CN105569285B - Combination balustrade preparation method - Google Patents
Combination balustrade preparation method Download PDFInfo
- Publication number
- CN105569285B CN105569285B CN201511017323.2A CN201511017323A CN105569285B CN 105569285 B CN105569285 B CN 105569285B CN 201511017323 A CN201511017323 A CN 201511017323A CN 105569285 B CN105569285 B CN 105569285B
- Authority
- CN
- China
- Prior art keywords
- cross bar
- column
- connecting portion
- facial canal
- flangings
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
- E04F11/1817—Connections therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
- E04H17/1413—Post-and-rail fences, e.g. without vertical cross-members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
- E04H17/1413—Post-and-rail fences, e.g. without vertical cross-members
- E04H17/1447—Details of connections between rails and posts
- E04H17/1452—Details of connections between rails and posts the ends of the rails are fixed on the lateral sides of the posts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
- E04F11/1817—Connections therefor
- E04F2011/1819—Connections therefor between balustrade posts and horizontal or sloping balustrade members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
- E04F11/1817—Connections therefor
- E04F2011/1819—Connections therefor between balustrade posts and horizontal or sloping balustrade members
- E04F2011/1821—Connections therefor between balustrade posts and horizontal or sloping balustrade members between balustrade posts and handrails
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
- E04F11/1817—Connections therefor
- E04F2011/1823—Connections therefor between balustrade filling members, e.g. balusters or panels, and horizontal or sloping balustrade members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention provides a kind of combination balustrade preparation method, belong to protector field, this method, which is included on cross bar, sets multiple mounting holes, and multiple water proof rings are corresponded on mounting hole respectively;Inner frame is made, many vertical rods are arranged between two cross bars be arrangeding in parallel, the two ends of vertical rod are inserted into corresponding mounting hole, makes water proof ring be set in the two ends of vertical rod, axially spaced-apart of many vertical rods along cross bar is set;Inner frame is arranged between the two root posts be arrangeding in parallel, cross bar is made perpendicular to column, and the two ends of cross bar are arranged with plastic fastening respectively, cross bar is fixedly connected with column, makes plastic fastening be clamped between cross bar and column;Facial canal is installed, makes facial canal perpendicular to column, is arranged plastic fastening in the end of column, facial canal is fixed in column grafting, and plastic fastening is clamped between column and facial canal.The compact conformation of the combination balustrade, it is easy for installation, the damage that is corroded is difficult, service life is long.
Description
Technical field
The present invention relates to protector field, in particular to a kind of combination balustrade preparation method and combination balustrade.
Background technology
Railing is very wide using scope in our daily lifes, railing is both provided with garden, balcony or window, now
Combination balustrade more than be made of metal material, built by many shapes and tower structure be made.
Inventor has found that at least there are the following problems for the installation of combination balustrade in the prior art under study for action:
When one, installation railing, be there is into hole in the position that railing direct splicing, i.e. shape are connected, it is empty
Gas is entered in railing by this space, and corrosion easily occurs for railing contact position, influences the service life of railing;
Secondly, after the railing of prior art connects, steam easily enters inside railing from link position, the inside of railing
Easily it is corroded, railing has a larger safety risks, and the service life of railing is short;
Thirdly, the accessory formula Assembled fence of prior art compare loosening, safety in utilization is low.
The content of the invention
It is an object of the invention to provide a kind of railing preparation method, easily gone out with the link position for improving existing railing
Existing gap, causes the service life of railing short and the problem of low railing security.
It is easy with the link position for improving existing combination balustrade the present invention also aims to provide a kind of combination balustrade
There is gap, cause the service life of railing short and the problem of low railing security.
What the present invention was realized in:
Based on above-mentioned first purpose, the invention provides a kind of combination balustrade preparation method, methods described includes:
Step S100, multiple mounting holes are set on cross bar, multiple water proof rings are corresponded installed in mounting hole respectively
On;
Step S200, making inner frame, the inner frame include many vertical rods and the cross bar, many vertical rods are arranged on
Between two cross bars be arrangeding in parallel, the two ends of the vertical rod are inserted into the corresponding mounting hole, make the waterproof
Snare is located at the two ends of the vertical rod, and axially spaced-apart of many vertical rods along the cross bar is set;
Step S300, the inner frame is arranged between the two root posts that be arranged in parallel, makes the cross bar perpendicular to institute
Column is stated, and the two ends of the cross bar are arranged with plastic fastening respectively, the cross bar is fixedly connected with the column, and order is described
Plastic fastening is clamped between the cross bar and the column;
Step S400, installation facial canal, make the facial canal perpendicular to the column, and plastics company is arranged in the end of the column
Fitting, the facial canal is fixed on by the column grafting, and the plastic fastening be clamped in the column and the facial canal it
Between.
It is preferred that, in the step S100, the cross bar is rectangular shaft, and the mounting hole site is same in the rectangular shaft
On side, and the mounting hole is rectangular opening.
It is preferred that, in the step S100, the two ends of the cross bar are separately provided for being fixedly connected with the column
First connecting portion, the plastic fastening is provided with the groove that matches with the first connecting portion, the first connecting portion position
In in the groove.
It is preferred that, the first connecting portion includes two flangings turned down outwardly, and described two flangings are located at the cross bar
On two relative sides, and described two flangings are respectively perpendicular to two relative sides of the cross bar;Described two flangings
On be respectively arranged with through hole, the through hole correspondence and be plugged with screw;
The first connecting portion is additionally provided with reinforcing rib structure, turn-line of the reinforcing rib structure edge perpendicular to the flanging
Direction extension, and one end of the reinforcing rib structure is located at the corresponding side of the cross bar being connected with the flanging
On, its other end is located on the flanging.
It is preferred that, the reinforcing rib structure is set to four, has two reinforcing rib structures on each flanging;
The reinforcing rib structure is depressed part, and the flanging has a top surface and bottom surface, and the depressed part is along the bottom surface towards the top
The direction depression in face, wherein, the top surface is oppositely arranged with the bottom surface, and the bottom surface is that the flanging is directed downward along turnover
Face, the top surface is the flanging along turnover direction face upward.
It is preferred that, in the step S300, one end of the column is welded with base, and its other end is provided with the second connection
Portion, the column is fixedly connected by the second connecting portion with the facial canal.
It is preferred that, the second connecting portion includes two flangings turned down outwardly, and described two flangings are located at the column
On two relative sides, and described two flangings are respectively perpendicular to two relative sides of the column;Described two flangings
On be respectively arranged with through hole, the through hole correspondence and be plugged with screw;The second connecting portion is arranged with plastic fastening.
Based on above-mentioned second purpose, the invention provides a kind of railing, including many shapes, many metal molds
Material constitutes tower structure, and the shape includes cross bar, vertical rod, column and facial canal, wherein:
The cross bar has multiple mounting holes, axially spaced-apart setpoint distance of the multiple mounting hole along the cross bar, institute
State to correspond in multiple mounting holes and water proof ring is installed, the vertical rod is located between two cross bars, and the vertical rod is passed through
The water proof ring and by the mounting hole inserting be fixed on the cross bar, the water proof ring is clamped in the vertical rod;
Two columns are be arranged in parallel, and two cross bars and the vertical rod are respectively positioned between two columns,
And the cross bar is perpendicular to the column;The end of the cross bar is provided with first connecting portion, and the first connecting portion is arranged
There is plastic fastening, the first connecting portion is fixedly connected with the column, the plastic fastening is clamped on described first and connected
Between socket part and the column;
The facial canal is respectively arranged with second perpendicular to the column, two columns positioned at two ends with one end
Connecting portion, the second connecting portion is provided with plastic fastening, and the second connecting portion is fixedly connected with the facial canal, the plastics
Connector is clamped between the second connecting portion and the facial canal.
It is preferred that, the first connecting portion is fixedly connected by STAINLESS STEEL HEX SOCKET CAP SCREWS with the vertical rod.
It is preferred that, the other end of the column is welded with base.
The beneficial effects of the invention are as follows:
In summary, the invention provides a kind of combination balustrade preparation method, this method makes obtained railing, railing
Link position does not have gap, and the overall structure of railing is compacter, the service life length of railing and safe and reliable.
Specifically, railing includes setting multiple mounting holes on cross bar, vertical rod, column and facial canal, cross bar, in the peace
Corresponded respectively in dress hole and install water proof ring, vertical rod grafting is fixed in mounting hole, water proof ring is clamped in vertical rod,
Water proof ring can not only prevent steam from entering the inside of railing, increase the service life of railing;Meanwhile, water proof ring has certain
Plastic deformation ability, when vertical rod grafting is fixed in the mounting hole of cross bar, water proof ring is by vertical rod clamping, vertical rod and the connection of cross bar
It is more firm.The cross bar is fixedly connected on column, when cross bar is connected with column, and the end of cross bar is provided with plastics connection
Part, after cross bar is connected with column, plastic fastening is clamped between the vertical rod and the cross bar, it is to avoid cross bar and vertical rod are straight
Contact, when improving metallic rod and directly contacting, the situation that contact surface is easily corroded, meanwhile, the contact surface of cross bar and vertical rod
Laminating is even closer, and without gap, air is not easily accessible, and the contact surface for effectively avoiding railing is corroded and causes railing to use
The problem of short life and low safety in utilization.Further, when the column is fixedly connected with the facial canal, the end of column
Plastic fastening is installed, plastic fastening is clamped between column and facial canal, contact of the column with facial canal is even closer, column
Gap is not produced with the contact surface of facial canal, the contact position of column and facial canal is difficult to be corroded, using safety and service life is long.
The combination balustrade that the present invention is provided, has the advantages that the railing that combinations thereof railing preparation method is obtained.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be attached to what is used required in embodiment
Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore is not construed as pair
The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this
A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is the structure chart of combination balustrade of the present invention;
Fig. 2 is the structure chart of the cross bar of combination balustrade of the present invention;
Fig. 3 is the structure chart of the first connecting portion of combination balustrade of the present invention;
Fig. 4 is the structure chart of the column of combination balustrade of the present invention;
Fig. 5 is the structure chart of the plastic fastening of railing of the present invention;
Fig. 6 is the cross bar and the attachment structure figure of column of the combination balustrade of prior art;
Fig. 7 is Fig. 6 right view.
Reference collects:
Cross bar 101, vertical rod 102, column 103, facial canal 104, screw 105 connects accessory 106, bottom surface 107, turn-line
108, flanging 109;
Mounting hole 201, water proof ring 202, plastic fastening 203, first connecting portion 204, second connecting portion 205, groove
206, base 207, reinforcing rib structure 208.
Embodiment
Railing is very wide using scope in our daily lifes, railing is both provided with garden, balcony or window, now
Combination balustrade more than be made of metal material, built by many shapes and tower structure be made, the combination of prior art
Metallic rod is directly fixed up by railing by the way of grafting, and needs to be fixedly connected by connector, metallic rod it
Between easily there is gap, air and steam are entered in metallic rod by gap, are easily corroded metallic rod, are caused the use of railing
Short life.
In consideration of it, the present invention designer provide a kind of combination balustrade preparation method and combination balustrade, metallic rod it
Between connected by plastic fastening, link position combines even closer, is not in gap, it is to avoid air and steam enter
Enter, the inside of railing is difficult to be corroded, the service life of railing is long.
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
A part of embodiment of the present invention, rather than whole embodiments.The present invention implementation being generally described and illustrated herein in the accompanying drawings
The component of example can be arranged and designed with a variety of configurations.Therefore, reality of the invention below to providing in the accompanying drawings
The detailed description for applying example is not intended to limit the scope of claimed invention, but is merely representative of the selected implementation of the present invention
Example.Based on the embodiment in the present invention, what those of ordinary skill in the art were obtained under the premise of creative work is not made
Every other embodiment, belongs to the scope of protection of the invention.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi
It is defined in individual accompanying drawing, then it further need not be defined and explained in subsequent accompanying drawing.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ",
The orientation or position relationship of the instruction such as " level ", " interior ", " outer " be based on orientation shown in the drawings or position relationship, or should
Orientation or position relationship that invention product is usually put when using, are for only for ease of the description present invention and simplify description, without
It is that instruction or the signified device of hint or element must have specific orientation, with specific azimuth configuration and operation, therefore not
It is understood that as limitation of the present invention.In addition, term " first ", " second ", " the 3rd " etc. are only used for distinguishing description, and it can not manage
Solve to indicate or imply relative importance.
In the description of the invention, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ",
" installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or one
Connect body;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirect by intermediary
It is connected, can is the connection of two element internals.For the ordinary skill in the art, on being understood with concrete condition
State the concrete meaning of term in the present invention.
Combination balustrade preparation method embodiment
Fig. 1-5 are referred to, the invention provides a kind of combination balustrade preparation method, methods described includes:
Step S100, multiple mounting holes 201 are set on cross bar 101, multiple water proof rings 202 are corresponded into installation respectively
On mounting hole 201;
Step S200, making inner frame, the inner frame includes many vertical rods 102 and the cross bar 101, by many vertical rods
102 are arranged between two cross bars 101 be arrangeding in parallel, and the two ends of the vertical rod 102 are inserted into the corresponding installation
In hole 201, the water proof ring 202 is made to be set in the two ends of the vertical rod 102, and many vertical rods 102 are along the cross bar 101
Axially spaced-apart set;
Step S300, the inner frame is arranged between the two root posts 103 that be arranged in parallel, makes the cross bar 101 hang down
It is straight that and the two ends of the cross bar 101 are arranged with plastic fastening 203 respectively in the column 103, the cross bar 101 with it is described
Column 103 is fixedly connected, and makes the plastic fastening 203 be clamped between the cross bar 101 and the column 103;
Step S400, installation facial canal 104, make the facial canal 104 perpendicular to the column 103, at the end of the column 103
Portion is arranged plastic fastening 203, and the grafting of column 103 is fixed on into the facial canal 104, and the plastic fastening 203 blocks
Tightly between the column 103 and the facial canal 104.
The invention provides a kind of combination balustrade preparation method, this method makes obtained railing, the link position of railing
There is no gap, the overall structure of railing is compacter, the service life length of railing and safe and reliable.
Specifically, railing includes setting multiple on cross bar 101, vertical rod 102, column 103 and facial canal 104, cross bar 101
Mounting hole 201, corresponds and installs water proof ring 202, the grafting of vertical rod 102 is fixed on into peace respectively in the mounting hole 201
Fill in hole 201, water proof ring 202 is clamped in vertical rod 102, water proof ring 202 can not only prevent steam from entering the inside of railing, increase
Plus the service life of railing;Meanwhile, water proof ring 202 has certain plastic deformation ability, and the grafting of vertical rod 102 is fixed on cross bar
When in 101 mounting hole 201, water proof ring 202 is by the clamping of vertical rod 102, and vertical rod 102 and the connection of cross bar 101 are more firm.
The cross bar 101 is fixedly connected on the column 103, when cross bar 101 is connected with column 103, the end of cross bar 101
Portion is provided with plastic fastening 203, after cross bar 101 is connected with column 103, and plastic fastening 203 is clamped on the He of vertical rod 102
Between the cross bar 101, it is to avoid cross bar 101 is directly contacted with vertical rod 102, when improving metallic rod and directly contacting, contact surface
Situation about being easily corroded, and cross bar 101 fitted with the contact surface of vertical rod 102 it is even closer, without gap, air be difficult into
Enter, the inside for effectively avoiding railing is corroded the problem of causing short railing service life and low safety in utilization.
Further, when the column 103 is fixedly connected with the facial canal 104, the end of column 103 is provided with plastics company
Fitting 203, plastic fastening 203 is clamped between column 103 and facial canal 104, and the contact with facial canal 104 of column 103 more steps up
Close, the contact surface of column 103 and facial canal 104 does not produce gap, and the contact position of column 103 and facial canal 104 is difficult to be corroded, and makes
With safety and service life is long.
Railing is tower structure, and tower structure not only saves material, meanwhile, it is easily installed and dismantles.Railing is installed
When, first cross bar 101 and vertical rod 102 are assembled, for the ease of vertical rod 102 is arranged on cross bar 101, and in order to increase cross bar
101 and the bonding tightness of vertical rod 102, the cross bar 101 is rectangular shaft, and rectangular shaft has smooth plane, in cross bar 101
When same side sets mounting hole 201, it is stamped to form using professional numerically controlled hydraulic press, mounting hole 201 is easy to process, and vertical rod
Water proof ring 202 is provided between 102 and cross bar 101, the binding face of water proof ring 202 and cross bar 101 is tightly combined, and is less prone to seam
Gap, waterproof and gas-tight effect are good.Vertical rod 102 is arranged on cross bar 101, and the structure of vertical rod 102 can be entered according to different situations
Row processing, vertical rod 102 can be processed as cylindrical bar, more attractive in appearance, accordingly, the multiple peaces set on the cross bar 101
Dress hole 201 is circular port, and the diameter of circular port is engaged with the diameter of the vertical rod 102, vertical rod 102 and the cooperation of cross bar 101
It is even closer;The vertical rod 102 can also be processed as rectangular shaft, and the intensity of rectangular shaft is good, easy to process, i.e., rectangular shaft has four
The length side that bar be arranged in parallel, every length side has two adjacent faces, and four length sides are four of rectangular shaft
Skeleton, rectangular shaft is unlikely to deform.
Meanwhile, in order to increase the structural strength after cross bar 101 is connected with vertical rod 102, by vertical rod 102 perpendicular to cross bar 101
Set, the quantity of vertical rod 102 is determined according to the height of railing, further, is determined according to the length of cross bar 101,
It is preferred that, four parallel vertical rods 102 are set between two cross bars 101.Cross bar 101 is vertically arranged with vertical rod 102, is stood
Processing is easy in the end of bar 102, is easy to the installation of vertical rod 102, and water proof ring 202 is vertical with vertical rod 102 is connected, water proof ring 202
Uniform force, be difficult loosen, good water-proof effect.
In the preferred scheme of the embodiment, in the step S100, the two ends of the cross bar 101 be separately provided for
The first connecting portion 204 that the column 103 is fixedly connected, the plastic fastening 203 is provided with and the phase of first connecting portion 204
The groove 206 of matching, the first connecting portion 204 is located in the groove 206.First connecting portion 204 it is simple in construction, according to
Different situations are processed, and selectivity is big, and processing is flexible, is easy to the connection of cross bar 101 and column 103, meanwhile, the first connection
Portion 204 is located in the groove 206 of plastic fastening 203, and first connecting portion 204 is difficult to be corroded, and service life is long.
In the preferred scheme of above-mentioned embodiment, the first connecting portion 204 includes two flangings 109 turned down outwardly,
Described two flangings 109 are located on two relative sides of the cross bar 101, and described two flangings 109 are respectively perpendicular to institute
State two relative sides of cross bar 101;Correspondence in through hole, the through hole is respectively arranged with described two flangings and is plugged with spiral shell
Nail;The first connecting portion 204 is additionally provided with reinforcing rib structure 208, and the reinforcing rib structure 208 is along perpendicular to the flanging 109
Turn-line 108 direction extension, and the reinforcing rib structure 208 one end be located at be connected with the flanging 109 described in
On the corresponding side of cross bar 101, its other end is located on the flanging 109.
First connecting portion 204 it is easy to process, by specialty hydraulic press punching press the flanging 109 is made, flanging 109
Precision is high, and the cooperation with the groove 206 of plastic fastening 203 is even closer, the first connecting portion 204 and the column 103
It is fixedly connected, screw is tightened in column 103 by screw using professional electric hand drill, screwing operations simple and fast, fixed effect
It is really good;Two flangings 109 are located at two relative sides of the cross bar 101, when flanging 109 is fixed, the stress of flanging 109
Uniformly, bigger power can be born.
Further, because first connecting portion 204 has reinforcing rib structure 208, reinforcing rib structure 208 adds flanging
109 intensity.When the cross bar 101 is fixed with column 103 by the flanging 109, it is not necessary to the other attachment structures of increase,
Installation steps are reduced, mounting material is saved, it is easier for installation;Fig. 6-7 are referred to, wherein, Fig. 6 and Fig. 7 are in order to clear
The connected mode of the traditional cross bar of Chu's expression and column, therefore illustrate only the structure chart of junction.Traditional combination balustrade is consolidated
, it is necessary to set connection accessory 106 when connecting surely, it is fixedly connected between cross bar 101 and column 103 by connecting accessory 106, i.e.
First connection accessory 106 is tightened on column 103 by screw 105, cross bar 101 is then inserted into connection accessory 106
It is interior, finally cross bar 101 is fixedly connected with being connected accessory 106 using screw 105, attachment structure is complicated, connected insecure;Together
When, there is larger gap between cross bar 101 and connection accessory 106 and column 103 and connection accessory 106, during use,
Cross bar 101 and the inside of column 103 are easily corroded, and safety in utilization is low, service life is short.
In the preferred scheme of above-mentioned embodiment, the reinforcing rib structure 208 is set to four, each flanging 109
It is upper that there are two reinforcing rib structures 208;The reinforcing rib structure 208 is depressed part, and the flanging 109 has top surface and bottom
Face 107, direction depression of the depressed part along the bottom surface 107 towards the top surface, wherein, the top surface and the bottom surface
107 are oppositely arranged, and the bottom surface 107 is the face that the flanging 109 is directed downward along turnover, and the top surface is the flanging 109
Along the face of turnover direction upward.Reinforcing rib structure 208 it is easy to process, directly process depressed part on flanging 109, it is not necessary to set
Unnecessary structure is put, alignment error is reduced, meanwhile, add the structural integrity of whole railing.Depressed part is preferably processed to
Bar-shaped trough, bar-shaped trough tactical rule is easy to processing, the similar bar construction of bar-shaped trough, with good support effect.Obviously, plus
The quantity of strengthening tendons structure is not unique, is selected according to actual conditions, and manufacture is flexible.
