CN105735205A - Horizontal construction joint dislocation repairing method for concrete panel - Google Patents

Horizontal construction joint dislocation repairing method for concrete panel Download PDF

Info

Publication number
CN105735205A
CN105735205A CN201610124261.3A CN201610124261A CN105735205A CN 105735205 A CN105735205 A CN 105735205A CN 201610124261 A CN201610124261 A CN 201610124261A CN 105735205 A CN105735205 A CN 105735205A
Authority
CN
China
Prior art keywords
construction joint
concrete slab
horizontal construction
concrete
slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610124261.3A
Other languages
Chinese (zh)
Inventor
周建波
王永明
王登银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Large Dam Safety Supervision Center National Energy Administration Of People's Republic Of China
PowerChina Huadong Engineering Corp Ltd
Original Assignee
Large Dam Safety Supervision Center National Energy Administration Of People's Republic Of China
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Large Dam Safety Supervision Center National Energy Administration Of People's Republic Of China, PowerChina Huadong Engineering Corp Ltd filed Critical Large Dam Safety Supervision Center National Energy Administration Of People's Republic Of China
Priority to CN201610124261.3A priority Critical patent/CN105735205A/en
Publication of CN105735205A publication Critical patent/CN105735205A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/06Earth-fill dams; Rock-fill dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints

Abstract

The invention relates to a horizontal construction joint dislocation repairing method for a concrete panel to improve safety and reliability of engineering operation. According to the technical scheme, the horizontal construction joint dislocation repairing method for the concrete panel is characterized by comprising the following steps that firstly, the damage range of the portions, on the periphery of a horizontal construction joint, of the concrete panel is determined; secondly, the portions, in the damage range, of the concrete panel are chiseled away; thirdly, deformed reinforcing steel bars are cut and repaired, the deformed reinforcing steel bars in the damage range are cut off, and replacement reinforcing steel bars are used for replacing the cut-off reinforcing steel bars; and fourthly, concrete panel backfilling is conducted, concrete is used for backfilling the chiseled area, and a repairing panel connecting an upper concrete panel body with a lower concrete panel body of the horizontal construction joint is formed, wherein the slope of the repairing panel is 1:K, K ranges from L-0.05 to L+0.05, and the designed slope ratio of a down slope of the original concrete panel is 1:L. The horizontal construction joint dislocation repairing method is suitable for similar engineering such as dislocation repairing treatment of horizontal construction joints of concrete panel rockfill dams.

