CN105569285B - Combination balustrade preparation method - Google Patents

Combination balustrade preparation method Download PDF

Info

Publication number
CN105569285B
CN105569285B CN201511017323.2A CN201511017323A CN105569285B CN 105569285 B CN105569285 B CN 105569285B CN 201511017323 A CN201511017323 A CN 201511017323A CN 105569285 B CN105569285 B CN 105569285B
Authority
CN
China
Prior art keywords
cross bar
column
connecting portion
facial canal
flangings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511017323.2A
Other languages
Chinese (zh)
Other versions
CN105569285A (en
Inventor
周欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Xinye Tieyi Handrail Facilities Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201511017323.2A priority Critical patent/CN105569285B/en
Publication of CN105569285A publication Critical patent/CN105569285A/en
Application granted granted Critical
Publication of CN105569285B publication Critical patent/CN105569285B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1817Connections therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/1413Post-and-rail fences, e.g. without vertical cross-members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/1413Post-and-rail fences, e.g. without vertical cross-members
    • E04H17/1447Details of connections between rails and posts
    • E04H17/1452Details of connections between rails and posts the ends of the rails are fixed on the lateral sides of the posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1817Connections therefor
    • E04F2011/1819Connections therefor between balustrade posts and horizontal or sloping balustrade members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1817Connections therefor
    • E04F2011/1819Connections therefor between balustrade posts and horizontal or sloping balustrade members
    • E04F2011/1821Connections therefor between balustrade posts and horizontal or sloping balustrade members between balustrade posts and handrails
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1817Connections therefor
    • E04F2011/1823Connections therefor between balustrade filling members, e.g. balusters or panels, and horizontal or sloping balustrade members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a kind of combination balustrade preparation method, belong to protector field, this method, which is included on cross bar, sets multiple mounting holes, and multiple water proof rings are corresponded on mounting hole respectively;Inner frame is made, many vertical rods are arranged between two cross bars be arrangeding in parallel, the two ends of vertical rod are inserted into corresponding mounting hole, makes water proof ring be set in the two ends of vertical rod, axially spaced-apart of many vertical rods along cross bar is set;Inner frame is arranged between the two root posts be arrangeding in parallel, cross bar is made perpendicular to column, and the two ends of cross bar are arranged with plastic fastening respectively, cross bar is fixedly connected with column, makes plastic fastening be clamped between cross bar and column;Facial canal is installed, makes facial canal perpendicular to column, is arranged plastic fastening in the end of column, facial canal is fixed in column grafting, and plastic fastening is clamped between column and facial canal.The compact conformation of the combination balustrade, it is easy for installation, the damage that is corroded is difficult, service life is long.

Description

Combination balustrade preparation method
Technical field
The present invention relates to protector field, in particular to a kind of combination balustrade preparation method and combination balustrade.
Background technology
Railing is very wide using scope in our daily lifes, railing is both provided with garden, balcony or window, now Combination balustrade more than be made of metal material, built by many shapes and tower structure be made.
Inventor has found that at least there are the following problems for the installation of combination balustrade in the prior art under study for action:
When one, installation railing, be there is into hole in the position that railing direct splicing, i.e. shape are connected, it is empty Gas is entered in railing by this space, and corrosion easily occurs for railing contact position, influences the service life of railing;
Secondly, after the railing of prior art connects, steam easily enters inside railing from link position, the inside of railing Easily it is corroded, railing has a larger safety risks, and the service life of railing is short;
Thirdly, the accessory formula Assembled fence of prior art compare loosening, safety in utilization is low.
The content of the invention
It is an object of the invention to provide a kind of railing preparation method, easily gone out with the link position for improving existing railing Existing gap, causes the service life of railing short and the problem of low railing security.
It is easy with the link position for improving existing combination balustrade the present invention also aims to provide a kind of combination balustrade There is gap, cause the service life of railing short and the problem of low railing security.
What the present invention was realized in:
Based on above-mentioned first purpose, the invention provides a kind of combination balustrade preparation method, methods described includes:
Step S100, multiple mounting holes are set on cross bar, multiple water proof rings are corresponded installed in mounting hole respectively On;
Step S200, making inner frame, the inner frame include many vertical rods and the cross bar, many vertical rods are arranged on Between two cross bars be arrangeding in parallel, the two ends of the vertical rod are inserted into the corresponding mounting hole, make the waterproof Snare is located at the two ends of the vertical rod, and axially spaced-apart of many vertical rods along the cross bar is set;
Step S300, the inner frame is arranged between the two root posts that be arranged in parallel, makes the cross bar perpendicular to institute Column is stated, and the two ends of the cross bar are arranged with plastic fastening respectively, the cross bar is fixedly connected with the column, and order is described Plastic fastening is clamped between the cross bar and the column;
Step S400, installation facial canal, make the facial canal perpendicular to the column, and plastics company is arranged in the end of the column Fitting, the facial canal is fixed on by the column grafting, and the plastic fastening be clamped in the column and the facial canal it Between.
It is preferred that, in the step S100, the cross bar is rectangular shaft, and the mounting hole site is same in the rectangular shaft On side, and the mounting hole is rectangular opening.
It is preferred that, in the step S100, the two ends of the cross bar are separately provided for being fixedly connected with the column First connecting portion, the plastic fastening is provided with the groove that matches with the first connecting portion, the first connecting portion position In in the groove.
It is preferred that, the first connecting portion includes two flangings turned down outwardly, and described two flangings are located at the cross bar On two relative sides, and described two flangings are respectively perpendicular to two relative sides of the cross bar;Described two flangings On be respectively arranged with through hole, the through hole correspondence and be plugged with screw;
The first connecting portion is additionally provided with reinforcing rib structure, turn-line of the reinforcing rib structure edge perpendicular to the flanging Direction extension, and one end of the reinforcing rib structure is located at the corresponding side of the cross bar being connected with the flanging On, its other end is located on the flanging.
It is preferred that, the reinforcing rib structure is set to four, has two reinforcing rib structures on each flanging; The reinforcing rib structure is depressed part, and the flanging has a top surface and bottom surface, and the depressed part is along the bottom surface towards the top The direction depression in face, wherein, the top surface is oppositely arranged with the bottom surface, and the bottom surface is that the flanging is directed downward along turnover Face, the top surface is the flanging along turnover direction face upward.
It is preferred that, in the step S300, one end of the column is welded with base, and its other end is provided with the second connection Portion, the column is fixedly connected by the second connecting portion with the facial canal.
It is preferred that, the second connecting portion includes two flangings turned down outwardly, and described two flangings are located at the column On two relative sides, and described two flangings are respectively perpendicular to two relative sides of the column;Described two flangings On be respectively arranged with through hole, the through hole correspondence and be plugged with screw;The second connecting portion is arranged with plastic fastening.
Based on above-mentioned second purpose, the invention provides a kind of railing, including many shapes, many metal molds Material constitutes tower structure, and the shape includes cross bar, vertical rod, column and facial canal, wherein:
The cross bar has multiple mounting holes, axially spaced-apart setpoint distance of the multiple mounting hole along the cross bar, institute State to correspond in multiple mounting holes and water proof ring is installed, the vertical rod is located between two cross bars, and the vertical rod is passed through The water proof ring and by the mounting hole inserting be fixed on the cross bar, the water proof ring is clamped in the vertical rod;
Two columns are be arranged in parallel, and two cross bars and the vertical rod are respectively positioned between two columns, And the cross bar is perpendicular to the column;The end of the cross bar is provided with first connecting portion, and the first connecting portion is arranged There is plastic fastening, the first connecting portion is fixedly connected with the column, the plastic fastening is clamped on described first and connected Between socket part and the column;
The facial canal is respectively arranged with second perpendicular to the column, two columns positioned at two ends with one end Connecting portion, the second connecting portion is provided with plastic fastening, and the second connecting portion is fixedly connected with the facial canal, the plastics Connector is clamped between the second connecting portion and the facial canal.
It is preferred that, the first connecting portion is fixedly connected by STAINLESS STEEL HEX SOCKET CAP SCREWS with the vertical rod.
It is preferred that, the other end of the column is welded with base.
The beneficial effects of the invention are as follows:
In summary, the invention provides a kind of combination balustrade preparation method, this method makes obtained railing, railing Link position does not have gap, and the overall structure of railing is compacter, the service life length of railing and safe and reliable.
Specifically, railing includes setting multiple mounting holes on cross bar, vertical rod, column and facial canal, cross bar, in the peace Corresponded respectively in dress hole and install water proof ring, vertical rod grafting is fixed in mounting hole, water proof ring is clamped in vertical rod, Water proof ring can not only prevent steam from entering the inside of railing, increase the service life of railing;Meanwhile, water proof ring has certain Plastic deformation ability, when vertical rod grafting is fixed in the mounting hole of cross bar, water proof ring is by vertical rod clamping, vertical rod and the connection of cross bar It is more firm.The cross bar is fixedly connected on column, when cross bar is connected with column, and the end of cross bar is provided with plastics connection Part, after cross bar is connected with column, plastic fastening is clamped between the vertical rod and the cross bar, it is to avoid cross bar and vertical rod are straight Contact, when improving metallic rod and directly contacting, the situation that contact surface is easily corroded, meanwhile, the contact surface of cross bar and vertical rod Laminating is even closer, and without gap, air is not easily accessible, and the contact surface for effectively avoiding railing is corroded and causes railing to use The problem of short life and low safety in utilization.Further, when the column is fixedly connected with the facial canal, the end of column Plastic fastening is installed, plastic fastening is clamped between column and facial canal, contact of the column with facial canal is even closer, column Gap is not produced with the contact surface of facial canal, the contact position of column and facial canal is difficult to be corroded, using safety and service life is long.
The combination balustrade that the present invention is provided, has the advantages that the railing that combinations thereof railing preparation method is obtained.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be attached to what is used required in embodiment Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore is not construed as pair The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is the structure chart of combination balustrade of the present invention;
Fig. 2 is the structure chart of the cross bar of combination balustrade of the present invention;
Fig. 3 is the structure chart of the first connecting portion of combination balustrade of the present invention;
Fig. 4 is the structure chart of the column of combination balustrade of the present invention;
Fig. 5 is the structure chart of the plastic fastening of railing of the present invention;
Fig. 6 is the cross bar and the attachment structure figure of column of the combination balustrade of prior art;
Fig. 7 is Fig. 6 right view.
Reference collects:
Cross bar 101, vertical rod 102, column 103, facial canal 104, screw 105 connects accessory 106, bottom surface 107, turn-line 108, flanging 109;
Mounting hole 201, water proof ring 202, plastic fastening 203, first connecting portion 204, second connecting portion 205, groove 206, base 207, reinforcing rib structure 208.
Embodiment
Railing is very wide using scope in our daily lifes, railing is both provided with garden, balcony or window, now Combination balustrade more than be made of metal material, built by many shapes and tower structure be made, the combination of prior art Metallic rod is directly fixed up by railing by the way of grafting, and needs to be fixedly connected by connector, metallic rod it Between easily there is gap, air and steam are entered in metallic rod by gap, are easily corroded metallic rod, are caused the use of railing Short life.
In consideration of it, the present invention designer provide a kind of combination balustrade preparation method and combination balustrade, metallic rod it Between connected by plastic fastening, link position combines even closer, is not in gap, it is to avoid air and steam enter Enter, the inside of railing is difficult to be corroded, the service life of railing is long.
