CN105782564A - 顶管泥浆物理触控减阻方法 - Google Patents

顶管泥浆物理触控减阻方法 Download PDF

Info

Publication number
CN105782564A
CN105782564A CN201610289938.9A CN201610289938A CN105782564A CN 105782564 A CN105782564 A CN 105782564A CN 201610289938 A CN201610289938 A CN 201610289938A CN 105782564 A CN105782564 A CN 105782564A
Authority
CN
China
Prior art keywords
mud
top pipe
push pipe
pipe
thixotropic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610289938.9A
Other languages
English (en)
Other versions
CN105782564B (zh
Inventor
赵抚名
吴祥红
邹菲岗
张颖红
李祥平
丁国老
胡根发
周佩祺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU CONSTRUCTION ENGINEERING GROUP NO3 CONSTRUCTION Co Ltd
Original Assignee
JIANGSU CONSTRUCTION ENGINEERING GROUP NO3 CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU CONSTRUCTION ENGINEERING GROUP NO3 CONSTRUCTION Co Ltd filed Critical JIANGSU CONSTRUCTION ENGINEERING GROUP NO3 CONSTRUCTION Co Ltd
Priority to CN201610289938.9A priority Critical patent/CN105782564B/zh
Publication of CN105782564A publication Critical patent/CN105782564A/zh
Application granted granted Critical
Publication of CN105782564B publication Critical patent/CN105782564B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

一种顶管泥浆物理触控减阻方法,其特征在于,触变泥浆按重量份原料混合配置,膨润土:羧甲基纤维素:纯碱:水=8‑10:0.1‑0.13:0.8‑0.9:90;混凝土振动棒通过钢片锚固在顶管的内壁上,并紧贴在管壁上;将所配置的触变泥浆注入顶管外侧面与土体之间的缝隙中,形成泥浆套。本发明的顶管泥浆物理触控减阻方法,使用方便、生产成本低,它采用物理振动方法激活泥浆的触变性,解决了泥浆静置在管土之间的时间较长导致顶推力增大的问题。突破了只研究泥浆材料、配比减阻的思维模式,在采用触变泥浆减阻的基础上,大大减小起始顶管顶推力。

Description

顶管泥浆物理触控减阻方法
技术领域
本发明属于顶管施工减阻技术领域,涉及一种在采用触变泥浆前提下的顶管泥浆物理触控减阻方法。
背景技术
顶管施工法是一种常用的地下非开挖铺管技术,管与土体之间的摩擦力较大,导致工作井要求提供的后支撑力也大,甚至无法提供支撑力,造成施工困难。目前顶管施工法中减小管土间摩阻力的方法多在于泥浆材料触变性能、配比等方面,并取得一定效果。但这类方法的缺点在于,当顶管施工采用触变泥浆减阻时,因施工间歇性停工时间较长,致使泥浆静置后的顶推力大大增加,仍然需要足够大的顶推力及其后支撑力,以产生一定的位移方能促泥浆触变减阻,如果不能产生位移就不能触变,摩擦力就降不下来,施工就不能继续。
发明内容
本发明的目的就是提供一种使用方便、生产成本低,能激活管土之间静置时间较长的泥浆触变性,降低因泥浆静置产生的摩阻力,减少起始顶管顶推力的顶管泥浆物理触控减阻方法。
本发明的顶管泥浆物理触控减阻方法,其特征在于,触变泥浆按重量份原料混合配置,膨润土:羧甲基纤维素(CMC):纯碱:水=8-10:0.1-0.13:0.8-0.9:90;混凝土振动棒通过钢片锚固在顶管的内壁上,并紧贴在管壁上;将所配置的触变泥浆注入顶管外侧面与土体之间的缝隙中,形成泥浆套。
本发明的顶管泥浆物理触控减阻方法,工作原理是,触变泥浆处于静止状态时,体系成悬浮胶凝状,当触变泥浆被搅拌、振动或泵送时,大多数微粒结构被分散、破坏,体系转变成为具有粘性和流动性的胶状液体,当悬浮液再次处于静止状态时,又会形成胶凝体,如此反复形成泥浆触变性能。利用泥浆这种触变性能,在顶管施工时,采用振动方法可激活泥浆的触变性,有助于减少顶进管道在地层间运动时静置产生的摩阻力增量。
本发明的顶管泥浆物理触控减阻方法,使用方便、生产成本低,它采用物理振动方法激活泥浆的触变性,解决了泥浆静置在管土之间的时间较长导致顶推力增大的问题。突破了只研究泥浆材料、配比减阻的思维模式,在采用触变泥浆减阻的基础上,大大减小起始顶管顶推力。
附图说明
图1为本发明的施工结构示意图;
1、土体, 2、泥浆套, 3、顶管, 4、混凝土振动棒,5、钢片。
具体实施方式
一种顶管泥浆物理触控减阻方法,其特征在于,触变泥浆按重量份原料混合配置,膨润土:羧甲基纤维素(CMC):纯碱:水=9: 0.13:0.87:90;混凝土振动棒4通过钢片5锚固在顶管3的内壁上,并紧贴在管壁上;将所配置的触变泥浆注入顶管3外侧面与土体1之间的缝隙中,形成泥浆套2。混凝土振动棒4振动频率为2200-2500hz。

Claims (3)

1.一种顶管泥浆物理触控减阻方法,其特征在于:触变泥浆按重量份原料混合配置,膨润土:羧甲基纤维素:纯碱:水=8-10 : 0.1-0.13 : 0.8-0.9 : 90;混凝土振动棒(4)通过钢片(5)锚固在顶管(3)的内壁上,并紧贴在管壁上;将所配置的触变泥浆注入顶管(3)外侧面与土体(1)之间的缝隙中,形成泥浆套(2)。
2.根据权利要求1所述的顶管泥浆物理触控减阻方法,其特征在于:混凝土振动棒(4)紧贴在顶管(3)的内壁上。
3.根据权利要求1所述的顶管泥浆物理触控减阻方法,其特征在于:所述混凝土振动棒(4)振动频率为2200-2500hz。
CN201610289938.9A 2016-05-05 2016-05-05 顶管泥浆物理触控减阻方法 Active CN105782564B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610289938.9A CN105782564B (zh) 2016-05-05 2016-05-05 顶管泥浆物理触控减阻方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610289938.9A CN105782564B (zh) 2016-05-05 2016-05-05 顶管泥浆物理触控减阻方法

Publications (2)

Publication Number Publication Date
CN105782564A true CN105782564A (zh) 2016-07-20
CN105782564B CN105782564B (zh) 2018-06-05

Family

ID=56401606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610289938.9A Active CN105782564B (zh) 2016-05-05 2016-05-05 顶管泥浆物理触控减阻方法

Country Status (1)

Country Link
CN (1) CN105782564B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111914373A (zh) * 2020-08-21 2020-11-10 重庆大学 长距离岩石顶管摩阻力计算方法及管岩接触状态检测方法
CN113531207A (zh) * 2020-04-17 2021-10-22 中建三局安装工程有限公司 适用于长距离岩石顶管工程的减阻、阻隔石屑注浆方法
CN113551968A (zh) * 2021-07-24 2021-10-26 西安理工大学 顶管结构与围岩土体模型成型装置的制备方法
CN114544481A (zh) * 2022-01-26 2022-05-27 合肥市市政设计研究总院有限公司 一种泥浆减摩效果测试仪器及方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1032204A1 (ru) * 1982-04-16 1983-07-30 Всесоюзный Научно-Исследовательский Институт Гидромеханизации,Санитарно-Технических И Специальных Строительных Работ Устройство дл погружени труб и других элементов в грунт
JP2002327596A (ja) * 2001-04-27 2002-11-15 Nippon Telegr & Teleph Corp <Ntt> 動的圧入推進工法及びこの工法に用いられる推進装置
CN101992937A (zh) * 2010-10-15 2011-03-30 镇江安达煤矿专用设备有限公司 土压平衡顶管机用螺旋输送机注浆减摩机构
CN203628020U (zh) * 2013-12-24 2014-06-04 中铁上海工程局有限公司 一种顶管用润滑减阻泥浆自动压注装置
CN104176976A (zh) * 2014-08-06 2014-12-03 上海隧道工程有限公司 大断面矩形顶管用的减摩泥浆及制备方法和注浆施工方法
CN104534167A (zh) * 2014-12-08 2015-04-22 中国十七冶集团有限公司 触变泥浆的减阻方法
CN204459454U (zh) * 2014-12-10 2015-07-08 中铁十八局集团第一工程有限公司 一种顶管施工中止后复顶施工装置
CN104891840A (zh) * 2015-05-15 2015-09-09 中铁二局股份有限公司 一种减摩泥浆及其应用

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1032204A1 (ru) * 1982-04-16 1983-07-30 Всесоюзный Научно-Исследовательский Институт Гидромеханизации,Санитарно-Технических И Специальных Строительных Работ Устройство дл погружени труб и других элементов в грунт
JP2002327596A (ja) * 2001-04-27 2002-11-15 Nippon Telegr & Teleph Corp <Ntt> 動的圧入推進工法及びこの工法に用いられる推進装置
CN101992937A (zh) * 2010-10-15 2011-03-30 镇江安达煤矿专用设备有限公司 土压平衡顶管机用螺旋输送机注浆减摩机构
CN203628020U (zh) * 2013-12-24 2014-06-04 中铁上海工程局有限公司 一种顶管用润滑减阻泥浆自动压注装置
CN104176976A (zh) * 2014-08-06 2014-12-03 上海隧道工程有限公司 大断面矩形顶管用的减摩泥浆及制备方法和注浆施工方法
CN104534167A (zh) * 2014-12-08 2015-04-22 中国十七冶集团有限公司 触变泥浆的减阻方法
CN204459454U (zh) * 2014-12-10 2015-07-08 中铁十八局集团第一工程有限公司 一种顶管施工中止后复顶施工装置
CN104891840A (zh) * 2015-05-15 2015-09-09 中铁二局股份有限公司 一种减摩泥浆及其应用

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113531207A (zh) * 2020-04-17 2021-10-22 中建三局安装工程有限公司 适用于长距离岩石顶管工程的减阻、阻隔石屑注浆方法
CN113531207B (zh) * 2020-04-17 2023-09-22 中建三局安装工程有限公司 适用于长距离岩石顶管工程的减阻、阻隔石屑注浆方法
CN111914373A (zh) * 2020-08-21 2020-11-10 重庆大学 长距离岩石顶管摩阻力计算方法及管岩接触状态检测方法
CN111914373B (zh) * 2020-08-21 2023-11-21 重庆大学 长距离岩石顶管摩阻力计算方法及管岩接触状态检测方法
CN113551968A (zh) * 2021-07-24 2021-10-26 西安理工大学 顶管结构与围岩土体模型成型装置的制备方法
CN114544481A (zh) * 2022-01-26 2022-05-27 合肥市市政设计研究总院有限公司 一种泥浆减摩效果测试仪器及方法

Also Published As

Publication number Publication date
CN105782564B (zh) 2018-06-05

Similar Documents

Publication Publication Date Title
CN105782564A (zh) 顶管泥浆物理触控减阻方法
CN102996159A (zh) 一种瓦斯抽采钻孔多相介质封堵装置及方法
CN102268973A (zh) 封孔装置
CN205422773U (zh) 一种新型中空注浆锚杆
CN209669880U (zh) 一种带止浆塞的注浆装置
CN208966342U (zh) 一种泥水平衡式顶管机的推进装置
CN201714337U (zh) 封孔装置
CN205370587U (zh) 一种煤矿破碎围岩深孔注浆加固装置
CN204187120U (zh) 支撑顶杆
CN205297608U (zh) 一种新型液压膨胀式可回收锚杆
CN204212158U (zh) 一种带套管的注浆管
CN106368717B (zh) 一种隧道防塌方支护结构
CN204000846U (zh) 花管注浆抗拔桩
CN205154208U (zh) 一种新型多功能锚杆
CN202450511U (zh) 一种注浆装置
CN204112233U (zh) 高墩砼输送泵管固定装置
CN202577279U (zh) 土体有压注浆加固用摩擦式封孔器
CN203271608U (zh) 一种用于多孔隙地基灌浆的钻孔杆
CN204456139U (zh) 一种基坑围护结构
CN204590041U (zh) 一种基坑围护结构
CN204418171U (zh) 后置杆体式锚固结构
CN202047595U (zh) 剪力墙支撑件
CN204571875U (zh) 大通流量抽油杆扶正器
CN204212041U (zh) 一种注浆管
CN203962035U (zh) 井下沿空留巷支护袋

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant