CN105618349A - Paint coating process - Google Patents

Paint coating process Download PDF

Info

Publication number
CN105618349A
CN105618349A CN201410701633.5A CN201410701633A CN105618349A CN 105618349 A CN105618349 A CN 105618349A CN 201410701633 A CN201410701633 A CN 201410701633A CN 105618349 A CN105618349 A CN 105618349A
Authority
CN
China
Prior art keywords
paint
polishing
putty
coating
ash
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410701633.5A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Cornerstone Machinery Co Ltd
Original Assignee
Chongqing Cornerstone Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Cornerstone Machinery Co Ltd filed Critical Chongqing Cornerstone Machinery Co Ltd
Priority to CN201410701633.5A priority Critical patent/CN105618349A/en
Publication of CN105618349A publication Critical patent/CN105618349A/en
Pending legal-status Critical Current

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention discloses a paint coating process. The process includes the following steps of material obtaining, paint mixing, clean grinding, derusting, grinding, deoiling, undercoat spraying, putty pasting, conducting of the next procedure, self-inspection, preparation of varnish, preparation of finishing coat, sanding, red hole filling putty pasting, floating coat spraying and sanding. According to the process, the procedures are reasonably and coordinately arranged, the rejection rate can be effectively decreased, and product quality is high.

Description

A kind of paint coating process
Technical field
The present invention relates to paint coating process.
Background technology
There is processing step phenomenon inharmonious, irrational in existing paint coating process, produces sometimes to repeat to process or excess processes, have a strong impact on product quality, and percent defective is higher, require higher to employee's operant skill, cause product cost higher.
Additionally existing paint coating process processing step is tediously long, and the distribution of each operation exists many irrational places.
Summary of the invention
In order to realize the purpose of the present invention, the present invention provides the paint coating process that a kind of procedure arrangement is reasonable, coordinate.
For solving above-mentioned technical problem, the present invention adopts the following technical scheme that
A kind of paint coating process, comprises the steps:
1), technological process: eye ash �� middle painting �� sand papering is filled out in neck material �� paint �� cleaning polishing �� rust cleaning �� polishing �� oil removing �� priming paint �� scraping with atomic ash �� Song Xia road �� self-inspection �� varnish �� finish paint �� sand papering �� scrape redness;
2), technological parameter:
2.1) relative humidity of environment to control below 50%, and optimum ambient temperature is at 18 DEG C-25 DEG C;
2.2) selecting relatively fine sandpaper (600#--800#) polishing after polishing machine polishing, the roughness caused after polishing is no more than 51 ��m;
2.3) prime 2��3 roads, finish paint 2��3 road; The every layer thickness of primer coating is 20��30 ��m; The every layer thickness of topcoat is 25��35 ��m, and gross thickness is 40��50 ��m;
2.4) low-viscosity dope, nozzle diameter 1��1.5mm; High viscosity coating, nozzle diameter 2��3mm; The relation of painted object and nozzle: spray little area, nozzle diameter 1��1.5mm; Spraying large area, nozzle diameter 2.5��3mm;
2.5) spraying air pressure: 0.35��0.7mpa(is 3��6kg/c about)
2.6) general spray base is 200��300mm;
3), application front surface processes
3.1) must remove clean by being coated with the impurity such as the welding slag on surface, spatter thing, overlap, burr, greasy dirt before application;
3.2) selecting waterproof abrasive paper (600#---800#) polishing after polishing machine polishing, the roughness caused after polishing is no more than 51 ��m;
3.3) clean and select banana oil to clean, must wash clean, it is impossible to have residue; Natural air drying;
4), primer spray
Notice that spray base 200��300mm, spraying rate are medium, at the uniform velocity spray; Spraying to overlap, and in layer carries out in order, and priming, it is uniform and thin to require; Conventional priming paint has metal conditioner, epoxy primer, red lead anticorrosive primer etc.; (parkerized rete outward appearance is lark, and phosphating coat surface ordinary circumstance is without sand paper hacking);
5), scraping with atomic ash
Puttying is smooth for ensureing smooth surface, the defect such as hole that simultaneously product fill motional collision produces and sand holes, scrapes the added time and wants conscientious, must not leak and scrape; Blade coating carries out in the same direction, must not roundtrip operation; Should scraping relatively thin, dried putty is not allow for coming off, slight crack every time; Must not there is tacky, bottom drain phenomenon existence after drying;
6), polishing putty: polishing putty, smooth with 600# liquid honing, and with air gun, polishing break flour cleaned out;
7), middle painting
Spray floating coating, the same primer spray of technique; Company is coated with typically by Soviet Union's ash scholar's priming paint; Floating coating 2-3 time; Thickness 30��40 ��m;
8), dry: natural airing: be put on display rack by workpiece natural air drying, summer generally wants more than 4 hours, and winter time to be grown;
9), scraping with atomic ash
Puttying is smooth for ensureing smooth surface, the defect such as hole that simultaneously product fill motional collision produces and sand holes, scrapes the added time and wants conscientious, must not leak and scrape; Blade coating carries out in the same direction, must not roundtrip operation; Should scraping relatively thin, dried putty is not allow for coming off, slight crack every time; Must not there is tacky, bottom drain phenomenon existence after drying;
10), polishing putty: polishing putty, smooth with 600# liquid honing, and with air gun, polishing break flour cleaned out;
11), middle painting
Spray floating coating, the same primer spray of technique; Company is coated with typically by Soviet Union's ash scholar's priming paint; Floating coating 2-3 time; Thickness 30��40 ��m;
12), dry:
12.1) natural airing: being put on display rack by workpiece natural air drying, summer generally wants more than 4 hours, and winter time to be grown;
12.2) baking priming paint, the baking temperature in middle level and time; 80 DEG C of 30 ~ 40MIN of the baking of priming paint and intermediate layer paint or room temperature are placed 8-24H and are polished;
13), scrape redness and fill out eye ash
Scraping red ash, it is therefore an objective to fill up sand holes and the putty polished off, therefore this work item operation can not be impetuous, and leakage is found out in carefulness, fills up complete; Baking priming paint, the baking temperature in middle level and time; 80 DEG C of 30 ~ 40MIN of the baking of priming paint and intermediate layer paint or room temperature are placed 8-24H and are polished;
14), scrape redness and fill out eye ash
Scraping red ash, it is therefore an objective to fill up sand holes and the putty polished off, therefore this work item operation can not be impetuous, and leakage is found out in carefulness, fills up complete;
15), sand papering
Polishing, uses #800 liquid honing, and surface must polish smooth;
Technique sand paper is applied: mill putty P120��280; Mill floating coating P600��800; Mill varnish is resprayed P1000��1200; Flour milling paint waxing P1500; Acryl facet corase grind P200��400; Acryl topcoating paint P800;
16), finish paint
Paint: 4:1 allotment generally pressed by paint and firming agent, and the paint such as viscosity for different cultivars is excessive, is transferred to desirable application viscosity with matched diluent, stirs and be finally filtered to remove impurity; Finish paint spraying 2-3 road, between every layer, flow time is 10MIN, to guarantee that in coating, solvent fully volatilizees, dried film thickness 40-50 ��m; Dry: 80 DEG C, 30-40MIN is dried or room temperature places 8-24H;
17), varnish
Coating varnish allotment ratio: main, Gu, rare: 5:2:1-2; Dried film thickness 20-30 ��m, dry: 80 DEG C, 30-40MIN is dried or room temperature places 8-24H.
Procedure arrangement of the present invention is reasonable, coordination, it is possible to be effectively reduced percent defective and product quality is high.
Detailed description of the invention
Below in conjunction with embodiment, the invention will be further described:
A kind of paint coating process, comprises the steps:
1), technological process: eye ash �� middle painting �� sand papering is filled out in neck material �� paint �� cleaning polishing �� rust cleaning �� polishing �� oil removing �� priming paint �� scraping with atomic ash �� Song Xia road �� self-inspection �� varnish �� finish paint �� sand papering �� scrape redness;
2), technological parameter:
2.1) relative humidity of environment to control below 50%, and optimum ambient temperature is at 18 DEG C-25 DEG C;
2.2) selecting relatively fine sandpaper (600#--800#) polishing after polishing machine polishing, the roughness caused after polishing is no more than 51 ��m;
2.3) prime 2��3 roads, finish paint 2��3 road; The every layer thickness of primer coating is 20��30 ��m; The every layer thickness of topcoat is 25��35 ��m, and gross thickness is 40��50 ��m;
2.4) low-viscosity dope, nozzle diameter 1��1.5mm; High viscosity coating, nozzle diameter 2��3mm; The relation of painted object and nozzle: spray little area, nozzle diameter 1��1.5mm; Spraying large area, nozzle diameter 2.5��3mm;
2.5) spraying air pressure: 0.35��0.7mpa(is 3��6kg/c about)
2.6) general spray base is 200��300mm;
3), application front surface processes
3.1) must remove clean by being coated with the impurity such as the welding slag on surface, spatter thing, overlap, burr, greasy dirt before application;
3.2) selecting waterproof abrasive paper (600#---800#) polishing after polishing machine polishing, the roughness caused after polishing is no more than 51 ��m;
3.3) clean and select banana oil to clean, must wash clean, it is impossible to have residue; Natural air drying;
4), primer spray
Notice that spray base 200��300mm, spraying rate are medium, at the uniform velocity spray; Spraying to overlap, and in layer carries out in order, and priming, it is uniform and thin to require; Conventional priming paint has metal conditioner, epoxy primer, red lead anticorrosive primer etc.; (parkerized rete outward appearance is lark, and phosphating coat surface ordinary circumstance is without sand paper hacking);
5), scraping with atomic ash
Puttying is smooth for ensureing smooth surface, the defect such as hole that simultaneously product fill motional collision produces and sand holes, scrapes the added time and wants conscientious, must not leak and scrape; Blade coating carries out in the same direction, must not roundtrip operation; Should scraping relatively thin, dried putty is not allow for coming off, slight crack every time; Must not there is tacky, bottom drain phenomenon existence after drying;
6), polishing putty: polishing putty, smooth with 600# liquid honing, and with air gun, polishing break flour cleaned out;
7), middle painting
Spray floating coating, the same primer spray of technique; Company is coated with typically by Soviet Union's ash scholar's priming paint; Floating coating 2-3 time; Thickness 30��40 ��m;
8), dry: natural airing: be put on display rack by workpiece natural air drying, summer generally wants more than 4 hours, and winter time to be grown;
9), scraping with atomic ash
Puttying is smooth for ensureing smooth surface, the defect such as hole that simultaneously product fill motional collision produces and sand holes, scrapes the added time and wants conscientious, must not leak and scrape; Blade coating carries out in the same direction, must not roundtrip operation; Should scraping relatively thin, dried putty is not allow for coming off, slight crack every time; Must not there is tacky, bottom drain phenomenon existence after drying;
10), polishing putty: polishing putty, smooth with 600# liquid honing, and with air gun, polishing break flour cleaned out;
11), middle painting
Spray floating coating, the same primer spray of technique; Company is coated with typically by Soviet Union's ash scholar's priming paint; Floating coating 2-3 time; Thickness 30��40 ��m;
12), dry:
12.1) natural airing: being put on display rack by workpiece natural air drying, summer generally wants more than 4 hours, and winter time to be grown;
12.2) baking priming paint, the baking temperature in middle level and time; 80 DEG C of 30 ~ 40MIN of the baking of priming paint and intermediate layer paint or room temperature are placed 8-24H and are polished;
13), scrape redness and fill out eye ash
Scraping red ash, it is therefore an objective to fill up sand holes and the putty polished off, therefore this work item operation can not be impetuous, and leakage is found out in carefulness, fills up complete; Baking priming paint, the baking temperature in middle level and time; 80 DEG C of 30 ~ 40MIN of the baking of priming paint and intermediate layer paint or room temperature are placed 8-24H and are polished;
14), scrape redness and fill out eye ash
Scraping red ash, it is therefore an objective to fill up sand holes and the putty polished off, therefore this work item operation can not be impetuous, and leakage is found out in carefulness, fills up complete;
15), sand papering
Polishing, uses #800 liquid honing, and surface must polish smooth;
Technique sand paper is applied: mill putty P120��280; Mill floating coating P600��800; Mill varnish is resprayed P1000��1200; Flour milling paint waxing P1500; Acryl facet corase grind P200��400; Acryl topcoating paint P800;
16), finish paint
Paint: 4:1 allotment generally pressed by paint and firming agent, and the paint such as viscosity for different cultivars is excessive, is transferred to desirable application viscosity with matched diluent, stirs and be finally filtered to remove impurity; Finish paint spraying 2-3 road, between every layer, flow time is 10MIN, to guarantee that in coating, solvent fully volatilizees, dried film thickness 40-50 ��m; Dry: 80 DEG C, 30-40MIN is dried or room temperature places 8-24H;
17), varnish
Coating varnish allotment ratio: main, Gu, rare: 5:2:1-2; Dried film thickness 20-30 ��m, dry: 80 DEG C, 30-40MIN is dried or room temperature places 8-24H.

Claims (1)

1. a paint coating process, comprises the steps:
1), technological process: eye ash �� middle painting �� sand papering is filled out in neck material �� paint �� cleaning polishing �� rust cleaning �� polishing �� oil removing �� priming paint �� scraping with atomic ash �� Song Xia road �� self-inspection �� varnish �� finish paint �� sand papering �� scrape redness;
2), technological parameter:
2.1) relative humidity of environment to control below 50%, and optimum ambient temperature is at 18 DEG C-25 DEG C;
2.2) selecting relatively fine sandpaper (600#--800#) polishing after polishing machine polishing, the roughness caused after polishing is no more than 51 ��m;
2.3) prime 2��3 roads, finish paint 2��3 road; The every layer thickness of primer coating is 20��30 ��m; The every layer thickness of topcoat is 25��35 ��m, and gross thickness is 40��50 ��m;
2.4) low-viscosity dope, nozzle diameter 1��1.5mm; High viscosity coating, nozzle diameter 2��3mm; The relation of painted object and nozzle: spray little area, nozzle diameter 1��1.5mm; Spraying large area, nozzle diameter 2.5��3mm;
2.5) spraying air pressure: 0.35��0.7mpa(is 3��6kg/c about)
2.6) general spray base is 200��300mm;
3), application front surface processes
3.1) must remove clean by being coated with the impurity such as the welding slag on surface, spatter thing, overlap, burr, greasy dirt before application;
3.2) selecting waterproof abrasive paper (600#---800#) polishing after polishing machine polishing, the roughness caused after polishing is no more than 51 ��m;
3.3) clean and select banana oil to clean, must wash clean, it is impossible to have residue; Natural air drying;
4), primer spray
Notice that spray base 200��300mm, spraying rate are medium, at the uniform velocity spray; Spraying to overlap, and in layer carries out in order, and priming, it is uniform and thin to require; Conventional priming paint has metal conditioner, epoxy primer, red lead anticorrosive primer etc.; (parkerized rete outward appearance is lark, and phosphating coat surface ordinary circumstance is without sand paper hacking);
5), scraping with atomic ash
Puttying is smooth for ensureing smooth surface, the defect such as hole that simultaneously product fill motional collision produces and sand holes, scrapes the added time and wants conscientious, must not leak and scrape; Blade coating carries out in the same direction, must not roundtrip operation; Should scraping relatively thin, dried putty is not allow for coming off, slight crack every time; Must not there is tacky, bottom drain phenomenon existence after drying;
6), polishing putty: polishing putty, smooth with 600# liquid honing, and with air gun, polishing break flour cleaned out;
7), middle painting
Spray floating coating, the same primer spray of technique; Company is coated with typically by Soviet Union's ash scholar's priming paint; Floating coating 2-3 time; Thickness 30��40 ��m;
8), dry: natural airing: be put on display rack by workpiece natural air drying, summer generally wants more than 4 hours, and winter time to be grown;
9), scraping with atomic ash
Puttying is smooth for ensureing smooth surface, the defect such as hole that simultaneously product fill motional collision produces and sand holes, scrapes the added time and wants conscientious, must not leak and scrape; Blade coating carries out in the same direction, must not roundtrip operation; Should scraping relatively thin, dried putty is not allow for coming off, slight crack every time; Must not there is tacky, bottom drain phenomenon existence after drying;
10), polishing putty: polishing putty, smooth with 600# liquid honing, and with air gun, polishing break flour cleaned out;
11), middle painting
Spray floating coating, the same primer spray of technique; Company is coated with typically by Soviet Union's ash scholar's priming paint; Floating coating 2-3 time; Thickness 30��40 ��m;
12), dry:
12.1) natural airing: being put on display rack by workpiece natural air drying, summer generally wants more than 4 hours, and winter time to be grown;
12.2) baking priming paint, the baking temperature in middle level and time; 80 DEG C of 30 ~ 40MIN of the baking of priming paint and intermediate layer paint or room temperature are placed 8-24H and are polished;
13), scrape redness and fill out eye ash
Scraping red ash, it is therefore an objective to fill up sand holes and the putty polished off, therefore this work item operation can not be impetuous, and leakage is found out in carefulness, fills up complete; Baking priming paint, the baking temperature in middle level and time; 80 DEG C of 30 ~ 40MIN of the baking of priming paint and intermediate layer paint or room temperature are placed 8-24H and are polished;
14), scrape redness and fill out eye ash
Scraping red ash, it is therefore an objective to fill up sand holes and the putty polished off, therefore this work item operation can not be impetuous, and leakage is found out in carefulness, fills up complete;
15), sand papering
Polishing, uses #800 liquid honing, and surface must polish smooth;
Technique sand paper is applied: mill putty P120��280; Mill floating coating P600��800; Mill varnish is resprayed P1000��1200; Flour milling paint waxing P1500; Acryl facet corase grind P200��400; Acryl topcoating paint P800;
16), finish paint
Paint: 4:1 allotment generally pressed by paint and firming agent, and the paint such as viscosity for different cultivars is excessive, is transferred to desirable application viscosity with matched diluent, stirs and be finally filtered to remove impurity; Finish paint spraying 2-3 road, between every layer, flow time is 10MIN, to guarantee that in coating, solvent fully volatilizees, dried film thickness 40-50 ��m; Dry: 80 DEG C, 30-40MIN is dried or room temperature places 8-24H;
17), varnish
Coating varnish allotment ratio: main, Gu, rare: 5:2:1-2; Dried film thickness 20-30 ��m, dry: 80 DEG C, 30-40MIN is dried or room temperature places 8-24H.
CN201410701633.5A 2014-11-28 2014-11-28 Paint coating process Pending CN105618349A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410701633.5A CN105618349A (en) 2014-11-28 2014-11-28 Paint coating process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410701633.5A CN105618349A (en) 2014-11-28 2014-11-28 Paint coating process

Publications (1)

Publication Number Publication Date
CN105618349A true CN105618349A (en) 2016-06-01

Family

ID=56033919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410701633.5A Pending CN105618349A (en) 2014-11-28 2014-11-28 Paint coating process

Country Status (1)

Country Link
CN (1) CN105618349A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106040514A (en) * 2016-06-22 2016-10-26 安徽天富泵阀有限公司 Brushing method of chemical pump body paint
CN106938487A (en) * 2017-03-06 2017-07-11 东莞市众金家具有限公司 A kind of High precision line processing technology
CN107552363A (en) * 2017-10-09 2018-01-09 东台市东环电工机械有限公司 A kind of paint coating process
CN107891312A (en) * 2017-09-29 2018-04-10 惠州康晟复合材料科技有限公司 Mend grinding process in a kind of surface of bicycle frame of carbon fiber
CN109013238A (en) * 2018-07-25 2018-12-18 苏州海马消防设备制造有限公司 A kind of fire-fighting equipment surface spray coating process
CN109731755A (en) * 2018-12-05 2019-05-10 佛山市酷狄五金有限公司 A kind of vacuum cup spray painting improvement technique
CN109986411A (en) * 2017-12-29 2019-07-09 杭州比亚迪汽车有限公司 SMC article surface processing method and its application
CN112024333A (en) * 2020-08-07 2020-12-04 厦门金牌厨柜股份有限公司 Antibacterial baking varnish door panel and preparation method thereof
CN112439664A (en) * 2020-11-18 2021-03-05 江西朝阳机械有限公司 Fireproof door coating process

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106040514A (en) * 2016-06-22 2016-10-26 安徽天富泵阀有限公司 Brushing method of chemical pump body paint
CN106938487A (en) * 2017-03-06 2017-07-11 东莞市众金家具有限公司 A kind of High precision line processing technology
CN107891312A (en) * 2017-09-29 2018-04-10 惠州康晟复合材料科技有限公司 Mend grinding process in a kind of surface of bicycle frame of carbon fiber
CN107891312B (en) * 2017-09-29 2019-08-02 惠州康晟复合材料科技有限公司 A kind of surface benefit grinding process of bicycle frame of carbon fiber
CN107552363A (en) * 2017-10-09 2018-01-09 东台市东环电工机械有限公司 A kind of paint coating process
CN109986411A (en) * 2017-12-29 2019-07-09 杭州比亚迪汽车有限公司 SMC article surface processing method and its application
CN109013238A (en) * 2018-07-25 2018-12-18 苏州海马消防设备制造有限公司 A kind of fire-fighting equipment surface spray coating process
CN109731755A (en) * 2018-12-05 2019-05-10 佛山市酷狄五金有限公司 A kind of vacuum cup spray painting improvement technique
CN112024333A (en) * 2020-08-07 2020-12-04 厦门金牌厨柜股份有限公司 Antibacterial baking varnish door panel and preparation method thereof
CN112439664A (en) * 2020-11-18 2021-03-05 江西朝阳机械有限公司 Fireproof door coating process

Similar Documents

Publication Publication Date Title
CN105618349A (en) Paint coating process
CN103182725B (en) Wood product surface embrocates the method for wood wax oil
CN103191858B (en) Spraying process of bullet train water system tanks
CN101234378A (en) Paint surface posthaste photo compensation method
CN105964510A (en) Varnish-baking surface coating technology
CN108906554A (en) A kind of rolling stock coating layer structure and coating process
CN107774548A (en) The process that a kind of car paint is quickly repaired
CN103480549A (en) Construction process for wiping paint color
CN109424135A (en) The technique that the putty of metope in building is coated
CN106760285A (en) The technique coated to indoor wall using putty in furniture factory building
CN103934174A (en) Bathroom hardware surface processing method
CN104399657A (en) Automobile body coating method
CN101966514B (en) Painting method
CN106000836A (en) Spraying technology for automobiles and oil tank trucks
CN111570236A (en) Paint spraying method for surface of carbon steel box body
CN1807811A (en) Decorative anti-slip epoxy floor coating construction process
CN103586185A (en) Wharf vehicle coating process
CN101857773A (en) Be used to polish and be used for the plastic soft composition of coating surface protective material
CN208810511U (en) A kind of rolling stock coating layer structure
CN104689959A (en) Method for strengthening protective capability of structural component with heat radiating tank
CN103071610B (en) Engineering oil cylinder coating method
KR100749352B1 (en) Device of partially coating crack of an automobile
CN107377335A (en) The coating process of water paint
CN104624458A (en) Automobile paint repair method
CN111097670B (en) Water-based coating and preparation method and application thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160601

WD01 Invention patent application deemed withdrawn after publication