CN105587322B - 一种tbm整体式步进过站的方法 - Google Patents

一种tbm整体式步进过站的方法 Download PDF

Info

Publication number
CN105587322B
CN105587322B CN201511032740.4A CN201511032740A CN105587322B CN 105587322 B CN105587322 B CN 105587322B CN 201511032740 A CN201511032740 A CN 201511032740A CN 105587322 B CN105587322 B CN 105587322B
Authority
CN
China
Prior art keywords
stepping
shield body
stand
lift cylinder
tbm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511032740.4A
Other languages
English (en)
Other versions
CN105587322A (zh
Inventor
孙鹤明
汪强宗
张书香
张波
胡林浩
彭朝阳
胡锡鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201511032740.4A priority Critical patent/CN105587322B/zh
Publication of CN105587322A publication Critical patent/CN105587322A/zh
Application granted granted Critical
Publication of CN105587322B publication Critical patent/CN105587322B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0621Shield advancing devices

Abstract

一种TBM步进过站工艺,其特征在于:盾体两侧焊制四个三角支架,在每个三角支架下方各焊接一个提升油缸,提升油缸共四个,在每个提升油缸下焊接一个受力底座,在盾体两侧各焊接两根滑轨,滑轨采用手扳葫芦与下部的步进台架连接,整体构成步进机构反力装置;步进机构反力装置通过连接件与盾体底部多组推进油缸相连接,推动多组油缸时,盾体推进;提升盾体与步进台架,提升高度控制在2‑3cm;回收推进油缸,进步台架前移,收起提升油缸,放下盾体与步进台架,准备下一循环的步进。本发明具有工期短、成本低、安全可控的优势。TBM整体过站不用断开盾构机的各种管、线路,不会造成二次污染;免除了下个区间始发时的复杂的设备调试阶段。

Description

一种TBM整体式步进过站的方法
技术领域
本发明型涉及地铁施工中TBM机过站工艺。
背景技术
近年来,各大城市相继发展地下公共交通设施,而TBM法施工已成为城市地铁施工的主要施工方法,其中TBM机通过车站再次始发是现在TBM隧道施工中必不可少的步骤,但在现有的过站工艺中,大部分过站工艺在实际应用中存在进度慢,成本高,人员机械使用效率低下的情况。为改善现状,现采用一种TBM机自行步进过站方式。
发明内容
本发明的目的是在TBM施工中,可以快速高效的通过地铁车站。
本发明所述过站方法为整体式步进过站,盾体出洞后,首先需要对盾体进行改造,为TBM安装举升装置与反力装置,利用步进台架与地面的摩擦力提供反力,主机的推进油缸提供动力进行步进。步进过程不必对后备拖车进行拆除,采用整体式步进过站的方法。安装完成后便可自行步进过站。极大减少了人力物力上的消耗。同时其可以适应一定的缓坡、弯道,过站效率较高。
一种TBM整体式步进过站工艺,其特征在于:盾体两侧焊制四个三角支架,在每个三角支架下方各焊接一个提升油缸,提升油缸共四个,在每个提升油缸下焊接一个受力底座,在盾体两侧各焊接两根滑轨,滑轨采用手扳葫芦与下部的步进台架连接,整体构成步进机构反力装置;
步进机构反力装置通过连接件与盾体底部多组推进油缸相连接,推动多组油缸时,盾体推进;提升盾体与步进台架,提升高度控制在2-3cm;回收推进油缸,进步台架前移,收起提升油缸,放下盾体与步进台架,准备下一循环的步进。且过站过程不必对后备拖车进行拆除,采用整体式步进过站。
利用本发明型的过站工艺,具有如下优点:
1.具有工期短、成本低、安全可控的优势。
2.TBM整体过站不用断开TBM机的各种管、线路,不会造成二次污染。
3.免除了下个区间始发时的复杂的设备调试阶段。
附图说明
图1.1为步进机构俯视图
图1.2为步进机构左视图
图1.3为步进机构主视图
图2为本发明型的施工工艺图
图3安装好步进机构,准备向前推进。
图4使用步进台架、TBM油缸将盾体向前推进至一定距离。
图5采用提升油缸将TBM与步进台架一同提升。提升高度控制在2-3cm。
图6回收推进油缸,步进台架向前行走,收起提升油缸,准备下一循环的步进。
图中:1——步进架反力装置 2——三角支架 3——推进油缸 4——提升油缸5——受力底座 6——滑轨 7——轨道 8——步进台架 9——连接件
具体实施方式
下面结合附图具体说明:
如图1.1为步进机构反力装置,提供TBM前进的支撑。该装置通过将H型钢焊接固定在始发台架上改装而成。并将其用一定长度的连接件(可采用H型钢)与盾体底部C组推进油缸相连接,推动C组油缸时,TBM前进。
如图2、3为步进机构举升装置,在步进中负责对盾体整体的举升。现对装置各部件予以说明:
盾体前进时需要盾体与托架发生竖直位移,之后托架与盾体再发生相对位移,从而实现推进的目的,故此需要在盾体两侧焊制四个三角支撑用作安置油缸来完成竖直位移,由于盾体的重心位于前中盾法兰连接面后300mm~450mm之间,经过计算算出盾体的四个受力点,将三角支架焊接与四个力点上,前盾、中盾左右各一个,共四个。因为要承受整个盾体的重量,所以焊接一定要牢固。
在每个三角支架下方各焊接一个提升油缸,共四个,在进步中负责对盾体整体的提升。在提升过程中可能产生较大扭矩,要将油缸焊接牢固。
在每个提升油缸下焊接一个受力底座,增大油缸与地面的接触面积,承受盾体重量。
在盾体两侧各焊接两根长度为2.4m滑轨,采用手扳葫芦与下部步进台架连接,当提升油缸时将TBM与步进台架同时提升。用于滑轨的钢板要达到足够的强度保证吊起托架时不会发生变形,其焊接位置应在托架的四个受力点的垂线与盾体相交的位置,保证托架提升时的稳定性从而保证盾体的稳定性。

Claims (1)

1.一种TBM整体式步进过站的方法,其特征在于:盾体两侧焊制四个三角支架,在每个三角支架下方各焊接一个提升油缸,提升油缸共四个,在每个提升油缸下焊接一个受力底座,在盾体两侧各焊接两根滑轨,滑轨采用手扳葫芦与下部的步进台架连接,整体构成步进机构反力装置;步进机构反力装置通过连接件与盾体底部多组推进油缸相连接,推动多组油缸时,盾体推进;提升盾体与步进台架,提升高度控制在2-3cm;回收推进油缸,进步台架前移,收起提升油缸,放下盾体与步进台架,准备下一循环的步进。
CN201511032740.4A 2015-12-31 2015-12-31 一种tbm整体式步进过站的方法 Active CN105587322B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511032740.4A CN105587322B (zh) 2015-12-31 2015-12-31 一种tbm整体式步进过站的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511032740.4A CN105587322B (zh) 2015-12-31 2015-12-31 一种tbm整体式步进过站的方法

Publications (2)

Publication Number Publication Date
CN105587322A CN105587322A (zh) 2016-05-18
CN105587322B true CN105587322B (zh) 2018-04-06

Family

ID=55927200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511032740.4A Active CN105587322B (zh) 2015-12-31 2015-12-31 一种tbm整体式步进过站的方法

Country Status (1)

Country Link
CN (1) CN105587322B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804762B (zh) * 2016-05-25 2017-10-27 中铁工程装备集团技术服务有限公司 一种盾构机过站、掉头装置的使用方法
CN106089223B (zh) * 2016-06-24 2019-04-19 中铁隧道集团二处有限公司 一种tbm快速空推方法
CN106640099A (zh) * 2017-01-10 2017-05-10 济南中铁重工轨道装备有限公司 盾构机主机液压步履式直行走过站机构
CN109899074B (zh) * 2019-02-02 2020-07-28 中国电建集团铁路建设有限公司 一种滑移钢套筒盾构机整体过站二次始发施工方法
CN109915154A (zh) * 2019-04-19 2019-06-21 中铁隧道股份有限公司 盾构机主机过站装置及狭小空间内的盾构机主机过站方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2922500B1 (ja) * 1998-07-10 1999-07-26 川崎重工業株式会社 シールド機構成物搬送台車
CN102200019B (zh) * 2011-04-14 2013-01-16 中铁第一勘察设计院集团有限公司 隧道掘进机中板步进加固支撑机构及其施工方法
CN102418530B (zh) * 2011-12-14 2013-07-31 中铁十二局集团第二工程有限公司 一种盾构整机滚轮导轨过站施工方法
CN102877851B (zh) * 2012-08-31 2015-01-07 中铁隧道集团有限公司 一种敞开式硬岩掘进机在城市地铁施工中的弧底步进过站方法
CN104775825B (zh) * 2015-05-06 2017-03-01 中铁四局集团有限公司 盾构机单井整体始发施工方法

Also Published As

Publication number Publication date
CN105587322A (zh) 2016-05-18

Similar Documents

Publication Publication Date Title
CN105587322B (zh) 一种tbm整体式步进过站的方法
CN204627625U (zh) 自动行走衬砌台车
CN104033157B (zh) 用于盾构始发井的可移动式反力设备
CN104653229B (zh) 盾构滑靴曲线上推过洞施工方法
CN103669216A (zh) 一种钢箱梁散拼滑移装置及安装方法
CN105221153A (zh) 盾构机整体过站施工方法
CN107489425A (zh) 盾构机整体移步式行走过站结构及施工工法
CN102285616B (zh) 步履式盾构机侧移系统及侧移方法
CN109441497B (zh) 无反复支撑超前支护、搬运成套设备及搬运方法
CN105525883A (zh) 一体化管柱自动排送装置及方法
CN204436288U (zh) 一种管柱自动排送装置
CN202148920U (zh) 一种隧道施工用运输机构
CN101173608A (zh) 双圆盾构过站千斤顶顶推法
CN111636883A (zh) 一种盾构机一体化过站平移装置及控制方法、盾构机
CN104727192B (zh) 一种拆卸整体道床的施工方法
CN206816263U (zh) 用于半封闭式车站盾构机平移升降装置
CN211174116U (zh) 一种盾构隧道管线移动装置
CN207974146U (zh) 一种浅埋综合管廊工程一体化施工装置
CN207513606U (zh) 一种用于盾构始发的反力装置
CN106315146B (zh) 一种锅炉炉顶起重机整体平移方法及辅助作业装置
CN210370694U (zh) 一种隧道二衬模板台车
CN205224090U (zh) 一种变坡滑道上跟踪顶进预制框架的台阶式混凝土后座
CN214089524U (zh) 预制桥梁安装平移装置
CN210948674U (zh) 一种用于管廊施工中盾构空推过成型暗挖隧道的辅助系统
CN208486890U (zh) 隧道衬砌台车用带轨行走装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Sun Heming

Inventor after: Chen Ming

Inventor after: Wang Qiangzong

Inventor after: Zhang Shuxiang

Inventor after: Liu Shuanding

Inventor after: Wang Wenguang

Inventor after: Zhang Linan

Inventor after: Zhang Bo

Inventor before: Chen Ming

Inventor before: Zhang Shuxiang

Inventor before: Liu Shuanding

Inventor before: Wang Wenguang

Inventor before: Wang Qiangzong

Inventor before: Zhang Linan

Inventor before: Zhang Bo

COR Change of bibliographic data
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Sun Heming

Inventor after: Wang Qiangzong

Inventor after: Zhang Shuxiang

Inventor after: Zhang Bo

Inventor after: Hu Linhao

Inventor after: Peng Chaoyang

Inventor after: Hu Xipeng

Inventor before: Sun Heming

Inventor before: Chen Ming

Inventor before: Wang Qiangzong

Inventor before: Zhang Shuxiang

Inventor before: Liu Shuanding

Inventor before: Wang Wenguang

Inventor before: Zhang Linan

Inventor before: Zhang Bo

GR01 Patent grant
GR01 Patent grant