CN105714651B - Highway waste asphalt rejects regeneration integrated construction device and its construction method - Google Patents

Highway waste asphalt rejects regeneration integrated construction device and its construction method Download PDF

Info

Publication number
CN105714651B
CN105714651B CN201610091751.8A CN201610091751A CN105714651B CN 105714651 B CN105714651 B CN 105714651B CN 201610091751 A CN201610091751 A CN 201610091751A CN 105714651 B CN105714651 B CN 105714651B
Authority
CN
China
Prior art keywords
hydraulic cylinder
heater box
car body
waste asphalt
heating apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610091751.8A
Other languages
Chinese (zh)
Other versions
CN105714651A (en
Inventor
余太金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi nonferrous metals Construction Group Co Ltd
Original Assignee
Jiangxi Nonferrous Metals Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Nonferrous Metals Construction Group Co Ltd filed Critical Jiangxi Nonferrous Metals Construction Group Co Ltd
Priority to CN201610091751.8A priority Critical patent/CN105714651B/en
Priority claimed from CN201410727611.6A external-priority patent/CN104480842B/en
Publication of CN105714651A publication Critical patent/CN105714651A/en
Application granted granted Critical
Publication of CN105714651B publication Critical patent/CN105714651B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/10Apparatus or plants for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
    • E01C19/1004Reconditioning or reprocessing bituminous mixtures, e.g. salvaged paving, fresh patching mixtures grown unserviceable; Recycling salvaged bituminous mixtures; Apparatus for the in-plant recycling thereof
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/46Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing and placing the materials, e.g. slurry seals

Abstract

Highway waste asphalt rejects regeneration integrated construction device and its construction method.Regeneration integrated construction device is rejected the invention discloses highway waste asphalt, it is characterized in that, including car body, the coil heating apparatus in front of haulage vehicle;Cutter device is arranged on coil heating apparatus rear, the cutter device includes being fixed on the hydraulic cylinder above railway carriage, track installation is in hydraulic cylinder side, the track is provided with and removable fly block is connected with hydraulic cylinder, expansion link is connected to below movable block, and its bottom is provided with the rotatable cutting knife for being passed through ground;Compared with prior art, it is an advantage of the invention that:In disclosed documents, it needs plurality of devices to cooperate simultaneously in work progress, and occupied ground is larger, and cost is high, and the present invention is provided simultaneously with heating, and batch mixing is pulverized in excision, discharges several functions of virgin material, the cost of equipment is lowered significantly.

Description

Highway waste asphalt rejects regeneration integrated construction device and its construction method
Technical field
The invention belongs to road engineering technical field, and in particular to a kind of highway waste asphalt rejects regeneration integrated construction dress Put and its construction method.
Background technology
When reparation of asphalt pavement road etc. is constructed, the method for peeling off asphalt pavement body, known use manpower are used as Multitude digs technique and water spray craft.
Publication number CN101415886A Chinese invention patent application method for removing asphalt pavement, asphalt pavement body is removed Except being disclosed so in the stripping means of system, electromagnetic induction coil unit, removing asphalt pavement device and asphalt pavement body A kind of method for removing asphalt pavement, it is peels off the asphalt pavement body being laid on steel plate from steel plate, and conduct has The method for removing asphalt pavement that the asphalt blocks of prescribed level are removed, it is characterised in that including:By entering to the steel plate Row electromagnetic induction heating, the softening layer that the following softening layer contacted with the steel plate is formed at into the asphalt pavement body forms work Sequence;The softening formed layer is peeled off from the steel plate contacted with the softening layer, the asphalt pavement body is blocked And the removal process taken out as asphalt blocks;And the shifting for moving the asphalt blocks taken out by the removal process Start building sequence.
It is identical that the document and the application belong to the problem of same technical field, solution, but its construction is more complicated, is applying During work, used construction equipment is a lot, and each construction cell is all independent individual, is not integrated device, its construct and Construction cost is higher, if a kind of equipment can reach the function of several distinct devices in file disclosed above, can so make into Originally substantially reduce, while can also reduce construction cost.
The content of the invention
The present invention is directed to disadvantage mentioned above, and the equipment for applying man-hour requirement based on the existing removing asphalt pavement of solution is more, into The problem of this is high.Propose a kind of highway waste asphalt and reject regeneration integrated construction device and its construction method, the equipment integrating Heating is provided simultaneously with, excision pulverizes batch mixing, discharges several functions of virgin material, the cost of equipment is lowered significantly.
To realize the purpose of the present invention, the technical solution adopted by the present invention is:
Highway waste asphalt rejects regeneration integrated construction device, it is characterized in that, including car body, the line in front of car body Enclose heater;
Cutter device is arranged on coil heating apparatus rear, and the cutter device includes being fixed on the hydraulic pressure above railway carriage Cylinder, track installation is in hydraulic cylinder side, and the track is provided with movable block is connected with hydraulic cylinder, and expansion link is connected to mobile cunning Below car, its bottom is provided with the rotatable cutting knife for being passed through ground;
Conveyer is arranged on cutter device rear, and the conveyer includes being arranged on the lifting pulley machine above railway carriage Group and conveyer belt, the conveyer belt feed end are provided with shovel board, and spring-backed quill is connected between shovel board and lifting pulley unit;
Constructing device is regenerated, the regeneration constructing device includes virgin material adding set and heater box, the virgin material addition dress Put and feed pipe is connected between heater box, heater box bottom is provided with the opening for receiving conveyer belt charging, and agitator tank, which is arranged on, to be added Below hot tank, its bottom is provided with discharging opening.
Preferentially, heater box is coil heats case, and its bottom is provided with filter screen, by motor drive in passageway back and forth Mobile pulverizes rod above filter screen.
Preferentially, spring-backed quill is divided into outer tube and inner tube, is provided with limited block in the outer tube, and inner tube is penetrated in outer tube and it Spring is provided between top and limited block;Wirerope-winding penetrates outer tube and is connected with inner tube on wheel unit.
Preferentially, conveyer belt discharge end is additionally provided with weighing device.
Preferentially, in addition to virgin material storage bin and generator, both are arranged on car body, and the generator is filled with cutting Put, conveyer and regeneration constructing device between connect electric power system respectively.
Preferentially, the car body is electricity energy driven vehicle.
Based on said structure, the present invention also provides a kind of highway waste asphalt and rejects regeneration integrated construction device construction party Method, it is characterised in that comprise the following steps,
(1)Start generator, start to be powered cutter device, conveyer and regeneration constructing device, set car body Motor program;
(2)Car body starts to move above in road, and coil heating apparatus drops to above roadbed, and it is soft that heating is carried out to it Change, make its roadbed temperature between 60 DEG C -80 degrees Celsius;
(3)Based on step(2), cutter device starts to cut the roadbed of heating and softening, passes through PLC programme-control Car body advances with retreating, and cutting knife is cut anyhow, forms rectangular block;
(4)Based on step(3), rectangular block scoops up feeding conveyer belt by shovel board, and rectangular block is passed through heater box bottom by conveyer belt Heated in the opening feeding heater box in portion;Before feeding, weighing device weighs rectangular block weight;
(5)Based on step(4), heater box starts to heat rectangular block, in the process, and motor, which drives, to be pulverized rod and exist Rectangular block is pulverized in motion in passageway, and rectangular block is fallen into agitator tank after being grinded up by filter screen;
(6)Based on step(5), utilization feed pipe will in proportion by weighing the weight of rectangular block in advance for virgin material adding set Virgin material is carried out in virgin material feeding agitator tank and old material is mixed, and road surface is poured into by discharging opening;
(7)Continuous repeat step(2)- step(6), constantly road is constructed;
(8)Based on step(7), road roller is immediately following car body, and the material that discharging opening is poured into road surface flattens to form new roadbed.
Compared with prior art, it is an advantage of the invention that:In disclosed documents, it needs in work progress Plurality of devices cooperates simultaneously, and occupied ground is larger, and cost is high, and the present invention is provided simultaneously with heating, and batch mixing is pulverized in excision, Several functions of virgin material are discharged, the cost of equipment is lowered significantly.
Brief description of the drawings
Brief description is next carried out to the present invention by means of the accompanying drawing of embodiment now.In accompanying drawing:
Fig. 1 shows that highway waste asphalt rejects the structural representation of regeneration integrated construction device;
Fig. 2 shows Fig. 1 face upwarding assumption diagram;
Fig. 3 shows the structural plan of conveyer and regeneration constructing device;
Fig. 4 shows the structure arrangement detail of regeneration constructing device;
Fig. 5 shows the structure arrangement detail of spring-backed quill;
Fig. 6 shows construction plan of the present invention;
Fig. 7 shows present invention construction side view;
Fig. 8 shows that shovel board of the present invention scoops up the schematic diagram of rectangular block.
Embodiment
With reference to specific embodiment, the present invention is described in detail.Following examples will be helpful to the technology of this area Personnel further understand the present invention, but the invention is not limited in any way.It should be pointed out that to the ordinary skill of this area For personnel, without departing from the inventive concept of the premise, various modifications and improvements can be made.These belong to the present invention Protection domain.
Embodiment 1
Highway waste asphalt rejects regeneration integrated construction device, including car body 1, the coil heats installed in the front of car body 1 Device 9;Coil heating apparatus 9 be shaped as it is circular or square, its heating surface (area) (HS be more than cutting area.Car body 1 drives for electric energy Motor-car, is adopted
Fuel can be saved with electrical energy drive, vehicle can pause for a long time, such as be driven using fuel oil in work progress Dynamic, then car can not stop working again, cause to waste, and use electrical energy drive to be not in then the situation for wasting the energy.
Cutter device 2 is arranged on the rear of coil heating apparatus 9, and it mainly cuts to the road surface after heating and softening Cut.Cutter device 2 includes being fixed on the hydraulic cylinder 202 above railway carriage, and track 203 is arranged on the side of hydraulic cylinder 202, described Track 203 is provided with the movable block 205 being connected with hydraulic cylinder 202, and expansion link 204 is connected to the lower section of movable block 205, Its bottom is provided with the rotatable cutting knife 201 for being passed through ground.Cutting knife 201 does transverse cuts by the flexible of hydraulic cylinder 202, Vertical cutting is done by the advance and retrogressing of car body 1.
Conveyer 3 is arranged on the rear of cutter device 2, and the conveyer 3 includes being arranged on the lifting above railway carriage Pulley unit 304 and conveyer belt 305, the feed end of conveyer belt 305 are provided with shovel board 301, shovel board 301 and lifting pulley machine Group
Spring-backed quill 303 is connected between 304.The discharge end of conveyer belt 305 is additionally provided with weighing device, can so weigh Shovel takes the weight of rectangular block 10, and data are provided for follow-up auto feed.
During the shovel of shovel board 301 takes rectangular block 10, in order that shovel board 301 is close on rugged roadbed Road surface, 303 points of spring-backed quill is that limited block 3033, inner tube are provided with outer tube 3032 and inner tube 3035, the outer tube 3032 3035 penetrate in outer tube 3032 and spring 3034 are provided between its top and limited block 3033;Steel wire rope 3031 is wrapped in Above lifting pulley unit 304, and penetrate outer tube 3032 and be connected with inner tube 3035.Spring 3034 is in be constantly in and upspring State, can so be close to road surface, when shovel board 301 runs into rugged roadbed, spring 3034 compressed and always Keep elastic force, it is ensured that it accurately scoops up rectangular block 10.
Constructing device 5 is regenerated, the regeneration constructing device 5 includes virgin material adding set 503 and heater box 501, described Feed pipe 502 is connected between virgin material adding set 503 and heater box 501, the bottom of heater box 501 is provided with reception conveyer belt The opening of 305 chargings, agitator tank is arranged on the lower section of heater box 501, and its bottom is provided with discharging opening 508.
The heater box 501 for regenerating constructing device 5 is coil heats case, and its bottom is provided with filter screen 507, passes through motor 504 rods 505 that pulverize moved back and forth in passageway 506 driven are arranged on the top of filter screen 507.
In addition, further comprises virgin material storage bin 8, both are arranged on car body 1, and virgin material storage bin 8 is used for storing for future use Material, material is supplemented in the case where the materials inside of virgin material adding set 503 is finished in time.Construction equipment on car body 1, Electric power system is necessary, therefore further comprises generator 4, and generator 4 is constructed with cutter device 2, conveyer 3 and regeneration Connecting electric power system between device 5 respectively makes each equipment work, in addition, the supply of electric power of car body 1 can also use generator 4 To complete.
Based on said structure, during present invention construction, comprise the following steps,
(1)Start generator 4, start to be powered cutter device 2, conveyer 3 and regeneration constructing device 5, if Determine the motor program of car body 1;
(2)Car body 1 starts to move above in road, and coil heating apparatus 9 drops to above roadbed, and it is added Thermal softening, makes its roadbed temperature between 60 DEG C -80 degrees Celsius;
(3)Based on step(2), cutter device 2 starts to cut the roadbed of heating and softening, passes through PLC program controls Car body 1 processed advances with retreating, and cutting knife 201 is cut anyhow, forms rectangular block 10;
(4)Based on step(3), rectangular block 10 scoops up feeding conveyer belt 305 by shovel board 301, and conveyer belt 305 is by rectangle Block 10 is sent into heater box 501 by the opening of the bottom of heater box 501 and heated;Before feeding, weighing device is weighed The weight of rectangular block 10;
(5)Based on step(4), heater box 501 starts to heat rectangular block 10, in the process, motor 504 Drive pulverizes the motion in the passageway 506 of rod 505 and pulverizes rectangular block 10, rectangular block 10 be grinded up after by filter screen 507 Fall into agitator tank;
(6)Based on step(5), virgin material adding set 503 utilizes in proportion by weighing the weight of rectangular block 10 in advance Virgin material is sent into agitator tank and carries out virgin material and old material mixing by feed pipe 502, and pours into road surface by discharging opening 508;
(7)Continuous repeat step(2)- step(6), constantly road is constructed;
(8)Based on step(7), road roller is immediately following car body 1, and the material that discharging opening 508 is poured into road surface flattens to form new road Base 11.