Description

A kind of concrete slab horizontal construction joint faulting of slab ends repair mode
Technical field
The present invention relates to a kind of concrete slab horizontal construction joint faulting of slab ends repair mode.It is applicable to concrete slab The similar engineerings such as face-plate of rockfill dam horizontal construction joint faulting of slab ends repair process.
Background technology
In CFRD engineering, because the slab joint that construction needs or other reasons is formed is for executing Work is stitched, and construction joint is divided into again horizontal construction joint and vertical lap seam etc. according to its function.Generally, panel water Flat construction joint with at the plate thickness 1/2 at seam as boundary, seam face, top is perpendicular to panel surface, seam face, bottom Joint form in horizontal plane.
In recent years, along with the appearance of the heavy rolling apparatus of modernization, CFRD builds height of dam degree not Disconnected increase, water cloth a strip of land between hills concrete slab engineering of maximum height of dam 233m is completed the most in the world, maximum height of dam The monkey rock face dam engineering of 223.5m is built.For the CFRD of meizoseismal area, Under seismic dynamic loading effect, easily cause the faulting of slab ends of panel-level construction joint, certain model at horizontal construction joint Enclose concrete slab produce extruding destroy, bar bending or the phenomenon such as cut off, have a strong impact on the antiseepage merit of panel Can, jeopardize the safe operation of dam.
Summary of the invention
The technical problem to be solved in the present invention is: for the problem of above-mentioned existence, it is provided that a kind of concrete slab Horizontal construction joint faulting of slab ends repair mode, the safety and reliability run with enhancement engineering.
The technical solution adopted in the present invention is: a kind of concrete slab horizontal construction joint faulting of slab ends repair mode, It is characterized in that step is as follows:
1, the damaged scope of horizontal construction joint periphery concrete slab is determined;
2, the concrete slab in the range of breakage is cut;
3, the cutting off and repairing of deformed bar, cuts off the deformed bar in the range of breakage, and uses replacement reinforcing bar Replace the reinforcing bar cut off;
4, concrete slab backfill, uses concrete to backfill cutting region, is formed and connect divergence Sewing on the repairing panel of portion's concrete slab and bottom concrete slab, the gradient of this repairing panel is 1:K, K=L-0.05~L+0.05, former concrete slab along design slope, slope than for 1:L.
The gradient will be formed on the concrete slab on horizontal construction joint top after concrete chisel removal in the range of breakage Upstream for 1:M is domatic, M=1~2, and it is 1:N that the concrete slab of horizontal construction joint bottom is formed the gradient Downstream domatic, N=0.5~1.
The concave-convex surface fluctuating that described upstream and downstream are domatic.
Described replacement reinforcing bar welds with the reinforcing bar fissure of displacement not cut off in concrete slab;The replacement steel arranged up and down Vertical bar connection is passed through between muscle.
The invention has the beneficial effects as follows: a, safety: this structure cuts horizontal construction joint periphery breakage concrete Panel, cuts off deformed bar former in cutting region, and the replacement reinforcing bar of benefit prototype number is to recover original design joining Muscle form, then with label identical with former panel, the concrete backfill of identical match ratio;Whole reparation thinking is patrolled It is clear to collect, quality controllable, it can be ensured that the safety of engineering operation after reparation.B, reliability: this structure makes Concrete slab after reparation and old panel effectively merge one, the bulk deformation adapting to dam body coordinates, The effect of opposing external load, has stronger reliability.C, practicality: the method is simple to operate, construction is just Profit, it is not necessary to special engineering equipment, has stronger practicality.
Accompanying drawing explanation
Fig. 1 is panel-level construction joint faulting of slab ends schematic diagram in the present invention.
Fig. 2 is panel-level construction joint faulting of slab ends concrete chisel removal schematic diagram in the present invention.
Fig. 3 is that in the present invention, schematic diagram repaired by panel-level construction joint faulting of slab ends concrete.
Detailed description of the invention
The present embodiment is a kind of concrete slab horizontal construction joint faulting of slab ends repair mode:
A, determine horizontal construction joint perimeter panel breakage scope: while panel-level construction joint faulting of slab ends, inevitable Cause the breakage of horizontal construction joint 1 periphery certain limit inner concrete panel 2, therefore, stitch at panel-level When faulting of slab ends is repaired, horizontal construction joint perimeter panel breakage scope need to be determined.The method that the present embodiment is taked is: Width, occurrence and development according to 1 week edge crack of horizontal construction joint determine;For the district that cannot judge Territory, uses the mode of boring and coring to verify the breakage of panel.Panel-level construction joint 1 time in this example Portion's breakage scope takes d1=1~2m, and top breakage scope takes d2=2~3m.
B, cut the concrete slab in the range of breakage: after determining horizontal construction joint perimeter panel breakage scope, This region inner concrete is cut.Construction for ease of later stage concrete is repaired, at horizontal construction joint after cutting Domatic 22 gradients in upstream that the concrete slab 2 on top is formed are 1:M, generally M=1~2;Chisel Domatic 21 gradients in downstream that after removing, concrete slab 2 in horizontal construction joint bottom is formed are 1:N, typically In the case of N=0.5~1.Cut the upstream and downstream domatic 22,21 that concrete formed should try one's best concavo-convex fluctuating, with It is easy to the combination of New-old concrete.
C, the cutting off and repairing of deformed bar: when cutting the concrete slab of breakage, deformed bar is cut off After, mend with the replacement reinforcing bar fissure of displacement welding of prototype number, recover original design form of reinforcement;Again levels is substituted Reinforcing bar Φ 16 vertical reinforcement is attached, and forms the bar-mat reinforcement closed.
D, concrete slab backfill: use label identical with old panel, identical match ratio concrete to cutting Region backfills, and uses vibrating head to fill concrete vibratory compaction, is formed and connect horizontal construction joint top The repairing panel 3 of concrete slab 2 and bottom concrete slab 2.Effective with former panel for guaranteeing repairing panel Combine together, adapt to dam body bulk deformation coordinate, opposing external load effect without occurring splitting Seam and breakage, gradient 1:K repairing panel 3 should strictly control, generally, when former concrete slab 2 along design slope, slope ratio during for 1:L, K=L-0.05~L+0.05.

Claims (4)

1. a concrete slab horizontal construction joint faulting of slab ends repair mode, it is characterised in that step is as follows:
1.1, the damaged scope of horizontal construction joint (1) periphery concrete slab is determined;
1.2, the concrete slab (2) in the range of breakage is cut;
1.3, the cutting off and repairing of deformed bar, cuts off the deformed bar in the range of breakage, and uses replacement steel Muscle replaces the reinforcing bar cut off;
1.4, concrete slab backfill, uses concrete to backfill cutting region, forms connection level and executes Work sews on the repairing panel (3) of portion's concrete slab (2) and bottom concrete slab (2), this repairing face The gradient of plate is 1:K, K=L-0.05~L+0.05, and former concrete slab (2) is 1 along design slope, slope ratio: L。
Concrete slab horizontal construction joint faulting of slab ends repair mode the most according to claim 1, its feature exists In: concrete slab (2) on horizontal construction joint (1) top after the concrete chisel removal in the range of by breakage The upper formation gradient is the upstream domatic (22) of 1:M, and M=1~2, on the concrete slab of horizontal construction joint bottom Form the downstream domatic (21) that the gradient is 1:N, N=0.5~1.
Concrete slab horizontal construction joint faulting of slab ends repair mode the most according to claim 2, its feature exists In: the concave-convex surface of described upstream and downstream domatic (22,21) rises and falls.
Concrete slab horizontal construction joint faulting of slab ends repair mode the most according to claim 1, its feature exists In: described replacement reinforcing bar welds with the reinforcing bar fissure of displacement not cut off in concrete slab;The replacement steel arranged up and down Vertical bar connection is passed through between muscle.
CN201610124261.3A 2016-03-04 2016-03-04 Horizontal construction joint dislocation repairing method for concrete panel Pending CN105735205A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610124261.3A CN105735205A (en) 2016-03-04 2016-03-04 Horizontal construction joint dislocation repairing method for concrete panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610124261.3A CN105735205A (en) 2016-03-04 2016-03-04 Horizontal construction joint dislocation repairing method for concrete panel

Publications (1)

Publication Number Publication Date
CN105735205A true CN105735205A (en) 2016-07-06

Family

ID=56249975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610124261.3A Pending CN105735205A (en) 2016-03-04 2016-03-04 Horizontal construction joint dislocation repairing method for concrete panel

Country Status (1)

Country Link
CN (1) CN105735205A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836133A (en) * 2017-03-31 2017-06-13 长江勘测规划设计研究有限责任公司 Structure and construction method are repaired in a kind of concrete slab extruding destruction
CN106906794A (en) * 2017-03-20 2017-06-30 中国华电科工集团有限公司 A kind of dam armored concrete panel construction crack treatment construction technology
CN110565457A (en) * 2019-08-21 2019-12-13 中铁四院集团岩土工程有限责任公司 Method for renovating exposed reinforcing steel bars of ballastless track base and repairing structure
CN114151103A (en) * 2021-11-30 2022-03-08 北京城建重工桥隧工程技术有限公司 Slab staggering steel lining reinforcing structure suitable for slab staggering diseases of subway tunnel duct pieces
CN114439058A (en) * 2022-04-11 2022-05-06 济南轨道交通集团有限公司 Classification early warning identification and jacking treatment process for dislocation deformation of deformation joint of pipe gallery
CN114502875A (en) * 2019-09-26 2022-05-13 气体运输技术公司 Method for repairing a wall of a tank for transporting and/or storing liquefied natural gas

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2562111B1 (en) * 1984-03-30 1988-08-05 Poteur Michel DEVICE FOR SEALING VERTICALLY OR SLIGHTLY INCLINED SPEAKERS
CN203307776U (en) * 2013-06-06 2013-11-27 中国水电顾问集团华东勘测设计研究院 Concrete face rock fill dam toe board structure
CN203923847U (en) * 2014-05-20 2014-11-05 山西省交通科学研究院 A kind of cement concrete pavement faulting of slab ends repair system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2562111B1 (en) * 1984-03-30 1988-08-05 Poteur Michel DEVICE FOR SEALING VERTICALLY OR SLIGHTLY INCLINED SPEAKERS
CN203307776U (en) * 2013-06-06 2013-11-27 中国水电顾问集团华东勘测设计研究院 Concrete face rock fill dam toe board structure
CN203923847U (en) * 2014-05-20 2014-11-05 山西省交通科学研究院 A kind of cement concrete pavement faulting of slab ends repair system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宋彦刚等: "紫坪铺水库大坝震损及应急修复综述", 《四川水力发电》 *
谈军等: "四川省紫坪铺水利枢纽工程建筑物震损修复", 《云南水力发电》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906794A (en) * 2017-03-20 2017-06-30 中国华电科工集团有限公司 A kind of dam armored concrete panel construction crack treatment construction technology
CN106836133A (en) * 2017-03-31 2017-06-13 长江勘测规划设计研究有限责任公司 Structure and construction method are repaired in a kind of concrete slab extruding destruction
CN110565457A (en) * 2019-08-21 2019-12-13 中铁四院集团岩土工程有限责任公司 Method for renovating exposed reinforcing steel bars of ballastless track base and repairing structure
CN114502875A (en) * 2019-09-26 2022-05-13 气体运输技术公司 Method for repairing a wall of a tank for transporting and/or storing liquefied natural gas
CN114502875B (en) * 2019-09-26 2024-03-12 气体运输技术公司 Method for repairing a wall of a tank for transporting and/or storing liquefied natural gas
CN114151103A (en) * 2021-11-30 2022-03-08 北京城建重工桥隧工程技术有限公司 Slab staggering steel lining reinforcing structure suitable for slab staggering diseases of subway tunnel duct pieces
CN114439058A (en) * 2022-04-11 2022-05-06 济南轨道交通集团有限公司 Classification early warning identification and jacking treatment process for dislocation deformation of deformation joint of pipe gallery
CN114439058B (en) * 2022-04-11 2022-08-12 济南轨道交通集团有限公司 Classification early warning identification and jacking treatment process for dislocation deformation of deformation joint of pipe gallery

Similar Documents

Publication Publication Date Title
CN105735205A (en) Horizontal construction joint dislocation repairing method for concrete panel
CN106522079B (en) The prefabricated assembled combination concrete trestle system of one kind and its construction method
CN104294769B (en) A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement
CN105648984A (en) Repair structure for concrete panel buckling damage and construction method
CN103225285A (en) Steel membrane concrete faced rockfill dam
CN107620262A (en) A kind of pot bearing for retaining whole anchor bolts changes construction method
CN108571328B (en) Stratum juncture shield tunnel segment lining structure and design method
CN103711066A (en) Novel steel box girder top plate unit structure and manufacturing method
JP5235748B2 (en) Wall metal fittings and underground continuous wall construction method
CN104762967B (en) The envelope stake device of the anchor jacked pile of a kind of improvement and construction method
CN207277344U (en) Guiding tool for the backfill of narrow Deep Foundation Pit Excavation
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN209482290U (en) A kind of assembled basement process device of soft soil foundation
CN207829223U (en) Bottom section assembled anti-knock function can restore shear wall
CN106149634B (en) The SR water sealing structure and its water-stopping method connected between connecting plate and cut-pff wall seam
CN108999200A (en) A kind of assembled anchor pole sash beam construction method
JP6193720B2 (en) Ground improvement structure
CN110206036B (en) Underground diaphragm wall construction technology with depth first and depth later
CN104329101B (en) The device of small radius variable curvature section curvature and thickness between accurate control tunnel side wall and inverted arch
CN113738422A (en) Method for calculating and controlling floor heave amount of soft rock roadway and method for determining control method
CN209260468U (en) A kind of karst region is anti-to collapse road structure suddenly
CN109056658B (en) Concrete panel defect repairing construction method
JP5932833B2 (en) How to improve reinforced soil structure
CN206544575U (en) A kind of Novel anti-fatigue bracket
CN206987420U (en) The antidetonation iterative structure reinforced for existing structure across bearing beam greatly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160706