CN105735648A - 一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺 - Google Patents
一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺 Download PDFInfo
- Publication number
- CN105735648A CN105735648A CN201610135334.9A CN201610135334A CN105735648A CN 105735648 A CN105735648 A CN 105735648A CN 201610135334 A CN201610135334 A CN 201610135334A CN 105735648 A CN105735648 A CN 105735648A
- Authority
- CN
- China
- Prior art keywords
- construction
- funnel
- hopper
- section
- segment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明公开了一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺,改善了现有漏斗施工复杂的问题。本发明的整个漏斗分为N+2个施工段进行混凝土浇筑,具体步骤如下:(1)第一施工段先施工漏斗顶部的四边大梁;(2)第二至N+1施工段施工漏斗;(3)第N+2施工段施工漏斗的顶部楼层板;其中,N为正整数,且N≥4;漏斗斜壁根据楼层板可承载的重量,计算漏斗总重量划分为N施工段,每一段的施工重量≤楼层板承载力。本发明采用N+2个施工段浇筑;这样分段施工,从而大大减少每段钢筋混凝土煤漏斗重量,其分段煤漏斗重量达到可直接在煤漏斗下层的楼面板上支设模板,而不在其以下各层逐层搭设加固支撑架,施工极其方便。
Description
技术领域
本发明涉及一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺。
背景技术
电厂主厂房框架结构架上的钢筋混凝土煤漏斗,设置在主厂房框架结构架上部较高处,一般达到标高20m以上,由于钢筋混凝土煤漏斗重量太大,施工时其下各楼层不能承担钢筋混凝土煤漏斗重量及施工荷载,传统支模施工方式,是从地面一层逐层搭设支撑架,加固钢筋混凝土煤漏斗下面的各楼层,从而在钢筋混凝土煤漏斗下部楼层处作为支模架平台,进行支模施工。这种传统支模施工方式较为复杂。
发明内容
为了改善上述问题,本发明的目的在于提供一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺。
为了实现上述目的,本发明采用的技术方案如下:
一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺,整个漏斗分为N+2个施工段进行混凝土浇筑,具体步骤如下:
(1)第一施工段先施工漏斗顶部的四边大梁;
(2)第二至N+1施工段施工漏斗;
(3)第N+2施工段施工漏斗的顶部楼层板;
其中,N为正整数,且N≥4;
漏斗斜壁根据楼层板可承载的重量,计算漏斗总重量划分为N施工段,每一段的施工重量≤楼层板承载力。
进一步地,在对漏斗进行施工时,是从下至上依次施工,且每一段施工完成后需养护7天以上。
再进一步地,在进行第二至N+1施工段施工时,直接在漏斗下方的楼层板上设置支撑架和模板,然后进行浇筑。
更进一步地,在进行第二至N+1施工段施工时,所述支撑架随着施工段的增加,其高度也逐渐升高以满足施工要求。
另外,所述支撑架为由钢管搭设的脚手架。
本发明采用N+2个施工段浇筑,第一施工段先施工漏斗顶部的四周大梁,第二至N+1施工段施工漏斗,第N+2施工段施工漏斗的顶部楼层板;这样分段施工,从而大大减少每段钢筋混凝土煤漏斗重量,其分段煤漏斗重量达到可直接在煤漏斗下层的楼面板上支设模板,而不在其以下各层逐层搭设加固支撑架,施工极其方便。
具体实施方式
下面结合实施例对本发明作进一步说明,本发明的实施方式包括但不限于下列实施例。
实施例
一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺,整个漏斗分为N+2个施工段进行混凝土浇筑,具体步骤如下:
(1)第一施工段先施工漏斗顶部的四边大梁;
(2)第二至N+1施工段施工漏斗;
(3)第N+2施工段施工漏斗的顶部楼层板;
其中,N为正整数,且N≥4;
漏斗斜壁根据楼层板可承载的重量,计算漏斗总重量划分为N施工段,每一段的施工重量≤楼层板承载力。
本发明采用上述施工方式,能够直接在煤漏斗下层的楼面板上设置支撑架支撑模板,这样就无需像传统施工方式,逐层搭设加固支撑架;主要原因在于本发明将漏斗施工分成了N个施工段,每个施工段的施工荷,楼层板完全能够承受,故而在施工过程能够确保施工的安全性,大大地简化了施工流程,使得施工较为方便,也大大地减少了人力。
为了能够提高施工的质量,在对漏斗进行施工时(也就是进行第二至N+1施工段时),是从下至上依次施工,且每一段施工完成后需养护7天以上。通过施工后的养护,能够大大地提高施工质量。
由于本发明是分段进行漏斗施工的,故而每次施工荷载较小,故而在进行第二至N+1施工段施工时,直接在漏斗下方的楼层板上设置支撑架和模板,然后进行浇筑。在对漏斗进行施工时,无需另外设置支撑平台,可直接以漏斗下方的楼层板作为支撑平台,在其上设置支撑架和模块即可进行浇筑,操作十分方便,减少了人力成本,提高了施工效率。
由于漏斗斜壁的高度是逐渐升高的,故而在进行第二至N+1施工段施工时,所述支撑架随着施工段的增加,其高度也逐渐升高以满足施工要求。通过逐渐升高支撑架,从而能够轻松满足漏斗每段的施工要求,从而提高施工效率。
为了便于安装和拆卸支撑架,所述支撑架为由钢管搭设的脚手架。在实际施工时,可以根据实际情况,可以搭设符合要求的模板支撑架,从而更加方便的进行支撑,同时由于是通过钢管进行搭设的,拆卸、安装均十分方便,提高了施工效率。
按照上述实施例,便可很好地实现本发明。值得说明的是,基于上述结构设计的前提下,为解决同样的技术问题,即使在本发明上做出的一些无实质性的改动或润色,所采用的技术方案的实质仍然与本发明一样,故其也应当在本发明的保护范围内。
Claims (5)
1.一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺,其特征在于,整个漏斗分为N+2个施工段进行混凝土浇筑,具体步骤如下:
(1)第一施工段先施工漏斗顶部的四边大梁;
(2)第二至N+1施工段施工漏斗;
(3)第N+2施工段施工漏斗的顶部楼层板;
其中,N为正整数,且N≥4;
漏斗斜壁根据楼层板可承载的重量,计算漏斗总重量划分为N施工段,每一段的施工重量≤楼层板承载力。
2.根据权利要求1所述的一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺,其特征在于,在对漏斗进行施工时,是从下至上依次施工,且每一段施工完成后需养护7天以上。
3.根据权利要求2所述的一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺,其特征在于,在进行第二至N+1施工段施工时,直接在漏斗下方的楼层板上设置支撑架和模板,然后进行浇筑。
4.根据权利要求3所述的一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺,其特征在于,在进行第二至N+1施工段施工时,所述支撑架随着施工段的增加,其高度也逐渐升高以满足施工要求。
5.根据权利要求4所述的一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺,其特征在于,所述支撑架为由钢管搭设的脚手架。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610135334.9A CN105735648B (zh) | 2016-03-10 | 2016-03-10 | 一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610135334.9A CN105735648B (zh) | 2016-03-10 | 2016-03-10 | 一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105735648A true CN105735648A (zh) | 2016-07-06 |
CN105735648B CN105735648B (zh) | 2018-01-02 |
Family
ID=56250267
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610135334.9A Active CN105735648B (zh) | 2016-03-10 | 2016-03-10 | 一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105735648B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03293445A (ja) * | 1990-04-11 | 1991-12-25 | Shimizu Corp | 建築物の構造体の施工方法 |
CN102708934A (zh) * | 2012-05-29 | 2012-10-03 | 中广核工程有限公司 | 核电厂反应堆堆腔结构及堆腔建造方法 |
CN102787741A (zh) * | 2012-08-23 | 2012-11-21 | 中国十九冶集团有限公司 | 大型煤仓仓壁施工方法及环梁部位的施工方法 |
US20120291378A1 (en) * | 2005-09-01 | 2012-11-22 | Schroeder Sr Robert | Express framing system |
CN103114754A (zh) * | 2013-02-04 | 2013-05-22 | 陕西煤业化工建设(集团)有限公司 | 联体煤仓顶桁架梁预就位替代吊装方法 |
-
2016
- 2016-03-10 CN CN201610135334.9A patent/CN105735648B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03293445A (ja) * | 1990-04-11 | 1991-12-25 | Shimizu Corp | 建築物の構造体の施工方法 |
US20120291378A1 (en) * | 2005-09-01 | 2012-11-22 | Schroeder Sr Robert | Express framing system |
CN102708934A (zh) * | 2012-05-29 | 2012-10-03 | 中广核工程有限公司 | 核电厂反应堆堆腔结构及堆腔建造方法 |
CN102787741A (zh) * | 2012-08-23 | 2012-11-21 | 中国十九冶集团有限公司 | 大型煤仓仓壁施工方法及环梁部位的施工方法 |
CN103114754A (zh) * | 2013-02-04 | 2013-05-22 | 陕西煤业化工建设(集团)有限公司 | 联体煤仓顶桁架梁预就位替代吊装方法 |
Non-Patent Citations (1)
Title |
---|
15149596898: "热电站主厂房煤仓漏斗施工方案", 《百度文库》 * |
Also Published As
Publication number | Publication date |
---|---|
CN105735648B (zh) | 2018-01-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204298825U (zh) | 基坑浇筑溜管支撑调节装置 | |
CN101824800B (zh) | 一种桥位现浇预应力混凝土连续梁的施工方法 | |
CN108019076A (zh) | 大直径钢筋混凝土筒仓施工方法及用于锥壳施工的装置 | |
CN208293405U (zh) | 一种衔接上承式便桥和填土便道的桥台 | |
CN102587663A (zh) | 一种超高层建筑钢管柱混凝土施工工艺 | |
CN106894346B (zh) | 一种连续梁桥施工方法 | |
CN103485574B (zh) | 一种造粒塔塔顶钢筋混凝土结构施工方法 | |
CN203834926U (zh) | 清水混凝土地下室外墙模板支模结构 | |
CN202626977U (zh) | 桩基钢筋笼及砼灌注料斗的固定装置 | |
CN106013434A (zh) | 一种预制装配式结构中间梁柱节点固定结构及安装方法 | |
CN201648978U (zh) | 桥位现浇预应力混凝土连续梁的系杆拱支架 | |
CN105781159B (zh) | 一种电厂主厂房钢筋混凝土煤漏斗施工工艺 | |
CN204608819U (zh) | 一种用于风力发电机的调平装置 | |
CN103031892A (zh) | 钢桁架支柱及钢桁架平台制造方法 | |
CN202220435U (zh) | 逆作地下混凝土结构降模设备 | |
CN102535535B (zh) | 带地下室多高层建筑地面预筑托降基底预压后固施工方法 | |
CN102828616B (zh) | 一种屋盖高支模体系 | |
CN204850469U (zh) | 商业大厦建造系统 | |
CN104060841A (zh) | 大跨度钢梁安装施工方法 | |
CN105735648B (zh) | 一种电厂主厂的房屋钢筋混凝用土煤漏斗多段支模浇筑施工工艺 | |
CN204000885U (zh) | 地铁深基坑混凝土支撑吊模模具 | |
CN106142301A (zh) | 一种批量预制的砼构件共享模板系统 | |
CN105781200A (zh) | 一种电厂主厂的房屋钢筋混凝用土煤漏斗分段支模浇筑施工工艺 | |
CN105113542B (zh) | 地下车站施工用悬挑系统及地下车站施工方法 | |
CN209670331U (zh) | 一种贝雷梁钢支撑复合模架体系支撑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |