CN101173608A - 双圆盾构过站千斤顶顶推法 - Google Patents

双圆盾构过站千斤顶顶推法 Download PDF

Info

Publication number
CN101173608A
CN101173608A CN 200610117775 CN200610117775A CN101173608A CN 101173608 A CN101173608 A CN 101173608A CN 200610117775 CN200610117775 CN 200610117775 CN 200610117775 A CN200610117775 A CN 200610117775A CN 101173608 A CN101173608 A CN 101173608A
Authority
CN
China
Prior art keywords
jack
shield machine
shield
double
pulling method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200610117775
Other languages
English (en)
Inventor
张兆逵
叶松明
李侃
张良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FOUNDATION ENGINEERING Co OF SHANGHAI CITY
Original Assignee
FOUNDATION ENGINEERING Co OF SHANGHAI CITY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOUNDATION ENGINEERING Co OF SHANGHAI CITY filed Critical FOUNDATION ENGINEERING Co OF SHANGHAI CITY
Priority to CN 200610117775 priority Critical patent/CN101173608A/zh
Publication of CN101173608A publication Critical patent/CN101173608A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本发明公开了一种双圆盾构过站千斤顶顶推法,在双圆盾构进洞后,通过顶升千斤顶将双圆盾构提升至与站台相齐,然后在工作面内铺设轨道,根据盾构机和设备车架的重量,分别设置重轨和轻轨,在轨道上置有盾构机支承装置,沿轨道方向,在盾构机支撑装置一侧置有顶推千斤顶,在其后部连接传力件,传力件后置有后靠,将双圆盾构机推至车站另一端头井,之后通过顶升千斤顶使盾构机下降至盾构工作标高。使双圆盾构快速、安全、准确地过站,施工简单、一步到位,从而实现盾构机在地铁车站内的过站的一种方法。

Description

双圆盾构过站千斤顶顶推法
技术领域
本发明属于隧道掘进领域,具体地说,是实现盾构机在地铁车站内的过站的一种方法。
背景技术
双圆盾构机在隧道掘进过程中可一次性进行上下行线的区间掘进,为进行相邻第二条区间掘进施工,可采用整体一次性过站施工技术(如图1),使双圆盾构机从地铁车站的接收井1转移至发射井3。在双圆盾构经过站台2期间,由于盾构机本身不具有向前行驶的动力装置,因此需要借助外部装置对盾构机进行推进。
发明内容
本发明是提供一种双圆盾构过站千斤顶顶推法,使双圆盾构快速、安全、准确地过站,施工简单、一步到位,从而实现盾构机在地铁车站内的过站的一种方法。
为达到上述目的,本发明的技术方案是:
双圆盾构过站千斤顶顶推法,在双圆盾构进洞后,通过顶升千斤顶将双圆盾构提升至与站台相齐,然后在工作面内铺设轨道,根据盾构机和设备车架的重量,分别设置重轨和轻轨,在轨道上置有盾构机支承装置,沿轨道方向,在盾构机支撑装置一侧置有顶推千斤顶,在其后部连接传力件,传力件后置有后靠,将双圆盾构机推至车站另一端头井,之后通过顶升千斤顶使盾构机下降至盾构工作标高
盾构机支承装置采用支承盾构机的平台,下部设有车轮,架于重轨上,左右两侧各设置两台200T顶升千斤顶,在盾构机上焊接钢牛腿,并置于支承装置的顶升千斤顶上。
顶推千斤顶采用2只100T千斤顶推进,每次推进行程不超过1000mm。
传力件采用不同长度的φ502钢管,连接顶推千斤顶与后靠,将顶力传递给后靠。
后靠设置在地铁车站底板上,千斤顶顶力通过传力件传至后靠,由于后靠通过预埋件固定于底板,因此可以使盾构机在千斤顶作用下向前推进。
本发明的有益效果是,采用千斤顶顶推方法可以使双圆盾构快速、安全、准确地过站,施工简单、一步到位。
附图说明
图1是现有双圆盾构机过站施工示意图;
图2是盾构机提升示意图;
图3是盾构机支承右视图;
图4是盾构机支承主视图;
图5是本发明的千斤顶顶推方法示意图;
图6是盾构机下降示意图。
具体实施方式
下面结合附图与实施例对本发明作进一步的说明。
如图2所示,双圆盾构过站千斤顶顶推法,在盾构4进洞后,通过顶升千斤顶5将双圆盾构4提升至与站台相齐,为盾构4过站做好准备。
如图5所示,双圆盾构过站千斤顶顶推法,在工作面内铺设轨道,根据盾构机4和设备车架的重量,分别设置重轨8和轻轨9,在轨道上置有盾构机4支承装置100,沿轨道方向,在盾构机支撑装置100一侧置有顶推千斤顶200,在其后部连接传力件300,传力件后置有后靠400。
如图3所示,盾构机支承装置100采用支承盾构机的平台,下部设有车轮7,架于重轨8上,左右两侧各设置两台顶升千斤顶5,盾构机4焊接钢牛腿,并置于顶升千斤顶5上。
如图3、4、5所示顶推千斤顶200采用2只100T千斤顶推进,每次推进行程不超过1000mm。
传力件300采用不同长度的φ502钢管,连接顶推千斤顶200与后靠400,将顶力传递给后靠400。
后靠400设置在地铁车站底板上,顶推千斤顶200顶力通过传力件300传至后靠400,由于后靠400通过预埋件固定于底板,因此可以使盾构机4在千斤顶200作用下向前推进。
在盾构机过站过程中,在工作面内铺设轨道,保证盾构机4沿正确路线推进,根据盾构机4和设备车架的重量,分别设置重轨8和轻轨9。启动千斤顶牵引盾构机缓慢前进,当盾构机4前进一段距离后,将盾构机4后面重轨替换到前面,并在重轨8后铺设轨枕和轻轨,使车架进入轨道,如此往复直至盾构机及车架到达盾构机发射井一侧。
如图6所示,双圆盾构过站千斤顶顶推法,在盾构4过站至车站另一端头井后,通过顶升千斤顶5使盾构机下降至盾构工作标高,准备下一区间推进。

Claims (5)

1.一种双圆盾构过站千斤顶顶推法,其特征在于,先将双圆盾构机顶升至与站台相齐,然后在工作面内铺设轨道,根据盾构机和设备车架的重量,分别设置重轨(8)和轻轨(9),在轨道上置有盾构机支承装置(100),沿轨道方向,在盾构机支撑装置(100)一侧置有顶推千斤顶(200),在其后部连接传力件(300),传力件后置有后靠(400)。当盾构机推进至另一端头井后,通过顶升千斤顶使盾构机下降至盾构工作标高。
2.根据权利要求1所述的双圆盾构过站千斤顶顶推法,其特征在于,所述盾构机支承装置(100)采用支承盾构机的平台,下部设有车轮(7),架于重轨(8)上,左右两侧各设置两台顶升千斤顶(5),盾构机(4)焊接钢牛腿,并置于顶升千斤顶(5)上。
3.根据权利要求1所述的双圆盾构过站千斤顶顶推法,其特征在于,所述顶升千斤顶两边各采用2只200T千斤顶,支承双圆盾构;所述顶推千斤顶采用2只100T千斤顶推进,每次推进行程不超过1000mm。
4.根据权利要求1所述的双圆盾构过站千斤顶顶推法,其特征在于,所述传力件(300)采用不同长度的φ502钢管,连接顶推千斤顶(200)与后靠(400),将顶力传递给后靠(400)。
5.根据权利要求1所述的双圆盾构过站千斤顶顶推法,其特征在于,所述后靠(400)设置在地铁车站底板上,顶推千斤顶(200)顶力通过传力件(300)传至后靠(400),由于后靠(400)通过预埋件固定于底板,因此可以使盾构机(4)在千斤顶作用下向前推进。
CN 200610117775 2006-10-31 2006-10-31 双圆盾构过站千斤顶顶推法 Pending CN101173608A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200610117775 CN101173608A (zh) 2006-10-31 2006-10-31 双圆盾构过站千斤顶顶推法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200610117775 CN101173608A (zh) 2006-10-31 2006-10-31 双圆盾构过站千斤顶顶推法

Publications (1)

Publication Number Publication Date
CN101173608A true CN101173608A (zh) 2008-05-07

Family

ID=39422326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200610117775 Pending CN101173608A (zh) 2006-10-31 2006-10-31 双圆盾构过站千斤顶顶推法

Country Status (1)

Country Link
CN (1) CN101173608A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922295A (zh) * 2010-08-23 2010-12-22 上海市第一市政工程有限公司 盾构平移过站反力系统
CN101713292B (zh) * 2009-10-19 2011-06-29 清华大学 一种用于土压平衡式盾构的全时推进系统结构
CN101725357B (zh) * 2008-10-23 2011-11-02 上海天演建筑物移位工程有限公司 地铁隧道下穿段施工方法
CN102337900A (zh) * 2011-09-16 2012-02-01 中铁三局集团有限公司 一种循环铺垫式盾构空推方法
CN102418530A (zh) * 2011-12-14 2012-04-18 中铁十二局集团第二工程有限公司 一种盾构整机滚轮导轨过站施工方法
CN103953352A (zh) * 2014-04-21 2014-07-30 中铁四局集团第二工程有限公司 封闭车站长距离盾构机快速过站调头施工方法
CN108756902A (zh) * 2018-05-28 2018-11-06 中铁五局集团有限公司 一种用于盾构机转场过站的辅助装置及盾构机转场方法
CN111927115A (zh) * 2020-09-11 2020-11-13 中国电建集团核电工程有限公司 用于凝汽器壳体的安装方法及安装设备
CN112320682A (zh) * 2020-11-02 2021-02-05 北京市政建设集团有限责任公司 一种盾构机平移通过地铁车站阶段的盾构机垂直升降方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101725357B (zh) * 2008-10-23 2011-11-02 上海天演建筑物移位工程有限公司 地铁隧道下穿段施工方法
CN101713292B (zh) * 2009-10-19 2011-06-29 清华大学 一种用于土压平衡式盾构的全时推进系统结构
CN101922295A (zh) * 2010-08-23 2010-12-22 上海市第一市政工程有限公司 盾构平移过站反力系统
CN102337900A (zh) * 2011-09-16 2012-02-01 中铁三局集团有限公司 一种循环铺垫式盾构空推方法
CN102418530A (zh) * 2011-12-14 2012-04-18 中铁十二局集团第二工程有限公司 一种盾构整机滚轮导轨过站施工方法
CN102418530B (zh) * 2011-12-14 2013-07-31 中铁十二局集团第二工程有限公司 一种盾构整机滚轮导轨过站施工方法
CN103953352A (zh) * 2014-04-21 2014-07-30 中铁四局集团第二工程有限公司 封闭车站长距离盾构机快速过站调头施工方法
CN103953352B (zh) * 2014-04-21 2016-03-16 中铁四局集团第二工程有限公司 封闭车站长距离盾构机快速过站调头施工方法
CN108756902A (zh) * 2018-05-28 2018-11-06 中铁五局集团有限公司 一种用于盾构机转场过站的辅助装置及盾构机转场方法
CN111927115A (zh) * 2020-09-11 2020-11-13 中国电建集团核电工程有限公司 用于凝汽器壳体的安装方法及安装设备
CN112320682A (zh) * 2020-11-02 2021-02-05 北京市政建设集团有限责任公司 一种盾构机平移通过地铁车站阶段的盾构机垂直升降方法

Similar Documents

Publication Publication Date Title
CN101173608A (zh) 双圆盾构过站千斤顶顶推法
CN203961989U (zh) 一种用于隧道短台阶法施工的全断面凿岩台架
CN101787891B (zh) 轮式移动基座过站施工方法及装置
CN104775834B (zh) 同时适应整环管片输送及小曲线掘进功能的管片输送小车
CN206707713U (zh) 地铁盾构施工盾构机过站系统
CN109026025B (zh) 用于施工隧道联络通道的顶管支撑与顶进系统
CN204341047U (zh) 液压迈步自移式设备列车
CN103161103B (zh) 用于群枕式铺轨机组的轨枕匀设装置及匀设施工方法
CN101943004A (zh) 液压自行式斜洞常态砼浇筑台车
CN102839578B (zh) 利用d型便梁加固多股道线路时人工纵移便梁的施工方法
CN106629390A (zh) 一种具有自动复位功能的过轨器
CN200941541Y (zh) 电缆输送机
CN204845531U (zh) 一种lng气瓶支架及使用该lng气瓶支架的车辆
CN102108679A (zh) 一种顶进地道桥的组合式框架钢构及顶进地道桥的方法
CN102305035B (zh) 车载式修井机整机对中井口调整装置
CN204827458U (zh) 一种外置推进式盾构机过站装置
CN104343456A (zh) 盾构机后配套台车整体过站移动托架及方法
CN202243482U (zh) 矿用液压自移无轨设备列车
CN105672878A (zh) 一种超前地质多孔位同步钻孔台车
CN201212403Y (zh) 无跑道自张紧便移式转载架
CN203186348U (zh) 双向顶窑车摆渡车
CN203020329U (zh) 综采工作面设备列车自移系统
CN114771675A (zh) 一种煤矿巷道用履带车运输式锚支护一体化装备
CN210370694U (zh) 一种隧道二衬模板台车
CN101671981B (zh) 矿山岩巷掘进迎头调车整体车场及移动方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination