CN105604339A - Secondary structure column reinforcing method - Google Patents

Secondary structure column reinforcing method Download PDF

Info

Publication number
CN105604339A
CN105604339A CN201510982012.3A CN201510982012A CN105604339A CN 105604339 A CN105604339 A CN 105604339A CN 201510982012 A CN201510982012 A CN 201510982012A CN 105604339 A CN105604339 A CN 105604339A
Authority
CN
China
Prior art keywords
constructional column
structure column
column
post
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510982012.3A
Other languages
Chinese (zh)
Other versions
CN105604339B (en
Inventor
柴旭光
张大鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201510982012.3A priority Critical patent/CN105604339B/en
Publication of CN105604339A publication Critical patent/CN105604339A/en
Application granted granted Critical
Publication of CN105604339B publication Critical patent/CN105604339B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a secondary structure column reinforcing method. The method comprises the steps that a structure column center line and an elevation control line are snapped; structure column bars are bound; an opposite-pull threaded rod and a wall horizontal tying bar are welded; a T-shaped locating steel bar is welded to the portion, 5 cm away from the root of a structure column, of a structure column main bar, and the section and axis position of the structure column are controlled; a wide sponge strip is pasted to the position about 5 mm away from the outer side of the skin of the structure column; a structure column formwork is mounted; a structure column hoop is mounted; the structure column formwork is corrected and reinforced; column concrete is poured; the formwork is detached, the portion, stretching out, of the threaded rod is cut off along the surface of the structure column, and the cut-off end of the threaded rod is subjected to antirust treatment. According to the method, the wall horizontal tying bar and the wall-penetrating opposite-pull threaded rod of the structure column are welded, the threaded rod is combined with a butterfly clasp to lock a steel tube for reinforcing a batten back edge at the end of the structure column, the pull force of the horizontal bar is utilized for providing horizontal constraint required for reinforcing the end of the structure column, and therefore stability is higher; the defect that a masonry structure causes reduction of wall integrity and compressive strength due to structure column formwork perforation is overcome.

Description

Secondary structure constructional column reinforcement means
Technical field
The present invention relates to building construction, secondary structure construction field, be specifically related to a kind of secondary structure constructional column reinforcement means.
Background technology
In current building trade, masonry structure need to add constructional column to strengthen masonry globality, and the formwork reinforcement of constructional column mainly adopts the conventional practice of the sleeve-penetrating that punches on masonry structure and steel pipe reinforcing template stupefied in conjunction with wood. Its shortcoming is globality and the compression strength that punching can destroy masonry structure on masonry wall, reduces the stability of body of wall, and follow-up plastering process is caused to the mass defect such as hollowing, crackle.
Application number is that 201420504673.6 documents 1 discloses the building block of a kind of constructional column template, directly build mould using the building block of constructional column template as constructional column, constructional column and body of wall can be constructed simultaneously, without formwork, but need to customize building block, cost improves, and does not consider the damage to building block mould and transport loss in the difference of the each department building block level of production and work progress. application number is that 200920217311.8 documents 2 discloses a kind of constructional column sleeve bolt formwork system, adopt in the horizontal mortar joint that is embedded in horse tooth trough both sides from top to bottom and the PVC sleeve pipe of length and constructional column masonry consistency of thickness, in PVC sleeve pipe, wear split bolt and realize the drawknot to constructional column, construct easy to control, save construction cost, save fee of material and labour, but require principle due to what specification must not punch to masonry wall, therefore take masonry wall sleeve-penetrating drawknot no longer feasible, this scheme does not consider that in mortar joint, burying sleeve pipe underground has violated the requirement to mortar joint control in specification, with sleeve pipe to masonry rigidity, intensity, globality, the adverse effect that masonry is attractive in appearance.
Summary of the invention
The technical problem to be solved in the present invention is, for existing Constructional Col-umn Construction above shortcomings, a kind of secondary structure constructional column reinforcement means is provided, fundamentally solve constructional column formwork and reinforced the problem that must punch on masonry structure, avoided masonry structure to cause the drawback of body of wall globality and compression strength step-down because constructional column formwork punches.
The present invention for solving the problems of the technologies described above adopted technical scheme is:
A kind of secondary structure constructional column reinforcement means, comprises the steps:
1) play constructional column center line, absolute altitude control line;
2) by constructional column axis, absolute altitude control point pilot measurement to post side, colligation constructional column post muscle;
3) by Screw arbor with nut at both-ends and the horizontal tension rib welding of body of wall;
4), according to constructional column center line, weld T-shaped spacer bar at the main muscle of the constructional column position of 4 ~ 6cm eminence on constructional column post root, in order to control constructional column sectional dimension and axial location (position-limiting action);
5) outside constructional column post skin, about 5mm pastes wide sponge strip, tight to ensure end opening and seam;
6) installation constitution column template, constructional column template comprises that post inner cross type supports and post surrounding exterior sheathing;
7) installation constitution post tie, the steel pipe that wherein styletable uses the screw combinations butterfly padlock welding with horizontal bar firmly to reinforce flitch back cord carries out formwork reinforcement;
8) constructional column template is proofreaied and correct, is reinforced;
9) cast post concrete;
10) form removal in the time that constructional column intensity reaches design strength, picks out at pre-buried Screw arbor with nut at both-ends cut-off part the pit that 8 ~ 12mm is dark, cuts off along constructional column surface the Screw arbor with nut at both-ends stretching out, and to the antirust processing of Screw arbor with nut at both-ends head after cutting off.
Press such scheme, in described step 5), sponge strip width is 18 ~ 22mm.
Press such scheme, described step 6) specifically comprises: first erection column inner cross type supports, back mounting pole surrounding exterior sheathing, the corresponding Screw arbor with nut at both-ends extended position welding with horizontal junction muscle muscle of punching when batching; Constructional column template is installed by logical organ timbering, and both sides column template is first installed, calibrated, draw again after reinforcing logical line install in the middle of each column template.
Press such scheme, in described step 7), tie comprises that flitch back cord, steel pipe and anti-skidding butterfly buckle, installation process is specially: the flitch back cord of following closely 50mm × 100mm in constructional column template, the about 100mm of spacing, be buckled in and on Screw arbor with nut at both-ends, tighten fixingly with the steel pipe of two external diameter 48mm wall thickness 3.5mm and the anti-skidding butterfly of twice along vertical flitch back cord direction, tie vertical interval is 300 ~ 500mm.
Press such scheme, described step 8) specifically comprises: first proofread and correct, reinforced both sides column template by constructional column axis, then hang up logical line and proofread and correct intermediolateral column template, column template timing must guarantee that four sides is on same straight line, perpendicularity deviation, misalignment of axe, adjacent two surperficial differences of height, surface smoothness and cross section inside dimension are all controlled within the scope of job specfication tolerance.
Press such scheme, in described step 10), the antirust processing of Screw arbor with nut at both-ends head is specially with cement mortar floating.
Compared with conventional construction method, beneficial effect of the present invention:
1, directly by horizontal body of wall tension rib and the welding of constructional column wall-punching pair-pulling threaded spindle, then live the steel pipe of constructional column end reinforcing flitch back cord with this screw combinations butterfly padlock, utilize the pulling force of horizontal bar to provide constructional column end to reinforce required horizontal restraint, fundamentally solve constructional column formwork and reinforced the problem that must punch on masonry structure, avoid masonry structure to cause the drawback of body of wall globality and compression strength step-down because constructional column formwork punches, make masonry globality and compression strength higher, construct more simple and efficient;
2, template construct, installation are all carried out operation by the quality requirement of plain form, shuttering supporting adopts the reinforcement system of flitch back cord combined steel pipe with screw rod drawknot, compare with traditional masonry wall sleeve-penetrating drawknot method, simple, this technique is gathered materials on the spot, expose the direct cutting process of screw rod, relatively the construction method template strength of other building block moulds is higher, more economical.
Brief description of the drawings
Fig. 1 is the reinforcing schematic diagram of secondary structure constructional column reinforcement means of the present invention;
Fig. 2 is that the horizontal tension rib of body of wall of the present invention coordinates welded structure schematic diagram with Screw arbor with nut at both-ends;
In figure, the horizontal tension rib of 1-body of wall, 2-Screw arbor with nut at both-ends, 3-flitch back cord.
Detailed description of the invention
Below in conjunction with drawings and Examples, technical solution of the present invention is described in detail.
Shown in Fig. 1 ~ Fig. 2, secondary structure constructional column reinforcement means of the present invention, comprises the following steps:
1) before envelope column template, first cut post root top layer laitance, and water rinses well, play constructional column center line, absolute altitude control line;
2) by constructional column axis, absolute altitude control point pilot measurement to post side, colligation constructional column post muscle;
3) Screw arbor with nut at both-ends 2 and the horizontal tension rib 1 of body of wall are welded to (10d single welding; 5d welding by both sides, d is the diameter of the horizontal tension rib 1 of body of wall);
4), according to constructional column center line, weld T-shaped spacer bar at the main muscle of the constructional column position of 5cm eminence on constructional column post root, in order to control constructional column sectional dimension and axial location (position-limiting action);
5) outside constructional column post skin, about 5mm pastes the wide sponge strip of 20mm, tight to ensure end opening and seam;
6) installation constitution column template: first erection column inner cross type supports, back mounting pole surrounding exterior sheathing, corresponding Screw arbor with nut at both-ends 2 extended positions that weld with horizontal junction muscle muscle of punching when batching; Constructional column template is installed by logical organ timbering, and both sides column template is first installed, calibrated, draw again after reinforcing logical line install in the middle of each column template;
7) installation constitution post tie: tie comprises that flitch back cord 3, steel pipe and anti-skidding butterfly buckle, in constructional column template, follow closely the flitch back cord 3 of 50mm × 100mm, the about 100mm of spacing, be buckled in and on Screw arbor with nut at both-ends 2, tighten fixingly with two φ 48 × 3.5 steel pipes (external diameter 48mm wall thickness 3.5mm) and the anti-skidding butterfly of twice along vertical flitch back cord 3 directions, tie vertical interval is 300 ~ 500mm;
8) constructional column template is proofreaied and correct, is reinforced: first proofread and correct, reinforced both sides column template by constructional column axis, then hang up logical line and proofread and correct intermediolateral column template, column template timing must guarantee that four sides is on same straight line, perpendicularity deviation, misalignment of axe, adjacent two surperficial differences of height, surface smoothness and cross section inside dimension are all controlled within the scope of job specfication tolerance;
9) cast post concrete;
10) form removal in the time that constructional column intensity reaches design strength, picks out at pre-buried Screw arbor with nut at both-ends 2 cut-off parts the pit that 10mm is dark, cuts off the Screw arbor with nut at both-ends 2 stretching out, with cement mortar floating (the antirust processing of screw head) along constructional column surface.
Obviously, above-described embodiment is only for example of the present invention is clearly described, and is not the restriction to embodiments of the present invention. The apparent variation of being extended out according to spirit of the present invention for those of ordinary skill in the field, or variation are still among protection scope of the present invention.

Claims (6)

1. secondary structure constructional column reinforcement means, is characterized in that, comprises the steps:
1) play constructional column center line, absolute altitude control line;
2) by constructional column axis, absolute altitude control point pilot measurement to post side, colligation constructional column post muscle;
3) by Screw arbor with nut at both-ends and the horizontal tension rib welding of body of wall;
4), according to constructional column center line, weld T-shaped spacer bar at the main muscle of the constructional column position of 4 ~ 6cm eminence on constructional column post root, in order to control constructional column sectional dimension and axial location;
5) outside constructional column post skin, about 5mm pastes wide sponge strip, tight to ensure end opening and seam;
6) installation constitution column template, constructional column template comprises that post inner cross type supports and post surrounding exterior sheathing;
7) installation constitution post tie, the steel pipe that wherein styletable uses the screw combinations butterfly padlock welding with horizontal bar firmly to reinforce flitch back cord carries out formwork reinforcement;
8) constructional column template is proofreaied and correct, is reinforced;
9) cast post concrete;
10) form removal in the time that constructional column intensity reaches design strength, picks out at pre-buried Screw arbor with nut at both-ends cut-off part the pit that 8 ~ 12mm is dark, cuts off along constructional column surface the Screw arbor with nut at both-ends stretching out, and to the antirust processing of Screw arbor with nut at both-ends head after cutting off.
2. secondary structure constructional column reinforcement means according to claim 1, is characterized in that, in described step 5), sponge strip width is 18 ~ 22mm.
3. secondary structure constructional column reinforcement means according to claim 1, it is characterized in that, described step 6) specifically comprises: first erection column inner cross type supports, back mounting pole surrounding exterior sheathing, the corresponding Screw arbor with nut at both-ends extended position welding with horizontal junction muscle muscle of punching when batching; Constructional column template is installed by logical organ timbering, and both sides column template is first installed, calibrated, draw again after reinforcing logical line install in the middle of each column template.
4. secondary structure constructional column reinforcement means according to claim 1, it is characterized in that, in described step 7), tie comprises that flitch back cord, steel pipe and anti-skidding butterfly buckle, installation process is specially: the flitch back cord of following closely 50mm × 100mm in constructional column template, the about 100mm of spacing, be buckled in and on Screw arbor with nut at both-ends, tighten fixingly with the steel pipe of two external diameter 48mm wall thickness 3.5mm and the anti-skidding butterfly of twice along vertical flitch back cord direction, tie vertical interval is 300 ~ 500mm.
5. secondary structure constructional column reinforcement means according to claim 1, it is characterized in that, described step 8) specifically comprises: first proofread and correct, reinforced both sides column template by constructional column axis, then hang up logical line and proofread and correct intermediolateral column template, column template timing must guarantee that four sides is on same straight line, perpendicularity deviation, misalignment of axe, adjacent two surperficial differences of height, surface smoothness and cross section inside dimension are all controlled within the scope of job specfication tolerance.
6. secondary structure constructional column reinforcement means according to claim 1, is characterized in that, in described step 10), the antirust processing of Screw arbor with nut at both-ends head is specially with cement mortar floating.
CN201510982012.3A 2015-12-22 2015-12-22 Secondary structure constructs column reinforcing method Active CN105604339B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510982012.3A CN105604339B (en) 2015-12-22 2015-12-22 Secondary structure constructs column reinforcing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510982012.3A CN105604339B (en) 2015-12-22 2015-12-22 Secondary structure constructs column reinforcing method

Publications (2)

Publication Number Publication Date
CN105604339A true CN105604339A (en) 2016-05-25
CN105604339B CN105604339B (en) 2017-12-15

Family

ID=55984637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510982012.3A Active CN105604339B (en) 2015-12-22 2015-12-22 Secondary structure constructs column reinforcing method

Country Status (1)

Country Link
CN (1) CN105604339B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107299701A (en) * 2017-07-31 2017-10-27 武汉冶建筑安装工程有限责任公司 Fill wall construction post one-time-concreting construction method
CN108425508A (en) * 2016-11-10 2018-08-21 叶香菲 Brick-concrete composite buildings reinforcing construction
CN113982261A (en) * 2021-09-27 2022-01-28 中国一冶集团有限公司 Constructional column compensation type combined aluminum mould and formwork supporting construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080110118A1 (en) * 2001-11-28 2008-05-15 Enrique Molina Building construction system
JP2008163646A (en) * 2006-12-28 2008-07-17 Taisei Corp Method and structure for reinforcing existing column
CN201627279U (en) * 2009-12-24 2010-11-10 青岛海川建设集团有限公司 Fixing device for masonry structure
CN104295003A (en) * 2014-09-26 2015-01-21 中建七局第二建筑有限公司 Structural column construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080110118A1 (en) * 2001-11-28 2008-05-15 Enrique Molina Building construction system
JP2008163646A (en) * 2006-12-28 2008-07-17 Taisei Corp Method and structure for reinforcing existing column
CN201627279U (en) * 2009-12-24 2010-11-10 青岛海川建设集团有限公司 Fixing device for masonry structure
CN104295003A (en) * 2014-09-26 2015-01-21 中建七局第二建筑有限公司 Structural column construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108425508A (en) * 2016-11-10 2018-08-21 叶香菲 Brick-concrete composite buildings reinforcing construction
CN108425508B (en) * 2016-11-10 2020-01-07 叶香菲 Brick-concrete house reinforcing structure
CN107299701A (en) * 2017-07-31 2017-10-27 武汉冶建筑安装工程有限责任公司 Fill wall construction post one-time-concreting construction method
CN107299701B (en) * 2017-07-31 2019-07-23 武汉一冶建筑安装工程有限责任公司 Fill wall construction column one-time-concreting construction method
CN113982261A (en) * 2021-09-27 2022-01-28 中国一冶集团有限公司 Constructional column compensation type combined aluminum mould and formwork supporting construction method thereof

Also Published As

Publication number Publication date
CN105604339B (en) 2017-12-15

Similar Documents

Publication Publication Date Title
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN104989102A (en) Improved concrete wall and column construction method
CN103132690B (en) Basement exterior wall unilateral template and method for supporting template thereof
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN103556819B (en) A kind of construction method of reserved constructional column hole on beam slab
CN103422674A (en) Cast-in-place section concrete construction method of assembling-type concrete structure
CN203441100U (en) Formwork structure of constructional column
CN105604339A (en) Secondary structure column reinforcing method
CN113216252A (en) Expansion joint reinforcing device and method for multi-section continuous casting of underground pipe gallery
CN104047419A (en) Wall linking method of scaffold and wall-linking member used by scaffold
CN201502176U (en) Constructional column sleeve bolt formwork erecting system
CN202509764U (en) Template bracing structure for constructional column
CN202247938U (en) Wedge-shaped foundation bolt preformed hole core formwork device
CN104453226A (en) Secondary structure post formwork erecting and positioning device
CN209798774U (en) Anchor sealing concrete template for rock-soil high slope anchor cable support
CN208010367U (en) A kind of tunnel shaped steel arch spatial cooperation support system
CN203097290U (en) Assembled type split bolt
CN106639099B (en) Plant-fibre type heat preservation dismounting-free formwork formwork system surface smoothness control method
CN109853730A (en) A kind of novel precast reinforced concrete frame joint and its method of construction
CN104908150B (en) A kind of piping shaft making template and the method based on factorial praluction piping shaft
CN212405142U (en) Supporting structure for pile foundation breaking
CN203866972U (en) Embedded component for filler wall tie bars
CN105317216A (en) Wall body reversed construction method and wall body and concrete framework casting structure
CN207673351U (en) A kind of tunnel lining trolley end mould

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant