insulator location meteorological data reaches icing condition;ρ is the iced insulator of insulator, g/cm3;B and C is the constant relevant with insulator structure pattern, can be obtained by trial curve matching.
6. according to the ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment described in claim 1, it is characterized in that, step S3 considers affect the principal element of covering ice for insulator flashover, air pressure when being specially the equivalent salt density before covering ice for insulator, equivalent grey close and icing, temperature, icing weight.
7. according to the ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment described in claim 1, it is characterised in that in step S3, Flashing Voltage in Ice Coated Insulator computing formula is:
U f = A ( ESDD ) - a &times; ( NSDD ) - b &times; ( 1 - H 45.1 ) 5.36 n &times; [ 1 + 0.02 ( t - 20 ) ] - w t &times; ( 1 - m 45.1 ) 5.36 &alpha;
Wherein, A is the constant relevant with insulator pattern, material, air pressure, voltage type etc.;A, b respectively salt close effect characteristics index close, grey;Equivalent salt density and the equivalence ash of ESDD, NSDD respectively insulator surface are close, mg/cm2;H is the height above sea level of shaft tower;N is effects of air pressure characteristic index, takes 0.53 in engineer applied;T is ambient temperature, DEG C;WtFor temperature Intrusion Index, engineering exchanges and generally takes 0.2, it is possible to obtained by result of the test;M is covering ice for insulator weight, kg;α is the characteristic index value that icing ghost image rings.
8. according to the ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment described in claim 1, it is characterised in that according to the rule of--icing insulator flashover voltage Normal Distribution, i.e. U~N (μ, σ in step S42), wherein μ represents flashover voltage U50%, σ is standard deviation, calculates different--icing insulator U corresponding to probability of flashover under working voltage50%Flashover voltage.
9. according to the ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment described in claim 1, it is characterised in that step S4 searches different--icing insulator U corresponding to probability of flashover under working voltage50%Flashover voltage curve, obtains UfCorresponding probability of flashover value.
10. according to the ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment described in claim 1, it is characterised in that step S4 carries out the risk stratification criteria for classifying according to covering ice for insulator probability of flashover and is:
P < 10%, for safe level;10% < P < 30%, for low-risk level;30% < P < 70%, for risk level;P > 70%, for excessive risk level.
CN201610217229.XA 2016-04-08 2016-04-08 A kind of ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment Active CN105785243B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610217229.XA CN105785243B (en) 2016-04-08 2016-04-08 A kind of ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610217229.XA CN105785243B (en) 2016-04-08 2016-04-08 A kind of ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment

Publications (2)

Publication Number Publication Date
CN105785243A true CN105785243A (en) 2016-07-20
CN105785243B CN105785243B (en) 2019-03-29

Family

ID=56395928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610217229.XA Active CN105785243B (en) 2016-04-08 2016-04-08 A kind of ultrahigh voltage alternating current transmission lines covering ice for insulator flashover methods of risk assessment

Country Status (1)

Country Link
CN (1) CN105785243B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106501686A (en) * 2016-10-10 2017-03-15 国网天津市电力公司 A kind of test method for analyzing snow slush flashover performance
CN106908702A (en) * 2017-03-10 2017-06-30 三峡大学 Composite insulator umbrella skirt surface ice-coating test machine and test method
CN107316129A (en) * 2017-06-05 2017-11-03 国网陕西省电力公司电力科学研究院 Transmission line of electricity natural calamity flashover risk integrative assessment method
CN107656182A (en) * 2017-11-15 2018-02-02 国网湖南省电力有限公司 220 KV transmission line insulator chain anti-ice-flashing check methods
CN107742853A (en) * 2017-11-15 2018-02-27 国网湖南省电力有限公司 110 KV transmission line insulator chain anti-ice-flashing check methods
CN108133280A (en) * 2017-10-23 2018-06-08 南京南瑞集团公司 A kind of icing flashover influence factor screening technique based on inclined mutual information method
CN108133225A (en) * 2017-10-23 2018-06-08 南京南瑞集团公司 A kind of icing flashover fault early warning method based on support vector machines
CN109635440A (en) * 2018-12-13 2019-04-16 国家电网公司西北分部 A kind of coated by ice of overhead power transmission line flashover tripping method for calculating probability
CN111709581A (en) * 2020-06-18 2020-09-25 国网天津市电力公司电力科学研究院 Method for predicting flashover voltage of insulator covered with wet snow
CN111723987A (en) * 2020-06-18 2020-09-29 国网天津市电力公司电力科学研究院 Method for predicting thickness of wet snow covered on composite insulator of power transmission line
CN111738617A (en) * 2020-07-01 2020-10-02 广东电网有限责任公司广州供电局 Transformer substation risk assessment method and early warning system in heavy rainfall weather
CN112150495A (en) * 2020-09-24 2020-12-29 西安工程大学 Insulator ice flashover risk prediction method based on deduction rule
CN112214860A (en) * 2020-10-30 2021-01-12 国网湖南省电力有限公司 Power transmission line deicing jump fault prediction method, device, medium and electronic equipment
CN113092960A (en) * 2021-03-31 2021-07-09 广东电网有限责任公司清远供电局 Insulator icing flashover monitoring method, device, equipment and storage medium
CN113221375A (en) * 2021-05-31 2021-08-06 山东建筑大学 Electric power system simulation method considering line icing and insulator flashover
CN113533906A (en) * 2021-07-28 2021-10-22 广西电网有限责任公司电力科学研究院 Intelligent overhead transmission line fault type diagnosis method and system
CN115752567A (en) * 2022-10-28 2023-03-07 贵州电网有限责任公司 Method for measuring ice-melting water drop parameters and deformation parameters of insulator in ice-melting period

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102590677A (en) * 2012-02-28 2012-07-18 浙江省电力试验研究院 Analyzing and processing method for test data of manual pollution flashover of insulator
CN102608501A (en) * 2012-02-28 2012-07-25 浙江省电力试验研究院 Assessment method of external insulting state of natural deposit insulator chain based on cross combination
CN103678865A (en) * 2013-08-28 2014-03-26 南京南瑞集团公司 Fault probability online evaluation method of power transmission line faults caused by freezing rain
WO2016028274A1 (en) * 2014-08-19 2016-02-25 Southern States, Llc Corona avoidance electric power line monitoring and response system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102590677A (en) * 2012-02-28 2012-07-18 浙江省电力试验研究院 Analyzing and processing method for test data of manual pollution flashover of insulator
CN102608501A (en) * 2012-02-28 2012-07-25 浙江省电力试验研究院 Assessment method of external insulting state of natural deposit insulator chain based on cross combination
CN103678865A (en) * 2013-08-28 2014-03-26 南京南瑞集团公司 Fault probability online evaluation method of power transmission line faults caused by freezing rain
WO2016028274A1 (en) * 2014-08-19 2016-02-25 Southern States, Llc Corona avoidance electric power line monitoring and response system

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106501686A (en) * 2016-10-10 2017-03-15 国网天津市电力公司 A kind of test method for analyzing snow slush flashover performance
CN106501686B (en) * 2016-10-10 2019-07-05 国网天津市电力公司 It is a kind of for analyzing the test method of snow slush flashover performance
CN106908702B (en) * 2017-03-10 2019-03-29 三峡大学 Composite insulator umbrella skirt surface ice-coating test machine and test method
CN106908702A (en) * 2017-03-10 2017-06-30 三峡大学 Composite insulator umbrella skirt surface ice-coating test machine and test method
CN107316129A (en) * 2017-06-05 2017-11-03 国网陕西省电力公司电力科学研究院 Transmission line of electricity natural calamity flashover risk integrative assessment method
CN107316129B (en) * 2017-06-05 2020-06-19 国网陕西省电力公司电力科学研究院 Comprehensive assessment method for natural disaster flashover risk of power transmission line
CN108133225A (en) * 2017-10-23 2018-06-08 南京南瑞集团公司 A kind of icing flashover fault early warning method based on support vector machines
CN108133280A (en) * 2017-10-23 2018-06-08 南京南瑞集团公司 A kind of icing flashover influence factor screening technique based on inclined mutual information method
CN107656182B (en) * 2017-11-15 2019-08-27 国网湖南省电力有限公司 220 KV transmission line insulator chain anti-ice-flashing check methods
CN107742853A (en) * 2017-11-15 2018-02-27 国网湖南省电力有限公司 110 KV transmission line insulator chain anti-ice-flashing check methods
CN107656182A (en) * 2017-11-15 2018-02-02 国网湖南省电力有限公司 220 KV transmission line insulator chain anti-ice-flashing check methods
CN109635440B (en) * 2018-12-13 2023-06-27 国家电网公司西北分部 Overhead transmission line icing flashover tripping probability calculation method
CN109635440A (en) * 2018-12-13 2019-04-16 国家电网公司西北分部 A kind of coated by ice of overhead power transmission line flashover tripping method for calculating probability
CN111709581A (en) * 2020-06-18 2020-09-25 国网天津市电力公司电力科学研究院 Method for predicting flashover voltage of insulator covered with wet snow
CN111723987A (en) * 2020-06-18 2020-09-29 国网天津市电力公司电力科学研究院 Method for predicting thickness of wet snow covered on composite insulator of power transmission line
CN111738617A (en) * 2020-07-01 2020-10-02 广东电网有限责任公司广州供电局 Transformer substation risk assessment method and early warning system in heavy rainfall weather
CN111738617B (en) * 2020-07-01 2023-12-26 广东电网有限责任公司广州供电局 Transformer substation risk assessment method and early warning system in heavy rainfall weather
CN112150495A (en) * 2020-09-24 2020-12-29 西安工程大学 Insulator ice flashover risk prediction method based on deduction rule
CN112150495B (en) * 2020-09-24 2023-03-14 西安工程大学 Insulator ice flashover risk prediction method based on deduction rule
CN112214860A (en) * 2020-10-30 2021-01-12 国网湖南省电力有限公司 Power transmission line deicing jump fault prediction method, device, medium and electronic equipment
CN113092960A (en) * 2021-03-31 2021-07-09 广东电网有限责任公司清远供电局 Insulator icing flashover monitoring method, device, equipment and storage medium
CN113221375A (en) * 2021-05-31 2021-08-06 山东建筑大学 Electric power system simulation method considering line icing and insulator flashover
CN113221375B (en) * 2021-05-31 2023-08-04 山东建筑大学 Power system simulation method considering line icing and insulator flashover
CN113533906A (en) * 2021-07-28 2021-10-22 广西电网有限责任公司电力科学研究院 Intelligent overhead transmission line fault type diagnosis method and system
CN113533906B (en) * 2021-07-28 2022-09-23 广西电网有限责任公司电力科学研究院 Intelligent overhead transmission line fault type diagnosis method and system
CN115752567A (en) * 2022-10-28 2023-03-07 贵州电网有限责任公司 Method for measuring ice-melting water drop parameters and deformation parameters of insulator in ice-melting period

Also Published As

Publication number Publication date
CN105785243B (en) 2019-03-29

Similar Documents

Publication Publication Date Title
CN105785243A (en) Evaluation method for insulator icing flashover risk of ultrahigh voltage alternating-current transmission line
CN107169645B (en) Power transmission line fault probability online evaluation method considering influence of rainstorm disaster
CN106017551A (en) Intelligent transmission line integrated monitoring analysis and early warning method
CN106682774A (en) Contact net insulator pollution flashover prediction method
CN109063975A (en) A kind of electric power microclimate disaster monitoring and prior-warning device
CN103678865B (en) A kind of sleet causes the probability of malfunction online evaluation method of transmission line malfunction
CN107578169A (en) The recognition methods of power network critical circuits and device under the conditions of a kind of typhoon disaster
CN103427367B (en) A kind of power transmission lines overhauling method
CN106022953A (en) Power grid infrastructure rainstorm risk assessment method
CN106611245A (en) GIS-based typhoon disaster risk assessment method for power grid
CN111612315A (en) Novel power grid disastrous gale early warning method
CN106570651A (en) Method for evaluating pollution flashover risk of insulator of power transmission line
CN104063750A (en) Method for predicting influence of disasters to power system based on improved AHP-anti-entropy weight
CN111738617B (en) Transformer substation risk assessment method and early warning system in heavy rainfall weather
CN109359882A (en) Transmission line of electricity trip risk appraisal procedure under a kind of typhoon disaster
CN109784683A (en) A kind of power grid wide area meteorological disaster integrated campaign method
CN104050518B (en) Power grid convection disaster-causing strong wind early warning method based on Doppler weather radar
CN104361535A (en) Electric transmission line icing state assessment method
CN114254831A (en) Early warning method for wind power grid
CN103940397A (en) Online monitoring method of overhead line equivalent icing thickness
CN103413176A (en) Method for quantitatively evaluating necessity of monitoring icing on transmission line
CN105930964A (en) Power transmission line icing risk assessment method based on impact from space-time factors
Farzaneh et al. Techniques for Protecting Overhead Lines in Winter Conditions: Dimensioning, Icephobic Surfaces, De-Icing Strategies
CN116363537B (en) Method and system for identifying hidden danger of hanging objects outside transformer substation
CN104614644A (en) High-voltage overhead transmission line icing diagnosis method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant