CN105625159B - A kind of water pocket air bag combined type pontoon bridge - Google Patents

A kind of water pocket air bag combined type pontoon bridge Download PDF

Info

Publication number
CN105625159B
CN105625159B CN201610172152.9A CN201610172152A CN105625159B CN 105625159 B CN105625159 B CN 105625159B CN 201610172152 A CN201610172152 A CN 201610172152A CN 105625159 B CN105625159 B CN 105625159B
Authority
CN
China
Prior art keywords
air bag
water
group
water pocket
pontoon bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610172152.9A
Other languages
Chinese (zh)
Other versions
CN105625159A (en
Inventor
陈凯
吴卫国
陈克强
王广东
甘进
孔祥韶
杨秀礼
徐杰
程茂林
李佳卫
任鹏良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan speed anda building rubber products Co., Ltd.
Original Assignee
Wuhan Speed Anda Building Rubber Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Speed Anda Building Rubber Products Co Ltd filed Critical Wuhan Speed Anda Building Rubber Products Co Ltd
Priority to CN201610172152.9A priority Critical patent/CN105625159B/en
Publication of CN105625159A publication Critical patent/CN105625159A/en
Application granted granted Critical
Publication of CN105625159B publication Critical patent/CN105625159B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/14Floating bridges, e.g. pontoon bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/14Floating bridges, e.g. pontoon bridges
    • E01D15/20Floating bridges, e.g. pontoon bridges collapsible, expandable, inflatable or the like with main load supporting structure consisting only of non-rigid members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides a kind of water pocket air bag combined type pontoon bridges, it can make vehicle and personnel safety passage but also play the role of wave resistance, can Fast Installation construction, storage transport space and weight are substantially reduced, technical solution of the present invention includes water surface air bag group, set on water pocket group below, the pipeline assembly to fill the water to the inflation of water surface air bag group and water pocket group and the quick floorings in water surface air bag group.

Description

A kind of water pocket air bag combined type pontoon bridge
Technical field
The present invention relates to pontoon bridge field, specially a kind of water pocket air bag combined type pontoon bridge.
Background technique
Pontoon bridge is a kind of current floating body of the common interim water surface, logical for the current construction of water surface engineering and emergency repair When row, especially wartime and natural calamity occur, in the case where bridge collapse, pontoon bridge can fast construction to restore current. With increasing for ocean operation, traditional fixed breakwater can play the role of wave resistance in the water surface, and sound construction, stability is high, But the effect current without vehicle and personnel, and its volume is big, is not easy to storage transport and emergency transports installation, and it can not Meet the requirement of marine mobile operation, fix that breakwater investment is big, the construction period is long in addition, thus with current and wave-resisting function in One and the novel floating bridge of energy-saving and environmental protection represent following developing direction.
Summary of the invention
The present invention provides a kind of water pocket air bag combined type pontoon bridges, and vehicle and personnel safety can be made to pass through but also play anti- Wave effect, can Fast Installation construction, substantially reduce storage transport space and weight.
Technical program of the present invention lies in:Including water surface air bag group, set below water pocket group, to water surface air bag The pipeline assembly and the quick floorings in water surface air bag group of group inflation and the water filling of water pocket group.
The water surface air bag group includes multiple air bags arranged in parallel, the water pocket group packet as a preferred embodiment of the above solution, Include multiple water pockets along pontoon bridge longitudinal arrangement.
The underwater air bag including multiple air bags arranged in parallel is equipped with below the water pocket group as a preferred embodiment of the above solution, Group.
The pipeline assembly includes the loading line being connected to air bag, is connected to water pocket as a preferred embodiment of the above solution, Water injecting pipeline and the pipeline controller for respectively connecting loading line and water injecting pipeline with extraneous charger and water injection equipment, institute Pipeline controller is stated on floorings, inside is equipped with pipe fitting, solenoid valve and pressure gauge.
Its interval is spaced apart between the adjacent cells of the underwater air bag group as a preferred embodiment of the above solution, greater than two Rice.
The orientation of the air bag and water pocket as a preferred embodiment of the above solution, is parallel to each other or vertically.
The water surface air bag group and water pocket group dislocation lap joint as a preferred embodiment of the above solution, two sides form contrary Step-like clinch.
The water surface air bag group, water pocket group, underwater air bag group and quick floorings pass through solid as a preferred embodiment of the above solution, Fixed band binding.
The beneficial effects of the present invention are:Above-mentioned pontoon bridge is placed in the construction water surface, logical for construction personnel, vehicle and other equipment Water pocket group is arranged below existing water surface air bag group, is filled the water to form rigid body using water pocket for row, has certain resistance to compression, with support Water surface air bag, while water pocket has certain mass to improve the stability of pontoon bridge, this pontoon bridge bearing capacity is strong, and its structure is simple, Installation, recovery time are short, convenient transportation, and occupancy memory space is small, and 8 meters of a standard are wide, when 100 meters long pontoon bridge storage is packed Only 25 cubes, emergency only needs 20 minutes energy normal uses when constructing, and can substantially reduce the relevant cost of construction, improve Construction efficiency guarantees the safety of construction personnel and construction equipment.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment one.
Fig. 2 is the structural schematic diagram of embodiment two.
Fig. 3, Fig. 4, Fig. 5 are the structural schematic diagram of embodiment three.
Specific embodiment
Below in conjunction with attached drawing detailed description of the present invention embodiment.
Embodiment one
As shown in Figure 1, the structure of the present embodiment include water surface air bag group 2, set below water pocket group 1, to water The pipeline assembly and the quick floorings 3 in water surface air bag group that the inflation of face air bag group 2 and water pocket group 1 fill the water.
In the present embodiment, the water surface air bag group 2 includes multiple air bags arranged in parallel, and the water pocket group 1 includes more It is a to be equipped with the underwater air bag including multiple air bags arranged in parallel below the water pocket of pontoon bridge longitudinal arrangement, the water pocket group 1 in parallel Group 4, the pipeline assembly include the loading line 7 being connected to air bag, the water injecting pipeline 6 being connected to water pocket and respectively by gas tube The pipeline controller 8 that road 7 and water injecting pipeline 6 are connect with extraneous charger and water injection equipment, the pipeline controller 8 are set to bridge On panel 3, inside is equipped with pipe fitting, solenoid valve and pressure gauge.The water surface air bag group 2, water pocket group 1 and underwater air bag group 4 are logical Fixing belt 5 is crossed to be fixedly connected.
In the present embodiment, water pocket group and underwater air bag group are located at the water surface 9 hereinafter, water surface air bag group bubbles through the water column 9, utilizes water Capsule fills the water to form rigid body, has the characteristics that certain resistance to compression, supports water surface air bag, while water pocket has certain mass to improve pontoon bridge Underwater air bag group is arranged in stability below water pocket group, can further effectively improve the rigidity and stability of entire pontoon bridge.
Air bag and water pocket are filled the water by pipeline controller using extraneous charger and water injection equipment, pressure gauge detects gas Corresponding pressure in capsule and water pocket carries out pressure adjusting to air bag and water pocket by solenoid valve.
Embodiment two
On the basis of example 1, the air bag of underwater air bag group 2 is alternatively arranged, as shown in Fig. 2, its spacing distance is greater than Two meters.
Embodiment three
On the basis of example 1, the air bag of water surface air bag group 2 can be for laterally (i.e. perpendicular to pontoon bridge length direction) The air bag orientation of arrangement or longitudinal (i.e. along pontoon bridge length direction) arrangement, underwater air bag group 4 can be for laterally It can be longitudinal (as shown in Fig. 2,3,4,5) that the water pocket orientation of intermediate water pocket group 1 is longitudinal (as shown in Fig. 2,3,4,5).
Example IV
On the basis of example 1, the water surface air bag group and water pocket group shift to install, and two sides form contrary Step-like clinch, as shown in Figure 2.The step-like clinch formed is convenient for the splicing of multiple pontoon bridges, makes easier for installation.
The pontoon bridge of above-mentioned four kinds of structures, installation and removal are convenient, and transport and storage occupy little space after recycling.And it is above-mentioned The pontoon bridge stability of structure is high, can effectively ensure that construction safety, reduces the relevant cost of construction, improves construction efficiency.

Claims (4)

1. a kind of water pocket air bag combined type pontoon bridge, it is characterised in that:Including water surface air bag group, the water pocket group set below, use With the pipeline assembly to the inflation of water surface air bag group and the water filling of water pocket group and the quick floorings in water surface air bag group, the water Face air bag group and water pocket group dislocation lap joint, two sides form contrary step-like clinch;The water surface air bag group includes more A air bag arranged in parallel, the water pocket group include multiple water pockets along pontoon bridge longitudinal arrangement;Packet is equipped with below the water pocket group Include the underwater air bag group of multiple air bags arranged in parallel;The pipeline assembly includes that the loading line being connected to air bag and water pocket connect Logical water injecting pipeline and the pipeline control for respectively connecting loading line and water injecting pipeline with extraneous charger and water injection equipment Device, the pipeline controller are set on floorings, and inside is equipped with pipe fitting, solenoid valve and pressure gauge.
2. water pocket air bag combined type pontoon bridge according to claim 1, it is characterised in that:The adjacent gas of the underwater air bag group It is spaced apart between capsule, interval is greater than two meters.
3. water pocket air bag combined type pontoon bridge according to claim 1, it is characterised in that:The arrangement side of the air bag and water pocket To being parallel to each other or vertically.
4. water pocket air bag combined type pontoon bridge according to claim 1, it is characterised in that:The water surface air bag group, water pocket group, Underwater air bag group and quick floorings are bound by fixing belt.
CN201610172152.9A 2016-03-24 2016-03-24 A kind of water pocket air bag combined type pontoon bridge Active CN105625159B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610172152.9A CN105625159B (en) 2016-03-24 2016-03-24 A kind of water pocket air bag combined type pontoon bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610172152.9A CN105625159B (en) 2016-03-24 2016-03-24 A kind of water pocket air bag combined type pontoon bridge

Publications (2)

Publication Number Publication Date
CN105625159A CN105625159A (en) 2016-06-01
CN105625159B true CN105625159B (en) 2018-11-27

Family

ID=56040470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610172152.9A Active CN105625159B (en) 2016-03-24 2016-03-24 A kind of water pocket air bag combined type pontoon bridge

Country Status (1)

Country Link
CN (1) CN105625159B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107620256A (en) * 2016-07-16 2018-01-23 赵彦杰 Expedient float bridge
CN107447643B (en) * 2017-08-31 2019-07-12 武汉理工大学 A kind of pre- buoyancy plug-in type flexibility pontoon bridge
CN108411765B (en) * 2018-05-14 2023-12-19 武汉速安达建筑橡塑制品有限公司 Emergency floating bridge capable of being rapidly inflated and deflated
CN109778818B (en) * 2019-03-28 2024-01-30 安徽中标环境科技有限公司 Processing apparatus to water surface eichhornia crassipes
CN110172901A (en) * 2019-06-17 2019-08-27 赵爱连 A kind of automation speedboat formula pontoon bridge
CN110080085A (en) * 2019-06-17 2019-08-02 赵爱连 A kind of automation submarine formula pontoon bridge
CN111535150B (en) * 2020-05-08 2021-08-17 武汉理工大学 Rigid-flexible combined folding floating bridge
CN114775402B (en) * 2022-04-20 2024-01-19 浙江海洋大学 Prevent wind bridge of unrestrained boat

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3237414A (en) * 1959-10-19 1966-03-01 Univ Minnesota Wave attenuating device and method of attenuating waves
FR2754513B1 (en) * 1996-10-15 1998-12-31 Tissavel Sa FLOATING PONTOON WITH STABILIZING Keel
CN2905887Y (en) * 2006-05-12 2007-05-30 温远城 Air bridge
US20100111613A1 (en) * 2007-12-31 2010-05-06 Walker Bay Boats Inflatable dock
CN202728516U (en) * 2012-08-03 2013-02-13 陶善国 Automatic and manual air inflation life raft
CN104790344B (en) * 2015-04-01 2016-08-24 中交第二航务工程局有限公司 A kind of flexible and floating type breakwater and storage device thereof
CN105113381A (en) * 2015-09-07 2015-12-02 田玉海 Inflatable floating bridge
CN205529844U (en) * 2016-03-24 2016-08-31 陈凯 Water pocket gasbag combination formula pontoon bridge

Also Published As

Publication number Publication date
CN105625159A (en) 2016-06-01

Similar Documents

Publication Publication Date Title
CN105625159B (en) A kind of water pocket air bag combined type pontoon bridge
CN205529844U (en) Water pocket gasbag combination formula pontoon bridge
CN103410133B (en) Air bag is utilized to carry out the method for Attention problems to deep water jacket
CN105197195B (en) A kind of Very Large Floating Structure
CN102787678B (en) Shear wall structure with energy-consuming horizontal seam
CN102587363A (en) Method for assembling truss framed leg of self-elevating drilling platform
CN102837966B (en) A kind of system of transportation of substances
CN202116992U (en) Structure of shed tunnel top
CN201367434Y (en) Coal injection and nitrogen conservation device for blast furnaces
CN202672400U (en) Novel bamboo type steel tube buckling restricting energy consumption support
CN201254349Y (en) Buffering air packaging apparatus
CN109264036B (en) Off-orbit electric power rope system of spacecraft
CN108029606A (en) A kind of ease of assembly formula wind and wave resistance metal wire casing for off-lying sea
CN207813629U (en) A kind of strong dynamic load anti-impact supporting new structure in tunnel
CN206155764U (en) Utricule structure and aerostatics
CN201809757U (en) Device for collecting leaked offshore oil
CN113212640B (en) Semi-closed bulkhead structure of cargo hold
CN202864459U (en) Fluid material transportation carrier and material transportation system
CN205329632U (en) Utilize geotechnique to fill provisional manger plate dykes and dams of irritating bag and construction of steelframe support system
CN107815996A (en) Bridge pier fluid anticollision device, collision-prevention device
CN201635088U (en) Special geotechnique woven sand bag vibration isolation device for unanchored equipment
CN201058655Y (en) Wreck-proof ship body structure
CN210117739U (en) Vertical shock attenuation underground pipe gallery
CN203214157U (en) Novel expansion water tank
CN201575532U (en) Header type movable heat supply system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180517

Address after: 430300 Tangjia 100, long Song Village, Shekou street, Huangpi District, Wuhan, Hubei

Applicant after: Wuhan speed anda building rubber products Co., Ltd.

Address before: 430063 Yangyuan new village, 980 Heping Road, Wuchang District, Wuhan, Hubei, B1-2-301

Applicant before: Chen Kai

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant