CN105649094B - A kind of deep water foundation bearing platform construction three wall steel cofferdams and its construction method - Google Patents

A kind of deep water foundation bearing platform construction three wall steel cofferdams and its construction method Download PDF

Info

Publication number
CN105649094B
CN105649094B CN201610031823.XA CN201610031823A CN105649094B CN 105649094 B CN105649094 B CN 105649094B CN 201610031823 A CN201610031823 A CN 201610031823A CN 105649094 B CN105649094 B CN 105649094B
Authority
CN
China
Prior art keywords
main body
cofferdam
construction
wall
bearing platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610031823.XA
Other languages
Chinese (zh)
Other versions
CN105649094A (en
Inventor
宋伟俊
龚国锋
余绍宾
陈宁贤
朱林达
张静
朱永盛
汤和达
张培炎
岳超杰
蔡文焘
张斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201610031823.XA priority Critical patent/CN105649094B/en
Publication of CN105649094A publication Critical patent/CN105649094A/en
Application granted granted Critical
Publication of CN105649094B publication Critical patent/CN105649094B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention provides a kind of deep water foundation bearing platform construction with three wall steel cofferdams, include the inner support frame and the workbench that is arranged on inner support frame of cofferdam main body and cofferdam main body inside top;The cofferdam main body includes outer wall, midfeather and inwall successively from outside to inside;The outer wall and midfeather are contour, and deep floor is provided between the two;The inwall is less than the midfeather, therebetween provided with concrete lift;The cofferdam main body inside bottom position is provided with cushion cap, and the cushion cap bottom is provided with some concretings stake.The present invention is applicable the deeper bridge deepwater foundation construction of construction bearing platform embedment basement rock.Working face can be formed earlier, drilled pile construction is carried out in advance, more can guarantee that the bridge foundation construction duration.Meanwhile, concrete lift and basement rock three between cofferdam main body, inwall and midfeather form an entirety, and structure is firmer, can more meet the construction operating mode that water is deep, velocity ratio is larger.

Description

A kind of deep water foundation bearing platform construction three wall steel cofferdams and its construction method
Technical field
The invention belongs to bridge construction technical field, more particularly, to a kind of deep water foundation bearing platform construction with three wall steel cofferdams And its construction method.
Background technology
At present, in the construction process for crossing over each rivers,lakes and seas bridge, to large bridge deep water foundation bearing platform construction dash Equipment, equipment uses single wall cofferdam or double-wall cofferdam at this stage, and single wall, Double-Wall Steel Boxed Cofferdam can not solve cushion cap embedment basement rock Deeper operating mode, is all generally to take the technical measures such as underwater demolition to remove basement rock at this stage, with the development of society, By other important buildings such as existing railway, highway, build that large bridge is more and more, the technology of explosion can not be now used again Basement rock is removed in measure, while newly-built large bridge has the duration tight, crosses that flood risk is big, the factor such as clear base workload is big, existing, single Wall, double-walled steel cofferdam structure can not meet use requirement.
The content of the invention
In view of this, the present invention is directed to propose a kind of deep water foundation bearing platform construction three wall steel cofferdams and its construction method, Meet large bridge cushion cap insertion basement rock it is deeper when construction bearing platform demand.
To reach above-mentioned purpose, the technical proposal of the invention is realized in this way:
A kind of deep water foundation bearing platform construction is with three wall steel cofferdams, including cofferdam main body and cofferdam main body inside top Inner support frame and the workbench being arranged on inner support frame;The cofferdam main body includes outer wall, centre successively from outside to inside Wall and inwall;The outer wall and midfeather are contour, and deep floor is provided between the two;The inwall is less than the midfeather, the two Between be provided with concrete lift;The cofferdam main body inside bottom position is provided with cushion cap, and the cushion cap bottom is provided with some coagulations Soil pours stake.
Further, the inner support frame is truss structure.
Further, the outer wall, midfeather and inwall are welded and fixed integrated structure.
Further, the inside of subterrane is stretched into the concreting stake.
The above-mentioned deep water foundation bearing platform construction construction method of three wall steel cofferdams, comprises the following steps:
1. cofferdam main body in place and is anchored by precalculated position, the top on the inside of the main body of cofferdam is installed in place and propped up afterwards Support, then arranges workbench on inner support frame top;
2. groove milling equipment is arranged on workbench, using inwall to be oriented to, to being in inwall and centre below the main body of cofferdam The basement rock groove milling hole of position between wall;After slotted eye milling is complete, borehole cleaning, and hole wall mud and bottom hole sediment are cleaned out;
3. to step 2. in slotted eye carry out underwater concreting, make mixed between cofferdam main body, inwall and midfeather Basement rock triplicity below solidifying soil LIFT and cofferdam main body is an entirety;
4. rig is arranged on workbench, the basement rock in the main body of cofferdam is drilled, with steel pile casting, steel pile casting at present Through in coating insertion basement rock;
5. after the completion of drilling, the water of cofferdam body interior is drained, more than basement rock unnecessary steel pile casting is cut off, and foundation ditch is entered Row cleaning;
6. it is smooth to foundation ditch progress after the completion of foundation ditch cleaning, and concrete cushion of constructing, pour cushion cap.
Further, when clearing up foundation ditch, construction machinery is hung in the main body of cofferdam, the coating in foundation ditch and basement rock are carried out Cleaning.
Further, pour before cushion cap, the first colligation cushion cap reinforcing bar on concrete cushion, and install mass concrete construction Circulating water pipe and thermometric component.
Relative to prior art, deep water foundation bearing platform construction of the present invention is had the advantage that with three wall steel cofferdams:
Solving single wall, Double-Wall Steel Boxed Cofferdam at all can not the deeper bridge deepwater foundation construction hardly possible of construction bearing platform embedment basement rock Topic.Also, three wall steel cofferdams in the present invention can form working face earlier, and drilled pile construction is carried out in advance, more be can guarantee that The bridge foundation construction duration.Meanwhile, concrete lift and basement rock three's shape between cofferdam main body, inwall and midfeather Into an entirety, structure is firmer, can more meet the construction operating mode that water is deep, velocity ratio is larger.
Brief description of the drawings
The accompanying drawing for constituting the part of the present invention is used for providing a further understanding of the present invention, schematic reality of the invention Apply example and its illustrate to be used to explain the present invention, do not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Construction schematic diagram when Fig. 1 is present invention anchoring cofferdam main body;
Fig. 2 installs construction schematic diagram when inner support frame and workbench for the present invention;
Construction schematic diagram when Fig. 3 is present invention construction slotted eye;
Fig. 4 pours construction schematic diagram during slotted eye for the present invention;
Fig. 5 carries out construction schematic diagram during concreting stake drilling for the present invention;
Construction schematic diagram when Fig. 6 is present invention cleaning foundation ditch;
Fig. 7 is the structural representation after cushion cap of the invention of having constructed;
Fig. 8 is provided with the top view of the cofferdam main body of inner support frame for the present invention;
Table plane schematic diagram when Fig. 9 is present invention construction slotted eye;
Table plane schematic diagram when Figure 10 is present invention construction concreting stake.
Description of reference numerals:
1- cofferdam main body;2- inner support frames;3- workbenches;4- outer walls;5- midfeathers;6- inwalls;7- deep floors;8- Concrete lift;9- cushion caps;10- concretings stake;11- basement rock;12- groove milling equipments;13- slotted eyes;14- rigs; 15- steel pile castings;16- coatings;17- stake holes.
Embodiment
It should be noted that in the case where not conflicting, the embodiment in the present invention and the feature in embodiment can phases Mutually combination.
In the description of the invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " on ", " under ", The orientation or position relationship of the instruction such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " are Based on orientation shown in the drawings or position relationship, it is for only for ease of the description present invention and simplifies description, rather than indicate or dark Specific orientation must be had, with specific azimuth configuration and operation by showing the device or element of meaning, therefore it is not intended that right The limitation of the present invention.In addition, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicating or implying phase To importance or the implicit quantity for indicating indicated technical characteristic.Thus, the feature for defining " first ", " second " etc. can To express or implicitly include one or more this feature.In the description of the invention, unless otherwise indicated, " multiple " It is meant that two or more.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, above-mentioned term can be understood by concrete condition Concrete meaning in the present invention.
Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
A kind of deep water foundation bearing platform construction is with three wall steel cofferdams, as shown in Fig. 1 to 10, including cofferdam main body 1 and cofferdam The inner support frame 2 of the inside top of main body 1 and the workbench 3 being arranged on inner support frame 2;The cofferdam main body 1 is by outside extremely Inside include outer wall 4, midfeather 5 and inwall 6 successively;The outer wall 4 and midfeather 5 are contour, and deep floor 7 is provided between the two;Institute Inwall 6 is stated less than the midfeather 5, therebetween provided with concrete lift 8;The inside bottom position of cofferdam main body 1 is set There is cushion cap 9, the bottom of cushion cap 9 is provided with some concretings stake 10.
It should be noted that the workbench 3 on the top of inner support frame 2 is as groove milling construction and the platform of drilling construction, together When, also as the inner supporting structure of cofferdam main body 1, and cofferdam main body 1 is together as the support of resistance effect of water pressure, its structure An entirety can be welded to by shaped steel.
Cofferdam main body 1 is supported on rock stratum top surface, and wherein outer wall 4 and midfeather 5 is stress supporting construction, plays isolation river Effect, subject deadweight, cushion cap basement rock cleaning when water pressure, drilling construction when rig load, inwall 6 have as follows make With:1) during groove milling, mechanically formed to groove milling it can be oriented to.2) as template during 13 casting concrete of slotted eye, it is ensured that cofferdam master The triplicity of basement rock 11 of concrete lift 8 and the lower section of cofferdam main body 1 between body 1, inwall 6 and midfeather 5 is one It is overall, the requirement that flood is crossed in works deep water can be met.
Wherein, the inner support frame 2 is truss structure, and stabilized structure, intensity is high.
Wherein, the outer wall 4, midfeather 5 and inwall 6 are welded and fixed integrated structure.It should be noted that cofferdam master Body can be with the shape such as rectangular, circular, arc end according to actual dimension of platform.The manufacture of three wall steel cofferdams can merogenesis system Make, install in place after on-site consolidation again;If in addition, during transhipment conditions permit, can also take monoblock type to manufacture, overall transportation by driving is just Position.The inwall headroom size of cofferdam main body 1 should be more bigger than the size of cushion cap 9, meets cofferdam positioning requirements.
Wherein, the inside of subterrane 11 is stretched into the concreting stake 10, it is ensured that cushion cap 9 is solid and reliable, and stress is good It is good.
Large bridge water foundation platform insertion basement rock of the present invention in rivers,lakes and seas is deeper, and cushion cap adjoins Important building Thing, when basement rock can not be removed using technical measures such as underwater demolitions, excavation of foundation pit, cushion cap 9 when can create a bearing platform construction Reinforcing bar colligation, the dry environment of the concreting of cushion cap 9, create a local anhydrous ring in rivers,lakes and seas deep water Border, it is ensured that construction is smoothed out.
The above-mentioned deep water foundation bearing platform construction construction method of three wall steel cofferdams, comprises the following steps:
1. cofferdam main body 1 in place and is anchored by precalculated position, installed afterwards on the top of the inner side of cofferdam main body 1 in place Support frame 2, then arranges workbench 3 on the top of inner support frame 2;Here it is possible to according to the situation of bridge location, can use and cast anchor Location technology or other method, are positioned to cofferdam;
2. groove milling equipment 12 is arranged on workbench 3, with inwall 6 to be oriented to, inwall 6 is in the lower section of cofferdam main body 1 The groove milling hole 13 of basement rock 11 of position between midfeather 5;After the milling of slotted eye 13 is complete, borehole cleaning, and hole wall mud and bottom hole sediment is clear Reason is clean;It is pointed out that the depth of slotted eye 13 should be met below the bottom surface for the cushion cap 9 that will deeply construct;
3. to step 2. in slotted eye 13 carry out underwater concreting, concrete reached after intensity, cofferdam main body 1, interior The triplicity of basement rock 11 of concrete lift 8 and the lower section of cofferdam main body 1 between wall 6 and midfeather 5 is an entirety;
4. rig 14 is arranged on workbench 3, the basement rock 11 in cofferdam main body 1 is needed by design to carry out stake holes 17 drillings, while the lower steel pile casting 15 in each drilling, the steel pile casting 15 of arrangement is both passed through in the insertion basement rock 11 of coating 16;
5. after the completion of drilling, the water inside cofferdam main body 1 is drained, the unnecessary part of steel pile casting 15 of basement rock more than 11 is cut off, And foundation ditch is cleared up;
6. it is smooth to foundation ditch progress after the completion of foundation ditch cleaning, and concrete cushion of constructing, pour cushion cap 9.
It should be noted that construction before, first according to the features of terrain of bridge bearing platform position yet to be built, geology rock feature and The peak level that can be met in bearing platform construction engineering, water level of setting up defences.The preliminary appearance and size for drafting three wall steel cofferdams, root According to the load acted on cofferdam, including deadweight, water pressure, soil pressure, flow force etc. are calculated three wall cofferdam in detail, most Cofferdam main body, inner support and each physical dimension of slotted eye are determined eventually.Secondly, according to the execution conditions at scene, each structural member is determined Manufacture and means of transportation, it is just overall using cofferdam overall processing if navigation channel meets the overall transportation by driving of cofferdam main body to the condition of bridge location The scheme of transportation by driving, can be in factory's piecemeal processing, after transport to bridge location, in bridge if navigation channel can not be met in the condition of overall transportation by driving Position nearby sets floating platform, the structural member in assembled cofferdam on the floating platform, and according to equipment crane capacity, assembly can be with whole Body is assembled, can also merogenesis assembly.
When clearing up foundation ditch, it is possible to use the artificial mode with reference to machinery carries out clear base, and excavating, workload is very big, and the duration will In the case of asking very tight, workbench 3 can be subjected to local flow improvement, by construction machinery hang in the inside of cofferdam main body 1 carry out it is clear Manage the prune job of foundation ditch inner covering layer 16 and basement rock 11.Improve operating efficiency.It is noted that during local flow improvement workbench 3 Selection workbench 3 structural strength is high, and the good position of stressing conditions carries out perforate, or splits out the corresponding part of workbench 3 temporarily Structure, is easy to construction machinery to enter.
Pour before cushion cap, the first colligation cushion cap reinforcing bar on concrete cushion, and install mass concrete construction recirculated water Pipe and thermometric component, to ensure that cushion cap 9 is smoothly carried out in order, construction effect is good.
The three wall steel cofferdams that the present invention is provided from solve at all single wall, Double-Wall Steel Boxed Cofferdam can not construction bearing platform embedment basement rock Deeper bridge deepwater foundation construction difficult problem.Also, this three wall steel cofferdam can form working face earlier, be drilled in advance Pile driving construction, more can guarantee that the bridge foundation construction duration.Meanwhile, the concreting between cofferdam main body 1, inwall 6 and midfeather 5 Layer 8 and the three of basement rock 11 form an entirety, and structure is firmer, can more meet the construction that water is deep, velocity ratio is larger Operating mode.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention God is with principle, and any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.

Claims (7)

1. a kind of deep water foundation bearing platform construction is with three wall steel cofferdams, it is characterised in that:Including in cofferdam main body and cofferdam main body The inner support frame of side roof part and the workbench being arranged on inner support frame;The cofferdam main body includes successively from outside to inside Outer wall, midfeather and inwall;The outer wall and midfeather are contour, and deep floor is provided between the two;The inwall is less than in described Partition, therebetween provided with concrete lift;The cofferdam main body inside bottom position is provided with cushion cap, and the cushion cap bottom is provided with Some concreting stakes.
2. a kind of deep water foundation bearing platform construction according to claim 1 is with three wall steel cofferdams, it is characterised in that:The interior branch Support is truss structure.
3. a kind of deep water foundation bearing platform construction according to claim 1 is with three wall steel cofferdams, it is characterised in that:It is described outer Wall, midfeather and inwall are welded and fixed integrated structure.
4. a kind of deep water foundation bearing platform construction according to claim 1 is with three wall steel cofferdams, it is characterised in that:The coagulation Soil pours the inside that subterrane is stretched into stake.
5. a kind of construction method of the three wall steel cofferdams of deep water foundation bearing platform construction described in claim 1, it is characterised in that bag Include following steps:
1. cofferdam main body in place and is anchored by precalculated position, inner support in place is installed on the top on the inside of the main body of cofferdam afterwards Frame, then arranges workbench on inner support frame top;
2. groove milling equipment is arranged on workbench, using inwall to be oriented to, to below the main body of cofferdam in inwall and midfeather it Between position basement rock groove milling hole;After slotted eye milling is complete, borehole cleaning, and hole wall mud and bottom hole sediment are cleaned out;
3. to step 2. in slotted eye carry out underwater concreting, make the concrete between cofferdam main body, inwall and midfeather Basement rock triplicity below LIFT and cofferdam main body is an entirety;
4. rig is arranged on workbench, the basement rock in the main body of cofferdam is drilled, with steel pile casting at present, steel pile casting is passed through In coating insertion basement rock;
5. after the completion of drilling, the water of cofferdam body interior is drained, more than basement rock unnecessary steel pile casting is cut off, and foundation ditch is carried out clear Reason;
6. it is smooth to foundation ditch progress after the completion of foundation ditch cleaning, and concrete cushion of constructing, pour cushion cap.
6. a kind of construction method of three wall steel cofferdams of deep water foundation bearing platform construction according to claim 5, its feature exists In:When clearing up foundation ditch, construction machinery is hung in the main body of cofferdam, the coating and basement rock in foundation ditch are cleared up.
7. a kind of construction method of three wall steel cofferdams of deep water foundation bearing platform construction according to claim 5, its feature exists In:Pour before cushion cap, the first colligation cushion cap reinforcing bar on concrete cushion, and install mass concrete construction circulating water pipe and survey Warm component.
CN201610031823.XA 2016-01-18 2016-01-18 A kind of deep water foundation bearing platform construction three wall steel cofferdams and its construction method Active CN105649094B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610031823.XA CN105649094B (en) 2016-01-18 2016-01-18 A kind of deep water foundation bearing platform construction three wall steel cofferdams and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610031823.XA CN105649094B (en) 2016-01-18 2016-01-18 A kind of deep water foundation bearing platform construction three wall steel cofferdams and its construction method

Publications (2)

Publication Number Publication Date
CN105649094A CN105649094A (en) 2016-06-08
CN105649094B true CN105649094B (en) 2017-10-31

Family

ID=56487706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610031823.XA Active CN105649094B (en) 2016-01-18 2016-01-18 A kind of deep water foundation bearing platform construction three wall steel cofferdams and its construction method

Country Status (1)

Country Link
CN (1) CN105649094B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107869144B (en) * 2017-11-17 2023-07-18 中铁二十二局集团第四工程有限公司 Comprehensive construction method for pre-cut ring-sealed double-wall steel cofferdam deep water foundation
CN109295990A (en) * 2018-11-26 2019-02-01 中国铁建大桥工程局集团有限公司 A kind of band opening blade foot has bottom steel boxed cofferdam
CN109371997A (en) * 2018-12-04 2019-02-22 中铁六局集团有限公司 A kind of double-wall cofferdam and pier construction method
CN110939148A (en) * 2019-12-05 2020-03-31 中国铁建大桥工程局集团有限公司 Construction method of double-wall steel suspension box cofferdam serving as drilling platform
CN112281895A (en) * 2020-11-24 2021-01-29 中交二航局第一工程有限公司 Bearing platform structure for sandy gravel stratum and construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4206165B2 (en) * 1999-03-18 2009-01-07 前田建設工業株式会社 Temporary deadline construction method
KR100383409B1 (en) * 2000-04-19 2003-05-14 (주)평화엔지니어링 Construction Method of Direct Foundation for using Caisson
CN101182718A (en) * 2007-12-05 2008-05-21 中铁大桥局股份有限公司 Under water putting down construction method of large-sized double-walled steel suspension box-cofferdam
CN101368389B (en) * 2008-09-24 2010-06-02 中铁大桥局集团第五工程有限公司 Single and double-wall combined steel cofferdam construction method and its single and double-wall combined steel cofferdam
CN205530305U (en) * 2016-01-18 2016-08-31 中国铁建大桥工程局集团有限公司 Cushion cap construction of large -scale bridge deep water basis is with three wall steel cofferdams

Also Published As

Publication number Publication date
CN105649094A (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN105649094B (en) A kind of deep water foundation bearing platform construction three wall steel cofferdams and its construction method
CN105951711A (en) Enclosing construction method of underground continuous wall of seashore power station
CN109113086B (en) A kind of steel reinforced concrete combined cofferdam construction method in deep water exposed bedrock riverbed area
CN102561371B (en) Steel caisson enclosure structure at island-tunnel combination part and construction method thereof
CN105239578B (en) Water-rich sand layer deep foundation pit underwater construction method
CN103321246A (en) Underground diaphragm wall based foundation pit construction method
CN103122642B (en) Construction method of vertical post support change
CN106498951B (en) A kind of shaft excavation construction method
CN206428707U (en) A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation
CN107956220A (en) A kind of prefabricated construction method for diaphragm walls based on TRD grooving
CN107620316A (en) A kind of rocky bed large volume deepwater foundation construction method
CN107489106A (en) A kind of rocky bed subaqueous bearing platform construction method
KR101187170B1 (en) Application of under pinning method in remodeling
CN103015446A (en) Method for constructing bearing platform on deepwater and rigid impermeable layer
CN107642101A (en) A kind of rocky bed steel cofferdam back cover leak stopping and guarded drainage construction method
CN105155578B (en) Complicated geological and environment access subway existing support system construction method
CN209194552U (en) A kind of combined cofferdam for bridge foundation construction
CN216108526U (en) Underground continuous wall structure for foundation pit support
CN205530305U (en) Cushion cap construction of large -scale bridge deep water basis is with three wall steel cofferdams
JP2588075B2 (en) Underground building construction method
JP4475116B2 (en) Vertical shaft structure and its construction method
CN206245325U (en) One kind lock steel pipe and Combined concrete pile cofferdam
CN118029415B (en) Prefabricated side slope vertical supporting structure and construction method thereof
AU2016250441A1 (en) A method of constructing a column, a subterranean structure, and a structure made from the method
JP2000096976A (en) Vertical shaft constructing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
CB03 Change of inventor or designer information

Inventor after: Song Weijun

Inventor after: Yue Chaojie

Inventor after: Cai Wendao

Inventor after: Zhang Bin

Inventor after: Gong Guofeng

Inventor after: Yu Shaobin

Inventor after: Chen Ningxian

Inventor after: Zhu Linda

Inventor after: Zhang Jing

Inventor after: Zhu Yongsheng

Inventor after: Tang Heda

Inventor after: Zhang Peiyan

Inventor before: Song Weijun

Inventor before: Gong Guofeng

Inventor before: Yu Shaobin

Inventor before: Chen Ningxian

Inventor before: Zhu Linda

Inventor before: Zhang Jing

Inventor before: Tang Heda

Inventor before: Zhang Peiyan

COR Change of bibliographic data
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant