CN105552755B - Transformer radiator tube butterfly valve maintenance unit - Google Patents

Transformer radiator tube butterfly valve maintenance unit Download PDF

Info

Publication number
CN105552755B
CN105552755B CN201510952383.7A CN201510952383A CN105552755B CN 105552755 B CN105552755 B CN 105552755B CN 201510952383 A CN201510952383 A CN 201510952383A CN 105552755 B CN105552755 B CN 105552755B
Authority
CN
China
Prior art keywords
maintenance
operation cabin
transformer
butterfly valve
cabin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510952383.7A
Other languages
Chinese (zh)
Other versions
CN105552755A (en
Inventor
秦卫东
郭跃东
苏长宝
孙更
高志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Weilong Electromechanical Technology Co.,Ltd.
Original Assignee
Chongqing Ou Ronglai Auto Parts Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Ou Ronglai Auto Parts Co Ltd filed Critical Chongqing Ou Ronglai Auto Parts Co Ltd
Priority to CN201510952383.7A priority Critical patent/CN105552755B/en
Publication of CN105552755A publication Critical patent/CN105552755A/en
Application granted granted Critical
Publication of CN105552755B publication Critical patent/CN105552755B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B3/00Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear

Abstract

The invention discloses a kind of transformer radiator tube butterfly valve maintenance unit, has a maintenance operation cabin, and maintenance operation cabin sets the flexible operation set being connected with handle hole;Set on maintenance operation cabin and auxiliary operation cabin is connected with maintenance operation cabin, maintenance operation cabin connects position with auxiliary operation cabin and sets closure door, and object access way mouth is set at the top of auxiliary operation cabin;The free end of flexible operation set is connected with gloves, and maintenance operation bilge portion sets telescopic outrigger, and maintenance operation bilge portion sets plug of draining the oil by drain oil, and the top in auxiliary operation cabin sets exhaust plug by steam vent.The method for maintaining of the present invention is without the transformer oil releasing in transformer shell and large scale equipment are coordinated, and whole maintenance activity only needs 2~3 people to coordinate, the maintenance of failure and the replacing of damaged part can be carried out, thus substantial amounts of human and material resources and maintenance cost are saved, the apparatus structure is simple, it is easy to use, it is securely and reliably, simple and practical.

Description

Transformer radiator tube butterfly valve maintenance unit
Technical field
The present invention relates to electric equipment maintenance technical field, more particularly to a kind of transformer radiator tube butterfly valve maintenance dress Put.
Background technology
In technology known to structure, transformer generally comprises transformer shell and is laid in its week side of boss and in communication more Individual radiating tube, transformer oil is filled with transformer shell and radiating tube, radiating and insulation for Transformer. The connecting portion of each radiating tube and transformer shell is provided with butterfly valve by adpting flange, the dimension for cooling system Repair.And in the actual moving process of transformer, generation is the most frequently the seal of the butterfly valve and its connecting portion It is easily damaged, and causes the failure of leakage or the transformer oil loop control of transformer oil, in addition the number of radiating tube and butterfly valve Measure it is more, so maintenance the frequency it is a lot.At present to the maintenance of such failure, oil truck, the oil for being typically first equipped with needs The large scale equipment such as pump, vavuum pump tissue is to scene, and then disconnecting transformer is connected with powered-down road, and the radiating tube that will appear from failure is torn open Get off, then all evacuated the transformer oil in transformer shell by oil pump, and be put into oil truck, then could be to butterfly Valve and sealing ring are removed for repair or replacement.Meanwhile after the completion of maintenance work, it is also necessary under the cooperation of vavuum pump, by transformation Device housing and all radiating tubes are completely filled with transformer oil, can enter the debugging, energization, operation of line transformer.This maintenance side The major defect of method is:1) need to coordinate the large scale equipments such as oil truck, oil pump, vavuum pump, and need more people to coordinate, workload Greatly, labor intensity is high;2) several tons at least of the transformer oil in transformer, at most more than ten tons, or even tens of tons, all be vented, It is completely filled with again, workload is very big, it is necessary to which time length, has a strong impact on maintenance efficiency, and transformer oil easily pollutes;2) due to Maintenance overall process must be carried out under power down mode, and maintenance time is long, the operation of whole power transmission and transformation system certainly will be influenceed, to confession Electric enterprise and user bring more serious influence and economic loss.
The content of the invention
The purpose of the present invention is the defects of overcoming prior art, there is provided a kind of without the cooling oil in transformer shell is put Go out and large scale equipment coordinates, you can carry out the maintenance of failure and the replacing of damaged part, simple in construction, easy to operate, maintenance effect Rate is high, the low transformer radiator tube butterfly valve maintenance unit of cost.
Technical scheme is used by realizing the purpose of the present invention:A kind of transformer radiator tube butterfly valve maintenance unit, tool There is a maintenance operation cabin, the side in the maintenance operation cabin sets handle hole, it is characterised in that:The maintenance operation cabin set with The flexible operation set of handle hole connection, the opposite side in maintenance operation cabin set the flexible sealing for being connected and connecting with maintenance operation cabin Set;Set on the maintenance operation cabin and auxiliary operation cabin is connected with maintenance operation cabin, maintenance operation cabin connects with auxiliary operation cabin Position sets closure door, sets object access way mouth at the top of auxiliary operation cabin, and set movable sealing cover plate;Flexible operation set Free end is connected with gloves, and the maintenance operation bilge portion sets telescopic outrigger, and the maintenance operation bilge portion is by putting Oilhole sets plug of draining the oil, and the top in the auxiliary operation cabin sets exhaust plug by steam vent.
As further preferred scheme, observation window is set on the maintenance operation cabin.
As further another preferred scheme, the opening of the flexible gland sets clip.
As further another preferred scheme, the maintenance operation cabin is transparent material product.
A kind of method for maintaining using the transformer radiator tube butterfly valve maintenance unit, it is to carry out according to the following steps:
1) maintenance prepares:
A. the outer connecting lines of disconnecting transformer, maintenance tool and new accessory to be replaced are put into the maintenance operation cabin, The radiating tube of trouble location is pulled down, maintenance operation cabin is sleeved on to the connection of transformer shell together with the flexible gland On flange and butterfly valve, and the opening of flexible gland is enclosed on to bind on the communicating pipe of adpting flange and fastened;
Or the outer connecting lines of b. disconnecting transformers, maintenance tool and new accessory to be replaced are put into the auxiliary operation cabin It is interior, the movable sealing cover plate is closed, then the maintenance operation cabin is sleeved on transformer together with the flexible gland On the adpting flange and butterfly valve of housing, and the opening of flexible gland is enclosed on to bind on the communicating pipe of adpting flange and pricked Jail;
2) maintenance operation:
A. operator's arm is injected in the flexible operation set, the closure door in the auxiliary operation cabin is opened, from the auxiliary Maintenance tool of being taken in operational window pulls down butterfly valve and seal, trouble location is overhauled or the seal that more renews or/ And butterfly valve;
Or b. operators arm is injected in the flexible operation set, is taken the gloves, is opened the closure door, is grasped from auxiliary Make required maintenance tool of being taken in cabin, pull down butterfly valve and seal, trouble location is overhauled, and the damage pulled down is matched somebody with somebody Part is sent into auxiliary operation cabin, and renewal accessory needed for taking out of auxiliary operation cabin is installed, then by maintenance operation cabin Maintenance tool be all sent into auxiliary operation cabins, close the closure door;
3) transformer radiating system maintenance unit is pulled down;
A. butterfly valve is closed, unclamps the opening of flexible gland, and the radiating oil discharge in maintenance operation cabin is collected, is taken Lower maintenance operation cabin and flexible gland, the radiating tube pulled down installation is connected on transformer shell, opens butterfly valve, according to Conventional method supplements a small amount of transformer oil into transformer shell body.
B. butterfly valve is closed, opens the movable sealing cover plate, all maintenance tools are taken out out of described auxiliary operation cabin And accessory, then, movable sealing cover plate is closed, open closure door, then drain the oil plug and the exhaust plug are removed, by maintenance operation Transformer oil in cabin and auxiliary operation cabin is all discharged, and is recycled in access collection vessel, finally, unclamps flexible gland Opening, remove transformer radiator tube butterfly valve maintenance unit, by the radiating tube pulled down installation be connected on transformer shell, beat Butterfly valve is driven, a small amount of transformer oil is conventionally supplemented into transformer shell body.
The transformer radiator tube butterfly valve maintenance unit and method for maintaining of the present invention, without by the transformation in transformer shell Device oil is released and large scale equipment coordinates, and whole maintenance activity only needs 2~3 people to coordinate, you can carries out the maintenance and damage of failure The replacing of part, substantial amounts of human and material resources and maintenance cost are thus saved, and greatly shorten transformer fault power time, tieed up Efficiency is repaiied to increase substantially.The apparatus structure is simple, easy to use, securely and reliably, simple and practical.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
Embodiment
Referring to Fig. 1, transformer radiator tube butterfly valve maintenance unit of the invention, there is a maintenance operation cabin 5, the maintenance The side of operational window 5 sets handle hole and flexible operation be connected with handle hole set 6, the opposite side in maintenance operation cabin 6 set and Connection and the flexible gland 16 that connects.Observation window 10 can be set on the maintenance operation cabin 5, in order to during maintenance operation Observation.3~4 telescopic outriggers 7 can be set in the bottom in the maintenance operation cabin 5, when maintenance operation cabin 5 is sleeved on transformer shell After on 1 adpting flange 2 and butterfly valve 4, the position in maintenance operation cabin 5 can be fixed by adjusting telescopic outrigger 7, overcome The influence of maintenance unit self gravitation, maintenance unit is set to be in the optimum position of maintenance operation all the time.The maintenance operation cabin 5 Lucite or other transparent material products can be used, maintenance observation more facilitates.The opening of the flexible gland 16 Settable clip 17, when flexible gland 16 was enclosed on the communicating pipe of transformer shell adpting flange 2, flexible gland 16 Tie up it is more convenient, sealing it is relatively reliable.The free end of flexible operation set 6 can integrally connected gloves 9, operator holds It is more convenient, flexible to hold instrument, progress maintenance operation.Auxiliary operation cabin 11 in communication is set on the maintenance operation cabin 5, its Connect position and closure door 15 is set, the top in auxiliary operation cabin 11 sets object access way mouth, and sets movable sealing cover plate 14. So, maintenance tool and new and old accessory can be all temporarily stored in auxiliary operation cabin 11, and will not be stored in maintenance operation cabin 5 influences dimension Operating space is repaiied, or generation maintenance tool or accessory are strayed into the phenomenon in transformer shell 1 during maintenance operation.The dimension Repair the bottom of operational window 5 and plug 8 of draining the oil is set by drain oil, after the completion of maintenance work, the maintenance operation cabin and auxiliary Help the discharge of transformer oil in operational window;The top in the auxiliary operation cabin 11 sets exhaust plug 12 by steam vent, is tieing up , can be by this when the transformer oil in transformer shell 1 enters the maintenance operation cabin 5 and auxiliary operation cabin 11 during repairing Exhaust plug 12 discharges gas, avoids gas from entering transformer shell 1 and cause the pollution of transformer oil.
Transformer radiator tube butterfly valve method for maintaining of the present invention is described further with reference to embodiment.
Embodiment one
When being used without the transformer radiator tube butterfly valve maintenance unit in auxiliary operation cabin, transformer radiator tube of the present invention The maintenance of butterfly valve is carried out as follows:
First, the instrument that may be used will be repaired and new accessory to be replaced is put into the maintenance operation cabin 5, will repaired Operational window 5 is sleeved on the adpting flange 2 and butterfly valve 4 of transformer shell 1 together with the flexible gland 16, and will be soft Property sealing shroud 16 opening be enclosed on the communicating pipe of adpting flange 2, bound and fastened with tied rope or the clip 17, prevent from becoming The leakage of depressor oil.So, a closed maintenance work nacelle is just formed.Then, operator's arm injects the flexible behaviour Make in set 6, wear gloves 9, butterfly valve 4 and seal 3 are pulled down with maintenance tool, trouble location is overhauled or more renewed Seal 3 or butterfly valve 4.When pulling down butterfly valve 4 and seal 3, the transformer oil in transformer shell 1 will be filled with maintenance behaviour Make cabin 5, operator will carry out maintenance operation in transformer oil.After the completion of maintenance, first butterfly valve 4 is closed.Then, unclamp The opening of flexible gland 16, and the transformer oil in maintenance operation cabin 5 is discharged, recycled in access collection vessel.Most After remove maintenance operation cabin 5 and flexible gland 16, by the radiating tube pulled down installation be connected on transformer shell, either on or off Butterfly valve, and the transformer oil wiped clean that butterfly valve 4 and the appearance of adpting flange 2 will be sticky deposited in.Due to whole maintenance activity All being carried out in closed maintenance operation cabin, the number of dropouts of transformer oil is limited with the volume in maintenance operation cabin in transformer shell 1, 0.03% or so of gross weight loading amount only in transformer, therefore after the completion of maintenance, can be according still further to conventional method to transformer shell The transformer oil of supplement trace in body 1, so far complete transformer radiating system maintenance activity.The transformer radiator tube of the present invention Butterfly valve method for maintaining, transformer oil is filled with a large amount of without discharge, thus coordinated without large scale equipments such as oil truck and oil pumps, Whole maintenance activity only needs 2~3 people to coordinate, 20 minutes maintenance activities that can complete butterfly valve.Thus substantially reduce maintenance Workload and labor intensity, and the efficiency of maintenance activity is greatly improved, shortens power off time, thus also improve The operational efficiency of transformer.
Embodiment two
When using the transformer radiator tube butterfly valve maintenance unit for carrying auxiliary operation cabin, transformer radiator tube of the present invention The maintenance of butterfly valve can be carried out as follows:
First, maintenance operation cabin 5 is sleeved on to the adpting flange of transformer shell 1 together with the flexible gland 16 2 and butterfly valve 4 on, and the opening of flexible gland 16 was enclosed on the communicating pipe of adpting flange 2 and uses tied rope or the card Hoop 17 binds and fastened, then by adjusting the telescopic outrigger 7 that the transformer radiator tube butterfly valve maintenance unit is stable suitable When position.Then, the movable sealing cover plate 14 in the auxiliary operation cabin 11 is opened, maintenance tool and accessory to be replaced are put into In auxiliary operation cabin 11, movable sealing cover plate 14 is closed, that is, completes maintenance preparation.Then, described in operator's arm injects In flexible operation set 6, wear gloves 9, the closure door 15 is opened, required maintenance tool of being taken out of auxiliary operation cabin 11, is pulled down Butterfly valve 4 and seal 3.After butterfly valve 4 are pulled down, the maintenance operation cabin 5 and auxiliary operation cabin 11 are and transformer shell 1 Connection, transformer oil enter and are full of maintenance operation cabin 5 and auxiliary operation cabin 11.Operator is in transformer oil to failure portion Position is overhauled, and damage accessory is sent into auxiliary operation cabin 11, then that changes needed for taking out of auxiliary operation cabin 11 new match somebody with somebody Part is assembled.The maintenance tool in maintenance operation cabin 5 is all sent into auxiliary operation cabin 11 after the completion of maintenance, closes the envelope Door 15 and butterfly valve 4, open the movable sealing cover plate 14, and all maintenance tools and accessory are taken out from auxiliary operation cabin 11 is interior. Then, movable sealing cover plate 14 is closed, opens closure door 15, then removes drain the oil plug 8 and the exhaust plug 12, by maintenance operation Transformer oil in cabin 5 and auxiliary operation cabin 11 is all discharged, and is recycled in access collection vessel.Finally, unclamp flexible close The opening of big envelope 16, transformer radiator tube butterfly valve maintenance unit is removed, the radiating tube pulled down installation is connected to transformer shell On body, the butterfly valve of either on or off, and the transformer oil wiped clean that butterfly valve 4 and the appearance of adpting flange 2 will be sticky deposited in. Whole maintenance activity, the number of dropouts of transformer oil is with the total measurement (volume) in maintenance operation cabin 4 and auxiliary operation cabin 9 in transformer shell 1 It is limited, 0.03% or so of gross weight loading amount only in transformer, therefore after the completion of maintenance can be according still further to conventional method to transformation Supplement trace transformer oil in device housing 1, so far complete the maintenance activity of transformer radiator tube butterfly valve.Due to the present embodiment In operation, maintenance tool and the accessory changed are stored in auxiliary operation cabin 11, thus can make full use of maintenance Space, can also suitably reduce the volume in maintenance operation cabin 5, can also avoid maintenance tool or accessory during maintenance operation from entering In transformer shell 1.

Claims (5)

1. a kind of transformer radiator tube butterfly valve maintenance unit, there is a maintenance operation cabin, the side in the maintenance operation cabin is set Put handle hole, it is characterised in that:The maintenance operation cabin sets the flexible operation set being connected with handle hole, maintenance operation cabin it is another Side sets the flexible gland for being connected and connecting with maintenance operation cabin;Set on the maintenance operation cabin and connect with maintenance operation cabin Logical auxiliary operation cabin, maintenance operation cabin connect position with auxiliary operation cabin and set closure door, set object to enter at the top of auxiliary operation cabin Go out passway, and movable sealing cover plate is set;The free end of flexible operation set is connected with gloves, the maintenance operation bilge Portion sets telescopic outrigger, and the maintenance operation bilge portion sets plug of draining the oil, the top in the auxiliary operation cabin by drain oil Exhaust plug is set by steam vent.
2. transformer radiator tube butterfly valve maintenance unit as claimed in claim 1, it is characterised in that:On the maintenance operation cabin Observation window is set.
3. transformer radiator tube butterfly valve maintenance unit as claimed in claim 1, it is characterised in that:The flexible gland Opening sets clip.
4. transformer radiator tube butterfly valve maintenance unit as claimed in claim 1, it is characterised in that:The maintenance operation cabin is Transparent material product.
5. the method for maintaining of transformer radiator tube butterfly valve maintenance unit any one of a kind of usage right requirement 1-4, its It is characterised by:It is to carry out according to the following steps:
A.
1) maintenance prepares:
The outer connecting lines of disconnecting transformer, maintenance tool and new accessory to be replaced are put into the maintenance operation cabin, pull down event Hinder position radiating tube, by maintenance operation cabin together with the flexible gland be sleeved on transformer shell adpting flange and On butterfly valve, and the opening of flexible gland is enclosed on to bind on the communicating pipe of adpting flange and fastened;
2) maintenance operation:
Operator's arm is injected in the flexible operation set, the closure door in the auxiliary operation cabin is opened, from the auxiliary operation cabin Maintenance tool of inside taking pulls down butterfly valve and seal, the seal or/and butterfly for being overhauled to trouble location or more being renewed Valve;
3) transformer radiator tube butterfly valve maintenance unit is pulled down:
Butterfly valve is closed, unclamps the opening of flexible gland, and the radiating oil discharge in maintenance operation cabin is collected, removes maintenance Operational window and flexible gland, the radiating tube pulled down installation is connected on transformer shell, butterfly valve is opened, to transformer shell A small amount of transformer oil is supplemented in vivo;
Or B.
1) maintenance prepares:
The outer connecting lines of disconnecting transformer, maintenance tool and new accessory to be replaced are put into the auxiliary operation cabin, close institute Movable sealing cover plate is stated, then the maintenance operation cabin is sleeved on to the connection of transformer shell together with the flexible gland On flange and butterfly valve, and the opening of flexible gland is enclosed on to bind on the communicating pipe of adpting flange and fastened;
2) maintenance operation:
Operator's arm is injected in the flexible operation set, is taken the gloves, is opened the closure door, is taken out of auxiliary operation cabin Required maintenance tool is taken, butterfly valve and seal is pulled down, trouble location is overhauled, and the damage accessory pulled down feeding is auxiliary Operational window is helped, and renewal accessory needed for taking out of auxiliary operation cabin is installed, then by the maintenance mans in maintenance operation cabin Tool is all sent into auxiliary operation cabin, closes the closure door;
3) transformer radiator tube butterfly valve maintenance unit is pulled down:
Butterfly valve is closed, the movable sealing cover plate is opened, all maintenance tools and accessory is taken out out of described auxiliary operation cabin, Then, movable sealing cover plate is closed, opens closure door, then removes drain the oil plug and exhaust plug, maintenance operation cabin and auxiliary are grasped The transformer oil made in cabin is all discharged, and is recycled in access collection vessel, finally, is unclamped the opening of flexible gland, take Lower transformer radiator tube butterfly valve maintenance unit, the radiating tube pulled down installation is connected on transformer shell, opens butterfly Valve, a small amount of transformer oil is supplemented into transformer shell body.
CN201510952383.7A 2012-06-25 2012-06-25 Transformer radiator tube butterfly valve maintenance unit Active CN105552755B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510952383.7A CN105552755B (en) 2012-06-25 2012-06-25 Transformer radiator tube butterfly valve maintenance unit

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201210209565.1A CN102709826B (en) 2012-06-25 2012-06-25 Transformer radiator tube butterfly valve maintenance unit and method for maintaining
CN201510952383.7A CN105552755B (en) 2012-06-25 2012-06-25 Transformer radiator tube butterfly valve maintenance unit

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201210209565.1A Division CN102709826B (en) 2012-06-25 2012-06-25 Transformer radiator tube butterfly valve maintenance unit and method for maintaining

Publications (2)

Publication Number Publication Date
CN105552755A CN105552755A (en) 2016-05-04
CN105552755B true CN105552755B (en) 2017-11-28

Family

ID=46902445

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201510952383.7A Active CN105552755B (en) 2012-06-25 2012-06-25 Transformer radiator tube butterfly valve maintenance unit
CN201210209565.1A Expired - Fee Related CN102709826B (en) 2012-06-25 2012-06-25 Transformer radiator tube butterfly valve maintenance unit and method for maintaining

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201210209565.1A Expired - Fee Related CN102709826B (en) 2012-06-25 2012-06-25 Transformer radiator tube butterfly valve maintenance unit and method for maintaining

Country Status (1)

Country Link
CN (2) CN105552755B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104821502B (en) * 2015-05-27 2017-06-23 国网山东省电力公司平阴县供电公司 Fan of dry type transformer apparatus for examination and repair
CN108630421A (en) * 2018-04-24 2018-10-09 广州发展集团股份有限公司 Forced oil-circulation transformer oil-immersed pump replacing options
CN111515212B (en) * 2020-04-24 2021-11-05 中国科学院空天信息创新研究院 Online cleaning maintenance device and method for side-hung laser
CN113266725A (en) * 2021-05-17 2021-08-17 点夺机电工程江苏有限公司 On-line operation zero-leakage sealer

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101692381A (en) * 2009-09-11 2010-04-07 江苏省电力公司句容市供电公司 Replacing device and replacing method for butterfly valve of main transformer
CN201478054U (en) * 2009-09-11 2010-05-19 江苏省电力公司句容市供电公司 Disc valve replacing apparatus for main transformer
CN201827390U (en) * 2010-09-20 2011-05-11 天工阀门集团有限公司 Triple eccentric multilayer hard seal butterfly valve with access hole
CN201884685U (en) * 2010-12-01 2011-06-29 沈阳市银海电器有限公司 Butterfly valve for transformer

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58206844A (en) * 1982-05-27 1983-12-02 Mikuni Kogyo Co Ltd Device for controlling supply of fuel for internal- combustion engine
JP3716695B2 (en) * 1999-12-24 2005-11-16 日本電気株式会社 Fast Hadamard transformer
CN1759996A (en) * 2005-02-18 2006-04-19 刘亚州 Glove box
CN101714449A (en) * 2008-10-08 2010-05-26 国网运行有限公司上海超高压管理处 Transformer accessory replacing method
CN202668564U (en) * 2012-06-25 2013-01-16 河南省电力公司南阳供电公司 Maintaining device for butterfly valve of radiating pipe of transformer

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101692381A (en) * 2009-09-11 2010-04-07 江苏省电力公司句容市供电公司 Replacing device and replacing method for butterfly valve of main transformer
CN201478054U (en) * 2009-09-11 2010-05-19 江苏省电力公司句容市供电公司 Disc valve replacing apparatus for main transformer
CN201827390U (en) * 2010-09-20 2011-05-11 天工阀门集团有限公司 Triple eccentric multilayer hard seal butterfly valve with access hole
CN201884685U (en) * 2010-12-01 2011-06-29 沈阳市银海电器有限公司 Butterfly valve for transformer

Also Published As

Publication number Publication date
CN102709826B (en) 2016-01-20
CN102709826A (en) 2012-10-03
CN105552755A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN105552755B (en) Transformer radiator tube butterfly valve maintenance unit
CN202194666U (en) Split communicated type airlock for shield machine
CN202668564U (en) Maintaining device for butterfly valve of radiating pipe of transformer
CN203774651U (en) Overhaul device special for transformer
CN107134733B (en) Method and platform for integrally assembling and disassembling circuit breaker
CN209327123U (en) The hydrophobic exhaust of the water pressure test and overpressure protection apparatus
CN108058793A (en) A kind of method of underwater quick-replaceable sounding instrument
CN209838840U (en) Hydraulic hose test tool
CN209093094U (en) Tar slag-drip opening slag-draining device and exhaust gas processing device
CN215479701U (en) Auxiliary installation equipment of separation explosion-proof skid-mounted refueling device
CN205934052U (en) Device for connecting aluminium electroloysis multifunctional machine group returns material addition system
CN206288252U (en) A kind of lifting airscrew mounting tool
CN202091698U (en) Connecting pipe device with gas drilling hole
CN212011910U (en) GIL pipeline transit bin
CN204892459U (en) Protector is washed in hoist and mount of acid -base equipment
CN206799115U (en) Portable cable well lid opens special purpose device
CN201844157U (en) Hydraulic pipeline leaking stopping device
CN207679652U (en) Oxygen cabin biting connecions rotary switch safety interaction type passs object cylinder
CN206144903U (en) Prevent blockking up hydro -cylinder and overhaul oil discharge device
CN205954311U (en) Automatic annotate material device
CN210212171U (en) Small-size container car of speedily carrying out rescue work
CN208399347U (en) Fluent metal loop corrosion experiment glove box
CN101629665B (en) Fast cut-off joint for water feeding of passenger train
CN203488991U (en) Manual inflation vacuumizing device of sulfur hexafluoride electrical device
CN219219830U (en) Split type open hopper for business tunnel concrete pump truck

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20171009

Address after: 400054 democratic Street, Huaxi street, Banan District, Chongqing

Applicant after: Chongqing ou Ronglai Auto Parts Co.,Ltd.

Address before: 450016 Zhengzhou economic and Technological Development Zone, No. 1356 East Road, sailing, the sea of sand, the Department of park, room, room, No. 217, Henan

Applicant before: ZHENGZHOU SIBIAN TECHNOLOGY Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180129

Address after: 401320 Banan District, Banan District, Chongqing, No. 8-29, Yu Nan Road, No. 8-29

Patentee after: Chongqing Boshi Intellectual Property Service Co.,Ltd.

Address before: 400054 democratic Street, Huaxi street, Banan District, Chongqing

Patentee before: Chongqing ou Ronglai Auto Parts Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201225

Address after: 274900 in Juye Coal Chemical Industry Park, Heze City, Shandong Province (south of Airport Road, west of dongguantun town government)

Patentee after: JUYE ZHONGHAI CHEMICAL Co.,Ltd.

Address before: 401320 Banan District, Banan District, Chongqing, No. 8-29, Yu Nan Road, No. 8-29

Patentee before: Chongqing Boshi Intellectual Property Service Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210412

Address after: 551100 1-09, No.13 Zhenfu Road, Dongmen neighborhood committee, Yongjing Town, Xifeng County, Guiyang City, Guizhou Province

Patentee after: Guiyang Yuguan Technical Service Center

Address before: 274900 in Juye Coal Chemical Industry Park, Heze City, Shandong Province (south of Airport Road, west of dongguantun town government)

Patentee before: JUYE ZHONGHAI CHEMICAL Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231124

Address after: 710016 Room 503, Building B, Xinjiamiao Coal Machinery Garden, Weiyang District, Xi'an City, Shaanxi Province

Patentee after: Xi'an Weilong Electromechanical Technology Co.,Ltd.

Address before: 551100 1-09, No.13 Zhenfu Road, Dongmen neighborhood committee, Yongjing Town, Xifeng County, Guiyang City, Guizhou Province

Patentee before: Guiyang Yuguan Technical Service Center

TR01 Transfer of patent right