CN105780790A - 近堤高水位差复合式钢板桩围堰水中承台施工方法 - Google Patents
近堤高水位差复合式钢板桩围堰水中承台施工方法 Download PDFInfo
- Publication number
- CN105780790A CN105780790A CN201610173505.7A CN201610173505A CN105780790A CN 105780790 A CN105780790 A CN 105780790A CN 201610173505 A CN201610173505 A CN 201610173505A CN 105780790 A CN105780790 A CN 105780790A
- Authority
- CN
- China
- Prior art keywords
- platform
- pipe
- pile
- steel sheet
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Foundations (AREA)
Abstract
本发明涉及一种近堤高水位差复合式钢板桩围堰水中承台的施工方法,主要施工步骤包括:(1)围护钢管桩打设;(2)复合式钢板桩围堰打设;(3)注浆加固;(4)施工平台搭设;(5)围堰内钢管支撑安装;(6)承台施工。本发明涉及的施工方法具有操作简单,构件连接刚度大,并且拆装方便等优点,具有较好的经济技术效益。
Description
技术领域
本发明涉及近堤高水位差钢板桩围堰水中承台的施工方法。
技术背景
随着基础设施建设的飞速发展,桥梁建设地域逐步向海上拓展。整体式钢板桩围堰是独立于桥梁承台与墩身之外的围水结构,是桥梁基础施工的一道安全屏障。
面对海洋气候多变和水文情况复杂等自然环境,传统钢板桩围堰在桥梁基础施工中的局限性主要体现在三个方面:1)由于是组拼式结构,整体刚度较小,其抗水流及波浪能力差,不宜在海洋环境下使用;2)受自身受力特性的局限,承台标高较低时需设置强而密的支撑,对后续的承台及墩身施工干扰很大;3)传统钢板桩围堰插打时在外力作用下易出现倾斜、带桩、不易合龙的情况。
鉴于此,如何通过一些技术措施解决高水差情况下水中承台的施工难题,是一个亟需解决的问题。
发明内容
本发明的目的在于提供一种近堤高水位差复合式钢板桩围堰水中承台的施工方法。
为实现上述目的,本发明采用了以下技术方案:
近堤高水位差复合式钢板桩围堰水中承台施工方法,包括以下步骤:
1)围护钢管桩打设:围护钢管桩按设计间距要求打设,以形成挡土要求为准;
2)复合式钢板桩围堰打设:先将夹梁按指定间距,从上至下安装至平台钢管桩上,然后在平台钢管桩指定位置绑扎注浆管,在夹梁外侧安装拉森钢板桩,最后将拉森钢板桩、夹梁、注浆管和平台钢管桩组成的结构整体打设;
3)注浆加固:在平台钢管桩两侧同时对称注浆,四角位置的平台钢管桩为三侧对称注浆,形成桩底注浆加固体;
4)施工平台搭设:先进行贝雷片平台梁的安装,在贝雷片平台梁上铺设施工平台垫板;
5)围堰内钢管支撑安装:在围堰内,先安装钢管支撑,再安装斜向钢管支撑,斜向钢管支撑四角位置布置,钢管支撑按一侧纵向布置;
6)承台施工:先浇筑承台底素砼,再浇筑承台,承台内设置冷却管;
步骤2)中所述的复合式钢板桩围堰由拉森钢板桩、夹梁、承台和平台钢管桩组成,夹梁腹板焊接于平台钢管桩上,夹梁上下翼缘通过连接角钢螺栓连接,连接角钢焊接于焊接垫板上,焊接垫板焊接于平台钢管桩上,拉森钢板桩通过连接螺栓与连接工字钢一端翼缘连接,连接工字钢另一端翼缘焊接于夹梁腹板上;
步骤3)中所述的对平台钢管桩底进行注浆加固,注浆管通过橡胶绑带固定于平台钢管桩上。
本发明具有以下的特点和有益效果:
(1)通过连接件形成拉森钢板桩、夹梁和平台钢管桩的组合结构,大大增强了围堰的整体刚度,提高了整个施工的安全。
(2)在平台钢管桩打设之后进行底部的注浆加固,形成浮泥层注浆加固体,稳定了整个施工平台,为后续施工提供便利。
附图说明
图1是近堤高水位差复合式钢板桩围堰水中承台结构示意图;
图2是钢板桩复合式围堰布置示意图;
图3是拉森钢板桩与平台钢管桩连接图;
图4是施工工艺流程图;
图中:1.承台;2.冷却管;3.承台底素砼;4.桩基;5.钢管支撑;6.平台钢管桩;7.拉森钢板桩;8.夹梁;9.贝雷片平台梁;10.施工平台垫板;11.围护钢管桩;12.路堤;13.斜向钢管支撑;14.注浆管;15.橡胶绑带;16.连接螺栓;17.连接工字钢;18.浮泥层注浆加固体;19.焊接垫板;20.连接角钢。
具体实施方式
本实施方式钢结构焊接工艺、螺栓连接施工工艺、模板设置工艺及混凝土浇筑施工工艺等本实施中就不在累述,重点阐述本发明涉及结构的实施方式。
近堤高水位差复合式钢板桩围堰水中承台结构,包括:1.承台;2.冷却管;3.承台底素砼;5.钢管支撑;6.平台钢管桩;7.拉森钢板桩;8.夹梁;9.贝雷片平台梁;10.施工平台垫板;11.围护钢管桩;13.斜向钢管支撑;14.注浆管;15.橡胶绑带;16.连接螺栓;17.连接工字钢;18.浮泥层注浆加固体;19.焊接垫板;20.连接角钢。
夹梁8腹板焊接于平台钢管桩6上,夹梁8上下翼缘通过连接角钢20螺栓连接,连接角钢20焊接于焊接垫板19上,焊接垫板19焊接于平台钢管桩6上,拉森钢板桩7通过连接螺栓16与连接工字钢17一端翼缘连接,连接工字钢17另一端翼缘焊接于夹梁8腹板上;注浆管14通过橡胶绑带15固定于平台钢管桩6上。
参照图2所示,图中:夹梁8间距根据平台钢管桩6的长细比确定,夹梁尺寸按平台钢管桩6的间距确定,厚度不小于3mm。
参照图2所示,图中:连接工字钢20可进行现场的切割焊接,高度取为拉森钢板桩7与夹梁8腹板外边之间的间距,橡胶绑带15可选用两端扣件式绑带。
本发明主要包括如下施工步骤:
1)围护钢管桩11打设:围护钢管桩11按设计间距要求打设,以形成挡土要求为准;
2)复合式钢板桩围堰打设:先将夹梁8按指定间距,从上之下安装至平台钢管桩6上,然后在平台钢管桩6指定位置绑扎注浆管14,在夹梁8外侧安装拉森钢板桩7,最后将拉森钢板桩7、夹梁8、注浆管14和平台钢管桩6组成的结构整体打设;
3)注浆加固:在平台钢管桩6两侧同时对称注浆,四角位置的平台钢管桩6位三侧对称注浆;
4)施工平台搭设:先进行贝雷片平台梁9的安装,在贝雷片平台梁9上铺设施工平台垫板10;
5)围堰内钢管支撑安装:在围堰内,先安装钢管支撑5,再安装斜向钢管支撑13,斜向钢管支撑13四角位置布置,钢管支撑5按一侧纵向布置;
6)承台施工:先浇筑承台底素砼3,再浇筑承台1,承台1内设置冷却管2;
步骤2)中所述的复合式钢板桩围堰由拉森钢板桩7、夹梁8、和平台钢管桩6组成,夹梁8腹板焊接于平台钢管桩6上,夹梁8上下翼缘通过连接角钢20螺栓连接,连接角钢20焊接于焊接垫板19上,焊接垫板19焊接于平台钢管桩6上,拉森钢板桩7通过连接螺栓16与连接工字钢17一端翼缘连接,连接工字钢17另一端翼缘焊接于夹梁8腹板上;
步骤3)中所述的对平台钢管桩6底进行注浆加固,注浆管14通过橡胶绑带15固定于平台钢管桩6上。
Claims (3)
1.一种近堤高水位差复合式钢板桩围堰水中承台施工方法,其特征在于包括以下步骤:
1)围护钢管桩(11)打设:围护钢管桩(11)按设计间距要求打设,以形成挡土要求为准;
2)复合式钢板桩围堰打设:先将夹梁(8)按指定间距,从上至下安装至平台钢管桩(6)上,然后在平台钢管桩(6)指定位置绑扎注浆管(14),在夹梁(8)外侧安装拉森钢板桩(7),最后将拉森钢板桩(7)、夹梁(8)、注浆管(14)和平台钢管桩(6)组成的结构整体打设;
3)注浆加固:在平台钢管桩(6)两侧同时对称注浆,四角位置的平台钢管桩(6)为三侧对称注浆,形成桩底注浆加固体(18);
4)施工平台搭设:先进行贝雷片平台梁(9)的安装,在贝雷片平台梁(9)上铺设施工平台垫板(10);
5)围堰内钢管支撑安装:在围堰内,先安装钢管支撑(5),再安装斜向钢管支撑(13),斜向钢管支撑(13)四角位置布置,钢管支撑(5)按一侧纵向布置;
6)承台施工:先浇筑承台底素砼(3),再浇筑承台(1),承台(1)内设置冷却管(2)。
2.根据权利要求1所述的近堤高水位差复合式钢板桩围堰水中承台施工方法,其特征在于:步骤2)中所述的复合式钢板桩围堰由拉森钢板桩(7)、夹梁(8)、承台(1)和平台钢管桩(6)组成,夹梁(8)腹板焊接于平台钢管桩(6)上,夹梁(8)上下翼缘通过连接角钢(20)螺栓连接,连接角钢(20)焊接于焊接垫板(19)上,焊接垫板(19)焊接于平台钢管桩(6)上,拉森钢板桩(7)通过连接螺栓(16)与连接工字钢(17)一端翼缘连接,连接工字钢(17)另一端翼缘焊接于夹梁(8)腹板上。
3.根据权利要求1所述的近堤高水位差复合式钢板桩围堰水中承台施工方法,其特征在于:步骤3)中所述的对平台钢管桩(6)底进行注浆加固,注浆管(14)通过橡胶绑带(15)固定于平台钢管桩(6)上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610173505.7A CN105780790B (zh) | 2016-03-24 | 2016-03-24 | 近堤高水位差复合式钢板桩围堰水中承台施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610173505.7A CN105780790B (zh) | 2016-03-24 | 2016-03-24 | 近堤高水位差复合式钢板桩围堰水中承台施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105780790A true CN105780790A (zh) | 2016-07-20 |
CN105780790B CN105780790B (zh) | 2017-10-03 |
Family
ID=56390855
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610173505.7A Active CN105780790B (zh) | 2016-03-24 | 2016-03-24 | 近堤高水位差复合式钢板桩围堰水中承台施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105780790B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107355225A (zh) * | 2017-08-11 | 2017-11-17 | 中铁第勘察设计院集团有限公司 | 水中超深盾构始发/吊出井结构及其施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201330400Y (zh) * | 2008-12-05 | 2009-10-21 | 广西壮族自治区公路桥梁工程总公司 | 搭接式组合钢板围堰 |
CN101838993A (zh) * | 2010-05-17 | 2010-09-22 | 中铁二十局集团有限公司 | 黄河河道内承台施工用钢板桩围堰施工工艺 |
WO2013008915A1 (ja) * | 2011-07-14 | 2013-01-17 | 新日鐵住金株式会社 | 組合せ鋼矢板、地中連続壁、及び組合せ鋼矢板の分解方法 |
CN203834491U (zh) * | 2014-04-25 | 2014-09-17 | 中交二航局第四工程有限公司 | 一种用于水中淤泥层中深基坑施工的围堰 |
CN104196042A (zh) * | 2014-08-15 | 2014-12-10 | 中国建筑第六工程局有限公司 | 一种钢板桩围堰结构施工方法 |
CN104196034A (zh) * | 2014-09-18 | 2014-12-10 | 中建交通建设集团有限公司 | 一种利用钢板桩作为支护围堰的基坑施工方法 |
-
2016
- 2016-03-24 CN CN201610173505.7A patent/CN105780790B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201330400Y (zh) * | 2008-12-05 | 2009-10-21 | 广西壮族自治区公路桥梁工程总公司 | 搭接式组合钢板围堰 |
CN101838993A (zh) * | 2010-05-17 | 2010-09-22 | 中铁二十局集团有限公司 | 黄河河道内承台施工用钢板桩围堰施工工艺 |
WO2013008915A1 (ja) * | 2011-07-14 | 2013-01-17 | 新日鐵住金株式会社 | 組合せ鋼矢板、地中連続壁、及び組合せ鋼矢板の分解方法 |
CN203834491U (zh) * | 2014-04-25 | 2014-09-17 | 中交二航局第四工程有限公司 | 一种用于水中淤泥层中深基坑施工的围堰 |
CN104196042A (zh) * | 2014-08-15 | 2014-12-10 | 中国建筑第六工程局有限公司 | 一种钢板桩围堰结构施工方法 |
CN104196034A (zh) * | 2014-09-18 | 2014-12-10 | 中建交通建设集团有限公司 | 一种利用钢板桩作为支护围堰的基坑施工方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107355225A (zh) * | 2017-08-11 | 2017-11-17 | 中铁第勘察设计院集团有限公司 | 水中超深盾构始发/吊出井结构及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105780790B (zh) | 2017-10-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105887806B (zh) | 装配式地下连续墙及其施工方法 | |
CN104775446A (zh) | 水上结构固定用筒墩及其安装施工方法 | |
US20150071711A1 (en) | Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method | |
US20100232878A1 (en) | Universal Framed Cofferdam | |
CN201857618U (zh) | 浮式导向平台和钢护筒支撑钻孔平台深水桩基础 | |
CN101368389A (zh) | 单双壁结合钢围堰施工方法及其单双壁结合钢围堰 | |
JP5347898B2 (ja) | 既設矢板岸壁の補強構造及び方法 | |
CN101538833B (zh) | 竖向分条双壁钢围堰止水施工工法 | |
JP4864774B2 (ja) | 水域構造物の補強工法 | |
CN102322069A (zh) | 一种沉井和钢管桩的水中组合基础及其施工方法 | |
CN102134854B (zh) | 船台滑道水下桩基的施工方法 | |
KR101211811B1 (ko) | 조립케이슨을 이용한 현장타설말뚝 | |
CN109241631A (zh) | 盾构隧道管片上浮量计算方法 | |
CN109736343A (zh) | 海上风电基础、其安装方法及风力发电机组 | |
CN100535264C (zh) | 一种钢套箱围堰及其回收方法 | |
CN111851523B (zh) | 一种基坑施工防沉降偏离方法 | |
CN104711931B (zh) | 一种适用于桥梁架设的水中临时墩制造安装及拆除方法 | |
CN103572770B (zh) | 一种桩箱水工结构物及其建造方法 | |
CN205776157U (zh) | 装配式地下连续墙 | |
CN203654309U (zh) | 一种桩箱水工结构物 | |
CN104975612A (zh) | 水上沉井施工新工艺 | |
CN205134342U (zh) | 一种大吨位单双壁结合钢围堰 | |
CN106223355A (zh) | 一种深水高桩承台抱箍法有底钢套箱的装置及施工方法 | |
CN105780790A (zh) | 近堤高水位差复合式钢板桩围堰水中承台施工方法 | |
CN202170512U (zh) | 一种沉井和钢管桩的水中组合基础 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |