CN105672139B - 一种桥梁空心墩封顶施工工法 - Google Patents
一种桥梁空心墩封顶施工工法 Download PDFInfo
- Publication number
- CN105672139B CN105672139B CN201610231696.8A CN201610231696A CN105672139B CN 105672139 B CN105672139 B CN 105672139B CN 201610231696 A CN201610231696 A CN 201610231696A CN 105672139 B CN105672139 B CN 105672139B
- Authority
- CN
- China
- Prior art keywords
- support plate
- construction
- hollow pier
- pier
- binds
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610231696.8A CN105672139B (zh) | 2016-04-14 | 2016-04-14 | 一种桥梁空心墩封顶施工工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610231696.8A CN105672139B (zh) | 2016-04-14 | 2016-04-14 | 一种桥梁空心墩封顶施工工法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105672139A CN105672139A (zh) | 2016-06-15 |
CN105672139B true CN105672139B (zh) | 2018-07-13 |
Family
ID=56310132
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610231696.8A Active CN105672139B (zh) | 2016-04-14 | 2016-04-14 | 一种桥梁空心墩封顶施工工法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105672139B (zh) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120544B (zh) * | 2016-08-22 | 2018-09-14 | 中交第二航务工程局有限公司 | 一种用于空心墩封顶的装置及施工方法 |
CN107299589A (zh) * | 2017-07-11 | 2017-10-27 | 中铁大桥局集团第二工程有限公司 | 一种预制梁板支撑空心墩墩帽的底模系统及其施工方法 |
CN110396937A (zh) * | 2019-08-06 | 2019-11-01 | 中铁二十三局集团第三工程有限公司 | 空心薄壁墩系梁墩梁异步施工工法 |
CN110468730A (zh) * | 2019-09-11 | 2019-11-19 | 广东省水利水电第三工程局有限公司 | 一种空心墩封顶施工工艺 |
CN113174862B (zh) * | 2021-04-29 | 2023-05-23 | 中交路桥建设有限公司 | 高墩中横隔板施工方法及高墩中横隔板结构体系 |
CN113403936A (zh) * | 2021-07-09 | 2021-09-17 | 中铁十一局集团第五工程有限公司 | 一种桥梁空心墩隔板的无支架快速施工方法 |
CN113756195B (zh) * | 2021-08-31 | 2023-01-31 | 中铁七局集团有限公司 | 空心墩墩顶实心段施工装置及方法 |
CN114016417A (zh) * | 2021-11-15 | 2022-02-08 | 中铁大桥局集团有限公司 | 一种斜向空心墩墩顶盖板封顶施工底模板及方法 |
CN115110437A (zh) * | 2022-08-12 | 2022-09-27 | 中国十九冶集团有限公司 | 空心薄壁桥墩实心段底模板施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201254691Y (zh) * | 2008-08-13 | 2009-06-10 | 中铁二院工程集团有限责任公司 | 双线纵向双悬臂刚架墩 |
CN101532276A (zh) * | 2009-02-09 | 2009-09-16 | 于心然 | 一种将简支梁桥改造成半整体式桥台桥梁的方法 |
CN102587287A (zh) * | 2012-03-29 | 2012-07-18 | 海波重型工程科技股份有限公司 | 单跨槽形梁桥单片钢槽梁整体吊装的施工方法 |
US8266751B2 (en) * | 2009-12-10 | 2012-09-18 | Yidong He | Method to compress prefabricated deck units by tensioning supporting girders |
CN103194971A (zh) * | 2013-03-29 | 2013-07-10 | 中国水电建设集团铁路建设有限公司 | 一种空心墩封顶施工方法 |
CN103510469A (zh) * | 2012-06-28 | 2014-01-15 | 中铁二十五局集团建筑安装工程有限公司 | 一种制造薄壁空心墩的施工方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8234738B2 (en) * | 2010-03-15 | 2012-08-07 | Newton Bridge Solutions Ltd | Bridge construction and method of replacing bridges |
