CN105569070B - 浇筑大尺寸混凝土梁柱的方法 - Google Patents
浇筑大尺寸混凝土梁柱的方法 Download PDFInfo
- Publication number
- CN105569070B CN105569070B CN201510942198.XA CN201510942198A CN105569070B CN 105569070 B CN105569070 B CN 105569070B CN 201510942198 A CN201510942198 A CN 201510942198A CN 105569070 B CN105569070 B CN 105569070B
- Authority
- CN
- China
- Prior art keywords
- column
- stupefied
- crossbeam
- template
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Abstract
本发明公开了浇筑大尺寸混凝土梁柱结构的方法,包括以下步骤a、设置立柱钢筋骨架,b、定位放线并设置立柱模板,c、安装立柱模板支撑体系,d、向立柱模板中浇筑混凝土,e、初凝前在立柱顶端插入增强钢筋,f、达到设定强度后拆除立柱模板,g、对柱体顶部进行凿毛处理,h、设置横梁钢筋骨架,i、设置横梁模板及其支撑体系,j、向横梁模板中浇筑混凝土并进行振捣,k、拆模养护,其中:步骤c中立柱模板支撑体系包括竖直次楞和水平双钢管主楞;步骤i的横梁模板支撑体系包括水平次楞、双钢管主楞和支撑脚手架。本发明先进行立柱施工,然后进行横梁浇筑,可提高产品一次合格率并提高施工安全性。
Description
技术领域
本发明涉及建筑工程领域,涉及大尺寸混凝土的浇筑方法,特别涉及蒸汽机基础施工方案,具体涉及分步浇筑汽轮机梁柱混凝土的方法。
背景技术
蒸汽机是将蒸汽的能量转换成为机械功的旋转式动力机械。又称蒸汽透平。主要用作发电用的原动机,也可直接驱动各种泵、风机、压缩机和船舶螺旋桨等。蒸汽机体积大、质量重,对安装基座的强度、刚度和耐久性有很高要求,目前蒸汽机基座多采用混泥土浇筑成型,常见的蒸汽机混泥土基座包括多根立柱和水平设置在立柱上端的横梁构成,使用时立柱安装在横梁上。
目前蒸汽机梁柱结构普遍采用一体化浇筑工艺,浇筑过程中受力情况如图3所示,立柱模板侧壁除需要承受自身压力外还需承受横梁施加的载荷,立柱对横梁支撑作用极小,横梁的重量主要靠横梁模板承担,这就增加了对横梁和立柱模板支撑体系的要求;目前立柱模板水平支撑体普遍采用20槽钢和A16对拉螺杆,横梁支撑体系中脚手架管的间距300~400mm,且支撑梁底模板处采用20槽钢支撑,即浪费原材料,又不利于工人进入脚手架区域内部进行检查,无法保证施工安全性。
发明内容
有鉴于此,本发明提供了一种浇筑大尺寸混凝土梁柱的方法。
浇筑大尺寸混凝土梁柱结构的方法,所述混凝土梁柱结构包括多根立柱和设置在立柱顶端的横梁,施工时首先进行立柱浇筑,然后进行横梁浇筑,具体过程如下:a、设置立柱钢筋骨架,b、定位放线并设置立柱模板,c、安装立柱模板支撑体系,d、向立柱模板中浇筑混凝土,e、初凝前在立柱顶端插入增强钢筋,f、达到设定强度后拆除立柱模板,g、对柱体顶部进行凿毛处理,h、设置横梁钢筋骨架,i、设置横梁模板及其支撑体系,j、向横梁模板中浇筑混凝土并进行振捣,k、拆模养护,其中:步骤c中立柱模板支撑体系包括竖直次楞和水平双钢管主楞,所述双钢管主楞之间通过对拉螺栓固定;步骤i的横梁模板支撑体系包括水平次楞、双钢管主楞和支撑脚手架。
作为本方法的优选,步骤b中立柱模板与立柱钢筋骨架的距离大于25mm。
作为本方法的优选,步骤c中立柱模板水平支撑体系采用A48×2.7双钢管和A12对拉螺杆。
作为本方法的优选,步骤e的增强钢筋为500mm长的A12螺纹钢筋,插入深度为300mm,间距200mm。
作为本方法的优选,步骤i的横梁模板垂直支撑体系采用间距500~600mm的脚手架管,所述脚手架顶部支撑梁底模板处采用A48×2.7双钢管支撑。
作为本方法的优选,所述混凝土梁柱结构包括三根立柱,高度为6.8m,中间立柱的截面尺寸为1.2×1.2m,两边立柱的截面尺寸为1.2×1.5m,一根横梁,所述横梁长度为17m,截面为3.33×2.15m。
作为本方法的进一步优选,所述混凝土由以下组分搅拌混合制得:水泥272kg,细骨料733kg,粗骨料1142kg,水160kg,外加剂5.17kg,粉煤灰70kg。
本发明的有益效果在于:本发明浇筑大尺寸混凝土梁柱的方法先进行立柱施工,然后进行横梁浇筑,从根本上克服了一次浇筑成型混凝土外观质量一次合格率低的缺陷且可以有效缩短施工工期;本发明还调整了柱体及横梁支撑体系,既增强了脚手架支撑体系的安全性又降低了模板及模板支撑材料消耗;本发明进一步调整了混凝土的原料成份及梁柱尺寸,可以有效增加混凝土的填充性能,增强梁柱结构的密实度。
附图说明
为了使本发明的目的、技术方案和优点更加清楚,下面将结合附图对本发明作进一步的详细描述,其中:
图1为本发明大尺寸混凝土梁柱结构示意图;
图2为本发明横梁施工时受力情况示意图;
图3为现有一体化施工技术受力情况示意图。
具体实施方式
以下将参照附图,对本发明的优选实施例进行详细的描述。
如图1所述,本实施例将公开一种大尺寸混凝土梁柱结构,包括三根立柱1和浇筑在立柱顶端的横梁2,优选的,该梁柱结构的横梁长度为17m,截面尺寸为3.33×2.15m,立柱高度为6.8m,中间立柱的截面尺寸为1.2×1.2m,两边立柱的截面尺寸为1.2×1.5m。
施工时,按照以下步骤进行,a、设置立柱钢筋骨架,b、定位放线并设置立柱模板,c、安装立柱模板支撑体系,d、向立柱模板中浇筑混凝土,e、初凝前在立柱顶端插入增强钢筋,f、达到设定强度后拆除立柱模板,g、对柱体顶部进行凿毛处理,h、设置横梁钢筋骨架,所述横梁钢筋骨架与立柱顶端的增强钢筋相连或相互交叉,i、设置横梁模板及其支撑体系,j、向横梁模板中浇筑混凝土并进行振捣,k、拆模养护。
其中:步骤b中立柱模板与立柱钢筋骨架的距离大于25mm;步骤c中立柱模板支撑体系包括竖直次楞和水平双钢管主楞,所述双钢管主楞之间通过对拉螺栓固定,所述水平双钢管为A48×2.7双钢管,所述对拉螺杆为A12对拉螺杆;步骤e的加强筋为500mm长的A12螺纹钢筋,插入深度为300mm,间距200mm;步骤i的横梁模板垂直支撑体系采用间距500~600mm的脚手架管,所述脚手架顶部支撑梁底模板处采用A48×2.7双钢管支撑。
特别的,本实施例中混凝土由以下组分搅拌混合制得:水泥272kg,细骨料733kg,粗骨料1142kg,水160kg,外加剂5.17kg,粉煤灰70kg。
大尺寸混凝土梁柱通常采用一体化浇筑,其受力情况如图3所示,立柱模板侧壁除需要承受自身压力外还需承受横梁施加的载荷;本实施例浇筑大尺寸混凝土梁柱的方法先进行立柱施工,然后进行横梁浇筑,横梁浇筑时受到立柱的支撑力(如图2所示),从而减轻了横梁支撑体系的所承受的重量,可以在减少支撑材料的同时提高体系安全性,本发明立柱施工时无需承受横梁的荷重,对模板侧壁压力大幅降低,可以降低对立柱支撑体系的要求。
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管通过参照本发明的优选实施例已经对本发明进行了描述,但本领域的普通技术人员应当理解,可以在形式上和细节上对其作出各种各样的改变,而不偏离所附权利要求书所限定的本发明的精神和范围。
Claims (2)
1.浇筑大尺寸混凝土梁柱结构的方法,其特征在于:所述混凝土梁柱结构包括多根立柱和设置在立柱顶端的横梁,施工时首先进行立柱浇筑,然后进行横梁浇筑,具体过程如下:a、设置立柱钢筋骨架,b、定位放线并设置立柱模板,c、安装立柱模板支撑体系,d、向立柱模板中浇筑混凝土,e、初凝前在立柱顶端插入增强钢筋,f、达到设定强度后拆除立柱模板,g、对柱体顶部进行凿毛处理,h、设置横梁钢筋骨架,i、设置横梁模板及其支撑体系,j、向横梁模板中浇筑混凝土并进行振捣,k、拆模养护,其中:步骤c中立柱模板支撑体系包括竖直次楞和水平双钢管主楞,所述双钢管主楞之间通过对拉螺栓固定;步骤i的横梁模板支撑体系包括水平次楞、双钢管主楞和支撑脚手架;步骤b中立柱模板与立柱钢筋骨架的距离大于25mm;步骤c中立柱模板水平支撑体系采用A48×2.7双钢管和A12对拉螺杆;步骤e的增强钢筋为500mm长的A12螺纹钢筋,插入深度为300mm,间距200mm;步骤i的横梁模板垂直支撑体系采用间距500~600mm的脚手架管,所述脚手架顶部支撑梁底模板处采用A48×2.7双钢管支撑;所述混凝土梁柱结构包括三根立柱,高度为6.8m,中间立柱的截面尺寸为1.2×1.2m,两边立柱的截面尺寸为1.2×1.5m,一根横梁,所述横梁长度为17m,截面尺寸为3.33×2.15m。
2.根据权利要求1所述浇筑大尺寸混凝土梁柱结构的方法,其特征在于:所述混凝土由以下组分搅拌混合制得:水泥272kg,细骨料733kg,粗骨料1142kg,水160kg,外加剂5.17kg,粉煤灰70kg。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510942198.XA CN105569070B (zh) | 2015-12-16 | 2015-12-16 | 浇筑大尺寸混凝土梁柱的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510942198.XA CN105569070B (zh) | 2015-12-16 | 2015-12-16 | 浇筑大尺寸混凝土梁柱的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105569070A CN105569070A (zh) | 2016-05-11 |
CN105569070B true CN105569070B (zh) | 2018-08-07 |
Family
ID=55879657
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510942198.XA Active CN105569070B (zh) | 2015-12-16 | 2015-12-16 | 浇筑大尺寸混凝土梁柱的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105569070B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111794267B (zh) * | 2020-07-10 | 2021-10-29 | 广州协安建设工程有限公司 | 一种施工升降机基础施工方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1502756A (zh) * | 2002-11-22 | 2004-06-09 | 钟肇鸿 | 建筑框架的梁柱节点结构及施工方法 |
WO2009055691A2 (en) * | 2007-10-24 | 2009-04-30 | Western Forms, Inc. | Multiple dimension beam, deck and column system |
CN102003067B (zh) * | 2010-11-04 | 2012-07-04 | 中建三局建设工程股份有限公司 | 饰面清水混凝土结构梁、柱接头模板加固体系 |
CN202007527U (zh) * | 2011-03-14 | 2011-10-12 | 江苏兴邦建工集团有限公司 | 一种现浇钢筋混凝土柱模板固定装置 |
CN104712141A (zh) * | 2013-12-12 | 2015-06-17 | 五冶集团上海有限公司 | 现浇钢筋混凝土密肋梁楼板施工方法 |
-
2015
- 2015-12-16 CN CN201510942198.XA patent/CN105569070B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105569070A (zh) | 2016-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205604088U (zh) | 一种盖梁可快速调节支架 | |
CN105971272B (zh) | 装配式铝模板砌块填充墙钢筋混凝土构造柱及施工方法 | |
CN103306208A (zh) | 1.6次抛物线形新型四柱板式空心变截面高墩爬模方法 | |
CN105803946B (zh) | 一种盖梁可快速调节支架及其施工方法 | |
CN103882813B (zh) | 用于桥墩与横系梁同步施工的牛腿托架平台及其搭建方法 | |
CN103967273B (zh) | 楼板浇筑用混凝土模板支撑装置 | |
CN201666157U (zh) | 仰拱整体式移动模架 | |
CN204357117U (zh) | 一种后浇带梁板模板及其格构柱 | |
CN105464216B (zh) | 基于整体提升式模板加固系统超高超大截面斜柱的施工方法 | |
CN202937005U (zh) | 现浇混凝土梁侧模板加固装置 | |
CN106320704A (zh) | 型钢混凝土结构模板套筒螺杆拉结施工方法 | |
CN103866697A (zh) | 一种桥墩与横系梁牛腿托架同步施工方法 | |
CN201738250U (zh) | 拱涵拱圈钢模台车 | |
CN210659228U (zh) | 一种用于地铁施工的可移动式单侧支模体系 | |
CN206513015U (zh) | 基于bim技术用于建筑物楼板施工的铝合金模板机构 | |
CN103362069A (zh) | 钢混结合箱梁混凝土翼板模板及施工方法 | |
CN102900230A (zh) | 一种可升降钢筋混凝土后浇带施工方法 | |
CN105569070B (zh) | 浇筑大尺寸混凝土梁柱的方法 | |
CN207959949U (zh) | 一种放线孔封堵快速支模加固装置 | |
CN203905488U (zh) | 楼板浇筑用混凝土模板支撑装置 | |
CN206397136U (zh) | 装配式铝模板砌块填充墙钢筋混凝土构造柱 | |
CN205822792U (zh) | 一种用于砌体直埋的调节支架 | |
CN103243731B (zh) | 剪力墙梯形截面基础的支模方法 | |
CN114277672B (zh) | 一种大跨度预应力混凝土盖梁构造及其施工方法 | |
CN102635237B (zh) | 浇筑abr反应池折流板的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 400000 Nanzi village, Nanping District, Chongqing 101 Patentee after: China Electrical Construction Group Chongqing Engineering Co., Ltd. Address before: 400070 Nanzi village, Nanping District, Chongqing 101 Patentee before: Chongqing Power Construction Company |