CN105672366B - Vegetation type aproll structure and its construction method - Google Patents

Vegetation type aproll structure and its construction method Download PDF

Info

Publication number
CN105672366B
CN105672366B CN201610078937.XA CN201610078937A CN105672366B CN 105672366 B CN105672366 B CN 105672366B CN 201610078937 A CN201610078937 A CN 201610078937A CN 105672366 B CN105672366 B CN 105672366B
Authority
CN
China
Prior art keywords
eco
layer
concrete
nutrition soil
soil layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610078937.XA
Other languages
Chinese (zh)
Other versions
CN105672366A (en
Inventor
刘宏涛
宋利平
刘刚
袁玲
郝钰斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Botanical Garden Gardening Center Co ltd
Original Assignee
Wuhan Botanical Garden of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Botanical Garden of CAS filed Critical Wuhan Botanical Garden of CAS
Priority to CN201610078937.XA priority Critical patent/CN105672366B/en
Publication of CN105672366A publication Critical patent/CN105672366A/en
Application granted granted Critical
Publication of CN105672366B publication Critical patent/CN105672366B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G2/00Vegetative propagation

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental Sciences (AREA)
  • Developmental Biology & Embryology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Botany (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The invention discloses a kind of vegetation type aproll structure and its construction method, the vegetation type aproll structure is cast in skin surrounding basic unit upper strata, includes successively from lower to upper:Antiseepage bed course, nutrition soil layer, eco-concrete layer and vegetable layer;Eco-concrete layer includes being covered in the planar section of the Nutrition Soil layer surface and goes along with sb. to guard him vertical portion on the outside of the nutrition soil layer, the vertical portion and the antiseepage layer contacts;The vegetation type aproll structure also includes several water fenders, and it is vertically arranged in the PVC pipeline that sandwiched in gap, the gap is connected to urban rainwater pipeline that is provided between the outside of the vertical portion, the water fender.The present invention by the core design of aproll structure for can permeable speed soon eco-concrete, when rainwater falls on eco-concrete, rainwater rapidly permeates into the planting soil of lower floor, therefore effectively reduction surface rain water runoff.

Description

Vegetation type aproll structure and its construction method
Technical field
The present invention relates to a kind of building structure and its construction method, it is more particularly related to which a kind of vegetation type dissipates Water-bound and its construction method.
Background technology
In general architectural engineering, designing unit is the thickness, width and the gradient for devising aproll, and outer is not carried Go out to strengthen ecological afforestation measure.Normal practice is molded according to design thickness one-time-concreting, forms hard surface or laying flower Brick, it is more difficult to form landscape effect.And when rainy season arrives, the effect of aproll is only to be introduced to rainwater away from wall from the wall base In the earth's surface of base, once the force of rain is excessive, a large amount of ponding in place of hardening aproll or ornamental slab for paving the floor laying, more likely, product can be made Water can flood aproll so that foundation of wall is soaked and destroyed, and now aproll loses original effect.
Also, at present the hardening aproll that generally uses would generally cause because of lower floor's rainwater immersion aproll occur depression and Cracking, and due to the irreversibility in crack, more exacerbate the crack of hardening aproll so that the wall base is easier by rainwater Corrosion;Using ornamental slab for paving the floor as aproll structure, because the laying of ornamental slab for paving the floor is relatively simple so that moisture content relies on soil after through ornamental slab for paving the floor The water imbibition of itself stores moisture content, once excessive rainfall or not raining for a long time, the soil texture of ornamental slab for paving the floor lower floor will occur Change so that ornamental slab for paving the floor is tilted or sunk, and plantable region is very few on ornamental slab for paving the floor, the impossible dense growth of vegetation, is very much difficult See.
Therefore, it is necessary to develop a kind of aproll structure of vegetation type so that when raining, rainwater is excluded rapidly from earth's surface, together When eliminate infringement of the rainwater to the wall base, and plan as a whole various landscape features, allow green vegetation to extend to external wall, be allowed to and build Build harmony.
The content of the invention
It is an object of the invention to solve at least the above, and provide the advantage that at least will be described later.
In order to realize according to object of the present invention and further advantage there is provided a kind of vegetation type aproll structure, it is poured Build on the basic unit upper strata of skin surrounding, the vegetation type aproll structure includes successively from lower to upper:Antiseepage bed course, nutrition Soil layer, eco-concrete layer and vegetable layer;
Wherein, eco-concrete layer is into falling " 7 " shape, including be covered in the planar section of the Nutrition Soil layer surface with And go along with sb. to guard him vertical portion on the outside of the nutrition soil layer, the vertical portion and the antiseepage layer contacts;
Wherein, the vegetation type aproll structure also includes several water fenders being arranged under earth's surface, and it is vertically arranged in Gap is provided between the outside of the vertical portion, the water fender, the gap sandwiched PVC pipeline, the PVC pipeline connects It is connected in urban rainwater pipeline.
Preferably, the antiseepage bed course is 37 lime earth layer or C15 concrete layers.
Preferably, the gradient of the planar section is 2-5%.
The present invention also provides a kind of construction method of vegetation type aproll structure, comprises the following steps:
S1, after skin and the construction of wall bottom base is completed, lay antiseepage bed course, the antiseepage bed course uses three Seven grey soil layers or C15 concrete layers;
S2, in the antiseepage bed course higher slice backfill planting soil to form nutrition soil layer, the compacted coefficient of planting soil is 88- 90%, then levelling to the upper surface progress coarse sand of nutrition soil layer, the gradient of the nutrition soil layer is in 2-5%;
S3, on nutrition soil layer upper berth non-woven fabrics is set, pour the eco-concrete that thickness is 5-10cm, eco-concrete includes It is covered in the planar section of the Nutrition Soil layer surface and goes along with sb. to guard him vertical portion on the outside of the nutrition soil layer, it is described vertical Part and the antiseepage layer contacts, vibrate to eco-concrete and shakeout, and it is in 2- that the eco-concrete gradient is controlled when pouring 5%, then conserved in the upper surface plastic covering film of eco-concrete, the plastic sheeting is removed after 7-10 days and is formed Eco-concrete layer;
S4, the eco-concrete layer vertical portion on the outside of go along with sb. to guard him several water fenders, two neighboring water fender 5cm gap is left, is connected in each gap sandwiched PVC pipeline, and by the PVC pipeline in urban rainwater pipeline;And
S5, the surface sowing herbaceous plant or small shrub in eco-concrete layer, to constitute vegetable layer, use drip The seam that blue or green mortar is filled up between eco-concrete layer and skin.
Preferably, the eco-concrete includes the following raw material of part by weight:1500-1700 parts of particle diameters are 0.8- 1.9cm limestone or gangue, 250-300 parts of P.O42.5 cement, 30-40 parts of fine silica powders or flyash, 3-4.5 Part water reducer and 50-80 parts of water.
Preferably, the step S5 is specifically included:After sedum lineare stem section being sowed on the surface of eco-concrete layer, plus Lid non-woven fabrics keeps non-woven fabrics moistening, after after the germination of sedum lineare stem section, per foliar fertilizer is sprayed within 7-10 days, after sedum lineare germinates Stop water seasoning within 28-35 days.
The present invention at least includes following beneficial effect:
1st, instant invention overcomes the technology prejudice that traditional aproll is only used as transfer tool of the rainwater in earth's surface, by aproll knot The core design of structure for can permeable speed soon eco-concrete, when rainwater falls on eco-concrete, rainwater is rapidly permeated into down The planting soil of layer, therefore surface rain water runoff is effectively reduced, the nutrition soil layer sponge huge equivalent to one can absorb a large amount of Rainwater, even if running into extra torrential rain, due to being provided with water fender and PVC pipeline, rainwater by water fender stop and guiding, Flowed into PVC pipeline, and then flow to urban rainwater pipeline.
2nd, by the planting vegetation on eco-concrete, such as herbaceous plant, the greening vegetation around building can be increased Coverage rate, improves the ecological benefits of environment.
3rd, the effective drainage porosity of eco-concrete, up to more than 25%, eco-concrete is penetrated beneficial to root system of plant in the present invention Take root to lower floor and plant nutrition soil layer, plant can be with direct culture on eco-concrete top layer, it is not necessary to mulching plant Nutrition Soil Layer, can preferably put rain drop erosion, and more difficult appearance laterally or vertically crack in large area, rapidly can arrange rainwater To earth's surface, prevent because of rainwater delay, permeate to the destruction caused by building foundation and wall face;Plant can be more quickly simultaneously Taken root in plantation Nutrition Soil, need not be set during late maintaining on the surface of eco-concrete by eco-concrete structure Nutrient solution or nutrition are put, therefore is more suitable for planting plants.
Further advantage, target and the feature of the present invention embodies part by following explanation, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Brief description of the drawings
Fig. 1 is the sectional schematic diagram of vegetation type aproll structure of the present invention;
Fig. 2 is the front view of vegetation type aproll structure of the present invention.
Embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to specification text Word can be implemented according to this.
It should be noted that experimental method described in following embodiments, is conventional method unless otherwise specified, institute Reagent and material are stated, unless otherwise specified, is commercially obtained;In the description of the invention, term " transverse direction ", " vertical To ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", the instruction such as " outer " side Position or position relationship are, based on orientation shown in the drawings or position relationship, to be for only for ease of the description present invention and simplify description, It is not instruction or implies that signified device or element there must be specific orientation, with specific azimuth configuration and operation, because This is not considered as limiting the invention.
As shown in Figure 1-2, the present invention provides a kind of vegetation type aproll structure, and it is cast in the basic unit of skin surrounding 1 upper strata, it is characterised in that the vegetation type aproll structure includes successively from lower to upper:Antiseepage bed course 2, nutrition soil layer 3, ecology Concrete layer 4 and vegetable layer 5;
Wherein, eco-concrete layer 4 is into falling " 7 " shape, including is covered in the planar section on the surface of nutrition soil layer 3 And vertical portion in the outside of the nutrition soil layer 3 is gone along with sb. to guard him, the vertical portion is contacted with the antiseepage bed course 2;
Wherein, the vegetation type aproll structure also includes several water fenders 6 being arranged under earth's surface, and it is vertically arranged in Sandwiched PVC pipeline 7, the pvc pipe in gap, the gap are provided between the outside of the vertical portion, the water fender 6 Road is connected in urban rainwater pipeline.
The antiseepage bed course 2 is 37 lime earth layer or C15 concrete layers.
The gradient of the planar section is 2-5%.
S1, complete skin and wall bottom base construction after, set up defences on backfill upper berth and ooze bed course, the antiseepage Bed course is using 37 lime earth layer or C15 concrete layers;
S2, in the antiseepage bed course higher slice backfill planting soil to form nutrition soil layer, the compacted coefficient of planting soil is 88- 90%, then levelling to the upper surface progress coarse sand of nutrition soil layer, the gradient of the nutrition soil layer is in 2-5%;
S3, on nutrition soil layer upper berth non-woven fabrics is set, pour the eco-concrete that thickness is 5-10cm, eco-concrete includes It is covered in the planar section of the Nutrition Soil layer surface and goes along with sb. to guard him vertical portion on the outside of the nutrition soil layer, it is described vertical Part and the antiseepage layer contacts, vibrate to eco-concrete and shakeout, and it is in 2- that the eco-concrete gradient is controlled when pouring 5%, then conserved in the upper surface plastic covering film of eco-concrete, the plastic sheeting is removed after 7-10 days and is formed Eco-concrete layer;
S4, the eco-concrete layer vertical portion on the outside of go along with sb. to guard him several water fenders, two neighboring water fender 5cm gap is left, is connected in each gap sandwiched PVC pipeline, and by the PVC pipeline in urban rainwater pipeline;And
S5, the surface sowing herbaceous plant in eco-concrete layer, to constitute vegetable layer, are filled up using asphalt mortar, bituminous mortar Seam between eco-concrete layer and skin.
The eco-concrete includes the following raw material of part by weight:The stone that 1500-1700 parts of particle diameters are 0.8-1.9cm Limestone or gangue, 250-300 parts of P.O42.5 cement, 30-40 parts of fine silica powders or flyash, 3-4.5 part water reducer with 50-80 parts of water.
The step S5 is specifically included:After sowing sedum lineare stem section on the surface of eco-concrete layer, nonwoven is capped Cloth keeps non-woven fabrics moistening, after after the germination of sedum lineare stem section, per foliar fertilizer is sprayed within 7-10 days, 28-35 days after sedum lineare germinates Stop water seasoning.
The industrial applicibility of the present invention
1st, instant invention overcomes the technology prejudice that traditional aproll is only used as transfer tool of the rainwater in earth's surface, by aproll knot The core design of structure for can permeable speed soon eco-concrete, when rainwater falls on eco-concrete, rainwater is rapidly permeated into down The planting soil of layer, therefore surface rain water runoff is effectively reduced, the nutrition soil layer sponge huge equivalent to one can absorb a large amount of Rainwater, even if running into extra torrential rain, due to being provided with water fender and PVC pipeline, rainwater by water fender stop and guiding, Flowed into PVC pipeline, and then flow to urban rainwater pipeline.
2nd, by the planting vegetation on eco-concrete, such as herbaceous plant, the greening vegetation around building can be increased Coverage rate, improves the ecological benefits of environment.
3rd, the effective drainage porosity of eco-concrete, up to more than 25%, eco-concrete is penetrated beneficial to root system of plant in the present invention Take root to lower floor and plant nutrition soil layer, plant can be with direct culture on eco-concrete top layer, it is not necessary to mulching plant Nutrition Soil Layer, can preferably put rain drop erosion, and more difficult appearance laterally or vertically crack in large area, rapidly can arrange rainwater To earth's surface, prevent because of rainwater delay, permeate to the destruction caused by building foundation and wall face, while plant can be more quickly Taken root in plantation Nutrition Soil, need not be set during late maintaining on the surface of eco-concrete by eco-concrete structure Nutrient solution or nutrition are put, therefore is more suitable for planting plants.
Although embodiment of the present invention is disclosed as above, it is not restricted in specification and embodiment listed With it can be applied to various suitable the field of the invention completely, can be easily for those skilled in the art Other modification is realized, therefore under the universal limited without departing substantially from claim and equivalency range, the present invention is not limited In specific details and shown here as the legend with description.

Claims (3)

1. a kind of construction method of vegetation type aproll structure, it is characterised in that comprise the following steps:
S1, after skin and wall subbase construction is completed, lay antiseepage bed course, the antiseepage bed course uses 37 lime earth Layer or C15 concrete layers;
S2, in the antiseepage bed course higher slice backfill planting soil to form nutrition soil layer, the compacted coefficient of planting soil is 88- 90%, then levelling to the upper surface progress coarse sand of nutrition soil layer, the gradient of the nutrition soil layer is 2-5%;
S3, on nutrition soil layer upper berth non-woven fabrics is set, pour the eco-concrete that thickness is 5-10cm, eco-concrete includes covering The Nutrition Soil layer surface planar section and go along with sb. to guard him vertical portion on the outside of the nutrition soil layer, the vertical portion Bottom and the antiseepage layer contacts, eco-concrete is vibrated and shakeout, eco-concrete planar section is controlled when pouring The gradient is 2-5%, is then conserved in the upper surface plastic covering film of eco-concrete, the plastics are removed after 7-10 days Film formation eco-concrete layer;
S4, the eco-concrete layer vertical portion on the outside of go along with sb. to guard him several water fenders, two neighboring water fender leaves 5cm gap, is connected in urban rainwater pipeline in each gap sandwiched PVC pipeline, and by the PVC pipeline;And
S5, the surface sowing herbaceous plant in eco-concrete layer, are formed vegetable layer, are filled up using asphalt mortar, bituminous mortar ecological mixed Solidifying seam between soil layer and skin, produces the vegetation type aproll structure,
Wherein, the vegetation type aproll structure includes successively from lower to upper:Antiseepage bed course, nutrition soil layer, eco-concrete layer with And vegetable layer;
Wherein, eco-concrete layer is into falling " 7 " shape, including is covered in the planar section of the Nutrition Soil layer surface and encloses The vertical portion protected on the outside of the nutrition soil layer, the bottom of the vertical portion and the antiseepage layer contacts;
Wherein, the vegetation type aproll structure also includes several water fenders being arranged under earth's surface, and it is vertically arranged in described Gap is provided between the outside of vertical portion, the water fender, the gap sandwiched PVC pipeline, the PVC pipeline is connected to In urban rainwater pipeline;The antiseepage bed course is 37 lime earth layer or C15 concrete layers;
The gradient of the planar section is 2-5%.
2. the construction method of vegetation type aproll structure as claimed in claim 1, it is characterised in that the eco-concrete includes The following raw material of part by weight:Limestone or gangue, 250-300 part that 1500-1700 parts of particle diameters are 0.8-1.9cm P.O42.5 cement, 30-40 part fine silica powder or flyash, 3-4.5 part water reducer and 50-80 parts of water.
3. the construction method of vegetation type aproll structure as claimed in claim 1, it is characterised in that step S5 is specifically included: The surface of the eco-concrete layer is sowed after sedum lineare stem section, and capping non-woven fabrics keeps non-woven fabrics moistening, treats sedum lineare stem section After germination, per foliar fertilizer is sprayed within 7-10 days, stop water seasoning within 28-35 days after sedum lineare germinates.
CN201610078937.XA 2016-02-04 2016-02-04 Vegetation type aproll structure and its construction method Active CN105672366B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610078937.XA CN105672366B (en) 2016-02-04 2016-02-04 Vegetation type aproll structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610078937.XA CN105672366B (en) 2016-02-04 2016-02-04 Vegetation type aproll structure and its construction method

Publications (2)

Publication Number Publication Date
CN105672366A CN105672366A (en) 2016-06-15
CN105672366B true CN105672366B (en) 2017-08-01

Family

ID=56304101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610078937.XA Active CN105672366B (en) 2016-02-04 2016-02-04 Vegetation type aproll structure and its construction method

Country Status (1)

Country Link
CN (1) CN105672366B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106993523A (en) * 2017-03-17 2017-08-01 广州绿创宝生物科技有限公司 A kind of environmental and ecological blanket preparation method
CN109386013A (en) * 2018-11-02 2019-02-26 南京林业大学 A kind of vegetal cover type aproll device applied to external wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999060212A1 (en) * 1998-05-16 1999-11-25 Coventry University Water flow control system
CN201546313U (en) * 2009-11-23 2010-08-11 中色科技股份有限公司 Landscape pebble apron with water drainage ditch
CN202346838U (en) * 2011-11-25 2012-07-25 中国水利水电科学研究院 Slope runoff ecological infiltration device of hydropower station warehouse surrounding
CN202492914U (en) * 2012-03-27 2012-10-17 孔蕾蕾 Concrete drainage slope
CN203022105U (en) * 2013-01-14 2013-06-26 金玲玲 Outdoor rubble apron slope
CN203684237U (en) * 2013-09-24 2014-07-02 中国十七冶集团有限公司 Ecological protection structure of slope vegetation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999060212A1 (en) * 1998-05-16 1999-11-25 Coventry University Water flow control system
CN201546313U (en) * 2009-11-23 2010-08-11 中色科技股份有限公司 Landscape pebble apron with water drainage ditch
CN202346838U (en) * 2011-11-25 2012-07-25 中国水利水电科学研究院 Slope runoff ecological infiltration device of hydropower station warehouse surrounding
CN202492914U (en) * 2012-03-27 2012-10-17 孔蕾蕾 Concrete drainage slope
CN203022105U (en) * 2013-01-14 2013-06-26 金玲玲 Outdoor rubble apron slope
CN203684237U (en) * 2013-09-24 2014-07-02 中国十七冶集团有限公司 Ecological protection structure of slope vegetation

Also Published As

Publication number Publication date
CN105672366A (en) 2016-06-15

Similar Documents

Publication Publication Date Title
US10385520B2 (en) Sports field construction
CN206143577U (en) Ecological garden view road that permeates water
CN110419284A (en) A kind of strand greenery patches salt discharge alkali construction technology
CN109403267A (en) A kind of cast-in-place green concrete of nutrition hole type and its construction method
CN100582371C (en) Environmental protection permeable pavement construction method
CN105672366B (en) Vegetation type aproll structure and its construction method
JP4721093B2 (en) Rainwater storage tank with permeable pavement at the top
JP4541337B2 (en) Parking floor structure
CN206752237U (en) Stealthy passageway for fire apparatus
CN214657144U (en) Novel ecological bank protection suitable for northwest loess plateau area
CN105474942B (en) The construction method on ground parking lawn
CN208038957U (en) A kind of tree well protective device for taking into account security protection and rainwater-collecting
JP5270748B2 (en) Planting base structure
CN103590301A (en) Cushion-layer-free permeable ecological grassing terrace and construction method thereof
CN103590302B (en) Prefabricated Cushion-layer-free permeable ecological grassing terrace and its mould and construction method
CN202285515U (en) Saline and alkaline land and coastal road surface paving and desalting system
CN206635806U (en) A kind of retaining wall
CN206350368U (en) A kind of protected fruit trees energy-saving heliogreenhouse
JP2007169940A (en) Partitioned frame body and permeable block pavement using it
CN211210816U (en) Landscape district tree planting cultivation structure
JP4974073B2 (en) Block paving frame
CN202730576U (en) Sand filling roadbed structure
JPH0585233U (en) Artificial ground for roof garden
TWI434980B (en) Base material and method for constructing underground base using the same
CN210086162U (en) Stone strip wall gentle slope

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220527

Address after: 430062 horticultural center building, Wuhan Botanical Garden, Chinese Academy of Sciences, No. 1, LUMO Road, East Lake ecotourism scenic spot, Wuhan City, Hubei Province

Patentee after: Wuhan Botanical Garden Gardening Center Co.,Ltd.

Address before: 430074 grinding hill, Hongshan District, Hubei, Wuhan

Patentee before: WUHAN BOTANICAL GARDEN, CHINESE ACADEMY OF SCIENCES

TR01 Transfer of patent right