-
2016
- 2016-04-14 CN CN201610231696.8A patent/CN105672139B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201254691Y (zh) * | 2008-08-13 | 2009-06-10 | 中铁二院工程集团有限责任公司 | 双线纵向双悬臂刚架墩 |
CN101532276A (zh) * | 2009-02-09 | 2009-09-16 | 于心然 | 一种将简支梁桥改造成半整体式桥台桥梁的方法 |
US8266751B2 (en) * | 2009-12-10 | 2012-09-18 | Yidong He | Method to compress prefabricated deck units by tensioning supporting girders |
CN102587287A (zh) * | 2012-03-29 | 2012-07-18 | 海波重型工程科技股份有限公司 | 单跨槽形梁桥单片钢槽梁整体吊装的施工方法 |
CN103510469A (zh) * | 2012-06-28 | 2014-01-15 | 中铁二十五局集团建筑安装工程有限公司 | 一种制造薄壁空心墩的施工方法 |
CN103194971A (zh) * | 2013-03-29 | 2013-07-10 | 中国水电建设集团铁路建设有限公司 | 一种空心墩封顶施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105672139A (zh) | 2016-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105672139B (zh) | 一种桥梁空心墩封顶施工工法 | |
CN105538484B (zh) | 一种用于防止放张拉应力破坏的u型梁模具及u型梁制备方法 | |
CN211173215U (zh) | 一种既有建筑加装电梯一次性现浇筑沉箱模板支撑装置 | |
CN103031918A (zh) | 销式石膏模壳与混凝土组合密肋无梁楼盖及其制作方法 | |
CN108643382A (zh) | 装配式剪力墙板竖向连接的施工方法 | |
CN106965302B (zh) | 一种预制梁式楼梯及其专用模具和施工方法 | |
KR101140884B1 (ko) | 건축물의 벽체 시공용 거푸집 장치 및 이를 이용한 시공방법 | |
CN205636473U (zh) | 一种具有l形槽口的桥梁空心墩 | |
CN209584813U (zh) | 框架桥系统 | |
CN104164882A (zh) | 在边坡上构建支护结构梁基础的施工方法及结构 | |
CN113059685B (zh) | 一种预制梁施工系统及施工方法 | |
CN111851318B (zh) | 悬臂桥边跨支模体系及其施工方法 | |
CN104234432B (zh) | 车库顶板结构施工方法 | |
CN207846202U (zh) | 一种用于预制梁安装的双钢筒临时支座 | |
CN113818334A (zh) | 一种含骨架的预制uhpc模壳填芯混凝土桥墩及其施工方法 | |
CN100999937B (zh) | 一种钢筋砼带肋预制板 | |
KR200233607Y1 (ko) | 교좌장치용 하부강판 구조 | |
CN206941628U (zh) | 一种施工场地围挡预制基础 | |
CN206359993U (zh) | 用于主变防火墙的托柱结构 | |
CN205021785U (zh) | 剪刀格构式空心砌块模具 | |
CN211396248U (zh) | 一种兼具刚度和施工效率的预制底板 | |
CN109538245A (zh) | 一种无柱直墙拱顶地铁车站模板台车及其施工方法 | |
CN216766233U (zh) | 一种适用于装配式pec柱后浇区域混凝土浇筑的节点 | |
CN212388908U (zh) | 下挂钢结构装配式管沟构造 | |
CN220434312U (zh) | 一种混凝土柱uhpc加固层施工结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Co-patentee after: CHINA RAILWAY ERJU 1ST ENGINEERING Co.,Ltd. Patentee after: China Railway Second Bureau Construction Co.,Ltd. Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Co-patentee before: CHINA RAILWAY ERJU 1ST ENGINEERING Co.,Ltd. Patentee before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190808 Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Co-patentee after: CHINA RAILWAY ERJU 1ST ENGINEERING Co.,Ltd. Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd. Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Co-patentee before: CHINA RAILWAY ERJU 1ST ENGINEERING Co.,Ltd. Patentee before: China Railway Second Bureau Construction Co.,Ltd. |