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.The present invention implementation being generally described and illustrated herein in the accompanying drawings The component of example can be arranged and designed with a variety of configurations.Therefore, reality of the invention below to providing in the accompanying drawings The detailed description for applying example is not intended to limit the scope of claimed invention, but is merely representative of the selected implementation of the present invention Example.Based on the embodiment in the present invention, what those of ordinary skill in the art were obtained under the premise of creative work is not made Every other embodiment, belongs to the scope of protection of the invention.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then it further need not be defined and explained in subsequent accompanying drawing.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ", The orientation or position relationship of the instruction such as " level ", " interior ", " outer " be based on orientation shown in the drawings or position relationship, or should Orientation or position relationship that invention product is usually put when using, are for only for ease of the description present invention and simplify description, without It is that instruction or the signified device of hint or element must have specific orientation, with specific azimuth configuration and operation, therefore not It is understood that as limitation of the present invention.In addition, term " first ", " second ", " the 3rd " etc. are only used for distinguishing description, and it can not manage Solve to indicate or imply relative importance.
In the description of the invention, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ", " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or one Connect body;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirect by intermediary It is connected, can is the connection of two element internals.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in the present invention.
Combination balustrade preparation method embodiment
Fig. 1-5 are referred to, the invention provides a kind of combination balustrade preparation method, methods described includes:
Step S100, multiple mounting holes 201 are set on cross bar 101, multiple water proof rings 202 are corresponded into installation respectively On mounting hole 201;
Step S200, making inner frame, the inner frame includes many vertical rods 102 and the cross bar 101, by many vertical rods 102 are arranged between two cross bars 101 be arrangeding in parallel, and the two ends of the vertical rod 102 are inserted into the corresponding installation In hole 201, the water proof ring 202 is made to be set in the two ends of the vertical rod 102, and many vertical rods 102 are along the cross bar 101 Axially spaced-apart set;
Step S300, the inner frame is arranged between the two root posts 103 that be arranged in parallel, makes the cross bar 101 hang down It is straight that and the two ends of the cross bar 101 are arranged with plastic fastening 203 respectively in the column 103, the cross bar 101 with it is described Column 103 is fixedly connected, and makes the plastic fastening 203 be clamped between the cross bar 101 and the column 103;
Step S400, installation facial canal 104, make the facial canal 104 perpendicular to the column 103, at the end of the column 103 Portion is arranged plastic fastening 203, and the grafting of column 103 is fixed on into the facial canal 104, and the plastic fastening 203 blocks Tightly between the column 103 and the facial canal 104.
The invention provides a kind of combination balustrade preparation method, this method makes obtained railing, the link position of railing There is no gap, the overall structure of railing is compacter, the service life length of railing and safe and reliable.
Specifically, railing includes setting multiple on cross bar 101, vertical rod 102, column 103 and facial canal 104, cross bar 101 Mounting hole 201, corresponds and installs water proof ring 202, the grafting of vertical rod 102 is fixed on into peace respectively in the mounting hole 201 Fill in hole 201, water proof ring 202 is clamped in vertical rod 102, water proof ring 202 can not only prevent steam from entering the inside of railing, increase Plus the service life of railing;Meanwhile, water proof ring 202 has certain plastic deformation ability, and the grafting of vertical rod 102 is fixed on cross bar When in 101 mounting hole 201, water proof ring 202 is by the clamping of vertical rod 102, and vertical rod 102 and the connection of cross bar 101 are more firm.
The cross bar 101 is fixedly connected on the column 103, when cross bar 101 is connected with column 103, the end of cross bar 101 Portion is provided with plastic fastening 203, after cross bar 101 is connected with column 103, and plastic fastening 203 is clamped on the He of vertical rod 102 Between the cross bar 101, it is to avoid cross bar 101 is directly contacted with vertical rod 102, when improving metallic rod and directly contacting, contact surface Situation about being easily corroded, and cross bar 101 fitted with the contact surface of vertical rod 102 it is even closer, without gap, air be difficult into Enter, the inside for effectively avoiding railing is corroded the problem of causing short railing service life and low safety in utilization.
Further, when the column 103 is fixedly connected with the facial canal 104, the end of column 103 is provided with plastics company Fitting 203, plastic fastening 203 is clamped between column 103 and facial canal 104, and the contact with facial canal 104 of column 103 more steps up Close, the contact surface of column 103 and facial canal 104 does not produce gap, and the contact position of column 103 and facial canal 104 is difficult to be corroded, and makes With safety and service life is long.
Railing is tower structure, and tower structure not only saves material, meanwhile, it is easily installed and dismantles.Railing is installed When, first cross bar 101 and vertical rod 102 are assembled, for the ease of vertical rod 102 is arranged on cross bar 101, and in order to increase cross bar 101 and the bonding tightness of vertical rod 102, the cross bar 101 is rectangular shaft, and rectangular shaft has smooth plane, in cross bar 101 When same side sets mounting hole 201, it is stamped to form using professional numerically controlled hydraulic press, mounting hole 201 is easy to process, and vertical rod Water proof ring 202 is provided between 102 and cross bar 101, the binding face of water proof ring 202 and cross bar 101 is tightly combined, and is less prone to seam Gap, waterproof and gas-tight effect are good.Vertical rod 102 is arranged on cross bar 101, and the structure of vertical rod 102 can be entered according to different situations Row processing, vertical rod 102 can be processed as cylindrical bar, more attractive in appearance, accordingly, the multiple peaces set on the cross bar 101 Dress hole 201 is circular port, and the diameter of circular port is engaged with the diameter of the vertical rod 102, vertical rod 102 and the cooperation of cross bar 101 It is even closer;The vertical rod 102 can also be processed as rectangular shaft, and the intensity of rectangular shaft is good, easy to process, i.e., rectangular shaft has four The length side that bar be arranged in parallel, every length side has two adjacent faces, and four length sides are four of rectangular shaft Skeleton, rectangular shaft is unlikely to deform.
Meanwhile, in order to increase the structural strength after cross bar 101 is connected with vertical rod 102, by vertical rod 102 perpendicular to cross bar 101 Set, the quantity of vertical rod 102 is determined according to the height of railing, further, is determined according to the length of cross bar 101, It is preferred that, four parallel vertical rods 102 are set between two cross bars 101.Cross bar 101 is vertically arranged with vertical rod 102, is stood Processing is easy in the end of bar 102, is easy to the installation of vertical rod 102, and water proof ring 202 is vertical with vertical rod 102 is connected, water proof ring 202 Uniform force, be difficult loosen, good water-proof effect.
In the preferred scheme of the embodiment, in the step S100, the two ends of the cross bar 101 be separately provided for The first connecting portion 204 that the column 103 is fixedly connected, the plastic fastening 203 is provided with and the phase of first connecting portion 204 The groove 206 of matching, the first connecting portion 204 is located in the groove 206.First connecting portion 204 it is simple in construction, according to Different situations are processed, and selectivity is big, and processing is flexible, is easy to the connection of cross bar 101 and column 103, meanwhile, the first connection Portion 204 is located in the groove 206 of plastic fastening 203, and first connecting portion 204 is difficult to be corroded, and service life is long.
In the preferred scheme of above-mentioned embodiment, the first connecting portion 204 includes two flangings 109 turned down outwardly, Described two flangings 109 are located on two relative sides of the cross bar 101, and described two flangings 109 are respectively perpendicular to institute State two relative sides of cross bar 101;Correspondence in through hole, the through hole is respectively arranged with described two flangings and is plugged with spiral shell Nail;The first connecting portion 204 is additionally provided with reinforcing rib structure 208, and the reinforcing rib structure 208 is along perpendicular to the flanging 109 Turn-line 108 direction extension, and the reinforcing rib structure 208 one end be located at be connected with the flanging 109 described in On the corresponding side of cross bar 101, its other end is located on the flanging 109.
First connecting portion 204 it is easy to process, by specialty hydraulic press punching press the flanging 109 is made, flanging 109 Precision is high, and the cooperation with the groove 206 of plastic fastening 203 is even closer, the first connecting portion 204 and the column 103 It is fixedly connected, screw is tightened in column 103 by screw using professional electric hand drill, screwing operations simple and fast, fixed effect It is really good;Two flangings 109 are located at two relative sides of the cross bar 101, when flanging 109 is fixed, the stress of flanging 109 Uniformly, bigger power can be born.
Further, because first connecting portion 204 has reinforcing rib structure 208, reinforcing rib structure 208 adds flanging 109 intensity.When the cross bar 101 is fixed with column 103 by the flanging 109, it is not necessary to the other attachment structures of increase, Installation steps are reduced, mounting material is saved, it is easier for installation;Fig. 6-7 are referred to, wherein, Fig. 6 and Fig. 7 are in order to clear The connected mode of the traditional cross bar of Chu's expression and column, therefore illustrate only the structure chart of junction.Traditional combination balustrade is consolidated , it is necessary to set connection accessory 106 when connecting surely, it is fixedly connected between cross bar 101 and column 103 by connecting accessory 106, i.e. First connection accessory 106 is tightened on column 103 by screw 105, cross bar 101 is then inserted into connection accessory 106 It is interior, finally cross bar 101 is fixedly connected with being connected accessory 106 using screw 105, attachment structure is complicated, connected insecure;Together When, there is larger gap between cross bar 101 and connection accessory 106 and column 103 and connection accessory 106, during use, Cross bar 101 and the inside of column 103 are easily corroded, and safety in utilization is low, service life is short.
In the preferred scheme of above-mentioned embodiment, the reinforcing rib structure 208 is set to four, each flanging 109 It is upper that there are two reinforcing rib structures 208;The reinforcing rib structure 208 is depressed part, and the flanging 109 has top surface and bottom Face 107, direction depression of the depressed part along the bottom surface 107 towards the top surface, wherein, the top surface and the bottom surface 107 are oppositely arranged, and the bottom surface 107 is the face that the flanging 109 is directed downward along turnover, and the top surface is the flanging 109 Along the face of turnover direction upward.Reinforcing rib structure 208 it is easy to process, directly process depressed part on flanging 109, it is not necessary to set Unnecessary structure is put, alignment error is reduced, meanwhile, add the structural integrity of whole railing.Depressed part is preferably processed to Bar-shaped trough, bar-shaped trough tactical rule is easy to processing, the similar bar construction of bar-shaped trough, with good support effect.Obviously, plus The quantity of strengthening tendons structure is not unique, is selected according to actual conditions, and manufacture is flexible.
As the preferred scheme of the present embodiment, in the step S300, one end of the column 103 is welded with base 207, Its other end is provided with second connecting portion 205, and the column 103 is fixed by the second connecting portion 205 with the facial canal 104 Connection.Base 207 is rectangular plate-like structure, easy to process, for railing to be fixedly mounted on suitably by the base 207 Position, when it is implemented, base 207 is made up of stainless steel material, is provided with four circular holes, four circular holes are located on base 207 The position at four angles of base 207, during non-floating rail, four circular holes is passed through by screw, fixed form is simple and reliable. The setting of second connecting portion 205, is easy to column 103 being fixedly connected with facial canal 104, and plastic fastening 203 installation more Convenient, after plastic fastening 203 is installed, the contact surface of plastic fastening 203 and facial canal 104 is even closer, its waterproof, gas-tight effect Fruit is more preferably.
For the ease of the installation of column 103 and facial canal 104, the cross section of column 103 is rectangular configuration, the horizontal stroke of facial canal 104 Section is also rectangular configuration, and facial canal 104 has smooth plane, and plastic fastening 203 and fitting for smooth flat are even closer, Waterproof, gas-tight effect are good.
In the preferred scheme of above-mentioned embodiment, the second connecting portion 205 includes two flangings turned down outwardly, described Two flangings are located on two relative sides of the column 103, and described two flangings are respectively perpendicular to the phase of column 103 To two sides;Correspondence in through hole, the through hole is respectively arranged with described two flangings and is plugged with screw;Described second Connecting portion 205 is arranged with plastic fastening 203.Second connecting portion 205 is simple in construction, is easy to processing, with plastic fastening 203 Coordinate even closer, be fixedly connected using screw, connected mode is simple and reliable, it is time saving and energy saving to install.Referring to Fig. 4, obviously, the Two flangings of two connecting portions 205 can also be processed as the structure with reinforcing rib structure 208, and intensity is high, and use is safer.
In actual processing, cross bar 101, vertical rod 102, column 103 and facial canal 104 can use hot-galvanized steel control Into corrosion resistance is more preferable.
Combination balustrade embodiment
Fig. 1-5 are referred to, the invention provides a kind of railing, including many shapes, many shape structures Into tower structure, the shape includes cross bar 101, vertical rod 102, column 103 and facial canal 104, wherein:
The cross bar 101 has multiple mounting holes 201, axially spaced-apart of the multiple mounting hole 201 along the cross bar 101 Corresponded in setpoint distance, the multiple mounting hole 201 and water proof ring 202 is installed, the vertical rod 102 is located at two horizontal strokes Between bar 101, the vertical rod 102 through the water proof ring 202 and is fixed on the cross bar by the mounting hole 201 inserting 101, the water proof ring 202 is clamped in the vertical rod 102;
Two columns 103 are be arranged in parallel, and two cross bars 101 and the vertical rod 102 are respectively positioned on described in two Between column 103, and the cross bar 101 is perpendicular to the column 103;The end of the cross bar 101 is provided with the first connection Portion 204, the first connecting portion 204 is arranged with plastic fastening 203, and the first connecting portion 204 is fixed with the column 103 Connection, the plastic fastening 203 is clamped between the first connecting portion 204 and the column 103;
The facial canal 104 is perpendicular to the column 103, and two columns 103 are located at two ends difference with one end Second connecting portion 205 is provided with, the second connecting portion 205 is provided with plastic fastening 203, the second connecting portion 205 and institute State facial canal 104 to be fixedly connected, the plastic fastening 203 is clamped between the second connecting portion 205 and the facial canal 104.
The railing that the present invention is provided, simple and compact for structure, the link position between metallic rod does not have gap, effectively to improve The problem of steam or air enter from gap and then corrode metallic rod, the service life length of railing and use safety.
In the preferred scheme of the embodiment, the first connecting portion 204 passes through STAINLESS STEEL HEX SOCKET CAP SCREWS and the vertical rod 102 are fixedly connected, and connected mode is simple and reliable, and it is time saving and energy saving to install.
In the preferred scheme of the embodiment, the other end of the column 103 is welded with base 207, is easy to the fixation of railing Install, meanwhile, railing is fixedly mounted by base 207, and railing can bear bigger power, and use is safer.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (6)

1. a kind of combination balustrade preparation method, it is characterised in that methods described includes:
Step S100, multiple mounting holes are set on cross bar, multiple water proof rings are corresponded on mounting hole respectively;
Step S200, making inner frame, the inner frame include many vertical rods and the cross bar, and many vertical rods are arranged on into parallel Between two cross bars set, the two ends of the vertical rod are inserted into the corresponding mounting hole, make the waterproof snare The two ends of the vertical rod are located at, and axially spaced-apart of many vertical rods along the cross bar is set;
Step S300, the inner frame is arranged between the two root posts that be arranged in parallel, makes the cross bar perpendicular to described vertical Post, and the two ends of the cross bar are arranged with plastic fastening respectively, the two ends of the cross bar are separately provided for standing with described The first connecting portion that post is fixedly connected, the first connecting portion includes two flangings turned down outwardly, and described two flangings are located at On two relative sides of the cross bar, and described two flangings are respectively perpendicular to two relative sides of the cross bar;It is described Correspondence in through hole, the through hole is respectively arranged with two flangings and is plugged with screw;
The first connecting portion is additionally provided with reinforcing rib structure, side of the reinforcing rib structure along the turn-line perpendicular to the flanging One end to extension, and the reinforcing rib structure is located on the corresponding side for the cross bar being connected with the flanging, its The other end is located on the flanging;The cross bar is fixedly connected by the first connecting portion with the column, makes the plastics Connector is clamped between the cross bar and the column;
Step S400, installation facial canal, make the facial canal perpendicular to the column, and plastics connection is arranged in the end of the column Part, the facial canal is fixed on by the column grafting, and the plastic fastening is clamped between the column and the facial canal.
2. combination balustrade preparation method according to claim 1, it is characterised in that
In the step S100, the cross bar is rectangular shaft, and the mounting hole site is on the same side of the rectangular shaft, and institute Mounting hole is stated for rectangular opening.
3. combination balustrade preparation method according to claim 2, it is characterised in that
In the step S100, the plastic fastening is provided with the groove matched with the first connecting portion, and described first connects Socket part is located in the groove.
4. combination balustrade preparation method according to claim 1, it is characterised in that the reinforcing rib structure is set to four It is individual, there are two reinforcing rib structures on each flanging;The reinforcing rib structure is depressed part, and the flanging has top Face and bottom surface, direction depression of the depressed part along the bottom surface towards the top surface, wherein, the top surface and the bottom surface phase To setting, the face that the bottom surface is directed downward for the flanging along turnover, the top surface is that flanging edge turns down direction upward Face.
5. combination balustrade preparation method according to claim 1, it is characterised in that
In the step S300, one end of the column is welded with base, and its other end is provided with second connecting portion, the column It is fixedly connected by the second connecting portion with the facial canal.
6. combination balustrade preparation method according to claim 5, it is characterised in that the second connecting portion includes court and turned up Two flangings of folding, described two flangings are located on two relative sides of the column, and described two flangings are respectively perpendicular In two relative sides of the column;Correspondence in through hole, the through hole is respectively arranged with described two flangings and is plugged with spiral shell Nail;The second connecting portion is arranged with plastic fastening.
CN201511017323.2A 2015-12-29 2015-12-29 Combination balustrade preparation method Active CN105569285B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511017323.2A CN105569285B (en) 2015-12-29 2015-12-29 Combination balustrade preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511017323.2A CN105569285B (en) 2015-12-29 2015-12-29 Combination balustrade preparation method

Publications (2)

Publication Number Publication Date
CN105569285A CN105569285A (en) 2016-05-11
CN105569285B true CN105569285B (en) 2017-10-17

Family

ID=55879856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511017323.2A Active CN105569285B (en) 2015-12-29 2015-12-29 Combination balustrade preparation method

Country Status (1)

Country Link
CN (1) CN105569285B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107034814A (en) * 2017-05-17 2017-08-11 无锡市汤成机电配件厂 Central road surface protection type guardrail
CN109881581B (en) * 2019-03-12 2021-03-26 北京市园林古建设计研究院有限公司 Steel plate wrapped wood handrail
CN112127645A (en) * 2020-09-23 2020-12-25 晟通科技集团有限公司 Railing unit and template combination
CN112095945B (en) * 2020-09-27 2021-08-17 深圳千里马装饰集团有限公司 Energy-saving decorative guardrail convenient to install

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007186901A (en) * 2006-01-13 2007-07-26 Tobu Imarin Kk Log barrier connection structure
CN201343780Y (en) * 2008-09-09 2009-11-11 无锡艾克赛尔栅栏有限公司 Balcony guardrail using snap spring and sleeve
CN102304984A (en) * 2011-08-31 2012-01-04 陈华斌 Assembly guardrail structure and special bulge extrusion tool
CN203022252U (en) * 2012-10-12 2013-06-26 上海博盾机电科技有限公司 Balcony guardrail
CN103669995A (en) * 2013-11-14 2014-03-26 安徽杰宇力防护设施有限公司 Assembly-type guardrail
CN205242896U (en) * 2015-12-29 2016-05-18 周欢 Combined guard -rail

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007186901A (en) * 2006-01-13 2007-07-26 Tobu Imarin Kk Log barrier connection structure
CN201343780Y (en) * 2008-09-09 2009-11-11 无锡艾克赛尔栅栏有限公司 Balcony guardrail using snap spring and sleeve
CN102304984A (en) * 2011-08-31 2012-01-04 陈华斌 Assembly guardrail structure and special bulge extrusion tool
CN203022252U (en) * 2012-10-12 2013-06-26 上海博盾机电科技有限公司 Balcony guardrail
CN103669995A (en) * 2013-11-14 2014-03-26 安徽杰宇力防护设施有限公司 Assembly-type guardrail
CN205242896U (en) * 2015-12-29 2016-05-18 周欢 Combined guard -rail

Also Published As

Publication number Publication date
CN105569285A (en) 2016-05-11

Similar Documents

Publication Publication Date Title
CN105569285B (en) Combination balustrade preparation method
CN206323069U (en) A kind of insulating bar method livewire work platform
CN205543820U (en) Novel mounting bracket
CN203605170U (en) Lamp installing suspension cable hooking clamp
CN108277759A (en) Adjustable-angle combines guardrail and its installation method
CN205242896U (en) Combined guard -rail
CN202492928U (en) Factory assembly type lattice lightweight steel construction
CN112211384B (en) Scaffold for building site
CN203961436U (en) A kind of novel wood-plastic fence
CN209260903U (en) A kind of logical connection structure in the steel side for being easy to be located by connecting
CN208563181U (en) A kind of adjustable fence unit of setting angle
CN209637259U (en) Edge protection system
CN210421443U (en) Non-welding flat plate fixing embedded part
CN206544188U (en) A kind of robot clamp aluminium section bar main frame structure part
CN205896397U (en) Prop up hanger device
CN203834833U (en) Guardrail
CN208563179U (en) Adjustable-angle combines guardrail
CN203547111U (en) Lightning protection connection device of construction steel tube scaffold and reinforced down lead
CN208023924U (en) It is a kind of to facilitate assembled construction site scaffold
CN214785222U (en) Gypsum board lamp house molding furred ceiling reinforced structure
CN204754185U (en) Fastener is connected to steel pipe
CN108265654A (en) A kind of adjustable fence unit of setting angle
CN108265653A (en) A kind of guardrail cross beams bindiny mechanism
CN204266503U (en) A kind of Assembled-type guardrail
CN207766187U (en) A kind of photovoltaic bracket column bar jointing structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230512

Address after: 230000 Factory Building 2 of Hefei Zhongji Group Machinery Manufacturing Co., Ltd. at the intersection of Xiangpu Road and Cuizhu Road in Taohua Town, Feixi County, Hefei City, Anhui Province

Patentee after: Hefei Xinye Tieyi Handrail Facilities Co.,Ltd.

Address before: Dianzhou Village Group, Yugang Village, Xiaomiao Town, Feixi County, Hefei City, Anhui Province, 231281

Patentee before: Zhou Huan

TR01 Transfer of patent right