As the preferred scheme of the present embodiment, in the step S300, one end of the column 103 is welded with base 207,
Its other end is provided with second connecting portion 205, and the column 103 is fixed by the second connecting portion 205 with the facial canal 104
Connection.Base 207 is rectangular plate-like structure, easy to process, for railing to be fixedly mounted on suitably by the base 207
Position, when it is implemented, base 207 is made up of stainless steel material, is provided with four circular holes, four circular holes are located on base 207
The position at four angles of base 207, during non-floating rail, four circular holes is passed through by screw, fixed form is simple and reliable.
The setting of second connecting portion 205, is easy to column 103 being fixedly connected with facial canal 104, and plastic fastening 203 installation more
Convenient, after plastic fastening 203 is installed, the contact surface of plastic fastening 203 and facial canal 104 is even closer, its waterproof, gas-tight effect
Fruit is more preferably.
For the ease of the installation of column 103 and facial canal 104, the cross section of column 103 is rectangular configuration, the horizontal stroke of facial canal 104
Section is also rectangular configuration, and facial canal 104 has smooth plane, and plastic fastening 203 and fitting for smooth flat are even closer,
Waterproof, gas-tight effect are good.
In the preferred scheme of above-mentioned embodiment, the second connecting portion 205 includes two flangings turned down outwardly, described
Two flangings are located on two relative sides of the column 103, and described two flangings are respectively perpendicular to the phase of column 103
To two sides;Correspondence in through hole, the through hole is respectively arranged with described two flangings and is plugged with screw;Described second
Connecting portion 205 is arranged with plastic fastening 203.Second connecting portion 205 is simple in construction, is easy to processing, with plastic fastening 203
Coordinate even closer, be fixedly connected using screw, connected mode is simple and reliable, it is time saving and energy saving to install.Referring to Fig. 4, obviously, the
Two flangings of two connecting portions 205 can also be processed as the structure with reinforcing rib structure 208, and intensity is high, and use is safer.
In actual processing, cross bar 101, vertical rod 102, column 103 and facial canal 104 can use hot-galvanized steel control
Into corrosion resistance is more preferable.
Combination balustrade embodiment
Fig. 1-5 are referred to, the invention provides a kind of railing, including many shapes, many shape structures
Into tower structure, the shape includes cross bar 101, vertical rod 102, column 103 and facial canal 104, wherein:
The cross bar 101 has multiple mounting holes 201, axially spaced-apart of the multiple mounting hole 201 along the cross bar 101
Corresponded in setpoint distance, the multiple mounting hole 201 and water proof ring 202 is installed, the vertical rod 102 is located at two horizontal strokes
Between bar 101, the vertical rod 102 through the water proof ring 202 and is fixed on the cross bar by the mounting hole 201 inserting
101, the water proof ring 202 is clamped in the vertical rod 102;
Two columns 103 are be arranged in parallel, and two cross bars 101 and the vertical rod 102 are respectively positioned on described in two
Between column 103, and the cross bar 101 is perpendicular to the column 103;The end of the cross bar 101 is provided with the first connection
Portion 204, the first connecting portion 204 is arranged with plastic fastening 203, and the first connecting portion 204 is fixed with the column 103
Connection, the plastic fastening 203 is clamped between the first connecting portion 204 and the column 103;
The facial canal 104 is perpendicular to the column 103, and two columns 103 are located at two ends difference with one end
Second connecting portion 205 is provided with, the second connecting portion 205 is provided with plastic fastening 203, the second connecting portion 205 and institute
State facial canal 104 to be fixedly connected, the plastic fastening 203 is clamped between the second connecting portion 205 and the facial canal 104.
The railing that the present invention is provided, simple and compact for structure, the link position between metallic rod does not have gap, effectively to improve
The problem of steam or air enter from gap and then corrode metallic rod, the service life length of railing and use safety.
In the preferred scheme of the embodiment, the first connecting portion 204 passes through STAINLESS STEEL HEX SOCKET CAP SCREWS and the vertical rod
102 are fixedly connected, and connected mode is simple and reliable, and it is time saving and energy saving to install.
In the preferred scheme of the embodiment, the other end of the column 103 is welded with base 207, is easy to the fixation of railing
Install, meanwhile, railing is fixedly mounted by base 207, and railing can bear bigger power, and use is safer.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area
For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies
Change, equivalent substitution, improvement etc., should be included in the scope of the protection.
Claims (6)
1. a kind of combination balustrade preparation method, it is characterised in that methods described includes:
Step S100, multiple mounting holes are set on cross bar, multiple water proof rings are corresponded on mounting hole respectively;
Step S200, making inner frame, the inner frame include many vertical rods and the cross bar, and many vertical rods are arranged on into parallel
Between two cross bars set, the two ends of the vertical rod are inserted into the corresponding mounting hole, make the waterproof snare
The two ends of the vertical rod are located at, and axially spaced-apart of many vertical rods along the cross bar is set;
Step S300, the inner frame is arranged between the two root posts that be arranged in parallel, makes the cross bar perpendicular to described vertical
Post, and the two ends of the cross bar are arranged with plastic fastening respectively, the two ends of the cross bar are separately provided for standing with described
The first connecting portion that post is fixedly connected, the first connecting portion includes two flangings turned down outwardly, and described two flangings are located at
On two relative sides of the cross bar, and described two flangings are respectively perpendicular to two relative sides of the cross bar;It is described
Correspondence in through hole, the through hole is respectively arranged with two flangings and is plugged with screw;
The first connecting portion is additionally provided with reinforcing rib structure, side of the reinforcing rib structure along the turn-line perpendicular to the flanging
One end to extension, and the reinforcing rib structure is located on the corresponding side for the cross bar being connected with the flanging, its
The other end is located on the flanging;The cross bar is fixedly connected by the first connecting portion with the column, makes the plastics
Connector is clamped between the cross bar and the column;
Step S400, installation facial canal, make the facial canal perpendicular to the column, and plastics connection is arranged in the end of the column
Part, the facial canal is fixed on by the column grafting, and the plastic fastening is clamped between the column and the facial canal.
2. combination balustrade preparation method according to claim 1, it is characterised in that
In the step S100, the cross bar is rectangular shaft, and the mounting hole site is on the same side of the rectangular shaft, and institute
Mounting hole is stated for rectangular opening.
3. combination balustrade preparation method according to claim 2, it is characterised in that
In the step S100, the plastic fastening is provided with the groove matched with the first connecting portion, and described first connects
Socket part is located in the groove.
4. combination balustrade preparation method according to claim 1, it is characterised in that the reinforcing rib structure is set to four
It is individual, there are two reinforcing rib structures on each flanging;The reinforcing rib structure is depressed part, and the flanging has top
Face and bottom surface, direction depression of the depressed part along the bottom surface towards the top surface, wherein, the top surface and the bottom surface phase
To setting, the face that the bottom surface is directed downward for the flanging along turnover, the top surface is that flanging edge turns down direction upward
Face.
5. combination balustrade preparation method according to claim 1, it is characterised in that
In the step S300, one end of the column is welded with base, and its other end is provided with second connecting portion, the column
It is fixedly connected by the second connecting portion with the facial canal.
6. combination balustrade preparation method according to claim 5, it is characterised in that the second connecting portion includes court and turned up
Two flangings of folding, described two flangings are located on two relative sides of the column, and described two flangings are respectively perpendicular
In two relative sides of the column;Correspondence in through hole, the through hole is respectively arranged with described two flangings and is plugged with spiral shell
Nail;The second connecting portion is arranged with plastic fastening.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511017323.2A CN105569285B (en) | 2015-12-29 | 2015-12-29 | Combination balustrade preparation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511017323.2A CN105569285B (en) | 2015-12-29 | 2015-12-29 | Combination balustrade preparation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105569285A CN105569285A (en) | 2016-05-11 |
CN105569285B true CN105569285B (en) | 2017-10-17 |
Family
ID=55879856
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511017323.2A Active CN105569285B (en) | 2015-12-29 | 2015-12-29 | Combination balustrade preparation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105569285B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107034814A (en) * | 2017-05-17 | 2017-08-11 | 无锡市汤成机电配件厂 | Central road surface protection type guardrail |
CN109881581B (en) * | 2019-03-12 | 2021-03-26 | 北京市园林古建设计研究院有限公司 | Steel plate wrapped wood handrail |
CN112127645A (en) * | 2020-09-23 | 2020-12-25 | 晟通科技集团有限公司 | Railing unit and template combination |
CN112095945B (en) * | 2020-09-27 | 2021-08-17 | 深圳千里马装饰集团有限公司 | Energy-saving decorative guardrail convenient to install |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007186901A (en) * | 2006-01-13 | 2007-07-26 | Tobu Imarin Kk | Log barrier connection structure |
CN201343780Y (en) * | 2008-09-09 | 2009-11-11 | 无锡艾克赛尔栅栏有限公司 | Balcony guardrail using snap spring and sleeve |
CN102304984A (en) * | 2011-08-31 | 2012-01-04 | 陈华斌 | Assembly guardrail structure and special bulge extrusion tool |
CN203022252U (en) * | 2012-10-12 | 2013-06-26 | 上海博盾机电科技有限公司 | Balcony guardrail |
CN103669995A (en) * | 2013-11-14 | 2014-03-26 | 安徽杰宇力防护设施有限公司 | Assembly-type guardrail |
CN205242896U (en) * | 2015-12-29 | 2016-05-18 | 周欢 | Combined guard -rail |
-
2015
- 2015-12-29 CN CN201511017323.2A patent/CN105569285B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007186901A (en) * | 2006-01-13 | 2007-07-26 | Tobu Imarin Kk | Log barrier connection structure |
CN201343780Y (en) * | 2008-09-09 | 2009-11-11 | 无锡艾克赛尔栅栏有限公司 | Balcony guardrail using snap spring and sleeve |
CN102304984A (en) * | 2011-08-31 | 2012-01-04 | 陈华斌 | Assembly guardrail structure and special bulge extrusion tool |
CN203022252U (en) * | 2012-10-12 | 2013-06-26 | 上海博盾机电科技有限公司 | Balcony guardrail |
CN103669995A (en) * | 2013-11-14 | 2014-03-26 | 安徽杰宇力防护设施有限公司 | Assembly-type guardrail |
CN205242896U (en) * | 2015-12-29 | 2016-05-18 | 周欢 | Combined guard -rail |
Also Published As
Publication number | Publication date |
---|---|
CN105569285A (en) | 2016-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105569285B (en) | Combination balustrade preparation method | |
CN206323069U (en) | A kind of insulating bar method livewire work platform | |
CN205543820U (en) | Novel mounting bracket | |
CN203605170U (en) | Lamp installing suspension cable hooking clamp | |
CN108277759A (en) | Adjustable-angle combines guardrail and its installation method | |
CN205242896U (en) | Combined guard -rail | |
CN202492928U (en) | Factory assembly type lattice lightweight steel construction | |
CN112211384B (en) | Scaffold for building site | |
CN203961436U (en) | A kind of novel wood-plastic fence | |
CN209260903U (en) | A kind of logical connection structure in the steel side for being easy to be located by connecting | |
CN208563181U (en) | A kind of adjustable fence unit of setting angle | |
CN209637259U (en) | Edge protection system | |
CN210421443U (en) | Non-welding flat plate fixing embedded part | |
CN206544188U (en) | A kind of robot clamp aluminium section bar main frame structure part | |
CN205896397U (en) | Prop up hanger device | |
CN203834833U (en) | Guardrail | |
CN208563179U (en) | Adjustable-angle combines guardrail | |
CN203547111U (en) | Lightning protection connection device of construction steel tube scaffold and reinforced down lead | |
CN208023924U (en) | It is a kind of to facilitate assembled construction site scaffold | |
CN214785222U (en) | Gypsum board lamp house molding furred ceiling reinforced structure | |
CN204754185U (en) | Fastener is connected to steel pipe | |
CN108265654A (en) | A kind of adjustable fence unit of setting angle | |
CN108265653A (en) | A kind of guardrail cross beams bindiny mechanism | |
CN204266503U (en) | A kind of Assembled-type guardrail | |
CN207766187U (en) | A kind of photovoltaic bracket column bar jointing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230512 Address after: 230000 Factory Building 2 of Hefei Zhongji Group Machinery Manufacturing Co., Ltd. at the intersection of Xiangpu Road and Cuizhu Road in Taohua Town, Feixi County, Hefei City, Anhui Province Patentee after: Hefei Xinye Tieyi Handrail Facilities Co.,Ltd. Address before: Dianzhou Village Group, Yugang Village, Xiaomiao Town, Feixi County, Hefei City, Anhui Province, 231281 Patentee before: Zhou Huan |
|
TR01 | Transfer of patent right |