CN201502176U - Constructional column sleeve bolt formwork erecting system - Google Patents

Constructional column sleeve bolt formwork erecting system Download PDF

Info

Publication number
CN201502176U
CN201502176U CN2009202173118U CN200920217311U CN201502176U CN 201502176 U CN201502176 U CN 201502176U CN 2009202173118 U CN2009202173118 U CN 2009202173118U CN 200920217311 U CN200920217311 U CN 200920217311U CN 201502176 U CN201502176 U CN 201502176U
Authority
CN
China
Prior art keywords
constructional column
formwork
construction
system comprises
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202173118U
Other languages
Chinese (zh)
Inventor
郭思恭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI FIRST CONSTRUCTION ENGINEERING Corp
Original Assignee
SHANXI FIRST CONSTRUCTION ENGINEERING Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI FIRST CONSTRUCTION ENGINEERING Corp filed Critical SHANXI FIRST CONSTRUCTION ENGINEERING Corp
Priority to CN2009202173118U priority Critical patent/CN201502176U/en
Application granted granted Critical
Publication of CN201502176U publication Critical patent/CN201502176U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model belongs to the technical field of constructional column formwork erecting in frame structure buildings, and particularly relates to a constructional column sleeve bolt formwork erecting system, which resolves problems that the existing formwork erecting method for constructional column directly affects on-site engineering quality, construction cost, cost efficiency and the like. The constructional column sleeve bolt formwork erecting system comprises a formwork system and a formwork fixing system, the formwork system comprises formworks, battens and platbands, the formwork fixing system comprises a plurality of PVC sleeves which are buried inside horizontal mortar joints on two sides of a stubble from top to bottom, the length of each PVC sleeve is identical to the thickness of a constructional column brickwork, opposite-pull bolts penetrate into the PVC sleeves, the length of each opposite-pull bolt is larger than or equal to the sum of the thickness of the constructional column brickwork and the thicknesses of the formworks, the battens and the platbands on two sides of the constructional column brickwork, and ends of the opposite-pull bolts are provided with E-shaped fasteners and nuts. The constructional column sleeve bolt formwork erecting system has the following advantages of 1, increasing engineering quality and meeting standard requirements, 2, being easy to control construction, saving construction cost and saving material cost and labor, and 3, increasing construction efficiency and shortening construction period.

Description

Constructional column sleeve bolt formwork system
Technical field
The utility model belongs to the technical field of constructional column formwork in the frame structure building, is specifically related to a kind of constructional column sleeve bolt formwork system.
Background technology
At present, in China's building field, all adopt lightweight masonries such as air-entrained concrete building block, slag hollow brick, sintering shale hollow brick in most of frame constructions as infilled wall.Though infilled wall is nonload bearing element in frame construction, but owing to wall body ultralong, shock resistance and reasons such as stable not enough one-level variation of ambient temperature and material contraction, usually can cause wall crazing, infiltration, diminish the impression and normal use the in house, body of wall also can take place under the geological process to collapse, therefore, China's " seismic design provision in building code " just requires to make clearly regulation relevant for the structure of overlength masonry infilled wall: for strengthening the shock resistance and the stability of infilled wall, framework masonry infilled wall length is during greater than 5m, and wall top and beam should have drawknot; Wall is long when surpassing high 2 times of wall, and reinforced concrete structural column should be set.But all not clear and definite concrete structure way of relevant specification and atlas.More employing is that constructional column is set in infilled wall in the present engineering design and construction.The mold method of infilled wall constructional column directly affects on-the-spot workmanship, civilized construction, cost benefit etc.
Usually the presentation quality defective of constructional column mainly contains: mould, appearance defect, honeycomb etc. expand.There is direct relation aspects such as the generation of these defectives and formwork erection method.Constructional column template tradition erection method has following several:
1. " stay establish the pin trick wear the steel pipe formwork method ": when masonry is constructed, stay apart from horse tooth trough 200-300mm place and to establish the pin trick, use
Figure G2009202173118D00011
Steel pipe is reinforced as tie and is installed.Regulation does not allow in the aerated concrete masonry to stay and establishes the pin trick in building operations handbook (the 4th edition), therefore can not adopt.
2. " tight step by step " reinforcing template construction method: when installing the constructional column template, reserve upright seam on brick wall, pre-buried 25 * 3mm band steel curves " tight step by step " template clamping reinforcing template of " IJ " type in the upright seam.During " tight step by step " reinforcing template, the first end of active card can only cooperate flitch to use, and when being used, jig is difficult for chucking, is difficult to satisfy rigidity requirement with relatively hard materials (as steel pipe etc.).When jig is removed, need to knock extraction, both influenced the integral rigidity of masonry, be difficult to guarantee full degree of mortar at bed joint again with iron hammer.And cost is also high, also should not adopt.
3.: the reinforcing template method of widening the view of holing: after the infilled wall construction, bore Φ 60 holes, the method for wearing Φ 48*3.5mm steel pipe reinforcing template apart from horse tooth trough 200-300mm place.This method cost is higher, and contaminated environment is also undesirable.
Summary of the invention
The utility model directly influences problems such as the workmanship of job site, construction cost, cost benefit in order to solve the mold method that has constructional column in the prior art now, and a kind of constructional column sleeve bolt formwork system is provided.
The utility model adopts following technical scheme to realize:
A kind of constructional column sleeve bolt formwork system comprises template system and template fixed system, and template system comprises template, the stupefied and cross band of wood; The template fixed system comprises in some horizontal mortar joints that are embedded in the horse tooth trough both sides from top to bottom and PVC sleeve pipe length and constructional column masonry consistency of thickness, wear split bolt in the PVC sleeve pipe, the length of split bolt adds the thickness of two side templates, the stupefied and cross band of wood more than or equal to constructional column masonry thickness, and the end of split bolt is provided with mountain type card and nut.
The utility model is the mortar joint size of utilizing in the middle-size and small-size masonry building block, in the constructional column both sides along adding the PVC sleeve pipe in the mortar joint of short transverse one determining deviation, add split bolt and template system knee wall body structure post in the PVC sleeve pipe, be applicable to the constructional column formwork of middle-size and small-size masonry building block.
The utlity model has following beneficial effect:
1, improves workmanship, satisfied code requirement, solved the defective of the mold method of existing infilled wall constructional column;
2, construction is easy to control, saves construction cost, and economical with materials is taken and the labour;
3, improve efficiency of construction, shorten construction period.
Description of drawings
Fig. 1 is a main TV structure schematic diagram of the present utility model
Fig. 2 is a side-looking structural representation of the present utility model
Among the figure: 1-constructional column masonry, the 2-template, 3-wood is stupefied, 4-cross band, 5-PVC sleeve pipe, 6-split bolt, 7-mountain type card, 8-nut.
The specific embodiment
In conjunction with the accompanying drawings the specific embodiment of the present utility model is described further.
A kind of constructional column sleeve bolt formwork system comprises template system and template fixed system, it is characterized in that template system comprises template 2, wood stupefied 3 and cross band 4; The template fixed system comprises in some horizontal mortar joints that are embedded in the horse tooth trough both sides from top to bottom and PVC sleeve pipe 5 length and constructional column masonry 1 consistency of thickness, wear split bolt 6 in the PVC sleeve pipe 5, the length of split bolt 6 adds two side templates 2, wood stupefied 3 and the thickness of cross band 4 more than or equal to constructional column masonry thickness, and the end of split bolt 6 is provided with mountain type card 7 and nut 8.
Certain school's laboratory building with applicant's construction is that example further specifies the utility model.
Certain university's laboratory building, overall floorage 12960m 2, B1, eight layers on the ground, the frame-shear wall structure, the aerated concrete masonry sealing, designing requirement is provided fortification against earthquakes by secondary, since eight layers of down construction successively.Be provided with 84 of constructional columns in every layer of infilled wall masonry, amount to 672, its strength grade of concrete is C20, and sectional dimension is 200 * 300mm; The building block modulus is 200 * 300 * 600mm.
In masonry panel, select the Φ 14pvc pipe of length and masonry consistency of thickness, be embedded in apart from horse tooth trough both sides 300mm, vertically in the horizontal mortar joint of 600mm, promptly establish together every three layers of building block.Control masonry horizontal mortar joint is 15mm, satisfies Φ 14pvc pipe and is embedded in the mortar joint effectively in advance.Penetrate Φ 12 split bolts (length adds template thickness, the stupefied and cross band width of wood for masonry thickness), mounting template, fluid concrete, form removal is extracted split bolt and pvc pipe, plug-hole.Both simplify operation, saved cost, guaranteed quality again.
When infilled wall was built by laying bricks or stones, strict controlling level mortar joint full degree of mortar at bed joint was not less than 90%, before the operation, conscientiously the marked rod modulus is carried out modular design, and setting-out, levelling, fixing.In the scheme implementation process, send special messenger's keeping under strict supervision close inspection inspection, strictness is constructed by standard and operating procedure standard, the strict 15mm control masonry gray seam thickness of pressing, guarantee that Φ 14pvc manages pre-buried position and satisfies the formwork needs, by close inspection, masonry planeness, perpendicularity deviation all are controlled in the 2mm.For eliminate bloated mould, spillage has been created good condition, corresponding full degree of mortar at bed joint all reaches more than 90%.
Behind the form removal, split bolt and pvc pipe are extracted recycling. Use again 1: 3 cement mortar plug-hole. Facts have proved and utilize the utility model both rationally effectively, again simple and easy to do, and fixing quite firm of template, pvc pipe and split bolt can reuse again simultaneously, avoided the generation of swollen mould defective, improve greatly impression quality, can satisfy code requirement, had again advantage easy to operate, system easy to control the quality.
By adopting formwork system described in the utility model, this project has obtained certain benefit, is mainly as follows:
1, save 4.8 ten thousand yuan of costs, wherein economical with materials is taken 3.84 ten thousand yuan, saves 4800 yuan of labour costs.
2, shift to an earlier date 8 days durations, economize on the use of funds 4800 yuan.
3, change the situation that the building waste that forms after former boring, the form removal is difficult to remove, reached the standard on " mark chemical industry ground ".

Claims (1)

1. a constructional column sleeve bolt formwork system comprises template system and template fixed system, it is characterized in that template system comprises template (2), wood stupefied (3) and cross band (4); The template fixed system comprises in some horizontal mortar joints that are embedded in the horse tooth trough both sides from top to bottom and PVC sleeve pipe (5) length and constructional column masonry (1) consistency of thickness, wear split bolt (6) in the PVC sleeve pipe (5), the length of split bolt (6) adds the thickness of two side templates (2), wood stupefied (3) and cross band (4) more than or equal to the thickness of constructional column masonry (1), and the end of split bolt (6) is provided with mountain type card (7) and nut (8).
CN2009202173118U 2009-09-24 2009-09-24 Constructional column sleeve bolt formwork erecting system Expired - Fee Related CN201502176U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202173118U CN201502176U (en) 2009-09-24 2009-09-24 Constructional column sleeve bolt formwork erecting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202173118U CN201502176U (en) 2009-09-24 2009-09-24 Constructional column sleeve bolt formwork erecting system

Publications (1)

Publication Number Publication Date
CN201502176U true CN201502176U (en) 2010-06-09

Family

ID=42453112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202173118U Expired - Fee Related CN201502176U (en) 2009-09-24 2009-09-24 Constructional column sleeve bolt formwork erecting system

Country Status (1)

Country Link
CN (1) CN201502176U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561681A (en) * 2012-03-15 2012-07-11 陕西建工集团总公司 Casting molding template and casting molding process for constructional columns of infilled walls
CN104405062A (en) * 2014-10-19 2015-03-11 张领然 Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment
CN105822062A (en) * 2015-01-04 2016-08-03 中天建设集团有限公司 Single dip angle column cap lamination squared timber combination triangle ribbed slab support formwork method
CN106760509A (en) * 2017-01-23 2017-05-31 中建八局第建设有限公司 A kind of T-shaped constructional column horse tooth trough does not damage the mold method of wall
CN107700710A (en) * 2017-10-30 2018-02-16 山东万鑫建设有限公司 Fill wall construction column template design checking and construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561681A (en) * 2012-03-15 2012-07-11 陕西建工集团总公司 Casting molding template and casting molding process for constructional columns of infilled walls
CN102561681B (en) * 2012-03-15 2013-12-11 陕西建工集团总公司 Casting molding template and casting molding process for constructional columns of infilled walls
CN104405062A (en) * 2014-10-19 2015-03-11 张领然 Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment
CN105822062A (en) * 2015-01-04 2016-08-03 中天建设集团有限公司 Single dip angle column cap lamination squared timber combination triangle ribbed slab support formwork method
CN106760509A (en) * 2017-01-23 2017-05-31 中建八局第建设有限公司 A kind of T-shaped constructional column horse tooth trough does not damage the mold method of wall
CN107700710A (en) * 2017-10-30 2018-02-16 山东万鑫建设有限公司 Fill wall construction column template design checking and construction method

Similar Documents

Publication Publication Date Title
CN109235499B (en) Open-cut underground building structure assembly type construction method
CN108005387B (en) Synchronous construction method for cast-in-place main body of assembled wallboard and short-limb shear wall
CN103590486B (en) Anti-seismic energy saving three-dimensional mortise and tenon joint net fixing one-piece cast building structure and construction method
CN105780964B (en) A kind of light block filling wall and frame structure construction technique
CN201502176U (en) Constructional column sleeve bolt formwork erecting system
CN108301531A (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node
CN115821972B (en) A prefabricated rock anchor foundation for power transmission lines and its construction method
CN201567584U (en) Prefabricated construction reinforced concrete cushion cap foundation
CN104532957A (en) Inversed construction method for adding basement in existing building
CN108625506A (en) A kind of connection method of the prefabricated combined wall board being welded to connect key based on mild steel plate and its construction method
CN101139849A (en) Modular building component and on-site hoisting building method
CN107100322A (en) Post stretching vertical prestressing cast-in-place concrete rod structure and construction method
CN110439291A (en) A kind of assembled production and construction method suitable for low-rise building
CN106894538A (en) Filling wall and agent structure concrete integral shaping method
CN212506301U (en) Support system in combination assembled forever
CN120505858A (en) Socket connection structure of steel sleeve prefabricated bridge pier column and bearing platform and construction method
CN215166455U (en) Low, multi-layer fully prefabricated assembled concrete structure
CN206769200U (en) First wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN206769199U (en) After wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN105804274B (en) A kind of light block filling wall and frame structure construction technique
CN109267578B (en) A kind of sloped plain concrete structure and its construction method
CN104047381B (en) Assembled integral rare-reinforcement concrete shear wall structure
CN203361332U (en) Prefabricated assembly type frame structure
CN212801939U (en) Factory building assembled steel concrete bent structure
CN207121992U (en) A kind of assembled Special-Shaped Column concrete frame structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100609

Termination date: 20170924

CF01 Termination of patent right due to non-payment of annual fee