CN105604344B - 一种有裂缝内墙的加固方法 - Google Patents
一种有裂缝内墙的加固方法 Download PDFInfo
- Publication number
- CN105604344B CN105604344B CN201610127849.4A CN201610127849A CN105604344B CN 105604344 B CN105604344 B CN 105604344B CN 201610127849 A CN201610127849 A CN 201610127849A CN 105604344 B CN105604344 B CN 105604344B
- Authority
- CN
- China
- Prior art keywords
- wall
- bar
- interior wall
- steel plate
- concrete girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000002787 reinforcement Effects 0.000 title claims abstract description 36
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims abstract description 25
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 25
- 239000010959 steel Substances 0.000 claims abstract description 25
- 210000003205 muscle Anatomy 0.000 claims abstract description 24
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 13
- 239000011449 brick Substances 0.000 claims abstract description 12
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 8
- 239000011083 cement mortar Substances 0.000 claims abstract description 6
- 210000002435 tendon Anatomy 0.000 claims abstract description 6
- 238000003466 welding Methods 0.000 claims abstract description 5
- 239000011241 protective layer Substances 0.000 claims abstract description 3
- 239000010410 layer Substances 0.000 claims 1
- 238000003780 insertion Methods 0.000 abstract description 2
- 230000037431 insertion Effects 0.000 abstract description 2
- 238000005266 casting Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 4
- 238000009877 rendering Methods 0.000 description 4
- 239000003822 epoxy resin Substances 0.000 description 3
- 229920000647 polyepoxide Polymers 0.000 description 3
- 230000001680 brushing effect Effects 0.000 description 2
- 238000007596 consolidation process Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000002245 particle Substances 0.000 description 2
- 238000005507 spraying Methods 0.000 description 2
- 229910000576 Laminated steel Inorganic materials 0.000 description 1
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 229910052760 oxygen Inorganic materials 0.000 description 1
- 239000001301 oxygen Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G23/0222—Replacing or adding wall ties
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
Claims (3)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710556045.0A CN107165435B (zh) | 2016-02-28 | 2016-02-28 | 一种有裂缝内墙的加固施工方法 |
CN201610127849.4A CN105604344B (zh) | 2016-02-28 | 2016-02-28 | 一种有裂缝内墙的加固方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610127849.4A CN105604344B (zh) | 2016-02-28 | 2016-02-28 | 一种有裂缝内墙的加固方法 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710556045.0A Division CN107165435B (zh) | 2016-02-28 | 2016-02-28 | 一种有裂缝内墙的加固施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105604344A CN105604344A (zh) | 2016-05-25 |
CN105604344B true CN105604344B (zh) | 2018-01-30 |
Family
ID=55984642
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710556045.0A Active CN107165435B (zh) | 2016-02-28 | 2016-02-28 | 一种有裂缝内墙的加固施工方法 |
CN201610127849.4A Expired - Fee Related CN105604344B (zh) | 2016-02-28 | 2016-02-28 | 一种有裂缝内墙的加固方法 |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710556045.0A Active CN107165435B (zh) | 2016-02-28 | 2016-02-28 | 一种有裂缝内墙的加固施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN107165435B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592839A (zh) * | 2017-03-03 | 2017-04-26 | 沈阳建筑大学 | 一种横张体外预应力压型钢板组合楼板 |
CN107327157B (zh) * | 2017-09-04 | 2023-12-15 | 安徽津达建材股份有限公司 | 混凝土楼板加固结构 |
CN108360839A (zh) * | 2018-03-26 | 2018-08-03 | 桂林理工大学 | 一种旧墙加固系统及其施工方法 |
CN110593597A (zh) * | 2019-08-26 | 2019-12-20 | 广东建宇建筑科技有限公司 | 一种修补墙体裂缝的方法 |
CN112359889B (zh) * | 2020-10-19 | 2022-01-28 | 中国建筑第二工程局有限公司 | 一种基础底板加固逆作施工方法 |
CN113417222B (zh) * | 2021-08-02 | 2022-07-29 | 杨伟涛 | 一种道路桥梁裂缝处理装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007136233A1 (en) * | 2006-05-24 | 2007-11-29 | Yan Sup Lee | Fix holder, steel wire, bricks, and bricks wall reinforcement method thereby |
CN201011136Y (zh) * | 2007-03-16 | 2008-01-23 | 中国建筑科学研究院 | 钢铰线、聚合物砂浆复合加固结构 |
CN201531124U (zh) * | 2009-09-24 | 2010-07-21 | 马人乐 | 分级体外预应力加固砌体结构 |