Claims (2)

1. highway waste asphalt rejects regeneration integrated construction device, it is characterized in that, including car body(1), installed in car body(1)Front Coil heating apparatus(9), coil heating apparatus( 9)It is shaped as circle, cutter device(2)Installed in coil heating apparatus (9)Rear;The cutter device(2)Including the hydraulic cylinder being fixed on above railway carriage(202), track(203)Installed in hydraulic cylinder (202)Side, the track(203)It is provided with and hydraulic cylinder(202)The movable block of connection(205), expansion link(204 )Even It is connected on movable block(205)Lower section, its bottom is provided with the rotatable cutting knife for being passed through ground(201);Conveyer(3)Install In cutter device(2)Rear, the conveyer(3)Including the lifting pulley unit above railway carriage(304)And transmission Band(305), the conveyer belt(305)Feed end is provided with shovel board(301), shovel board(301)With lifting pulley unit(304)Between connect It is connected to spring-backed quill(303);
Regenerate constructing device(5), the regeneration constructing device(5)Including virgin material adding set(503)And heater box(501), institute State virgin material adding set(503)And heater box(501)Between be connected with feed pipe(502), heater box(501)Bottom is provided with reception Conveyer belt(305)The opening of charging, agitator tank is arranged on heater box(501)Lower section, its bottom is provided with discharging opening(508);
The heater box(501)For coil heats case, its bottom is provided with filter screen(507), pass through motor(504)What is driven is pressing from both sides Road(506)What is inside moved back and forth pulverizes rod(505)Installed in filter screen(507)Top;
The conveyer belt(305)Discharge end is additionally provided with weighing device.
2. the highway waste asphalt according to claim 1 rejects regeneration integrated construction device, it is characterized in that, the car body (1)For electricity energy driven vehicle.
CN201610091751.8A 2014-12-05 2014-12-05 Highway waste asphalt rejects regeneration integrated construction device and its construction method Active CN105714651B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610091751.8A CN105714651B (en) 2014-12-05 2014-12-05 Highway waste asphalt rejects regeneration integrated construction device and its construction method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410727611.6A CN104480842B (en) 2014-12-05 2014-12-05 Highway waste asphalt is rejected regeneration integrated construction device and construction method thereof
CN201610091751.8A CN105714651B (en) 2014-12-05 2014-12-05 Highway waste asphalt rejects regeneration integrated construction device and its construction method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410727611.6A Division CN104480842B (en) 2014-12-05 2014-12-05 Highway waste asphalt is rejected regeneration integrated construction device and construction method thereof

Publications (2)

Publication Number Publication Date
CN105714651A CN105714651A (en) 2016-06-29
CN105714651B true CN105714651B (en) 2017-09-15

Family

ID=56156071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610091751.8A Active CN105714651B (en) 2014-12-05 2014-12-05 Highway waste asphalt rejects regeneration integrated construction device and its construction method

Country Status (1)

Country Link
CN (1) CN105714651B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351107B (en) * 2016-10-27 2018-10-30 郑小龙 A kind of Pavement Improvement auxiliary device
CN111560819B (en) * 2020-05-16 2021-08-17 萍乡新越沥青有限公司 Integrative device is utilized to innoxious of pitch collection processing

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2581480Y (en) * 2002-07-09 2003-10-22 陕西秦川畅通公路机械开发有限公司 Asphalt road surface curing vehicle for automatically loading and unloading, and mixing material
KR100634225B1 (en) * 2006-02-09 2006-10-16 인해엔지니어링(주) Heating system waste ascon-ascon and constructing method using thereof
KR100708372B1 (en) * 2006-10-13 2007-04-18 이순익 Method and apparatus for regenerating of pavement
JP2012012846A (en) * 2010-07-01 2012-01-19 East Nippon Expressway Co Ltd Heating method and heating device for asphalt generating material
CN203530826U (en) * 2013-09-03 2014-04-09 郑州大学 Pavement cutting machine

Also Published As

Publication number Publication date
CN105714651A (en) 2016-06-29

Similar Documents

Publication Publication Date Title
CN105696438B (en) Highway waste asphalt rejects regeneration integrated construction device and its construction method
CN105714651B (en) Highway waste asphalt rejects regeneration integrated construction device and its construction method
CN105714660B (en) Highway waste asphalt rejects regeneration integrated construction device and its construction method
CN105672107B (en) Highway waste asphalt rejects regeneration integrated construction device and its construction method
CN102108693A (en) Full-section multi-functional channel concrete lining machine
CN106985271A (en) A kind of water-permeable brick complex forming equipment
CN111455864A (en) Construction method for transverse wet joint of prefabricated bridge deck factory
CN204311331U (en) Highway waste asphalt rejects regeneration integrated construction device
CN105696439B (en) Highway waste asphalt rejects regeneration integrated construction device and its construction method
CN204282163U (en) A kind of flexible pavement layering hot recycling machine
CN201605514U (en) Sand heating spreading vehicle
CN206825654U (en) A kind of water-permeable brick complex forming equipment
CN213625135U (en) Bituminous paving regeneration is laying device on spot
CN204311319U (en) A kind of integral type cold in place recycling device continuously
CN105755935A (en) Microwave hot in-place recycling complete equipment
CN104480832A (en) Extruded asphalt pavement milling material crushing and screening device
CN202031067U (en) Multifunctional full-section concrete lining machine for canal
CN107685407A (en) A kind of pretreatment unit for junked tire recovery
CN212077543U (en) Asphalt mixing station based on microwave heating
CN106884368A (en) A kind of paver for bituminous paving
CN101954975A (en) Central deicing system for planes at runway ends
CN214939108U (en) A cementation of fissures machine for highway engineering
KR101611493B1 (en) Protection facility cutting machine of road
CN109537424A (en) A kind of municipal works asphalt surface repair apparatus
CN205259587U (en) Stable form beam column or shear force be heat preservation -in -place mould for wall and special production facility thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Yu Taijin

Inventor before: Hou Hongwei

Inventor before: Yang Songtao

Inventor before: Xiong Dayu

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170814

Address after: 330038 Jiangxi province Nanchang Honggutan Exhibition Road No. 29

Applicant after: Jiangxi nonferrous metals Construction Group Co Ltd

Address before: More than and 3 Village Chongqing city Tongliang County Fuguo town 400060 5 Group No. 31

Applicant before: Xiong Dayu

GR01 Patent grant
GR01 Patent grant