CN105696840B - 一种水塔的建筑安装方法 - Google Patents

一种水塔的建筑安装方法 Download PDF

Info

Publication number
CN105696840B
CN105696840B CN201610112040.4A CN201610112040A CN105696840B CN 105696840 B CN105696840 B CN 105696840B CN 201610112040 A CN201610112040 A CN 201610112040A CN 105696840 B CN105696840 B CN 105696840B
Authority
CN
China
Prior art keywords
water tower
jack
traction
construction
branch barrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610112040.4A
Other languages
English (en)
Other versions
CN105696840A (zh
Inventor
杨春霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changshu Southeast High Tech Venture Service Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610112040.4A priority Critical patent/CN105696840B/zh
Publication of CN105696840A publication Critical patent/CN105696840A/zh
Application granted granted Critical
Publication of CN105696840B publication Critical patent/CN105696840B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/30Water-towers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明涉及一种施工方法,具体为一种水塔的建筑安装方法。解决水塔施工的技术问题,本发明所述的施工方法是由以下技术方案实现的:施工水塔支筒,水塔支筒外侧安装螺纹状的滑道,在水塔支下方设置水塔模板及支架,浇铸混凝土形成水塔,然后采用螺旋举升的办法将水塔提升到水塔支筒最高处,本发明所述的施工方法,设计合理巧妙,可以利用简单的工具和简易的物理原理将水塔提升到一定高度,降低了施工成本。

Description

一种水塔的建筑安装方法
技术领域
本发明涉及一种施工方法,具体为一种水塔的建筑安装方法。
背景技术
相对于目前倒锥壳保温水塔水柜通常采用预制保温水柜,再通过外加施工装置进行提升的方法,水柜采用高位现浇施工具有施工简便,工艺先进,安全可靠等特点传统的水柜通常采用预制提升的方法,这种方法施工周期很长(水柜强度达到100%以后才能提升);水柜提升受风荷载的影响较大(风力大于5级时停止提升),不能保证连续提升水柜,无形中延长了施工工期。预制水柜在提升过程中由于液压系统回油产生的后坐力容易使水柜产生微小的裂缝,水柜防渗(漏)要求较难达标。现有技术中还使用了将混凝土直接浇筑在支撑柱顶端的方法,混凝土凝固后形成的水柜已经安装在水塔支筒上方。这种方法的缺点是需要大量的模具以及高空作业,也具有一定的危险性。
发明内容
本发明为了解决倒锥壳保温水塔水柜安装的问题,提供一种水塔的建筑安装方法。
本发明所述的施工方法是由以下技术方案实现的:施工水塔支筒,水塔支筒外侧安装螺纹状的滑道,在水塔支筒下方设置水塔模板及支架,浇注混凝土形成水塔,然后采用螺旋举升的办法将水塔提升到水塔支筒最高处,所述的水塔的内孔壁上设有内螺纹,内螺纹紧扣滑道,在水塔支筒顶部设有牵引圈,牵引圈上设有上挂环,在水塔的外缘设有下挂环,在上挂环和下挂环之间设有牵引绳,在牵引圈内设有支座,在支座上对称设置有千斤顶,千斤顶前端顶接牵引圈卡槽,通过千斤顶推动牵引圈转动,牵引圈通过牵引绳带动水塔旋转,在旋转过程中,水塔上升,所述的上升过程中,左侧的千斤顶工作,右侧的千斤顶油缸收缩待命,左侧的千斤顶驱动结束,保持油压,使牵引圈固定不动,启动右侧的千斤顶使顶杆顶住牵引圈,左侧的千斤顶油缸收缩待命,两个千斤顶依次工作,使牵引圈始终向一个方向转动,直到将水塔提示到设定高度,最后在水塔支筒上打固定杆,将水塔固定住。
本发明所述的施工方法,设计合理巧妙,可以利用简单的工具和简易的物理原理将水塔提升到一定高度,降低了施工成本。
附图说明
图1为本发明的步骤图之一
图2为本发明的步骤图之二
图3为图2的A向视图
图4为本发明的步骤图之三
图5为本发明的步骤图之四。
具体实施方式
保温水塔的安装方法,如图1所示意,施工水塔支筒4,水塔支筒4外侧安装螺纹状的滑道3,在水塔支筒4下方设置水塔模板1及支架2,浇注混凝土形成水塔6,然后采用螺旋举升的办法将水塔6提升到水塔支筒4最高处,所述的水塔的内孔壁上设有内螺纹,内螺纹紧扣滑道3,如图2、3所示意,在水塔支筒4顶部设有牵引圈7,牵引圈7上设有上挂环,在水塔6的外缘设有下挂环,在上挂环和下挂环之间设有牵引绳5,在牵引圈7内设有支座9,在支座9上对称设置有千斤顶8、10,千斤顶前端顶接牵引圈卡槽11,通过千斤顶推动牵引圈转动,牵引圈通过牵引绳带动水塔旋转,在旋转过程中,水塔上升,所述的上升过程中,左侧的千斤顶10工作,右侧的千斤顶8油缸收缩待命,左侧的千斤顶10驱动结束,保持油压,使牵引圈固定不动,启动右侧的千斤8顶使顶杆顶住牵引圈,左侧的千斤顶10油缸收缩待命,两个千斤顶依次工作,使牵引圈7始终向一个方向转动,直到将水塔6提示到设定高度,最后在水塔支筒4上打固定杆12,将水塔6固定住。
所述的滑道升角不超过2°,滑道螺距不超过10厘米。
最后完成整个水塔的组装结构。

Claims (2)

1.一种水塔的建筑安装方法,其特征是施工水塔支筒(4),水塔支筒(4)外侧安装螺纹状的滑道(3),在水塔支筒(4)下方设置水塔模板(1)及支架(2),浇注混凝土形成水塔(6),然后采用螺旋举升的办法将水塔(6)提升到水塔支筒(4)最高处,所述的水塔的内孔壁上设有内螺纹,内螺纹紧扣滑道(3),在水塔支筒(4)顶部设有牵引圈(7),牵引圈(7)上设有上挂环,在水塔(6)的外缘设有下挂环,在上挂环和下挂环之间设有牵引绳(5),在牵引圈(7)内设有支座(9),在支座(9)上对称设置有千斤顶(8、10),千斤顶前端顶接牵引圈卡槽(11),通过千斤顶推动牵引圈转动,牵引圈通过牵引绳带动水塔旋转,在旋转过程中,水塔上升,所述的上升过程中,左侧的千斤顶(10)工作,右侧的千斤顶(8)油缸收缩待命,左侧的千斤顶(10)驱动结束,保持油压,使牵引圈固定不动,启动右侧的千斤顶(8)使顶杆顶住牵引圈,左侧的千斤顶(10)油缸收缩待命,两个千斤顶依次工作,使牵引圈(7)始终向一个方向转动,直到将水塔(6)提示到设定高度,最后在水塔支筒(4)上打固定杆(12),将水塔(6)固定住。
2.根据权利要求1所述的水塔的建筑安装方法,其特征是所述的滑道(3)升角不超过2°,滑道螺距不超过10厘米。
CN201610112040.4A 2016-02-29 2016-02-29 一种水塔的建筑安装方法 Active CN105696840B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610112040.4A CN105696840B (zh) 2016-02-29 2016-02-29 一种水塔的建筑安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610112040.4A CN105696840B (zh) 2016-02-29 2016-02-29 一种水塔的建筑安装方法

Publications (2)

Publication Number Publication Date
CN105696840A CN105696840A (zh) 2016-06-22
CN105696840B true CN105696840B (zh) 2018-04-24

Family

ID=56223569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610112040.4A Active CN105696840B (zh) 2016-02-29 2016-02-29 一种水塔的建筑安装方法

Country Status (1)

Country Link
CN (1) CN105696840B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2261650A (en) * 1991-11-21 1993-05-26 Lanesfield Engineering Seals L Lifting pin
CN101634197A (zh) * 2009-07-17 2010-01-27 中冶实久建设有限公司 一种倒锥壳水塔水箱提升的新型施工方法
CN101666158A (zh) * 2009-09-15 2010-03-10 中冶实久建设有限公司 滑模法施工倒锥形水塔筒身结构工程提升平台支承杆的纠偏方法
CN202299410U (zh) * 2011-10-11 2012-07-04 中国二十二冶集团有限公司 大吨位倒锥形水塔水箱下锥壳模板支设结构
CN104727545A (zh) * 2015-04-08 2015-06-24 中国十九冶集团有限公司 大型水塔筒身液压滑模垂直运输系统及方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2261650A (en) * 1991-11-21 1993-05-26 Lanesfield Engineering Seals L Lifting pin
CN101634197A (zh) * 2009-07-17 2010-01-27 中冶实久建设有限公司 一种倒锥壳水塔水箱提升的新型施工方法
CN101666158A (zh) * 2009-09-15 2010-03-10 中冶实久建设有限公司 滑模法施工倒锥形水塔筒身结构工程提升平台支承杆的纠偏方法
CN202299410U (zh) * 2011-10-11 2012-07-04 中国二十二冶集团有限公司 大吨位倒锥形水塔水箱下锥壳模板支设结构
CN104727545A (zh) * 2015-04-08 2015-06-24 中国十九冶集团有限公司 大型水塔筒身液压滑模垂直运输系统及方法

Also Published As

Publication number Publication date
CN105696840A (zh) 2016-06-22

Similar Documents

Publication Publication Date Title
CN104040096B (zh) 一种套筒式塔架的架设方法
CN104563491B (zh) 便捷液压自爬模板的使用方法
CN104314776B (zh) 一种用于海上和陆上风电机组的装配式预应力塔筒
CN202125080U (zh) 混凝土散热装置
CN105008636A (zh) 滑动模板成形的混凝土塔
CN106321367A (zh) 斜拉预应力钢与混凝土组合式风机塔架
CN105155572A (zh) 现浇式预应力锚索风机基础系统及其施工方法
CN104477788A (zh) 风力发电塔跨越自爬式平移吊机
CN105696840B (zh) 一种水塔的建筑安装方法
CN207226863U (zh) 一种用于塔吊的回转机构
CN203877745U (zh) 建筑空心板液压联动式吊装卡钳装置
CN103924653A (zh) 一种框架式排水井及其施工方法
CN203782863U (zh) 一种框架式排水井
CN204089044U (zh) 便携式架空导线移位装置
CN108979285A (zh) 一种分段组装环形混凝土电杆及其安装方法
CN205329648U (zh) 大型抽水蓄能机组中拆检修用拆卸结构
CN204281116U (zh) 风力发电塔跨越自爬式平移吊机
CN203463039U (zh) 液压吊卡翻转驱动器
CN206309111U (zh) 一种线杆定位安装组件
CN105256793B (zh) 一种双层下桩设备
CN210317604U (zh) 一种垂直轴风力发电机旋转笼的施工升降装置
CN205046571U (zh) 一种现浇式预应力锚索风机基础装置
CN221321948U (zh) 电杆根部现场成型补强结构
CN104019003B (zh) 一种法兰连接结构及含有其的防雷分段组合式塔架
CN203769693U (zh) 一种连续油管液压丢手装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Yang Chunxia

Inventor before: Zhang Hui

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180314

Address after: In the town of Anxi County in Quanzhou city in 362403 in Fujian Province in the Village Road No. 90

Applicant after: Yang Chunxia

Address before: 100010 Xueyuan Road, Haidian District, Beijing, No. 115

Applicant before: Zhang Hui

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200605

Address after: 215500 Qiuzhen building, Southeast campus, Changshu Institute of technology, No. 99, Hushan Road, Changshu Southeast Economic Development Zone, Suzhou City, Jiangsu Province

Patentee after: Changshu southeast high tech Venture Service Co., Ltd

Address before: In the town of Anxi County in Quanzhou city in 362403 in Fujian Province in the Village Road No. 90

Patentee before: Yang Chunxia