CN103469939A (zh) * | 2013-09-24 | 2013-12-25 | 中国建筑第二工程局有限公司 | 一种砌体填充墙与主体柔性连接抗震结构及其施工方法 |
CN103835521A (zh) * | 2012-11-20 | 2014-06-04 | 贵阳铝镁设计研究院有限公司 | 一种砖墙的加固方法及结构 |
CN103883022A (zh) * | 2014-03-20 | 2014-06-25 | 中国建筑第二工程局有限公司 | 围护结构内外墙抗震与隔音抗裂一体化构造及其施工方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100316276B1 (ko) * | 1999-01-28 | 2001-12-12 | 원종균 | 벽체보수방법 |
CN103089021A (zh) * | 2011-11-08 | 2013-05-08 | 上海美创建筑加固工程有限公司 | 砌体结构抗震加固圈梁制造方法 |
CN103075022B (zh) * | 2012-11-09 | 2016-02-03 | 河南省建设集团有限公司 | 一种既有建筑砌体增加暗梁结构及其施工方法 |
CN103243804B (zh) * | 2013-05-23 | 2015-04-15 | 东北石油大学 | 预应力薄壁型钢—混凝土组合框架及其施工方法 |
CN103352581B (zh) * | 2013-07-09 | 2015-12-09 | 北京筑福国际工程技术有限责任公司 | 采用内部预应力钢筋锚杆加固烧结粘土砖砌体结构的方法 |
CN103758362B (zh) * | 2014-01-06 | 2016-05-04 | 北京筑福国际工程技术有限责任公司 | 既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法 |
CN103967127B (zh) * | 2014-05-23 | 2016-06-01 | 东北石油大学 | 内置芯柱的异强组合柱组合梁框架及其施工方法 |
-
2016
- 2016-02-28 CN CN201710556045.0A patent/CN107165435B/zh active Active
- 2016-02-28 CN CN201610127849.4A patent/CN105604344B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007136233A1 (en) * | 2006-05-24 | 2007-11-29 | Yan Sup Lee | Fix holder, steel wire, bricks, and bricks wall reinforcement method thereby |
CN201011136Y (zh) * | 2007-03-16 | 2008-01-23 | 中国建筑科学研究院 | 钢铰线、聚合物砂浆复合加固结构 |
CN201531124U (zh) * | 2009-09-24 | 2010-07-21 | 马人乐 | 分级体外预应力加固砌体结构 |
CN103835521A (zh) * | 2012-11-20 | 2014-06-04 | 贵阳铝镁设计研究院有限公司 | 一种砖墙的加固方法及结构 |
CN103469939A (zh) * | 2013-09-24 | 2013-12-25 | 中国建筑第二工程局有限公司 | 一种砌体填充墙与主体柔性连接抗震结构及其施工方法 |
CN103883022A (zh) * | 2014-03-20 | 2014-06-25 | 中国建筑第二工程局有限公司 | 围护结构内外墙抗震与隔音抗裂一体化构造及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105604344A (zh) | 2016-05-25 |
CN107165435B (zh) | 2019-05-03 |
CN107165435A (zh) | 2017-09-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105604344B (zh) | 一种有裂缝内墙的加固方法 | |
CN101614125B (zh) | V级围岩隧道施工方法 | |
CN106498950B (zh) | 锚头置于桩身的深基坑桩锚支护体系的实施方法 | |
CN108412125A (zh) | 一种劲性混凝土组合结构框架梁柱施工工法 | |
CN103510540B (zh) | 浆砌片石挡土墙加固施工方法及其结构 | |
CN105113797A (zh) | 一种与圈梁连接的构造柱的浇筑装置及浇注方法 | |
CN109611102A (zh) | 一种冷开挖下穿立交桥施工方法 | |
CN108005401A (zh) | 一种既有框架结构隔震加固的柱的托换方法 | |
CN101333815B (zh) | 一种混凝土锚杆及其施工方法 | |
CN103088830A (zh) | 超深地下室复合外墙结构的施工方法 | |
CN113605771B (zh) | 一种预应力装配式框架结构体系 | |
CN208717934U (zh) | 一种塔吊基础结构 | |
CN110080454A (zh) | Lpm轻质填充体现浇混凝土空心楼盖施工方法 | |
CN109826192A (zh) | 一种装配式预应力围护桩 | |
CN103194949A (zh) | 一种斜向预应力水泥混凝土路面裂缝修补结构及修补方法 | |
CN206408630U (zh) | 锚头置于桩身的深基坑桩锚支护体系 | |
CN108060789A (zh) | 一种既有砌体结构隔震加固的墙体托换方法 | |
CN103410144B (zh) | 预应力钢筋嵌岩灌注桩及施工方法 | |
CN205976167U (zh) | 基于可拆卸式定位控制件现浇楼板结构 | |
CN108978870A (zh) | 折线形钢梁与混凝土组合结构施工方法 | |
CN206245730U (zh) | 一种现浇坡屋面双层模板结构 | |
CN108755394A (zh) | 一种预应力筋加固桥梁异形墩柱的方法 | |
CN207211389U (zh) | 一种装配式建筑悬挑外架锚箍 | |
CN207920139U (zh) | 一种具有加固结构的钢筋混凝土轴心受压柱 | |
CN101105077A (zh) | 钢筋混凝土结构物的连接方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: 236000 room 1004, unit 2, building 3, Owen doctor yuan, Zhenge North Road, Yingshang County, Fuyang City, Anhui Province Patentee after: Ye Xiangzhu Address before: 325000, Jingshan Hill, Zhejiang, Wenzhou, group 11, Room 302 Patentee before: Ye Xiangzhu |
|
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: 325000, Jingshan Hill, Zhejiang, Wenzhou, group 11, Room 302 Patentee after: Ye Xiangzhu Address before: 236000 room 1004, unit 2, building 3, Owen doctor yuan, Zhenge North Road, Yingshang County, Fuyang City, Anhui Province Patentee before: Ye Xiangzhu |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201223 Address after: Room 403-2, No.1 Yanwu street, Tongling Town, Dongshan County, Zhangzhou City, Fujian Province Patentee after: Zhangzhou erjietang Network Technology Co.,Ltd. Address before: Room 302, building 11, Jingshan group, Wenzhou City, Zhejiang Province 325000 Patentee before: Ye Xiangzhu |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211228 Address after: 276000 No. 001, Torch Building, Keji Avenue, Linyi high tech Zone, Linyi City, Shandong Province Patentee after: Linyi high tech Real Estate Co.,Ltd. Address before: Room 403-2, No.1 Yanwu street, Tongling Town, Dongshan County, Zhangzhou City, Fujian Province Patentee before: Zhangzhou erjietang Network Technology Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180130 |