CN105604590A - 一种隧道施工用拱部锚杆机支撑装置及其方法 - Google Patents
一种隧道施工用拱部锚杆机支撑装置及其方法 Download PDFInfo
- Publication number
- CN105604590A CN105604590A CN201610150135.5A CN201610150135A CN105604590A CN 105604590 A CN105604590 A CN 105604590A CN 201610150135 A CN201610150135 A CN 201610150135A CN 105604590 A CN105604590 A CN 105604590A
- Authority
- CN
- China
- Prior art keywords
- bolter
- bracing
- roof
- strutting arrangement
- arch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/003—Machines for drilling anchor holes and setting anchor bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/003—Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明涉及一种隧道施工用拱部锚杆机支撑装置及其方法,包括对锚杆机进行夹持约束的固定体、主支撑体、滑动槽体、支撑底座、底座上调节角度用的调节螺栓,优选的,还可以包括斜撑支撑体。本装置通过固定体固定锚杆机进行工作。现有的锚杆机工作为纯人工扶持,施工时不安全、且需要3到4人扶持,本发明只需一人操作,具有更经济、更保障施工质量和施工安全等优点。
Description
技术领域
本发明涉及一种隧道施工用拱部锚杆机支撑装置,适用于所有的隧道工程及其方法。
背景技术
按照《公路隧道施工技术规范》要求,隧道锚杆钻孔应圆而直,钻孔方向宜尽量与岩层主要结构面垂直。按照《岩土锚杆与喷射混凝土支护工程技术规范GB50086-2015》要求:锚杆的安设角度宜与洞室开挖壁面垂直。因此国内通常情况下隧道内锚杆施工,为保证拱部锚杆的施作质量,要求对拱部锚杆采用专门锚杆机进行施作,锚杆机性能必须适合硬岩条件下的钻孔要求。
而目前国内通常使用的锚杆机为液压式锚杆台车或者垂直式锚杆机。前者造价昂贵,一台均在数十万元以上,且不适用于新奥法施工的隧道工程,并且无法精确保证钻孔角度。后者垂直式锚杆机在使用过程中,需多人扶持,且在钻孔过程中会摇晃、摆动,无法确保拱顶钻孔的各种角度,锚杆钻孔质量无法得到保障。并且在垂直或大角度钻孔过程中,顶部的岩石会发生掉块伤人以及钻杆断落伤人的现象,存在安全隐患。
发明内容
本发明的目的就是为了解决上述现有技术存在的质量、安全缺陷而提供一种更经济、安全更确保质量的隧道施工用拱部锚杆机支撑装置。
本发明的目的可以通过以下技术方案来实现:
一种隧道施工用拱部锚杆机支撑装置,包括对锚杆机进行夹持约束的固定体、主支撑体、滑动槽体、支撑底座、底座上调节角度用的调节螺栓,优选的,还可以包括斜撑支撑体。
所述的固定体包括两个U型扣。
固定体采用螺栓与滑动槽体固定连接。
滑动槽体为矩形中空结构,滑动槽体采用中空结构与主支撑体上的导轨连接,并可上下滑动。
主支撑体采用工字钢作为柱体,利用工字钢的特性作为机体上下移动的滑槽。
主支撑体采用角钢作为三角形支撑体,设三级踏步,作为上下踏步并起防倾斜支撑作用。
主支撑体采用无缝钢管作为斜撑支撑体,通过螺纹连接至工字钢柱体上,作为防倾斜支撑作用。
支撑底座采用角钢通过焊接与主支撑体连接,支撑底座为正方形结构。
底座调解螺栓通过螺纹连接至支撑底座上,螺栓底部焊接有滚轮,起移动作用。
设置在主支撑体上的坡比尺,可以随时掌握工作角度,保证隧道拱部的各个大角度锚杆施工质量。
所述隧道施工用拱部锚杆机支撑装置的施工方法是:将锚杆机通过固定体的两个U型扣固定在滑动槽体上,滑动槽体沿主支撑体的柱体上下移动带动锚杆机的上下移动;
观察设置在主支撑体上的坡比尺,并调节支撑底座上的调节螺栓使锚杆机达到设定工作角度,保证隧道拱部的各个大角度锚杆施工质量;
三角形支撑体用于支撑柱体防倾斜,并作为操作人员踏步使用,在非垂直角度的工作状态下,将斜撑支撑体通过螺栓连接在主支撑体上的,防止装置在非垂直角度的工作状态下倾覆。
与现有技术相比,本发明具有更经济、更保障施工质量和施工安全等优点。
附图说明
图1为本发明支撑装置的结构示意图(正视图);
图2为本发明装置的侧视图;
图3为本发明装置的俯视图;
图4为本发明装置的固定体结构示意图;
图5为本发明装置的滑动槽体结构示意图;
图6为本发明装置的附斜撑支撑体结构示意图。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。
如图1所示,本发明的隧道施工用拱部锚杆机支撑装置包括:主支撑体2;
与主支撑体上的导轨相连的滑动槽体3,所述的滑动槽体可沿主支撑体上的导轨上下滑动;
通过螺栓与滑动槽体相连的固定体1,用于对锚杆机进行夹持约束;
焊接在主支撑体底部的支撑底座4,
通过螺纹连接至支撑底座上的调节螺栓5,用于调节工作角度。
如图4所示,所述的固定体包括两个U型卡环,通过两个U型扣,将垂直式锚杆机固定在本支撑装置上。
如图2和图5所示,固定体采用螺栓与滑动槽体3固定连接,滑动槽体与主支撑体上的导轨相连,垂直式锚杆机的工作行程通过滑动槽体在主支撑体上上下移动。
如图3所示,所述的支撑底座为正方形结构。通过设置在支撑底座上的调节螺栓5,可以调节工作角度,适用于隧道拱部的各个大角度锚杆施工。
通过观察设置在主支撑体上的坡比尺,可以随时掌握工作角度,保证隧道拱部的各个大角度锚杆施工质量。
如图6所示为本发明斜撑支撑体6的一种实现方式,通过螺栓连接在主支撑体上的斜撑支撑体6,可以有效防止非垂直角度的工作状态下倾覆。
Claims (9)
1.一种隧道施工用拱部锚杆机支撑装置,其特征在于包括:
主支撑体,
与主支撑体上的导轨相连的滑动槽体,所述的滑动槽体可沿主支撑体上的导轨上下滑动,
通过螺栓与滑动槽体相连的固定体,用于对锚杆机进行夹持约束,
焊接在主支撑体底部的支撑底座,
通过螺纹连接至支撑底座上的调节螺栓,用于调节工作角度。
2.根据权利要求1所述的隧道施工用拱部锚杆机支撑装置,其特征在于所述的支撑底座为正方形结构。
3.根据权利要求2所述的隧道施工用拱部锚杆机支撑装置,其特征在于所述的主支撑体包括柱体和三角形支撑体,所述的柱体采用工字钢,垂直固定在支撑底座一边的中点上,所述的三角形支撑体采用角钢,呈等边三角形结构,顶端与柱体连接,两个底端分别与支撑底座的两个角连接。
4.根据权利要求3所述的隧道施工用拱部锚杆机支撑装置,其特征在于所述的三角形支撑体上设有用于上下踏步并起防倾斜支撑作用的三级踏步。
5.根据权利要求1所述的隧道施工用拱部锚杆机支撑装置,其特征在于所述的固定体包括两个U型扣。
6.根据权利要求1-5任一项所述的隧道施工用拱部锚杆机支撑装置,其特征在于所述的调节螺栓底部焊接有滚轮。
7.根据权利要求6所述的隧道施工用拱部锚杆机支撑装置,其特征在于所述的拱部锚杆机支撑装置还包括附斜撑支撑体,所述的斜撑支撑体采用无缝钢管,通过螺纹连接至工字钢柱体上。
8.根据权利要求6所述的隧道施工用拱部锚杆机支撑装置,其特征在于所述的拱部锚杆机支撑装置还包括设置在主支撑体上的坡比尺。
9.一种如权利要求1所述隧道施工用拱部锚杆机支撑装置的施工方法,其特征在于:
将锚杆机通过固定体的两个U型扣固定在滑动槽体上,滑动槽体沿主支撑体的柱体上下移动带动锚杆机的上下移动;
观察设置在主支撑体上的坡比尺,并调节支撑底座上的调节螺栓使锚杆机达到设定工作角度,保证隧道拱部的各个大角度锚杆施工质量;
调节螺栓底部的滚轮用于本支撑装置的移动,三角形支撑体用于支撑柱体防倾斜,并作为操作人员踏步使用,在非垂直角度的工作状态下,将斜撑支撑体通过螺栓连接在主支撑体上的,防止装置在非垂直角度的工作状态下倾覆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610150135.5A CN105604590A (zh) | 2016-03-16 | 2016-03-16 | 一种隧道施工用拱部锚杆机支撑装置及其方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610150135.5A CN105604590A (zh) | 2016-03-16 | 2016-03-16 | 一种隧道施工用拱部锚杆机支撑装置及其方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105604590A true CN105604590A (zh) | 2016-05-25 |
Family
ID=55984875
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610150135.5A Pending CN105604590A (zh) | 2016-03-16 | 2016-03-16 | 一种隧道施工用拱部锚杆机支撑装置及其方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105604590A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113107563A (zh) * | 2021-05-19 | 2021-07-13 | 中交二公局第一工程有限公司 | 一种隧道拱顶中空锚杆固定装置 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3827865C1 (en) * | 1988-08-17 | 1989-06-22 | Armo Gesellschaft Fuer Bauelemente, Bau- Und Wohnbedarf Mbh, 4350 Recklinghausen, De | Roof-bolt drilling apparatus movable on support sections forming running rails |
CN201231532Y (zh) * | 2008-05-23 | 2009-05-06 | 河北省第四建筑工程公司 | 一种移动式建筑顶板钻孔装置 |
CN201560798U (zh) * | 2009-12-15 | 2010-08-25 | 北京首尔工程技术有限公司 | 水平定向钻机机架 |
CN102979458A (zh) * | 2012-12-13 | 2013-03-20 | 中国水利水电第十四工程局有限公司 | 一种岩壁梁斜面光爆凿孔导向定位装置 |
CN103562498A (zh) * | 2011-02-16 | 2014-02-05 | 兰博有限公司 | 矿锚杆机 |
CN104632080A (zh) * | 2014-12-26 | 2015-05-20 | 中国矿业大学 | 一种三向精确定位相似模拟巷道微型钻机 |
CN104775753A (zh) * | 2015-04-22 | 2015-07-15 | 江苏省无锡探矿机械总厂有限公司 | 钻机用行走和支撑两用装置 |
CN205503156U (zh) * | 2016-03-16 | 2016-08-24 | 浙江八达隧道工程股份有限公司 | 一种隧道施工用拱部锚杆机支撑装置 |
-
2016
- 2016-03-16 CN CN201610150135.5A patent/CN105604590A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3827865C1 (en) * | 1988-08-17 | 1989-06-22 | Armo Gesellschaft Fuer Bauelemente, Bau- Und Wohnbedarf Mbh, 4350 Recklinghausen, De | Roof-bolt drilling apparatus movable on support sections forming running rails |
CN201231532Y (zh) * | 2008-05-23 | 2009-05-06 | 河北省第四建筑工程公司 | 一种移动式建筑顶板钻孔装置 |
CN201560798U (zh) * | 2009-12-15 | 2010-08-25 | 北京首尔工程技术有限公司 | 水平定向钻机机架 |
CN103562498A (zh) * | 2011-02-16 | 2014-02-05 | 兰博有限公司 | 矿锚杆机 |
CN102979458A (zh) * | 2012-12-13 | 2013-03-20 | 中国水利水电第十四工程局有限公司 | 一种岩壁梁斜面光爆凿孔导向定位装置 |
CN104632080A (zh) * | 2014-12-26 | 2015-05-20 | 中国矿业大学 | 一种三向精确定位相似模拟巷道微型钻机 |
CN104775753A (zh) * | 2015-04-22 | 2015-07-15 | 江苏省无锡探矿机械总厂有限公司 | 钻机用行走和支撑两用装置 |
CN205503156U (zh) * | 2016-03-16 | 2016-08-24 | 浙江八达隧道工程股份有限公司 | 一种隧道施工用拱部锚杆机支撑装置 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113107563A (zh) * | 2021-05-19 | 2021-07-13 | 中交二公局第一工程有限公司 | 一种隧道拱顶中空锚杆固定装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109577342B (zh) | 一种圆形井坑施工的快捷支护装置 | |
CN104963301A (zh) | 用于墩顶梁段与桥墩拆除的拖拉平移下放装置及方法 | |
CN109298416B (zh) | 一种隧道工程地质雷达探测辅助装置及工作方法 | |
CH704534A1 (de) | Vorrichtung zum Bohren und Spalten von festen Materialien. | |
CN107227862B (zh) | 建筑物的滑移施工方法 | |
CN203822175U (zh) | 一种钻机机架 | |
JP3178279U (ja) | スライドダウン装置 | |
CN103711495A (zh) | 一种暗挖隧道无支架无负环盾构始发方法 | |
CN105604590A (zh) | 一种隧道施工用拱部锚杆机支撑装置及其方法 | |
CN205503156U (zh) | 一种隧道施工用拱部锚杆机支撑装置 | |
CN205024600U (zh) | 一种用于桥梁水中桩基施工的作业平台 | |
CN112360347A (zh) | 一种隧道拱架锁脚锚杆钻孔的定向装置 | |
CN204662929U (zh) | 一种跨线行走式防护操作装置 | |
CN203702002U (zh) | 一种简易双向快速滑动架 | |
CN206591451U (zh) | 一种用于竖向钢筋安装的定位装置 | |
CN213683976U (zh) | 一种隧道拱架锁脚锚杆钻孔的定向装置 | |
CN105625424B (zh) | 用于控制矩形牛腿桩垂直度和方位角的装置及施工方法 | |
CN204385885U (zh) | 具有双调节机构的桥梁施工用塔吊桩基扶墙 | |
CN103046555A (zh) | 一种用于钢管支撑的双向可调节整体十字接头节点 | |
CN107794846B (zh) | 一种连续梁转体施工助推、防超转装置及施工方法 | |
CN110847175A (zh) | 一种基桩截除导向支架 | |
CN203867459U (zh) | 一种预裂造孔可移动快速定位装置 | |
CN206053345U (zh) | 一种泵管支撑装置 | |
CN218815698U (zh) | 一种明挖法施工用围栏 | |
CN205224571U (zh) | 一种悬挑脚手架的锚固装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160525 |