CN105568864A - 确定斜拉桥合理施工索力的综合算法 - Google Patents

确定斜拉桥合理施工索力的综合算法 Download PDF

Info

Publication number
CN105568864A
CN105568864A CN201610118494.2A CN201610118494A CN105568864A CN 105568864 A CN105568864 A CN 105568864A CN 201610118494 A CN201610118494 A CN 201610118494A CN 105568864 A CN105568864 A CN 105568864A
Authority
CN
China
Prior art keywords
cable
value
force value
bridge
suo
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610118494.2A
Other languages
English (en)
Other versions
CN105568864B (zh
Inventor
孙全胜
孟安鑫
王希瑞
王亚洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast Forestry University
Original Assignee
Northeast Forestry University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Forestry University filed Critical Northeast Forestry University
Priority to CN201610118494.2A priority Critical patent/CN105568864B/zh
Publication of CN105568864A publication Critical patent/CN105568864A/zh
Application granted granted Critical
Publication of CN105568864B publication Critical patent/CN105568864B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/04Cable-stayed bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种确定斜拉桥合理施工索力的综合算法,所述算法包括如下步骤:首先计算斜拉索初次张拉最小限值,通过初拟索力值正装计算得到成桥状态,并提取索力影响矩阵,通过影响矩阵,调整张拉力值,使成桥状态索力值和设计成桥索力吻合,分别检验成桥状态下和施工过程中结构受力性能是否满足规范要求。本发明克服了确定合理施工索力单一方法的局限性,综合了正装迭代法和影响矩阵法的优点,考虑了施工过程中主梁收缩徐变和非线性对结构的影响,同时利用影响矩阵法,大大减少了正装迭代的次数,节省大量的时间,而且与合理成桥索力值更加接近;同时施工阶段发生变化时也能较快的将成桥索力调整成为设计成桥索力值。

Description

确定斜拉桥合理施工索力的综合算法
技术领域
本发明涉及一种确定斜拉桥合理施工索力的方法。
背景技术
斜拉桥又称斜张桥,是将梁体用许多斜拉索直接拉在桥塔上的一种桥梁,是由承压的桥塔、受拉的斜拉索和承弯的梁体组合起来的一种结构体系。斜拉桥可看做是斜拉索代替支墩的多跨弹性支承连续梁,其可使梁体内弯矩减小,降低建筑高度,减轻结构重量,节省材料。由于斜拉索的可调性,使得斜拉索的设计计算算法与一般桥型不同,斜拉桥可以通过对斜拉索索力的调整,改变结构内力分布,因此斜拉索索力对结构的应力和变形起着决定性的作用。斜拉桥成桥状态的索力进行确定后,实际施工也需要对施工过程中的索力进行优化和确定,使得施工完毕后的索力值与设计成桥状态索力值相一致。
目前对斜拉桥的合理施工索力的研究,归纳起来可分为四大类:倒拆法、正装-倒拆迭代法、正装迭代法和无应力状态控制法。其中,倒拆法计算复杂,由于受到混凝土收缩徐变及几何非线性等因素的影响,存在状态和计算不闭合现象,正装完成后的结构其结果与设计值存在偏差。正装-倒拆迭代法和正装迭代法虽能消除由于混凝土收缩徐变及非线性等引起的不闭合现象,但是迭代次数较多,需要处理多组数据,耗费大量时间。无应力状态控制法最晚提出,使用还不成熟。
发明内容
为了克服确定合理施工索力单一方法的局限性,本发明提出了一种确定斜拉桥合理施工索力的综合算法,通过正装迭代法和影响矩阵法的综合算法来确定斜拉桥的合理施工索力。
本发明的目的是通过以下技术方案实现的:
一种确定斜拉桥合理施工索力的综合算法,包括如下步骤:
一、计算斜拉索初次张拉索力最小限值,具体实施依据公式(1)-(4);
二、参照步骤一计算得到的初次张拉索力最小限值,拟定大于最小限值的初始张拉索力值,利用正装迭代法,正装计算得到成桥状态,并提取索力影响矩阵;
三、通过索力影响矩阵,调整张拉索力值,使成桥状态斜拉索索力值和设计成桥索力值吻合,具体实施依据公式(5)-(8);
四、检验成桥状态下结构受力性能是否满足规范要求,如果满足要求,则执行步骤五,如果不满足要求,则调整张拉索力值,执行步骤二;
五、检验施工过程中结构受力性能是否满足规范要求,如果满足要求,则步骤三中确定的张拉索力值即为斜拉索最终张拉索力值,如果不满足要求,则调整施工顺序,执行步骤一。
本发明具有如下优点:
1、本发明将正装迭代法和影响矩阵法两种方法结合,确定出适用于斜拉桥合理施工索力的综合算法。
2、本发明克服了确定合理施工索力单一方法的局限性,综合了正装迭代法和影响矩阵法的优点,考虑了施工过程中主梁收缩徐变和非线性对结构的影响,同时利用影响矩阵法,大大减少了正装迭代的次数,节省大量的时间,而且与合理成桥索力值更加接近;同时施工阶段发生变化时也能较快的将成桥索力调整成为设计成桥索力值。
附图说明
图1为本发明确定斜拉桥合理施工索力的综合算法流程图。
具体实施方式
下面结合附图对本发明的技术方案作进一步的说明,但并不局限于此,凡是对本发明技术方案进行修改或者等同替换,而不脱离本发明技术方案的精神和范围,均应涵盖在本发明的保护范围中。
本发明提供的确定斜拉桥合理施工索力的综合算法,包括如下步骤:首先计算斜拉索初次张拉最小限值,通过初拟索力值正装计算得到成桥状态,并提取索力影响矩阵,通过影响矩阵,调整张拉力值,使成桥状态索力值和设计成桥索力吻合,分别检验成桥状态下和施工过程中结构受力性能是否满足规范要求。如图1所示,具体操作步骤如下:
张拉索力最小限值计算过程如下:
设f为斜拉索跨中垂度,l为斜拉索在水平方向的投影,lc为斜拉索塔梁锚固点之间的直线段长度,sc为斜拉索的下料长度,几者的关系可表示为:
f = l c 3 8 ( s c l c - 1 ) - - - ( 1 ) .
斜拉索受力平衡得:
V 1 x + q x cos a · x 2 = H y - - - ( 2 ) .
其中:qlc=G,H=Tcosa。
T-斜拉索张拉索力值;
a-斜拉索与主梁之间夹角;
G-斜拉索重力;
q-斜拉索每延米重力;
x、y-控制截面距斜拉索与主梁交点的水平距离和垂直距离。
代入可得:
H = q · l c 8 f - - - ( 3 ) .
此时相应牵引力为:
T = H / cos a = q · l c 2 8 f - - - ( 4 ) .
设需要张拉拉索的总次数为m,需要控制的参数个数为n,选择理想成桥恒载索力[T1]m×1作为第一组张拉索力值,根据施工过程进行第一次正装计算得到成桥状态控制参数和目标值的差值闭合差:
[ΔB]m×1=[B0]m×1-[B1]m×1(5)。
[B0]m×1-正装计算得到控制参数计算值;
[B1]m×1-控制参数目标值;
[ΔB]m×1-控制参数计算值与控制参数目标值的差值。
通过影响矩阵来进行斜拉索索力调整:
MinF(ΔT)=||[A]n×m[ΔT]m×1-[ΔB]n×1||2(6)。
其中,[ΔT]m×1-正装计算得到的斜拉索索力与斜拉索目标索力的差值;
[A]n×m-索力影响矩阵;
[ΔB]n×1-控制参数计算值与控制参数目标值的差值。
也可考虑带加权系数矩阵的二次优化模型:
MinF(ΔT)=||[ρ][A]n×m[ΔT]m×1-[ρ][ΔB]n×1||2(7)。
[ρ]-加权系数矩阵;
斜拉索最终索力值:
[T2]m×1=[T1]m×1+[ΔT]m×1(8)。
[T1]m×1-斜拉索试算索力矩阵;
[ΔT]m×1-斜拉索试算索力所得斜拉索索力值与设计斜拉索索力值的差值矩阵;
[T2]m×1-优化后斜拉索张拉索力矩阵。

Claims (5)

1.一种确定斜拉桥合理施工索力的综合算法,其特征在于所述算法步骤如下:
一、计算斜拉索初次张拉索力最小限值;
二、参照步骤一计算得到的初次张拉索力最小限值,拟定大于最小限值的初始张拉索力值,利用正装迭代法,正装计算得到成桥状态,并提取索力影响矩阵;
三、通过索力影响矩阵,调整张拉索力值,使成桥状态斜拉索索力值和设计成桥索力值吻合;
四、检验成桥状态下结构受力性能是否满足规范要求,如果满足要求,则执行步骤五,如果不满足要求,则调整张拉索力值,执行步骤二;
五、检验施工过程中结构受力性能是否满足规范要求,如果满足要求,则步骤三中确定的张拉索力值即为斜拉索最终张拉索力值,如果不满足要求,则调整施工顺序,执行步骤一。
2.根据权利要求1所述的确定斜拉桥合理施工索力的综合算法,其特征在于所述步骤一中,计算斜拉索初次张拉索力最小限值的方法如下:
设f为斜拉索跨中垂度,l为斜拉索在水平方向的投影,lc为斜拉索塔梁锚固点之间的直线段长度,sc为斜拉索的下料长度,几者的关系可表示为:
f = l c 3 8 ( s c l c - 1 ) ;
斜拉索受力平衡得:
V 1 x + q x cos a · x 2 = H y ,
其中: V 1 = T · sin a - G 2 , qlc=G,H=Tcosa;
T-斜拉索张拉索力值;
a-斜拉索与主梁之间夹角;
G-斜拉索重力;
q-斜拉索每延米重力;
x、y-控制截面距斜拉索与主梁交点的水平距离和垂直距离;
代入可得:
H = q · l c 8 f ;
此时相应斜拉索张拉索力值为:
T = H / cos a = q · l c 2 8 f .
3.根据权利要求1所述的确定斜拉桥合理施工索力的综合算法,其特征在于所述步骤三中,设需要张拉拉索的总次数为m,需要控制的参数个数为n,选择理想成桥恒载索力[T1]m×1作为第一组张拉索力值,根据施工过程进行第一次正装计算得到成桥状态控制参数和目标值的差值闭合差:
[ΔB]m×1=[B0]m×1-[B1]m×1
其中:[B0]m×1-正装计算得到控制参数计算值;
[B1]m×1-控制参数目标值;
[ΔB]m×1-控制参数计算值与控制参数目标值的差值;
通过影响矩阵来进行斜拉索索力调整:
MinF(ΔT)=||[A]n×m[ΔT]m×1-[ΔB]n×1||2
其中:[ΔT]m×1-正装计算得到的斜拉索索力与斜拉索目标索力的差值;
[A]n×m-索力影响矩阵;
[ΔB]n×1-控制参数计算值与控制参数目标值的差值。
4.根据权利要求3所述的确定斜拉桥合理施工索力的综合算法,其特征在于通过带加权系数矩阵的二次优化模型来进行斜拉索索力调整:
MinF(ΔT)=||[ρ][A]n×m[ΔT]m×1-[ρ][ΔB]n×1||2
[ρ]-加权系数矩阵。
5.根据权利要求3所述的确定斜拉桥合理施工索力的综合算法,其特征在于所述斜拉索最终索力值的计算公式为:
[T2]m×1=[T1]m×1+[ΔT]m×1
其中:[T1]m×1-斜拉索试算索力矩阵;
[ΔT]m×1-斜拉索试算索力所得斜拉索索力值与设计斜拉索索力值的差值矩阵;
[T2]m×1-优化后斜拉索张拉索力矩阵。
CN201610118494.2A 2016-03-02 2016-03-02 确定斜拉桥合理施工索力的综合算法 Expired - Fee Related CN105568864B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610118494.2A CN105568864B (zh) 2016-03-02 2016-03-02 确定斜拉桥合理施工索力的综合算法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610118494.2A CN105568864B (zh) 2016-03-02 2016-03-02 确定斜拉桥合理施工索力的综合算法

Publications (2)

Publication Number Publication Date
CN105568864A true CN105568864A (zh) 2016-05-11
CN105568864B CN105568864B (zh) 2017-03-08

Family

ID=55879454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610118494.2A Expired - Fee Related CN105568864B (zh) 2016-03-02 2016-03-02 确定斜拉桥合理施工索力的综合算法

Country Status (1)

Country Link
CN (1) CN105568864B (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107014543A (zh) * 2017-05-02 2017-08-04 中铁大桥科学研究院有限公司 一种斜拉桥索力测试方法
CN107622174A (zh) * 2017-10-18 2018-01-23 哈尔滨工业大学 基于影响矩阵修正的斜拉桥拉索张拉施工闭环控制方法
CN110096806A (zh) * 2019-04-30 2019-08-06 东南大学 一种确定斜拉桥施工初张拉索力的简便算法
CN110472306A (zh) * 2019-07-26 2019-11-19 武汉工程大学 一种斜拉桥索力优化方法、装置、设备和可读存储介质
CN110700072A (zh) * 2019-11-08 2020-01-17 中国矿业大学 一种斜拉桥缩尺试验模型斜拉索的安装方法
CN110807221A (zh) * 2019-11-04 2020-02-18 珠海交通工程技术有限公司 基于等效力位移法的索力计算方法
CN111611644A (zh) * 2020-05-28 2020-09-01 广西新发展交通集团有限公司 施工过程索力最优的斜拉桥斜拉索张拉方法
CN112048988A (zh) * 2020-08-21 2020-12-08 中铁大桥勘测设计院集团有限公司 一种斜拉桥斜拉索优化方法和系统
CN112199764A (zh) * 2020-11-02 2021-01-08 合肥市市政设计研究总院有限公司 用于独塔单索面斜拉桥桥梁拆除的计算机分析方法
CN112231805A (zh) * 2020-09-28 2021-01-15 天津市市政工程设计研究院 一种基于大数据的组合梁斜拉桥索力估计方法
CN114741648A (zh) * 2022-03-15 2022-07-12 中铁第四勘察设计院集团有限公司 斜拉桥的索力分析方法及装置、电子设备及存储介质
CN115434247A (zh) * 2022-08-30 2022-12-06 中铁大桥勘测设计院集团有限公司 一种斜拉索张拉两阶段控制方法及系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6470524B1 (en) * 1998-03-04 2002-10-29 Benjamin Mairantz Composite bridge superstructure with precast deck elements
CN101241522A (zh) * 2008-02-28 2008-08-13 中铁大桥勘测设计院有限公司 利用单元原始尺寸确定斜拉桥施工中间状态的方法
US20080313825A1 (en) * 2004-06-09 2008-12-25 Jun Murakoshi Cable Stayed Suspension Bridge Making Combined Use of One-Box and Two-Box Girders
CN101937485A (zh) * 2010-10-11 2011-01-05 武汉理工大学 斜拉桥初始成桥初始索力确定方法
CN104328739A (zh) * 2014-10-29 2015-02-04 上海建工集团股份有限公司 系杆拱桥吊杆的索力测试及其施工控制方法
CN104899377A (zh) * 2015-06-08 2015-09-09 大连理工大学 一种悬索桥索力优化方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6470524B1 (en) * 1998-03-04 2002-10-29 Benjamin Mairantz Composite bridge superstructure with precast deck elements
US20080313825A1 (en) * 2004-06-09 2008-12-25 Jun Murakoshi Cable Stayed Suspension Bridge Making Combined Use of One-Box and Two-Box Girders
CN101241522A (zh) * 2008-02-28 2008-08-13 中铁大桥勘测设计院有限公司 利用单元原始尺寸确定斜拉桥施工中间状态的方法
CN101937485A (zh) * 2010-10-11 2011-01-05 武汉理工大学 斜拉桥初始成桥初始索力确定方法
CN104328739A (zh) * 2014-10-29 2015-02-04 上海建工集团股份有限公司 系杆拱桥吊杆的索力测试及其施工控制方法
CN104899377A (zh) * 2015-06-08 2015-09-09 大连理工大学 一种悬索桥索力优化方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
霍学晋等: "多拱肋蝶形拱桥的施工索力优化研究", 《公路交通科技》 *
黄炎: "大跨PC斜拉桥塔梁同步施工及关键部位力学性能研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107014543A (zh) * 2017-05-02 2017-08-04 中铁大桥科学研究院有限公司 一种斜拉桥索力测试方法
CN107622174A (zh) * 2017-10-18 2018-01-23 哈尔滨工业大学 基于影响矩阵修正的斜拉桥拉索张拉施工闭环控制方法
CN110096806A (zh) * 2019-04-30 2019-08-06 东南大学 一种确定斜拉桥施工初张拉索力的简便算法
CN110472306A (zh) * 2019-07-26 2019-11-19 武汉工程大学 一种斜拉桥索力优化方法、装置、设备和可读存储介质
CN110472306B (zh) * 2019-07-26 2023-01-10 武汉工程大学 一种斜拉桥索力优化方法、装置、设备和可读存储介质
CN110807221A (zh) * 2019-11-04 2020-02-18 珠海交通工程技术有限公司 基于等效力位移法的索力计算方法
CN110700072A (zh) * 2019-11-08 2020-01-17 中国矿业大学 一种斜拉桥缩尺试验模型斜拉索的安装方法
CN110700072B (zh) * 2019-11-08 2021-03-26 中国矿业大学 一种斜拉桥缩尺试验模型斜拉索的安装方法
CN111611644A (zh) * 2020-05-28 2020-09-01 广西新发展交通集团有限公司 施工过程索力最优的斜拉桥斜拉索张拉方法
CN111611644B (zh) * 2020-05-28 2023-03-21 广西新发展交通集团有限公司 施工过程索力最优的斜拉桥斜拉索张拉方法
CN112048988A (zh) * 2020-08-21 2020-12-08 中铁大桥勘测设计院集团有限公司 一种斜拉桥斜拉索优化方法和系统
CN112231805A (zh) * 2020-09-28 2021-01-15 天津市市政工程设计研究院 一种基于大数据的组合梁斜拉桥索力估计方法
CN112231805B (zh) * 2020-09-28 2022-04-19 天津市市政工程设计研究院 一种基于大数据的组合梁斜拉桥索力估计方法
CN112199764A (zh) * 2020-11-02 2021-01-08 合肥市市政设计研究总院有限公司 用于独塔单索面斜拉桥桥梁拆除的计算机分析方法
CN114741648A (zh) * 2022-03-15 2022-07-12 中铁第四勘察设计院集团有限公司 斜拉桥的索力分析方法及装置、电子设备及存储介质
CN114741648B (zh) * 2022-03-15 2024-05-03 中铁第四勘察设计院集团有限公司 斜拉桥的索力分析方法及装置、电子设备及存储介质
CN115434247A (zh) * 2022-08-30 2022-12-06 中铁大桥勘测设计院集团有限公司 一种斜拉索张拉两阶段控制方法及系统

Also Published As

Publication number Publication date
CN105568864B (zh) 2017-03-08

Similar Documents

Publication Publication Date Title
CN105568864A (zh) 确定斜拉桥合理施工索力的综合算法
CN105354363A (zh) 基于核极限学习机的脉动风速预测方法
CN105803941B (zh) 一种斜拉桥双索同时张拉无应力状态施工控制方法
CN105787183A (zh) 确定斜拉桥合理成桥索力的综合算法
CN104899377A (zh) 一种悬索桥索力优化方法
CN103696356A (zh) 一种设有双排支座体系的多塔斜拉桥
CN113255029B (zh) 一种活载作用下悬索桥结构变形及内力的确定方法
CN105975649A (zh) 一种方形太阳帆表面褶皱形态的建模方法
CN110807221A (zh) 基于等效力位移法的索力计算方法
CN111967085A (zh) 大跨径悬索管道桥成桥风索线形计算方法
CN113468632B (zh) 一种偏心活载作用下的悬索桥全桥响应的确定方法
CN105781126B (zh) 一种张弦结构被动建立预应力施工方法
CN117744222A (zh) 一种独斜塔斜拉桥施工过程中状态影响规律的确定方法
CN203625762U (zh) 一种设有双排支座体系的多塔斜拉桥
CN100535912C (zh) 利用单元原始尺寸确定斜拉桥施工中间状态的方法
Wang et al. Analysis of temperature stress in control of bridge construction
CN103761367B (zh) 一种基于位移控制目标的弦支梁结构内力的解析计算方法
Tian et al. Nonlinear time-varying analysis algorithms for modeling the behavior of complex rigid long-span steel structures during construction processes
CN115510535A (zh) 一种悬索桥空缆缆形与索鞍预偏量的联合求解方法
CN105155424B (zh) 一种拱门形钢斜塔斜拉扣挂施工技术
CN103761380A (zh) 一种模拟大型复杂屋面水流形态的方法
CN106385026A (zh) 一种电力系统运行状态协调优化方法
Chengfeng et al. Numerical analysis of long-span cable-stayed bridge in the construction phase
Wang et al. Optimal design model for wind resistance based on static numerical simulation of large span bridges and its application
Yang et al. Wind suction effect on long-span stiffened steel truss bridges during erection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170308

Termination date: 20180302

CF01 Termination of patent right due to non-payment of annual fee