CN105569687B CN201510938593.0A CN201510938593A CN105569687B CN 105569687 B CN105569687 B CN 105569687B CN 201510938593 A CN201510938593 A CN 201510938593A CN 105569687 B CN105569687 B CN 105569687B
Authority
CN
China
Prior art keywords
door frame
bar
longitudinal beam
truss
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510938593.0A
Other languages
Chinese (zh)
Other versions
CN105569687A (en
Inventor
赵自静
汪庆兵
孙昆鹏
王安会
姚俊峰
阮立峰
黄武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of CTCE Group
Original Assignee
First Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of CTCE Group filed Critical First Engineering Co Ltd of CTCE Group
Priority to CN201510938593.0A priority Critical patent/CN105569687B/en
Publication of CN105569687A publication Critical patent/CN105569687A/en
Application granted granted Critical
Publication of CN105569687B publication Critical patent/CN105569687B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of tunnel lining trolley door frame supporting construction, it is characterized in that setting arch door frame, it is to be connected between the two root posts of left and right with top cross-bar, left and right two root posts are arched towards the tunnel-side direction of column side with the back of " C " shape part;Top longitudinal beam is fixedly connected between the top cross-bar of preceding road door frame and rear road door frame;It is longitudinally spaced between twice top longitudinal beam to set the wing bar that two ends are stretched out at the top of each road truss, truss to be supported in top longitudinal beam, the end of wing bar is provided with adjustable connecting-rod, lining shuttering back rib is connected using adjustable connecting-rod;Overall structure can be advanced using road wheel in tunnel along horizontal rail.The present invention conducts oneself with dignity by truss and the support force of truss support template is transferred to arch door frame, and its big headroom formed is beneficial to tunnel ventilation, is worked beneficial to platform building cart bottom.

Description

Tunnel lining trolley door frame supporting construction
Technical field
It is more particularly to a kind of to apply in Tunnel Second Lining Construction the invention belongs to lining trolley field Lining trolley door frame supporting construction, thinks that guarantee tunnel ventilation is good, and for lining trolley provide one big cross-section with Top workbench.
Background technology
Lining trolley is important equipment during Tunnel Second Lining Construction, the secondary lining coagulation for tunnel inner wall Soil application work.Conventional lining trolley is gate trolley at present, and door frame is located in lining shuttering, takes a large amount of inner spaces.Tunnel Construction environment is complicated, needs to walk inside a variety of motor vehicles and machines, and lower space, potential safety hazard are have compressed in guarantee top workbench Greatly.Inner space is narrow and small to also result in that ventilation is difficult, and air quality is poor in tunnel, influence health;Various component volumes are larger Also increase assembled welding difficulty, mobile inconvenience.
The content of the invention
The present invention is that there is provided a kind of tunnel lining trolley to avoid and improve the weak point present in above-mentioned prior art Door frame supporting construction, to increase tunnel bottom headroom, and provides top workbench and shuttering supporting point.
The present invention solves technical problem and adopted the following technical scheme that:
Tunnel lining trolley door frame supporting construction of the present invention, its feature is:
Arch door frame, is to be connected between the two root posts of left and right with top cross-bar, the column is with upper bend " C " shape part of section, middle part vertical section and lower, curved, section, left and right two root posts be with the opening side of " C " shape part in relative, with The back of " C " shape part is arched towards the tunnel-side direction of column side;The arch door frame is twice, before being respectively Road door frame and rear road door frame, and there is top longitudinal beam to be fixedly connected between the top cross-bar of preceding road door frame and rear road door frame;
The top longitudinal beam is parallel and spaced twice, longitudinally spaced between twice top longitudinal beam to set each Road truss, the truss is in " ware " font, and the wing bar that truss top two ends are stretched out is supported in the top longitudinal beam, described The end of wing bar is provided with adjustable connecting-rod, adjustable connecting-rod adjustable length on the bearing of trend along wing bar, using described Adjustable connecting-rod connects lining shuttering back rib;
Road wheel is installed in the bottom of the column, the road wheel is supported on the horizontal rail of a pair of parallel setting On, and can be advanced along horizontal rail.
Tunnel lining trolley door frame supporting construction of the present invention, its feature is lain also in:The column and top cross-bar, it Between, and between the top cross-bar and top longitudinal beam be fixedly connected using ring flange, at the wing bar and top It is welded to connect between fir beam.
Tunnel lining trolley door frame supporting construction of the present invention, its feature is also resided in:It is arranged in series in the bottom of the column There is the retractor device of adjustable stem height, the road wheel is arranged on the bottom of the retractor device;
The retractor device and adjustable connecting-rod are hydraulic cylinder.
Compared with the prior art, the present invention has the beneficial effect that:
1st, structure type of the invention effectively conducts oneself with dignity truss and the support force of truss support template is transferred to arched door Frame is there is provided pressure from surrounding rock pipeline, and overall structure is solid and reliable.
2nd, truss is set in " ware " font in the present invention, respective outer side edges jail between its sound construction, with top longitudinal beam Gu reliable, the structure type being attached using its adjustable connecting-rod and lining shuttering back rib both can guarantee that bearing capacity, maintain again The reasonable layout in space.
3rd, arch door frame is used in the present invention, and column is set to arch, is erected by top cross-bar and top longitudinal beam Broad space, forms big headroom, largely facilitates in tunnel and divulges information, also beneficial to staff in platform building cart lower running work Make, a more comfortable, convenient, broad working space is provided to staff;
4th, the present invention generally frame structure, its is simple in construction, builds speed soon, consumptive material is few, significantly reduces material Cost and personnel cost, and effectively shorten the duration;
Brief description of the drawings
Figure 1A is arch door frame section structure schematic diagram in the present invention;
Figure 1B is arch door frame side structure schematic view in the present invention;
Fig. 1 C are arch door frame dimensional structure diagram in the present invention;
Fig. 2A is schematic structural view of the invention;
Fig. 2 B are section structure schematic diagram of the present invention;
Label in figure:Under vertical section in the middle part of road door frame after the preceding road door frames of 11a, 11b, 111a upper bends section, 111b, 111c Portion's bending section, 112 top cross-bars, 113 road wheels, 114 retractor devices, 12 top longitudinal beams, 13 horizontal rails, 14 tunnels, 21 purlins Frame, 21a wing bars, 21b adjustable connecting-rods.
Embodiment
Referring to Figure 1A, Figure 1B and Fig. 1 C, arch door frame is set in the present embodiment, is with top between the two root posts of left and right Crossbeam 112 is connected, and column is with upper bend section 111a, middle part vertical section 111b and lower, curved, section 111c " C " shape Part, left and right two root posts are in relative, with the back of " C " shape part towards column side with the opening side of " C " shape part Tunnel-side direction is arched;Arch door frame is twice, is preceding road door frame 11a and rear road door frame 11b respectively, and have top longitudinal beam 12 are fixedly connected between preceding road door frame 11a and rear road door frame 11b top cross-bar 112.
Road wheel 113 is installed in the bottom of column, road wheel 113 is supported on the horizontal rail 13 of a pair of parallel setting On, it and can be advanced along horizontal rail 13, lining trolley is integrally advanced in tunnel, realize applying for different parts in tunnel Work is operated, it is to avoid build the lining trolley of Multiple Type, saves cost, improves production efficiency.
Referring to Fig. 2A and Fig. 2 B, top longitudinal beam 12 has twice in the present embodiment, is that parallel interval is set, is indulged at the top of twice Longitudinally spaced between beam 12 to set each road truss 21, truss 21 is in " ware " font, the wing bar that the top two ends of truss 21 are stretched out 21a is supported in top longitudinal beam 12, is provided with adjustable connecting-rod 21b in wing bar 21a end, and adjustable connecting-rod 21b is along wing bar Adjustable length on 21a bearing of trend, lining shuttering back rib is bolted using adjustable connecting-rod 21b, is realized to lining cutting mould The support of plate, and different formwork structures can be adapted to by adjustment of the adjustable connecting-rod 21b in length.At column 111 and top Crossbeam 112Between, and between top cross-bar 112 and top longitudinal beam 12 be fixedly connected using ring flange, it connects Joint is few, and is less prone to mistake and takes, it is ensured that without the stability and security that door frame lining trolley is overall;Wing bar 21a with It is welded to connect between top fir beam 12, it is solid and reliable.
As shown in Figure 1A, the present embodiment is arranged in series the retractor device of adjustable stem height in the bottom of column 111 114, road wheel 113 is arranged on the bottom of retractor device 114 so that lining trolley is adapted to different height section in tunnel Constructing operation.Retractor device 114 and adjustable connecting-rod 21b are hydraulic cylinder, and it is easy to control and can accurately adjust.
In specific implementation, the main part of truss 21 is located between a pair of top longitudinal beams 12, and the bottom of truss 21 is used as horizontal stroke Connect oblique transmission rod to support, horizontal rail 13 is laid on the ground in tunnel 14, laid in top cross-bar 112 pedal and Its safety device including guardrail.

Claims (4)

1. a kind of tunnel lining trolley door frame supporting construction, it is characterized in that setting:
Arch door frame, is to be connected between the two root posts of left and right with top cross-bar (112), the column is with upper bend " C " shape part of section (111a), middle part vertical section (111b) and lower, curved, section (111c), left and right two root posts are with " C " shape part Opening side in relative, it is arched towards the tunnel-side direction of column side with the back of " C " shape part;The arch Door frame is twice, is preceding road door frame (11a) and rear road door frame (11b) respectively, and has top longitudinal beam (12) in preceding road door frame (11a) It is fixedly connected between the top cross-bar (112) of rear road door frame (11b);
The top longitudinal beam (12) is parallel and spaced twice, longitudinally spaced between twice top longitudinal beam (12) to set Zhi Ge roads truss (21), the truss (21) is in " ware " font, and the wing bar (21a) that truss (21) top two ends are stretched out is supported on On the top longitudinal beam (12), adjustable connecting-rod (21b), the adjustable connecting-rod (21b) are provided with the end of the wing bar (21a) The adjustable length on the bearing of trend along wing bar (21a), lining shuttering back rib is connected using the adjustable connecting-rod (21b);
Road wheel (113) is installed in the bottom of the column, the road wheel (113) is supported on the level of a pair of parallel setting On track (13), and it can be advanced along horizontal rail (13).
2. tunnel lining trolley door frame supporting construction according to claim 1, it is characterized in that:The column (111) with Between top cross-bar (112), and between the top cross-bar (112) and top longitudinal beam (12) consolidated using ring flange Fixed connection, is welded to connect between the wing bar (21a) and top longitudinal beam (12).
3. tunnel lining trolley door frame supporting construction according to claim 1, it is characterized in that:In the column (111) Bottom is arranged in series the retractor device (114) of adjustable stem height, and the road wheel (113) is arranged on the retractor device (114) bottom.
4. tunnel lining trolley door frame supporting construction according to claim 3, it is characterized in that:The retractor device (114) It is hydraulic cylinder with adjustable connecting-rod (21b).
CN201510938593.0A 2015-12-14 2015-12-14 Tunnel lining trolley door frame supporting construction Active CN105569687B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510938593.0A CN105569687B (en) 2015-12-14 2015-12-14 Tunnel lining trolley door frame supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510938593.0A CN105569687B (en) 2015-12-14 2015-12-14 Tunnel lining trolley door frame supporting construction

Publications (2)

Publication Number Publication Date
CN105569687A CN105569687A (en) 2016-05-11
CN105569687B true CN105569687B (en) 2017-10-10

Family

ID=55880243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510938593.0A Active CN105569687B (en) 2015-12-14 2015-12-14 Tunnel lining trolley door frame supporting construction

Country Status (1)

Country Link
CN (1) CN105569687B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108561155A (en) * 2018-04-18 2018-09-21 中铁二院工程集团有限责任公司 The mountain tunnel structure of assembled prefabricated secondary lining and prefabricated secondary lining assembly trolley
CN109356620B (en) * 2018-12-03 2024-06-21 湖南五新隧道智能装备股份有限公司 Portal structure
CN114263484A (en) * 2021-12-24 2022-04-01 江苏新鹏能源科技有限公司 Underground supporting device

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2835004B2 (en) * 1994-07-06 1998-12-14 三洋電機株式会社 Food molding equipment
IT1320275B1 (en) * 2000-03-24 2003-11-26 Mecsider S P A ADJUSTABLE SIZE TROLLEY FOR TUNNELS.
JP4343078B2 (en) * 2004-09-30 2009-10-14 大成建設株式会社 Underground structure and method for constructing underground structure
CN201546737U (en) * 2009-11-24 2010-08-11 广汉金达隧道机械有限公司 Built-out door frame type steel mould trolley
CN102230381B (en) * 2011-06-02 2013-03-20 中铁五局集团第一工程有限责任公司 Hollow needle beam lining trolley
CN104018855B (en) * 2014-06-26 2016-01-20 湖南五新隧道智能装备股份有限公司 General formula needle beam lining trolley in a kind of
CN104358577B (en) * 2014-10-29 2016-09-07 湖南五新隧道智能装备股份有限公司 A kind of tunnel lining trolley
CN104405416A (en) * 2014-12-18 2015-03-11 北京铁五院工程机械有限公司 Whole-section, large-headroom and rapid lining trolley
CN205206840U (en) * 2015-12-14 2016-05-04 中铁四局集团第一工程有限公司 Tunnel lining platform truck portal bearing structure

Also Published As

Publication number Publication date
CN105569687A (en) 2016-05-11

Similar Documents

Publication Publication Date Title
CN106089253B (en) A kind of all-hydraulic template system poured for culvert
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN105422137B (en) Large-clearance modular lining trolley for tunnel
CN205805577U (en) A kind of arch wall type open cut tunnel chassis
CN105569687B (en) Tunnel lining trolley door frame supporting construction
CN205638490U (en) A portable platform truck that is used for subway station tread wind channel to pour
CN206801592U (en) Hydraulic lining trolley for cut-and-cover tunnel concreting
CN207161110U (en) Self-walking type moving trolley for tunnel roof with horseshoe-shaped cross section in construction open excavation
CN110130937B (en) Tunnel construction trolley
CN104358577B (en) A kind of tunnel lining trolley
CN104499434A (en) Movable formwork for casting of wide-body box girder and construction method
CN105298111A (en) Open tunnel lining construction template and construction device and construction method of same
CN205100119U (en) Steel form device in self -propelled
CN205206840U (en) Tunnel lining platform truck portal bearing structure
CN206329348U (en) A kind of minitunnel lining trolley
CN207847651U (en) Self-walking type moving trolley for construction rail top air channel plate
CN103615262A (en) Steel form jumbo with main structure capable of passing conventional sections, and implementation method thereof
CN207829914U (en) A kind of lining trolley of pure frame structure
CN208793010U (en) A kind of lining trolley with all-hydraulic automatic revenue and expenditure template
CN203033721U (en) Portable-type lift truck
CN206636581U (en) A kind of shield tunnel Second Lining Construction chassis
CN206205905U (en) A kind of chassis suitable for City Subway Station abnormity big cross section lining cutting one-piece casting
CN103615261A (en) Height-adjustable steel form jumbo and implementation method thereof
CN203559909U (en) Height-adjustable lining trolley
CN205400754U (en) Arch abutment car is detained at station

Legal Events

Date Code Title Description